This document contains a draft solicitation and associated documents for engineering products and technical services. The Naval Air Warfare Center Aircraft Division at Patuxent River, Maryland is seeking these services including fleet support, supply support, technical support, systems improvement, development, test and evaluation, software development and maintenance, field change program support, production, special test fixture development, test bed support, and overhaul and restoration program support. Interested vendors have 14 days to submit questions on the draft solicitation, which has a North American Industry Classification System code of 541330 for engineering services and a small business size standard of $41.5 million. The requirement is a follow-on to contract N00421-16-D-0010 and aims to procure these services on a competitive basis to support the Air Traffic Control and Landing Systems Division.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N00421-20-R-0119

Source Selection Information 1 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Contract Surveillance Plan for

Air Traffic Control and Landing Systems Division

Engineering Products and Technical Services (EPTS)

1. Purpose

This Contract Surveillance Plan (CSP) document is a Government developed and applied document used to ensure systematic Quality Assurance (QA) methods are used in the administration and surveillance of tasking under the Contract. The intent is to ensure the

Contractor performs In Accordance With (IAW) the Statement of Work (SOW), and the

Government receives the quality of services called for in each Task Order (TO) SOW.

This Contract will provide engineering products and technical services for various systems and subsystems under the Naval Air Warfare Center Aircraft Division (NAWCAD) Webster

Outlying Field (WOLF) Air Traffic Control and Landing Systems (ATC&LS) Division cognizance. These services shall include fleet support; supply support, technical support; pre-positioned technical support; systems improvement; systems development; systems test and evaluation; software development, test, and maintenance; field change program; production;

special purpose test fixture development; test bed support; and overhaul and restoration program support.

This Contract will have Cost Plus Fixed Fee (CPFF) term Contract Line Item Numbers (CLINs) for labor and corresponding cost reimbursable CLINs for Other Direct Costs (ODCs). The

Contract will have one (1) five-year ordering period. A properly executed CSP will assist the

Government in achieving the objectives of this procurement.

2. Authority

Authority for issuance of this CSP is provided under Contract Section E - Inspection and

Acceptance, which provides for inspections and acceptance of the services, products, and documentation called for in the Contract executed by the Contracting Officer (KO) or a duly authorized representative.

3. Scope

To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan (QCP) and the CSP. The Contractor, and not the Government, is responsible for the QCP, which defines the management and quality control actions necessary to meet the quality standards set forth in the Contract and all resultant

TOs.

The CSP provides Government surveillance oversight of the Contractor’s efforts to assure they are timely, effective, and delivering the results specified in the Contract and each TO.

4. Government Resources

Source Selection Information 2 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

The following definitions for Government resources are applicable to this plan:

KO: A person duly appointed with the authority to enter into a contract (Procuring Contracting

Officer (PCO)), or a person with the authority to administer contracts (Administrative

Contracting Officer (ACO)) and make related determinations and findings on behalf of the

Government. The PCO for this Contract is Stacey C. MacMillan. The ACO will be designated in the resulting Contract. KOs are designated via a written warrant that sets forth limitations of authority.

Contracting Officer’s Representative (COR): An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the Contract. The COR will be appointed in the resulting Contract. The limitations of authority are contained in the letter of appointment.

Alternate Contracting Officer’s Representative (ACOR): An individual appointed in writing by the PCO to act as their authorized representative, in the absence of the COR, to assist in administering the Contract. The ACOR will be appointed in the resulting Contract. The limitations of authority are contained in a written letter of appointment.

Government Project Lead (GPL): The COR designates individual GPLs to assist in administering of specific efforts under the Contract.

5. Responsibilities

The following Government resources will have responsibility for the implementation of this

CSP:

KO: The KO (PCO or ACO) ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the Contract, and safeguards the interests of the United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the Contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

COR: The COR is responsible for technical administration of the Contract and assures proper

Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms or conditions shall be referred to the KO for action.

ACOR: The ACOR assists the COR for technical administration of the Contract and assures proper Government surveillance of the Contractor’s performance. The ACOR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.

Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.

Source Selection Information 3 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

GPL: The GPL is responsible for assisting in administering specific efforts under the Contract.

A GPL cannot, in any manner, alter the scope of the Contract, make commitments or authorize any changes on the Government’s behalf.

6. Methods of QA Surveillance

a. Contractor Performance Assessment Reporting System (CPARS): The marketplace for this type of effort is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS under this Contract. Additionally, an evaluation using the CPARS format will be performed at the end of each ordering year. This evaluation will be one (1) determinant in the award of future contracts or TOs. The Government will address the quality of product or service, schedule, cost control, business relations, management, utilization of Small Business (SB), and other important areas for this procurement. Some of the monitoring methods to be used will be Government observation, review of reports, customer feedback, and review of Contract Data Requirements Lists (CDRLs). As this information may affect future source selections throughout the Department of Defense

(DoD), as well as the continuation of this tasking, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool within the policies of this CSP.

b. CSP: This document will be used by the COR, ACOR, and GPLs in the technical administration of this Contract. In addition to the below instructions, the form to be used for documentation of QA surveillance is the Surveillance Activity Checklist (SAC) provided herein.

7. Surveillance

Enclosure (2) sets forth the performance standards, incentives, and surveillance methods for the

Contractor, the COR/ACOR, and GPLs while Enclosures (1) and (3) provide the checklist and means for the COR to document the results of the surveillance and will be provided to the KO.

8. Documentation

In addition to providing reports to the KO, the COR will maintain a complete QA file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the

Contractor’s performance of the QA function, including the originals of the QA Checklists. All such records will be maintained for the life of the Contract. The COR will forward these records to the KO at termination or completion of the Contract.

9. Enclosures

Enclosure (1) SAC

Enclosure (2) Quarterly Evaluation by CDRL

Enclosure (3) Annual Surveillance Summary

Enclosure (1)

Source Selection Information 4 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (1): SAC

Quarterly Surveillance:

The COR will perform a quarterly assessment of quality, schedule, cost control, business relations, management, utilization of SB, and other areas as applicable utilizing the CPARS evaluation rating definitions listed in Enclosure (3).

QUARTERLY EVALUATION – BY SOW Paragraph

Description Surveillance Method/

Measure Dates

Quality

Assessment

Schedule

Assessment

Cost Control

Assessment

Business

Relations

Assessment

Management

Assessment

Utilization of SB

Assessment

Other Areas

Assessment

Provide fleet support IAW SOW

Para. 3.3.1

100% Inspection by

COR/ACOR and/or GPLs

Provide supply support IAW SOW

Para. 3.3.2

Provide technical

Para. 3.3.3

Provide pre-positioned technical support

IAW SOW Para.

3.3.4

Provide systems improvement support IAW SOW

Para. 3.3.5

Provide systems development support IAW SOW

Para. 3.3.6

Enclosure (1)

Source Selection Information 5 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Description Surveillance Method/

Measure Dates

Quality

Assessment

Schedule

Assessment

Cost Control

Assessment

Business

Relations

Assessment

Management

Assessment

Utilization of SB

Assessment

Other Areas

Assessment

Provide systems test and evaluation support IAW SOW

Para. 3.3.7

Provide operational software development and maintenance support IAW SOW

Para. 3.3.8

Provide software development, test, and maintenance support IAW SOW

Para. 3.3.9

Provide field change program support IAW SOW

Para. 3.3.10

Provide production

Para. 3.3.11

Provide special purpose test fixture support IAW SOW

Para. 3.3.12

Provide test bed

Para. 3.3.13

Provide overhaul and restoration program support

IAW SOW Para.

3.3.14

Enclosure (2)

Source Selection Information 6 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (2) QUARTERLY EVALUATION BY CONTRACT DATA REQUIREMENTS LISTS

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Contracting Officer’s Management

Report (Progress and Financial

Status Report) CDRL A001

100% Inspection by COR/ACOR and/or GPLs.

Engineering and Technical Services

Accomplishment Report (Trip

Report) CDRL A002

Phase-Out Transition Plan

(Transition-Out Plan) CDRL A003

Operations Security (OPSEC) Plan

CDRL A004

Certification/Data Report (Final

Certification/Verification Report)

CDRL A005

Certification/Verification Manuals

CDRL A006

Scientific and Technical Reports

(Recommendations Technical

Report) CDRL A007

Status Report (Maintenance Action

Form (MAF) Status Report CDRL

A008

Technical Report – Study/Services

(Fleet Metrics Report) CDRL A009

(Parts Inventory List) CDRL A010

Report of Receipts, Inventory, Adjustments and Shipments of

Government Property (Accounting

Report) CDRL A011

Source Selection Information 7 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Report of Receipts, Inventory, Adjustments and Shipments of

Government Property (Payback

Status Report) CDRL A012

(Data Information Form) CDRL

A013

Contracting Officer’s Management

Report (Status Report) CDRL A014

Status Report CDRL A015

Technical Report – Study/Service

(Field Change Installation Program

Form) CDRL A016

Engineering Drawings (Installation

Control Drawings) CDRL A017

Provisioning Parts List (PPLs)

CDRL A018

Provisioning Technical Document

CDRL A019

Government Property (Landing Data

Summary Report) CDRL A020

Planned Maintenance System

(PMS)/Maintenance Requirements

Card (MRC) CDRL A021

(PMS)/Maintenance Index Page

(MIP) CDRL A022

Navy Training System Plan (NTSP)

CDRL A023

Source Selection Information 8 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Logistics Support Status Report

(Integrated Logistics Support Plan

(ILSP)) CDRL A024

Logistics Support Status Report

(User Logistics Support Summary

(ULSS)) CDRL A025

Logistics Plan (Maintenance Plans)

CDRL A026

Management Plan (Life Cycle

Management Plan) CDRL A027

Test Plans/Test Procedures

(Acceptance Test Plans and

Procedures) CDRL A028

Test Plans/Test Procedures

(Performance Test Plans and

Procedures) CDRL A029

(Test Report) CDRL A030

(Trouble Report) CDRL A031

Software/Firmware Report (Software

Change Proposal (SCP)) CDRL

A032

Software Product Specification

(Program Package Document)

CDRL A033

Software Test Plan (STP) (Computer

Software Test Plans and Procedures)

CDRL A034

Technical Report – Study/Service

(Software Certification Form) CDRL

A035

Source Selection Information 9 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Software Test Report (STR)

(Computer Software Test Report)

CDRL A036

Software Test Description

(Computer Software Version

Description Document) CDRL A037

Software Center Operator Manual

(Systems Operator’s Manual) CDRL

A038

Government Property (Computer

Program Support Library Inventory

Report) CDRL A039

Engineering Change Proposal CDRL

A040

Field Change Bulletin CDRL A041

System Technical Manual

(Sanitized) (Technical Manual

Revisions) CDRL A042

Engineering Drawings (Level I/II/III

Drawings) CDRL A043

(PMS)/Maintenance Index Page

(MIP) (Equipment Maintenance

Logbook) CDRL A044

(Flight Test Logbooks) CDRL A045

System Problem Report (SPR)

(Problem Report) CDRL A046

Source Selection Information 10 UNCLASSIFIED//FOR OFFICIAL USE ONLY

See FAR 2.101 and 3.104

Description Surveillance Method/Measure Dates

Due

Dates

Completed

No.

Submittals

No. of

Req’d

Rework

Percentage

On Time Comments

Technical Report – Study/Services

(Certification Test Report) CDRL

A047

Technical Repair Standards (TRS) for Hull, Mechanical and Electrical

(HM&E) Equipment, Electronic

Equipment, and Ordnance

Equipment (Technical Repair

Standards) CDRL A048

Repair/Modification/Overhaul Status

Report (Restoration Status Report)

CDRL A049

Contracting Officer’s Management

Report (Segregation of Cost and

Invoice Requirements Reporting

(TDLs)) CDRL A050

Metric Summary:

Current Period

Cumulative

Total Number of Deliverables Submitted:

Total Number of Deliverables Submitted Late:

Total Number of Deliverables Requiring Revision:

Percentage of Deliverables Submitted Late:

Percentage of Deliverables Requiring Revision:

Enclosure (3)

Source Selection Information 11 UNCLASSIFIED//FOR OFFICIAL USE ONLY

ENCLOSURE (3) ANNUAL SURVEILLANCE SUMMARY

The COR will perform an assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in

Enclosure (3). This assessment will be completed annually covering the previous twelve (12) months.

Description Surveillance Method/Measure Date Planned Date Completed Summary Rating/Results

Quality of Product or Service Review of Quarterly Ratings

Schedule Review of Quarterly Ratings

Cost Control Review of Quarterly Ratings

Business Relations Review of Quarterly Ratings

Management Review of Quarterly Ratings

Utilization of SB Review of Quarterly Ratings

Other Areas Review of Quarterly Ratings

Annual Surveillance Completed By: _______________________

Date Completed: ________________

All SOW and CDRL tasks, including sub-tasks, will be assessed focusing on the following.

Quality of Product or Service: Assess the Contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces and the management of a totally integrated effort of all program management concerns to meet cost, performance and schedule objectives. Assess how successfully the Contractor meets program quality.

Schedule: Assess the Contractor’s adherence to the required delivery schedule by assessing the Contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes and assess the effectiveness of Contractor corrective actions.

Source Selection Information 12 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Cost Control: Assess the Contractor’s effectiveness in forecasting, managing and controlling contract cost. Is the Contractor experiencing cost growth or under-run? If so, discuss the causes and Contractor proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon Contractor provided person hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the Contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.

Business Relations: Assess the timelines, completeness and quality of problem identification; corrective action plans; proposal submittals; the Contractor’s reasonable and cooperative behavior; effective business relations; and customer satisfaction.

Management: Assess the Contractor’s success with timely award and management of subcontracts, including whether the Contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the Contractor discharges its responsibility for integration and coordination of all activity needed to execute the Contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the Contractor’s risk mitigation plans.

Utilization of SB: The Request for Proposal (RFP) and FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the SB Subcontracting Program. Assess whether the Contractor provided maximum practicable opportunity for SB

(including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes

ANCs and Indian Tribes), Women Owned SBs (WOSBs), HUBZone, Veteran Owned SBs (VOSBs), Service Disabled Veteran

Owned SB (SDVOSB), and ANCs and Indian Tribes that are not Small Disadvantaged Businesses (SDBs) or SBs) to participate in contract performance consistent with efficient performance of the Contract. Evaluation will focus on the metrics of actual SB utilization as compared to the Contract required targets and the Contractor’s submitted SB plan.

Other areas: Assess additional evaluation areas unique to the Contract or that cannot be captured elsewhere.

The evaluation ratings are as follows:

Exceptional Performance: Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Source Selection Information 13 UNCLASSIFIED//FOR OFFICIAL USE ONLY

Very Good Performance: Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance: Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance: Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance: Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

File details come from the government source that posted it. Updated .