Attachment (2) Contractor Past Experience Information Sheet_FY21 SCIF MATOC.DOCX
DOCX document 40 KB Posted
- Attached to
- FY21 DB-DBB SCIF Construction MATOC Federal contract opportunity
- Solicitation number
- W912GB21R0010
- Issued by
- Department of the Army European Command
About this file
This document contains a contractor past experience information sheet template for an indefinite delivery indefinite quantity multiple award task order contract solicitation for SCIF construction, repair, and force protection work in the EUCOM and AFRICOM areas of responsibility. Offerors must provide details for at least five past projects demonstrating experience, with at least three as a prime contractor and two involving SCIF construction. Experience as a prime contractor, joint venture, or key subcontractor can be included, with additional explanation required for joint ventures and key subcontractors. The solicitation number is W912GB21R0010 and is being issued by the Department of the Army European Command for SCIF construction MATOC purposes across the specified geographic regions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| US Government Bidder Inquiry Responses AMD 0003.pdf | ||
| 21R0010 AMD 0003.pdf | ||
| Standard Form 24 - Bid Bond.pdf | ||
| Bidder Inquiry Responses 21 May 2021.pdf | ||
| Attachment B BPRICING SCHEDULE_v2.XLSX | XLSX spreadsheet | |
| 21R0010 Amend 0002.pdf | ||
| A.03.16 Spec Binder.pdf | ||
| 21R0010P00001.pdf | ||
| Attachment (6) _ProjNet Instructions.pdf | ||
| Attachment (4) AE Experience_FINAL.docx | DOCX document | |
| 21R0010RFP.pdf | ||
| Attachment (5) SAMPLE LETTER OF COMMITMENT.pdf | ||
| Attachment B BPRICING SCHEDULE.XLSX | XLSX spreadsheet | |
| Attachment (3) USACEPastPerformanceQuestionnaire.docx | DOCX document | |
| Attachment (1)Contractor Past Experience Overview Sheet_FY21 SCIF MATOC.DOCX | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
FY21 SCIF Construction MATOC
CONTRACTOR PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____, Page 1 Must have a total of 5 projects, more than 5 will not be evaluated; less than 5 may result in a lower rating Project Name and Location:
Experience:
1. The location work was performed Outside the Continental United States (OCONUS). Note: work performed within the EUCOM AOR will be considered most relevant, while projects performed in AFRICOM AOR will be considered more relevantThe location work was performed Outside the Continental United States (OCONUS). Note: project performed within the European Union will be considered most relevant, while projects in Israel and Africa will be considered more relevant: ___________________________________
2. The day, month, and year work was completed: _______________
3. Is this project more than 50% complete? ____ Yes ____ No If “No” explain percentage of completion, if not 50% complete for any reason, rating may be lower
4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for projects in at least one of the following categories:
| a. | Design-Build/Design-Bid-Build construction projects |
| b. | New Construction or Renovations of Buildings that demonstrate experience with Sensitive Compartmented Information Facilities (SCIFs) in compliance with ICD 705 standards; |
| c. | Replacement to include major building systems (electrical, mechanical, structural, etc) repaired or replaced; |
NOTE: The prime contractor must have performed at least three (3) of the five (5) projects submitted for Factor 1 AND two (2) of the five (5) projects submitted must be SCIF construction. This aspect is a pass/fail element. In case of a Joint Venture, the work must have been performed by at least one of the JV partners as the prime. Offerors who do not meet this minimum requirement are not eligible for award.
(Continue typing if required to provide more information)
ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET
PROJECT NO. _____ Page 2
Offeror: A contractor and/or company submitting a proposal for this solicitation.
Prime Contractor: A contractor that performed at least 20% of the work, and managed all other work for the project.
Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.
Joint Venture: More than one contractor with a legal binding agreement to work together.
Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror is allowed to take credit for the Key Subcontractor’s experience. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.
5. Mark one of these selections:
Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor
a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.
b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.
c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:
d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals:
File details come from the government source that posted it. Updated .