Attachment 2 CSP.pdf
PDF 336 KB Posted
- Solicitation number
- N00421-20-R-0119
About this file
This document contains a draft solicitation and associated documents for engineering products and technical services. The Naval Air Warfare Center Aircraft Division at Patuxent River, Maryland is seeking these services including fleet support, supply support, technical support, systems improvement, development, test and evaluation, software development and maintenance, field change program support, production, special test fixture development, test bed support, and overhaul and restoration program support. Interested vendors have 14 days to submit questions on the draft solicitation, which has a North American Industry Classification System code of 541330 for engineering services and a small business size standard of $41.5 million. The requirement is a follow-on to contract N00421-16-D-0010 and aims to procure these services on a competitive basis to support the Air Traffic Control and Landing Systems Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A Draft Solicitation N0042120R0119 Final.docx | DOCX document | |
| Attachment 6 List of WD.pdf | ||
| Attachment P4 PPIF.pdf | ||
| Attachment P1 Cost Summary Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment 4 Data Transmittal Form.pdf | ||
| EPTS FO Draft RFP N00421-20-R-0119 Final.pdf | ||
| Attachment 5 Locator Form.pdf | ||
| Exhibit A CDRLs .pdf | ||
| Attachment P2 Annual Fully Burdened Rates.xlsx | XLSX spreadsheet | |
| Attachment 3 OCI List.pdf | ||
| Attachment P3 CPAQ.pdf | ||
| Attachment 1 DD254.pdf | ||
| Attachment P5 CPAQ Instructions.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-20-R-0119
Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Contract Surveillance Plan for
Air Traffic Control and Landing Systems Division
Engineering Products and Technical Services (EPTS)
1. Purpose
This Contract Surveillance Plan (CSP) document is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the
Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the
Government receives the quality of services called for in each Task Order (TO) SOW.
This Contract will provide engineering products and technical services for various systems and subsystems under the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster
Outlying Field (WOLF) Air Traffic Control and Landing Systems (ATC&LS) Division cognizance. These services shall include fleet support; supply support, technical support; pre-positioned technical support; systems improvement; systems development; systems test and evaluation; software development, test, and maintenance; field change program; production;
special purpose test fixture development; test bed support; and overhaul and restoration program support.
This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The
Contract will have one (1) five-year ordering period. A properly executed CSP will assist the
Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this CSP is provided under Contract Section E - Inspection and
Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant
TOs.
The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.
4. Government Resources
Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
The following definitions for Government resources are applicable to this plan:
KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting
Officer (PCO)), or a person with the authority to administer contracts (Administrative
Contracting Officer (ACO)) and make related determinations and findings on behalf of the
Government. The PCO for this Contract is Stacey C. MacMillan. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.
Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.
Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.
Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.
5. Responsibilities
The following Government resources will have responsibility for the implementation of this
CSP:
KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
COR: The COR is responsible for technical administration of the Contract and assures proper
Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.
ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.
Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.
Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
GPL: The GPL is responsible for assisting in administering specific efforts under the Contract.
A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense
(DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.
b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC) provided herein.
7. Surveillance
Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the
Contractor, the COR/ACOR, and GPLs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.
8. Documentation
In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the
Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO at termination or completion of the Contract.
9. Enclosures
Enclosure (1) SAC
Enclosure (2) Quarterly Evaluation by CDRL
Enclosure (3) Annual Surveillance Summary
Enclosure (1)
Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (1): SAC
Quarterly Surveillance:
The COR will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of SB, and other areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).
QUARTERLY EVALUATION – BY SOW Paragraph
Description Surveillance Method/
Measure Dates
Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of SB
Assessment
Other Areas
Assessment
Provide fleet support IAW SOW
Para. 3.3.1
100% Inspection by
COR/ACOR and/or GPLs
Provide supply support IAW SOW
Para. 3.3.2
Provide technical
Para. 3.3.3
Provide pre-positioned technical support
IAW SOW Para.
3.3.4
Provide systems improvement support IAW SOW
Para. 3.3.5
Provide systems development support IAW SOW
Para. 3.3.6
Enclosure (1)
Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/
Measure Dates
Quality
Assessment
Schedule
Assessment
Cost Control
Assessment
Business
Relations
Assessment
Management
Assessment
Utilization of SB
Assessment
Other Areas
Assessment
Provide systems test and evaluation support IAW SOW
Para. 3.3.7
Provide operational software development and maintenance support IAW SOW
Para. 3.3.8
Provide software development, test, and maintenance support IAW SOW
Para. 3.3.9
Provide field change program support IAW SOW
Para. 3.3.10
Provide production
Para. 3.3.11
Provide special purpose test fixture support IAW SOW
Para. 3.3.12
Provide test bed
Para. 3.3.13
Provide overhaul and restoration program support
IAW SOW Para.
3.3.14
Enclosure (2)
Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (2) QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Contracting Officer’s Management
Report (Progress and Financial
Status Report) CDRL A001
100% Inspection by COR/ACOR and/or GPLs.
Engineering and Technical Services
Accomplishment Report (Trip
Report) CDRL A002
Phase-Out Transition Plan
(Transition-Out Plan) CDRL A003
Operations Security (OPSEC) Plan
CDRL A004
Certification/Data Report (Final
Certification/Verification Report)
CDRL A005
Certification/Verification Manuals
CDRL A006
Scientific and Technical Reports
(Recommendations Technical
Report) CDRL A007
Status Report (Maintenance Action
Form (MAF) Status Report CDRL
A008
Technical Report – Study/Services
(Fleet Metrics Report) CDRL A009
(Parts Inventory List) CDRL A010
Report of Receipts, Inventory, Adjustments and Shipments of
Government Property (Accounting
Report) CDRL A011
Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Report of Receipts, Inventory, Adjustments and Shipments of
Government Property (Payback
Status Report) CDRL A012
(Data Information Form) CDRL
A013
Contracting Officer’s Management
Report (Status Report) CDRL A014
Status Report CDRL A015
Technical Report – Study/Service
(Field Change Installation Program
Form) CDRL A016
Engineering Drawings (Installation
Control Drawings) CDRL A017
Provisioning Parts List (PPLs)
CDRL A018
Provisioning Technical Document
CDRL A019
Government Property (Landing Data
Summary Report) CDRL A020
Planned Maintenance System
(PMS)/Maintenance Requirements
Card (MRC) CDRL A021
(PMS)/Maintenance Index Page
(MIP) CDRL A022
Navy Training System Plan (NTSP)
CDRL A023
Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Logistics Support Status Report
(Integrated Logistics Support Plan
(ILSP)) CDRL A024
Logistics Support Status Report
(User Logistics Support Summary
(ULSS)) CDRL A025
Logistics Plan (Maintenance Plans)
CDRL A026
Management Plan (Life Cycle
Management Plan) CDRL A027
Test Plans/Test Procedures
(Acceptance Test Plans and
Procedures) CDRL A028
Test Plans/Test Procedures
(Performance Test Plans and
Procedures) CDRL A029
(Test Report) CDRL A030
(Trouble Report) CDRL A031
Software/Firmware Report (Software
Change Proposal (SCP)) CDRL
A032
Software Product Specification
(Program Package Document)
CDRL A033
Software Test Plan (STP) (Computer
Software Test Plans and Procedures)
CDRL A034
Technical Report – Study/Service
(Software Certification Form) CDRL
A035
Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Software Test Report (STR)
(Computer Software Test Report)
CDRL A036
Software Test Description
(Computer Software Version
Description Document) CDRL A037
Software Center Operator Manual
(Systems Operator’s Manual) CDRL
A038
Government Property (Computer
Program Support Library Inventory
Report) CDRL A039
Engineering Change Proposal CDRL
A040
Field Change Bulletin CDRL A041
System Technical Manual
(Sanitized) (Technical Manual
Revisions) CDRL A042
Engineering Drawings (Level I/II/III
Drawings) CDRL A043
(PMS)/Maintenance Index Page
(MIP) (Equipment Maintenance
Logbook) CDRL A044
(Flight Test Logbooks) CDRL A045
System Problem Report (SPR)
(Problem Report) CDRL A046
Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY
See FAR 2.101 and 3.104
Description Surveillance Method/Measure Dates
Due
Dates
Completed
No.
Submittals
No. of
Req’d
Rework
Percentage
On Time Comments
Technical Report – Study/Services
(Certification Test Report) CDRL
A047
Technical Repair Standards (TRS) for Hull, Mechanical and Electrical
(HM&E) Equipment, Electronic
Equipment, and Ordnance
Equipment (Technical Repair
Standards) CDRL A048
Repair/Modification/Overhaul Status
Report (Restoration Status Report)
CDRL A049
Contracting Officer’s Management
Report (Segregation of Cost and
Invoice Requirements Reporting
(TDLs)) CDRL A050
Metric Summary:
Current Period
Cumulative
Total Number of Deliverables Submitted:
Total Number of Deliverables Submitted Late:
Total Number of Deliverables Requiring Revision:
Percentage of Deliverables Submitted Late:
Percentage of Deliverables Requiring Revision:
Enclosure (3)
Source Selection Information 11 UNCLASSIFIED//FOR OFFICIAL USE ONLY
ENCLOSURE (3) ANNUAL SURVEILLANCE SUMMARY
The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in
Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.
Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results
Quality of Product or Service Review of Quarterly Ratings
Schedule Review of Quarterly Ratings
Cost Control Review of Quarterly Ratings
Business Relations Review of Quarterly Ratings
Management Review of Quarterly Ratings
Utilization of SB Review of Quarterly Ratings
Other Areas Review of Quarterly Ratings
Annual Surveillance Completed By: _______________________
Date Completed: ________________
All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.
Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.
Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.
Source Selection Information 12 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Cost Control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.
Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.
Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB
(including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes
ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran
Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs) to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.
Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Source Selection Information 13 UNCLASSIFIED//FOR OFFICIAL USE ONLY
Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
File details come from the government source that posted it. Updated .