Text version

BASE YEAR

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
BASE YEAR
*Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years.
ITEMDESCRIPTIONUNIT PRICEEST QTYBASE YEAR EXTENDED PRICE
COMPONENT OVERHAULS
CLIN 0001For Approval, Sample Test Plan and Inspection Reports Formats in accordance with specification #P-233-2039, Section 3.3.$ NSP1$ NSP
CLIN 0002Open, Inspect "A1" Turbo 2950-12-390-3739 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A1 Turbo be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0003Parts and Labor, including preparation for delivery, standard overhaul of "A1" Turbo 2950-12-390-3739 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0004Open, Inspect "A2" Turbo 2950-12-390-3213 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A2 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A2 Turbo be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0005Parts and Labor, including preparation for delivery, standard overhaul of "A2" Turbo 2950-12-390-3213 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0006Open, Inspect "B1" Turbo 2950-12-390-3341 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the B1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any B1 Turbo be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0007Parts and Labor, including preparation for delivery, standard overhaul of "B1" Turbo 2950-12-390-3341 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. Preservation requirements are found in Para 3.2 & its subparagraphs of the spec. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0008Open, Inspect "B2" Turbo 2950-12-390-5601 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Turbo be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0009Parts and Labor, including preparation for delivery, standard overhaul of "B2" Turbo 2950-12-390-5601 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0010Open, Inspect Cylinder Head, 2815-12-390-8721 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Cylinder Head to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Cylinder Head be determined to be beyond economical repair.$ - 080$ - 0
CLIN 0011Parts and Labor, including preparation for delivery, standard overhaul of Cylinder Head, 2815-12-390-8721 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Cylinder Head to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 080$ - 0
CLIN 0012Open, Inspect Starter 2920-12-385-6651 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0013Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6651 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0014Open, Inspect Starter 2920-12-385-6663 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0015Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6663 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0016Open, Inspect Coolant Pump, 2930-12-385-6887 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Coolant Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Coolant pump be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0017Parts and Labor, including preparation for delivery, standard overhaul of Coolant Pump, 2930-12-385-6887 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Coolant Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0018Open, Inspect Sea Water Pump, 4320-12-387-3261 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Sea Water Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Sea Water Pump be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0019Parts and Labor, including preparation for delivery, standard overhaul of Sea Water Pump, 4320-12-387-3261 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Sea Water Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0020Open, Inspect Intercooler Core, 2930-12-387-1031 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Intercooler Core to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Intercoller Core be determined to be beyond economical repair.$ - 02$ - 0
CLIN 0021Parts and Labor, including preparation for delivery, standard overhaul of Intercooler Core, 2930-12-387-1031 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Intercooler Core to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 02$ - 0
CLIN 0022Prepare for Shipment and re-crate any F Condition component not being repaired in accordance with specification. P-233-2039$ - 01$ - 0
CLIN 0023For approval, package, pack, mark and prepare for shipment any item not meeting the requirements of section 1.2 in accordance with specification P-233-2039$ - 01$ - 0
CLIN 0024For Approval, Final inspection and test report on each overhauled component in accordance with specification P-233-2039$ NSP1$ NSP
CLIN 0025Coast Guard Quality Assurance Inspection at Contractors facility$ NSP1$ NSP
PARTS
CLIN 0026Arm Rocker, P/N: X52405500145$ - 01$ - 0
CLIN 0027Arm Rocker, P/N: X5240550216$ - 01$ - 0
CLIN 0028Cable Assy, Electrical, P/N: X00013978$ - 04$ - 0
CLIN 0029Carrier Ring, Bushing Sleeve, P/N: X00010426$ - 01$ - 0
CLIN 0030Circuit Card Assembly, P/N: X00E50206571/S0001$ - 02$ - 0
CLIN 0031Cover, Engine Poppet Valve, P/N: X00009406$ - 01$ - 0
CLIN 0032Cylinder Assembly, Actuating, P/N: 0000983019$ - 01$ - 0
CLIN 0033Cylinder Head, Diesel Engine, P/N: X52404100142$ - 010$ - 0
CLIN 0034Driver Mechanical, P/N: X52408100002$ - 01$ - 0
CLIN 0035Gage Rod Liquid Level, P/N: X5960400012$ - 01$ - 0
CLIN 0036Gasket, P/N: 5240161680$ - 01$ - 0
CLIN 0037Gasket, P/N: X59601800008$ - 01$ - 0
CLIN 0038Gasket, P/N: X52404200052$ - 01$ - 0
CLIN 0039Gasket, P/N: 535D01023/1$ - 01$ - 0
CLIN 0040Gasket, P/N: X00009917$ - 01$ - 0
CLIN 0041Gasket, P/N: 007603026106$ - 02$ - 0
CLIN 0042Governor Diesel Engine, P/N: B00E50208145/76$ - 01$ - 0
CLIN 0043Hose Assembly, Nonmetllic, P/N: 735038008107$ - 01$ - 0
CLIN 0044Housing Intake, P/N: X59612300090$ - 01$ - 0
CLIN 0045HP Accumulator RGT, P/N: X59607700001$ - 01$ - 0
CLIN 0046Indicator, Liquid Quantity, P/N: 535D01022/1$ - 01$ - 0
CLIN 0047Manifold Turbocharger, P/N: X00043025$ - 01$ - 0
CLIN 0048Nozzle, Oil Spray, P/N: X5941840007$ - 01$ - 0
CLIN 0049O-Ring, P/N: 700429192000$ - 036$ - 0
CLIN 0050O-Ring, P/N: 700429058001$ - 03$ - 0
CLIN 0051O-Ring, P/N: 700429039000$ - 02$ - 0
CLIN 0052O-Ring, P/N: XP59307300007$ - 01$ - 0
CLIN 0053O-Ring, P/N: 700429095004$ - 01$ - 0
CLIN 0054O-Ring, P/N: 700429065001$ - 01$ - 0
CLIN 0055O-Ring, P/N: 700429041000$ - 01$ - 0
CLIN 0056O-Ring, P/N: 700429050000$ - 01$ - 0
CLIN 0057O-Ring, P/N: 700429048000$ - 01$ - 0
CLIN 0058O-Ring, P/N: 700429042002$ - 01$ - 0
CLIN 0059O-Ring, P/N: 700429028000$ - 01$ - 0
CLIN 0060O-Ring, P/N: 700429017002$ - 01$ - 0
CLIN 0061Packing, Performed, P/N: 5240160319$ - 01$ - 0
CLIN 0062Plate Oil Cooler, Engine, P/N: X594203000055$ - 01$ - 0
CLIN 0063Push Rod, Engine Poppet Valve, P/N: 5240500930$ - 01$ - 0
CLIN 0064Restrictor, P/N: X59420200233$ - 01$ - 0
CLIN 0065Restrictor, P/N: X59420200234$ - 01$ - 0
CLIN 0066Restrictor, P/N: X59420200235$ - 01$ - 0
CLIN 0067Restrictor, P/N: X59420200238$ - 01$ - 0
CLIN 0068Seal, P/N: 219976647$ - 01$ - 0
CLIN 0069Seal, Ring, P/N: 5269970045$ - 01$ - 0
CLIN 0070Strainer Element Sediment, P/N: XP52699100006$ - 01$ - 0
CLIN 0071Switch, Liquid Fluid, P/N: X00031109$ - 01$ - 0
CLIN 0072Switch Liquid Level, P/N: X00E50203662$ - 01$ - 0
CLIN 0073Transmitter, Pressure, P/N: 0045358931$ - 02$ - 0
CLIN 0074Transmitter, Pressure, P/N: 510.00517$ - 01$ - 0
CLIN 0075Transmitter, Pressure, P/N: 0035351731$ - 01$ - 0
CLIN 0076Transmitter, Pressure, P/N: 0035352931$ - 01$ - 0
CLIN 0077Tube Assembly Metal, P/N: X59408600035$ - 01$ - 0
CLIN 0078Tube Assy, Metal, P/N: X00035420$ - 01$ - 0
CLIN 0079Tube Assy, Metal, P/N: X00035421$ - 01$ - 0
CLIN 0080Tube Assy, Metal, P/N: X00035422$ - 01$ - 0
CLIN 0081Tube Assy, Metal Branched, P/N: X00026992$ - 01$ - 0
CLIN 0082Tube Assy, Metal Branched, P/N: X00026993$ - 01$ - 0
CLIN 0083Washer, P/N: 70052106200$ - 01$ - 0
CORE EXCHANGE
ITEMDESCRIPTIONUNIT PRICE w/o CORE EXCHANGEUNIT PRICE with CORE EXCHANGEEST QTYBASE YEAR EXTENDED PRICE
CLIN 0084Conrod, P/N: RX52603800003/42$ - 0$ - 01$ - 0
CLIN 0085Coupling, P/N: X59625100006/32$ - 0$ - 01$ - 0
CLIN 0086Crankcase, P/N: X59601100003$ - 0$ - 01$ - 0
CLIN 0087Crankshaft, P/N: X59603100002$ - 0$ - 01$ - 0
CLIN 0088Flywheel, P/N: X59403200001/32$ - 0$ - 01$ - 0
CLIN 0089HP Fuel Pump, P/N: EX59507300018/87$ - 0$ - 01$ - 0
CLIN 0090Injector Assembly, Fuel, P/N: X59407500022$ - 0$ - 023$ - 0
CLIN 0091Piston, P/N: X00035690$ - 0$ - 01$ - 0
CLIN 0092Vibration Damper, P/N: X52803500001$ - 0$ - 01$ - 0
CLIN 0093PARTS LIST FOR 20V4000M93L Series MDEPERCENTAGE INCREASE (+) or DECREASE (-) OFF LIST PRICE$ - 0
Total Estimated Amount$ - 0

1ST OP

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
1ST OPTION PERIOD
*Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years.
ITEMDESCRIPTIONUNIT PRICEEST QTY1ST OPTION PERIOD EXTENDED PRICE
COMPONENT OVERHAULS
CLIN 0001-$ NSP0$ NSP
CLIN 1002Open, Inspect "A1" Turbo 2950-12-390-3739 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A1 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1003Parts and Labor, including preparation for delivery, standard overhaul of "A1" Turbo 2950-12-390-3739 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1004Open, Inspect "A2" Turbo 2950-12-390-3213 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A2 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A2 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1005Parts and Labor, including preparation for delivery, standard overhaul of "A2" Turbo 2950-12-390-3213 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1006Open, Inspect "B1" Turbo 2950-12-390-3341 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the B1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any B1 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1007Parts and Labor, including preparation for delivery, standard overhaul of "B1" Turbo 2950-12-390-3341 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. Preservation requirements are found in Para 3.2 & its subparagraphs of the spec. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1008Open, Inspect "B2" Turbo 2950-12-390-5601 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1009Parts and Labor, including preparation for delivery, standard overhaul of "B2" Turbo 2950-12-390-5601 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1010Open, Inspect Cylinder Head, 2815-12-390-8721 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Cylinder Head to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Cylinder Head be determined to be beyond economical repair.$ - 0160$ - 0
CLIN 1011Parts and Labor, including preparation for delivery, standard overhaul of Cylinder Head, 2815-12-390-8721 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Cylinder Head to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 0160$ - 0
CLIN 1012Open, Inspect Starter 2920-12-385-6651 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1013Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6651 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1014Open, Inspect Starter 2920-12-385-6663 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1015Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6663 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1016Open, Inspect Coolant Pump, 2930-12-385-6887 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Coolant Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Coolant pump be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1017Parts and Labor, including preparation for delivery, standard overhaul of Coolant Pump, 2930-12-385-6887 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Coolant Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1018Open, Inspect Sea Water Pump, 4320-12-387-3261 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Sea Water Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Sea Water Pump be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1019Parts and Labor, including preparation for delivery, standard overhaul of Sea Water Pump, 4320-12-387-3261 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Sea Water Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1020Open, Inspect Intercooler Core, 2930-12-387-1031 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Intercooler Core to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Intercoller Core be determined to be beyond economical repair.$ - 04$ - 0
CLIN 1021Parts and Labor, including preparation for delivery, standard overhaul of Intercooler Core, 2930-12-387-1031 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Intercooler Core to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 1022Prepare for Shipment and re-crate any F Condition component not being repaired in accordance with specification. P-233-2039$ - 01$ - 0
CLIN 1023For approval, package, pack, mark and prepare for shipment any item not meeting the requirements of section 1.2 in accordance with specification P-233-2039$ - 01$ - 0
CLIN 1024For Approval, Final inspection and test report on each overhauled component in accordance with specification P-233-2039$ NSP1$ NSP
CLIN 1025Coast Guard Quality Assurance Inspection at Contractors facility$ NSP1$ NSP
PARTS
CLIN 1026Arm Rocker, P/N: X52405500145$ - 01$ - 0
CLIN 1027Arm Rocker, P/N: X5240550216$ - 01$ - 0
CLIN 1028Cable Assy, Electrical, P/N: X00013978$ - 04$ - 0
CLIN 1029Carrier Ring, Bushing Sleeve, P/N: X00010426$ - 01$ - 0
CLIN 1030Circuit Card Assembly, P/N: X00E50206571/S0001$ - 02$ - 0
CLIN 1031Cover, Engine Poppet Valve, P/N: X00009406$ - 01$ - 0
CLIN 1032Cylinder Assembly, Actuating, P/N: 0000983019$ - 01$ - 0
CLIN 1033Cylinder Head, Diesel Engine, P/N: X52404100142$ - 010$ - 0
CLIN 1034Driver Mechanical, P/N: X52408100002$ - 01$ - 0
CLIN 1035Gage Rod Liquid Level, P/N: X5960400012$ - 01$ - 0
CLIN 1036Gasket, P/N: 5240161680$ - 01$ - 0
CLIN 1037Gasket, P/N: X59601800008$ - 01$ - 0
CLIN 1038Gasket, P/N: X52404200052$ - 01$ - 0
CLIN 1039Gasket, P/N: 535D01023/1$ - 01$ - 0
CLIN 1040Gasket, P/N: X00009917$ - 01$ - 0
CLIN 1041Gasket, P/N: 007603026106$ - 02$ - 0
CLIN 1042Governor Diesel Engine, P/N: B00E50208145/76$ - 01$ - 0
CLIN 1043Hose Assembly, Nonmetllic, P/N: 735038008107$ - 01$ - 0
CLIN 1044Housing Intake, P/N: X59612300090$ - 01$ - 0
CLIN 1045HP Accumulator RGT, P/N: X59607700001$ - 01$ - 0
CLIN 1046Indicator, Liquid Quantity, P/N: 535D01022/1$ - 01$ - 0
CLIN 1047Manifold Turbocharger, P/N: X00043025$ - 01$ - 0
CLIN 1048Nozzle, Oil Spray, P/N: X5941840007$ - 01$ - 0
CLIN 1049O-Ring, P/N: 700429192000$ - 036$ - 0
CLIN 1050O-Ring, P/N: 700429058001$ - 03$ - 0
CLIN 1051O-Ring, P/N: 700429039000$ - 02$ - 0
CLIN 1052O-Ring, P/N: XP59307300007$ - 01$ - 0
CLIN 1053O-Ring, P/N: 700429095004$ - 01$ - 0
CLIN 1054O-Ring, P/N: 700429065001$ - 01$ - 0
CLIN 1055O-Ring, P/N: 700429041000$ - 01$ - 0
CLIN 1056O-Ring, P/N: 700429050000$ - 01$ - 0
CLIN 1057O-Ring, P/N: 700429048000$ - 01$ - 0
CLIN 1058O-Ring, P/N: 700429042002$ - 01$ - 0
CLIN 1059O-Ring, P/N: 700429028000$ - 01$ - 0
CLIN 1060O-Ring, P/N: 700429017002$ - 01$ - 0
CLIN 1061Packing, Performed, P/N: 5240160319$ - 01$ - 0
CLIN 1062Plate Oil Cooler, Engine, P/N: X594203000055$ - 01$ - 0
CLIN 1063Push Rod, Engine Poppet Valve, P/N: 5240500930$ - 01$ - 0
CLIN 1064Restrictor, P/N: X59420200233$ - 01$ - 0
CLIN 1065Restrictor, P/N: X59420200234$ - 01$ - 0
CLIN 1066Restrictor, P/N: X59420200235$ - 01$ - 0
CLIN 1067Restrictor, P/N: X59420200238$ - 01$ - 0
CLIN 1068Seal, P/N: 219976647$ - 01$ - 0
CLIN 1069Seal, Ring, P/N: 5269970045$ - 01$ - 0
CLIN 1070Strainer Element Sediment, P/N: XP52699100006$ - 01$ - 0
CLIN 1071Switch, Liquid Fluid, P/N: X00031109$ - 01$ - 0
CLIN 1072Switch Liquid Level, P/N: X00E50203662$ - 01$ - 0
CLIN 1073Transmitter, Pressure, P/N: 0045358931$ - 02$ - 0
CLIN 1074Transmitter, Pressure, P/N: 510.00517$ - 01$ - 0
CLIN 1075Transmitter, Pressure, P/N: 0035351731$ - 01$ - 0
CLIN 1076Transmitter, Pressure, P/N: 0035352931$ - 01$ - 0
CLIN 1077Tube Assembly Metal, P/N: X59408600035$ - 01$ - 0
CLIN 1078Tube Assy, Metal, P/N: X00035420$ - 01$ - 0
CLIN 1079Tube Assy, Metal, P/N: X00035421$ - 01$ - 0
CLIN 1080Tube Assy, Metal, P/N: X00035422$ - 01$ - 0
CLIN 1081Tube Assy, Metal Branched, P/N: X00026992$ - 01$ - 0
CLIN 1082Tube Assy, Metal Branched, P/N: X00026993$ - 01$ - 0
CLIN 1083Washer, P/N: 70052106200$ - 01$ - 0
CORE EXCHANGE
ITEMDESCRIPTIONUNIT PRICE w/o CORE EXCHANGEUNIT PRICE with CORE EXCHANGEEST QTYBASE YEAR EXTENDED PRICE
CLIN 1084Conrod, P/N: RX52603800003/42$ - 0$ - 01$ - 0
CLIN 1085Coupling, P/N: X59625100006/32$ - 0$ - 01$ - 0
CLIN 1086Crankcase, P/N: X59601100003$ - 0$ - 01$ - 0
CLIN 1087Crankshaft, P/N: X59603100002$ - 0$ - 01$ - 0
CLIN 1088Flywheel, P/N: X59403200001/32$ - 0$ - 01$ - 0
CLIN 1089HP Fuel Pump, P/N: EX59507300018/87$ - 0$ - 01$ - 0
CLIN 1090Injector Assembly, Fuel, P/N: X59407500022$ - 0$ - 023$ - 0
CLIN 1091Piston, P/N: X00035690$ - 0$ - 01$ - 0
CLIN 1092Vibration Damper, P/N: X52803500001$ - 0$ - 01$ - 0
CLIN 1093PARTS LIST FOR 20V4000M93L Series MDEPERCENTAGE INCREASE (+) or DECREASE (-) OFF LIST PRICE$ - 0
Total Estimated Amount$ - 0

2ND OP

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
2ND OPTION PERIOD
*Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years.
ITEMDESCRIPTIONUNIT PRICEEST QTY2ND OPTION PERIOD EXTENDED PRICE
COMPONENT OVERHAULS
CLIN 2001-$ NSP0$ NSP
CLIN 2002Open, Inspect "A1" Turbo 2950-12-390-3739 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A1 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2003Parts and Labor, including preparation for delivery, standard overhaul of "A1" Turbo 2950-12-390-3739 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2004Open, Inspect "A2" Turbo 2950-12-390-3213 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A2 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A2 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2005Parts and Labor, including preparation for delivery, standard overhaul of "A2" Turbo 2950-12-390-3213 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each A2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2006Open, Inspect "B1" Turbo 2950-12-390-3341 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the B1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any B1 Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2007Parts and Labor, including preparation for delivery, standard overhaul of "B1" Turbo 2950-12-390-3341 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B1 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. Preservation requirements are found in Para 3.2 & its subparagraphs of the spec. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2008Open, Inspect "B2" Turbo 2950-12-390-5601 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Turbo be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2009Parts and Labor, including preparation for delivery, standard overhaul of "B2" Turbo 2950-12-390-5601 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each B2 Turbo to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2010Open, Inspect Cylinder Head, 2815-12-390-8721 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Cylinder Head to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Cylinder Head be determined to be beyond economical repair.$ - 0160$ - 0
CLIN 2011Parts and Labor, including preparation for delivery, standard overhaul of Cylinder Head, 2815-12-390-8721 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Cylinder Head to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 0160$ - 0
CLIN 2012Open, Inspect Starter 2920-12-385-6651 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2013Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6651 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2014Open, Inspect Starter 2920-12-385-6663 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Starter to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Starter be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2015Parts and Labor, including preparation for delivery, standard overhaul of Starter 2920-12-385-6663 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Starter to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2016Open, Inspect Coolant Pump, 2930-12-385-6887 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Coolant Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Coolant pump be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2017Parts and Labor, including preparation for delivery, standard overhaul of Coolant Pump, 2930-12-385-6887 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Coolant Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2018Open, Inspect Sea Water Pump, 4320-12-387-3261 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Sea Water Pump to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Sea Water Pump be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2019Parts and Labor, including preparation for delivery, standard overhaul of Sea Water Pump, 4320-12-387-3261 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Sea Water Pump to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2020Open, Inspect Intercooler Core, 2930-12-387-1031 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the Intercooler Core to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any Intercoller Core be determined to be beyond economical repair.$ - 04$ - 0
CLIN 2021Parts and Labor, including preparation for delivery, standard overhaul of Intercooler Core, 2930-12-387-1031 & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 Note: Contractor shall provide all labor and material required to complete a Standard Overhaul and reassembly of each Intercooler Core to include all Mandatory Parts, Testing, Inspections, Preservation, Packaging, Markings and Bar-Coding. This price shall be a fixed-price that the Government shall be obligated to pay for a Standard Overhaul.$ - 04$ - 0
CLIN 2022Prepare for Shipment and re-crate any F Condition component not being repaired in accordance with specification. P-233-2039$ - 01$ - 0
CLIN 2023For approval, package, pack, mark and prepare for shipment any item not meeting the requirements of section 1.2 in accordance with specification P-233-2039$ - 01$ - 0
CLIN 2024For Approval, Final inspection and test report on each overhauled component in accordance with specification P-233-2039$ NSP1$ NSP
CLIN 2025Coast Guard Quality Assurance Inspection at Contractors facility$ NSP1$ NSP
PARTS
CLIN 2026Arm Rocker, P/N: X52405500145$ - 01$ - 0
CLIN 2027Arm Rocker, P/N: X5240550216$ - 01$ - 0
CLIN 2028Cable Assy, Electrical, P/N: X00013978$ - 04$ - 0
CLIN 2029Carrier Ring, Bushing Sleeve, P/N: X00010426$ - 01$ - 0
CLIN 2030Circuit Card Assembly, P/N: X00E50206571/S0001$ - 02$ - 0
CLIN 2031Cover, Engine Poppet Valve, P/N: X00009406$ - 01$ - 0
CLIN 2032Cylinder Assembly, Actuating, P/N: 0000983019$ - 01$ - 0
CLIN 2033Cylinder Head, Diesel Engine, P/N: X52404100142$ - 010$ - 0
CLIN 2034Driver Mechanical, P/N: X52408100002$ - 01$ - 0
CLIN 2035Gage Rod Liquid Level, P/N: X5960400012$ - 01$ - 0
CLIN 2036Gasket, P/N: 5240161680$ - 01$ - 0
CLIN 2037Gasket, P/N: X59601800008$ - 01$ - 0
CLIN 2038Gasket, P/N: X52404200052$ - 01$ - 0
CLIN 2039Gasket, P/N: 535D01023/1$ - 01$ - 0
CLIN 2040Gasket, P/N: X00009917$ - 01$ - 0
CLIN 2041Gasket, P/N: 007603026106$ - 02$ - 0
CLIN 2042Governor Diesel Engine, P/N: B00E50208145/76$ - 01$ - 0
CLIN 2043Hose Assembly, Nonmetllic, P/N: 735038008107$ - 01$ - 0
CLIN 2044Housing Intake, P/N: X59612300090$ - 01$ - 0
CLIN 2045HP Accumulator RGT, P/N: X59607700001$ - 01$ - 0
CLIN 2046Indicator, Liquid Quantity, P/N: 535D01022/1$ - 01$ - 0
CLIN 2047Manifold Turbocharger, P/N: X00043025$ - 01$ - 0
CLIN 2048Nozzle, Oil Spray, P/N: X5941840007$ - 01$ - 0
CLIN 2049O-Ring, P/N: 700429192000$ - 036$ - 0
CLIN 2050O-Ring, P/N: 700429058001$ - 03$ - 0
CLIN 2051O-Ring, P/N: 700429039000$ - 02$ - 0
CLIN 2052O-Ring, P/N: XP59307300007$ - 01$ - 0
CLIN 2053O-Ring, P/N: 700429095004$ - 01$ - 0
CLIN 2054O-Ring, P/N: 700429065001$ - 01$ - 0
CLIN 2055O-Ring, P/N: 700429041000$ - 01$ - 0
CLIN 2056O-Ring, P/N: 700429050000$ - 01$ - 0
CLIN 2057O-Ring, P/N: 700429048000$ - 01$ - 0
CLIN 2058O-Ring, P/N: 700429042002$ - 01$ - 0
CLIN 2059O-Ring, P/N: 700429028000$ - 01$ - 0
CLIN 2060O-Ring, P/N: 700429017002$ - 01$ - 0
CLIN 2061Packing, Performed, P/N: 5240160319$ - 01$ - 0
CLIN 2062Plate Oil Cooler, Engine, P/N: X594203000055$ - 01$ - 0
CLIN 2063Push Rod, Engine Poppet Valve, P/N: 5240500930$ - 01$ - 0
CLIN 2064Restrictor, P/N: X59420200233$ - 01$ - 0
CLIN 2065Restrictor, P/N: X59420200234$ - 01$ - 0
CLIN 2066Restrictor, P/N: X59420200235$ - 01$ - 0
CLIN 2067Restrictor, P/N: X59420200238$ - 01$ - 0
CLIN 2068Seal, P/N: 219976647$ - 01$ - 0
CLIN 2069Seal, Ring, P/N: 5269970045$ - 01$ - 0
CLIN 2070Strainer Element Sediment, P/N: XP52699100006$ - 01$ - 0
CLIN 2071Switch, Liquid Fluid, P/N: X00031109$ - 01$ - 0
CLIN 2072Switch Liquid Level, P/N: X00E50203662$ - 01$ - 0
CLIN 2073Transmitter, Pressure, P/N: 0045358931$ - 02$ - 0
CLIN 2074Transmitter, Pressure, P/N: 510.00517$ - 01$ - 0
CLIN 2075Transmitter, Pressure, P/N: 0035351731$ - 01$ - 0
CLIN 2076Transmitter, Pressure, P/N: 0035352931$ - 01$ - 0
CLIN 2077Tube Assembly Metal, P/N: X59408600035$ - 01$ - 0
CLIN 2078Tube Assy, Metal, P/N: X00035420$ - 01$ - 0
CLIN 2079Tube Assy, Metal, P/N: X00035421$ - 01$ - 0
CLIN 2080Tube Assy, Metal, P/N: X00035422$ - 01$ - 0
CLIN 2081Tube Assy, Metal Branched, P/N: X00026992$ - 01$ - 0
CLIN 2082Tube Assy, Metal Branched, P/N: X00026993$ - 01$ - 0
CLIN 2083Washer, P/N: 70052106200$ - 01$ - 0
CORE EXCHANGE
ITEMDESCRIPTIONUNIT PRICE w/o CORE EXCHANGEUNIT PRICE with CORE EXCHANGEEST QTYBASE YEAR EXTENDED PRICE
CLIN 2084Conrod, P/N: RX52603800003/42$ - 0$ - 01$ - 0
CLIN 2085Coupling, P/N: X59625100006/32$ - 0$ - 01$ - 0
CLIN 2086Crankcase, P/N: X59601100003$ - 0$ - 01$ - 0
CLIN 2087Crankshaft, P/N: X59603100002$ - 0$ - 01$ - 0
CLIN 2088Flywheel, P/N: X59403200001/32$ - 0$ - 01$ - 0
CLIN 2089HP Fuel Pump, P/N: EX59507300018/87$ - 0$ - 01$ - 0
CLIN 2090Injector Assembly, Fuel, P/N: X59407500022$ - 0$ - 023$ - 0
CLIN 2091Piston, P/N: X00035690$ - 0$ - 01$ - 0
CLIN 2092Vibration Damper, P/N: X52803500001$ - 0$ - 01$ - 0
CLIN 2093PARTS LIST FOR 20V4000M93L Series MDEPERCENTAGE INCREASE (+) or DECREASE (-) OFF LIST PRICE$ - 0
Total Estimated Amount$ - 0

3RD OP

SUPPLIES/SERVICES AND PRICES/COSTS FOR:
3RD OPTION PERIOD
*Note, unless otherwise stated. All prices on below CLINs shall be a firm fixed price for one year and applicable option years.
ITEMDESCRIPTIONUNIT PRICEEST QTY3RD OPTION PERIOD EXTENDED PRICE
COMPONENT OVERHAULS
CLIN 3001-$ NSP0$ NSP
CLIN 3002Open, Inspect "A1" Turbo 2950-12-390-3739 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039. Note: Contractor shall provide labor and material required to disassemble, clean and inspect the A1 Turbo to obtain the overall condition and determine the estimated cost to overhaul (should the scope of the overhaul exceed that of a Standard overhaul. This price shall be the price the Government shall be obligated to pay should any A1 Turbo be determined to be beyond economical repair.$ - 08$ - 0