ATTACHMENT 2_COMBINED SOW and SPECS_Hopewell Recreation Site Improvements_Stamped.pdf
PDF 2 MB Posted
- Solicitation number
- 127EAX26Q0008
About this file
This is a combined Statement of Work and Technical Specifications document for Hopewell Recreation Site Improvements on the Carson National Forest in Rio Arriba County, New Mexico, located approximately 19.8 miles northeast of Tres Piedras. The project encompasses seven major site improvements: a new site entrance roundabout, campground entrance road, trailhead parking lot, modified group area parking lot, new waterline and hydrants, campground host site, and site furnishings. Work includes clearing and grubbing, installation of bulletin boards and signs, construction of aggregate-surfaced roadways and parking areas, barrier rocks, curb stops, culverts, and related infrastructure. The contract timeline specifies a summer 2026 start date with a base bid duration of 365 calendar days; no additional days are authorized for optional items.
The specifications address material requirements, installation procedures, and quality control across multiple construction disciplines. Key components include water distribution systems (HDPE and galvanized steel piping), onsite wastewater treatment with holding tanks, electrical systems with underground conduit and grounding, site furnishings (picnic tables and fire rings), erosion and sediment control measures, earthwork and compaction requirements, crushed aggregate base courses, trails and paths, family unit and tent pads, precast concrete elements, and seeding. All work must comply with Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG), Forest Service Trail Accessibility Guidelines (FSTAG), and the Architectural Barriers Act. The contractor is responsible for construction staking, quality control sampling and testing, survey notes, equipment pressure washing to prevent noxious weed transport, temporary facilities, utility location, and material sourcing with landscape color and shape matching. Specific testing frequencies and compaction densities are mandated for earthwork, concrete, aggregate base, hydrostatic pressure testing of water systems, and bacteriological examination following disinfection. All waterlines must achieve a minimum 1% grade for drainage, and sewerlines must meet a minimum 2% grade; systems failing these requirements shall be removed and replaced at contractor expense.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1
Section C - Description/Specifications/Statement of Work
GENERAL SPECIFICATIONS
HOPEWELL LAKE SITE IMPROVEMENTS
1.1 SCOPE OF CONTRACT
A. This project includes construction the following site improvements at Hopewell Lake:
1. New Site Entrance Roundabout
2. New Campground Entrance Road
3. New Trailhead Parking Lot
4. Modified Parking Lot at Group Area
5. New Waterline and Hydrants for site
6. New Campground Host Site
7. New Site Furnishings
B. The work includes clearing and grubbing of the areas to receive the new roads and parking areas, installation of new bulletin boards, construction of aggregate surfaced roadways and other pads, and installation of signs, barrier rocks, curb stops, culvert and other work as described in the plans and specifications.
C. Quantities associated with these options are identified in the Schedule of Items.
1.2 PROJECT LOCATION
A. The project is located on the Tres Piedras Ranger District of the Carson National Forest, Rio Arriba County, New Mexico. It is located approximately 19.8 miles Northeast of Tres Piedras, New Mexico. The project may be accessed from State Highway 64.
1.3 SITE INFORMATION AND LIMITATIONS
A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:
1. Construction sites will be closed to the public during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access.
2. Contractor will provide all materials and labor necessary to protect streams, wet or dry, during construction activities. The Contractor will be required to submit an erosion control plan and receive approval from the COR, in writing, prior to the beginning of construction.
3. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treds, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
4. Utilities are not available at the site for construction purposes.
5. The Contractor shall provide temporary toilet facilities (porta-potty) at the site
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2
during all construction work.
6. The Contractor shall locate all existing utilities at the site prior to any ground disturbing activities.
7. The Contractor is responsible for sourcing construction materials for aggregate, rock and riprap materials that blend with surrounding landscape (colors, and shape) and meet contract requirements. The contractor shall certify in submittal that this responsibility is being meet. Contracting Officer will consult with Forest Recreation Staff to ensure that materials will blend with surrounding landscape.
1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING
A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and New Mexico Department of Transportation. Obtain necessary permits for roadway activities along New Meixco state highways from the New Mexico Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.
B. Traffic Control Plan shall include temporary signage and other features to re-route pedestrian traffic using the Continental Divide Trail. Refer to drawings for location of the trail and coordinate re-routes with the Contracting Officer prior to submission of the proposed re-routes.
1.5 DESIGN REFERENCES
A. This project was designed in accordance with the following documents (the contractor shall have a minimum one (1) copy of the document onsite to reference as needed):
1. Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).
https://www.fs.usda.gov/recreation/programs/accessibility/FSORAG_2013%20Update .1.pdf
2. Forest Service Trail Accessibility Guidelines (FSTAG).
https://www.fs.usda.gov/recreation/programs/accessibility/FSTAG_2013%20Update.p df
3. Architectural Barriers Act (ABA). https://www.access-board.gov/aba/#aba-502
B. Contractor is required to comply with these documents during construction. Any field adjustment proposed by the Contractor shall be in accordance with these documents and approved by the Contracting Officer.
1.6 WORK CAMPS, STAGING AND STORAGE AREAS
A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work or housing) on site.
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3
1.7 INSPECTION OF WORKSITE
A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.
1.8 START DATE
A. Summer 2026
1.9 CONTRACT TIME
A. Base Bid: 365 Calendar Days
B. Option Bid: No additional days, to be incorporated into Base Bid Calendar Days
1.10 SPECIFICATIONS
A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental, and no additional compensation will be made.
010250 CONSTRUCTION STAKING
011250 MEASUREMENT AND PAYMENT
011900 MOBILIZATION
013300 SUBMITTAL PROCEDURES
014100 QUALITY CONTROL
023701 SEDIMENT AND EROSION CONTROL MEASURES
024100 WASTE MATERIAL DISPOSAL
024102 REMOVAL AND DISPOSAL OF EXISTING STRUCTURES
033000 CAST IN PLACE CONCRETE
033020 CONCRETE FROM PACKAGED DRY MIX FOR MINOR STRUCTURES
101110 BULLETIN BOARD
101400 SIGNS
101415 MINOR SITE ID SIGN
129300 SITE FURNISHINGS
129700 FEE TUBE
133402 221100
UTILITY BOXES
WATER DISTRIBUTION SYSTEMS
221102 CURB VALVES AND BOXES
221103 PLUMBING APPURTENANCES
221105 WATER HYDRANTS
221300 ONSITE WASTEWATER TREATMENT SYSTEMS
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-4
260500 COMMON WORK RESULTS FOR ELECTRICAL
260519 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
262416 OTHER ELECTRICAL TESTS AND CALIBRATIONS
262716 WALK-IN ENCLOSURE
311000 CLEARING AND GRUBBING
312000 EARTHWORK
312100 PROJECT SITE PREPARATION AND GRADING
312225 EXCAVATION AND EMBANKMENT
321204 321206
CRUSHED AGGREGATE BASE OR SURFACE COURSE
LOOSE ROCK RIPRAP
321460 TRAILS AND PATHS
322100 FAMILY UNIT AND TENT PAD
322205 BARRIER ROCK
322622 PRECAST CONCRETE CURB STOPS
323116 GATES FOR ROADS
329220 SEEDING
332228 CULVERT PIPE AND PIPE ARCHES
END OF SECTION C
April 2024
CONSTRUCTION STAKING 010250-1
USDA FOREST SERVICE, R-3
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 010250 - CONSTRUCTION STAKING
PART 1 - GENERAL
1.1 SUMMARY
A. This work shall consist of the construction staking of roads, parking lots, parking spurs, and culverts in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation, and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.
1.2 QUALITY CONTROL
A. Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.
1.3 MEASUREMENT AND PAYMENT
A. Measurement shall be lump sum for staking the project through all phases of construction.
PART 2 - PRODUCTS
2.1 GOVERNMENT-FURNISHED SURVEY CONTROL SHEETS
A. The Government will provide the contractor with a set of survey control sheets showing horizontal and vertical control for site to be staked. The Government will provide the Contractor with layout information that will include:
1. Control Points - Northing, Easting, Existing Elevations.
2. Roads, Parking Areas - Northing, Easting, and Finish Elevations for subgrade centerline and edge of roads, and parking areas.
2.2 STAKES
A. Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable.
Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:
CONSTRUCTION STAKING 010250-2
1. Roads, parking lots, and parking spurs -Orange
2. Culverts -Blue/White Striped
3. Waterlines and Other Utilities -Blue
4. Family Unit Pads and Paths -Red
2.3 SURVEY NOTE PAPER AND BOOKS
A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.
PART 3 - EXECUTION
3.1 GENERAL
A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.
B. Accuracy requirements:
1. Minimum position close; 1/1000
2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)
3. Cross section and slope stake precision:
C. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.
D. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross section points will not exceed: 1.0 ft.
E. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%. Clearing limits: 1.0 ft.
3.2 ESTABLISHING AND REFERENCING IMPROVEMENT LOCATIONS
A. Access Roads, Parking Spurs, and Parking lots:
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established.
Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles, typical road section templates, as shown on the drawings and the information provided with staking points.
CONSTRUCTION STAKING 010250-3
2. Slope stakes shall be set at 50-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points. Slope stakes shall be set at 25-foot intervals around curves having a radius less than 100 feet.
B. Group Units, Family Units and Tent Pads
1. Slope stakes shall be established at the corners of family units. Slope stakes shall be written to reference the sub-grade grade of the unit or pad being staked.
C. Paths and Trails
1. Slope stakes (cut and fill catch points), clearing limits, and slope stake references shall be established on both sides of the centerline at each station established.
Slope stakes and slope stake references shall be located on a line at right angles to tangents and on radial lines or curves. Slope stake catch points shall be located by using the grading plans and/or profiles as shown on the drawings.
2. Slope stakes shall be set at 25-foot intervals, at significant breaks in the ground profile, culvert locations, and widening transition points.
D. Culverts
1. Slope stakes and slope reference stakes shall be set at all culvert locations. A culvert reference stake and hub shall be set on the centerline of the culvert 10 feet from each end or beyond the clearing limit, whichever is greater. The following shall be recorded on these stakes:
a. The actual field measured length
b. The vertical and horizontal distance from hubs to the invert at the ends of the culvert.
E. Waterline, Sewerline, & other Utilities
1. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.
a. Where shown on the drawings, local LIDAR survey was used to design waterline alignment elevations. The contractor shall verify the elevations provided in the drawings, and adjust in the field to alignment, grade and elevation in coordination with the Contracting Officer. Work shall be considered incidental to construction stakeout.
3.3 DISCREPANCIES
A. The contractor shall compare the staked centerline horizontal and vertical alignment with the design data. Differences between previously recorded and observed elevations of benchmarks shall be referred to the Contracting Officer. Differences in centerline profile elevations exceeding 1 foot at any two or more consecutive points shall be
CONSTRUCTION STAKING 010250-4
reported to the contracting Officer for evaluation and possible revision. Staking of these areas shall be deferred until the Contacting Officer resolves these differences.
3.4 VERTICAL CONTROL
A. Vertical control for construction shall be as referenced on the Drawings.
3.5 MARKING STAKES
A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below.
PI Point of Intersection of tangents PC Point of curvature POC Point on curve Pt Point of tangency POT Point on tangent RP Reference point P P-line (preliminary location line) L L-line (final location line) BM Benchmark TBM Temporary benchmark BT Begin taper (any) ET End taper (any) C Cut F Fill L Centerline D Ditch W Width
3.6 SURVEY NOTES
A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the
The party chief shall sign or initial each page of the
B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day
END OF SECTION 010250
April 2021
MEASUREMENT AND PAYMENT 011250-1
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 011250 - MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.
B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.
1.2 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be
MEASUREMENT AND PAYMENT 011250-2
made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
1.3 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Acre: Make longitudinal and transverse measurements for area computations horizontally.
2. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery.
Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
3. Each (EA): One complete unit, which may consist of one or more parts.
4. Linear Foot (LF): Measurement of work along its length from point-to-point;
parallel to the base or foundation. Do not measure overlaps.
5. Lump Sum (LS): One complete unit.
1.4 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist
MEASUREMENT AND PAYMENT 011250-3
of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.
5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 011250
MOBILIZATION 011900-1
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 011900 - MOBILIZATION
PART 1 - GENERAL
1.1 SUMMARY
A. This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project; and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
1.2 MEASUREMENT AND PAYMENT
A. The measurement shall be lump sum for mobilization. Payment shall be as follows:
1. Bond premiums will be reimbursed after receipt of the evidence of payment.
2. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid following completion of 5% of the original contract amount not including mobilization and bond premiums.
3. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not including mobilization and bond premiums.
4. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.
5. Progress payments for mobilization and preparatory work shall be subject to retainage.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
END OF SECTION 011900
SUBMITTAL PROCEDURES 013300-1
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 013300 - SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. See Table 013300-1 for a summary of required submittals.
B. See other specification section within this package for additional requirements on submittal.
1.2 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Contracting Officer (CO) reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 14 days for initial review of each submittal. Allow additional time if processing must be delayed, to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 14 days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space on label or beside title block to record Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
SUBMITTAL PROCEDURES 013300-2
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. If more than one item is shown on submittal sheet, identify item.
D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
1.3 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment shall be included with work shown in the schedule of items.
2.1 ACTION SUBMITTALS (Submittals requiring CO approval)
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
SUBMITTAL PROCEDURES 013300-3
g. Compliance with recognized testing agency standards.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Include the following information, as applicable:
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Roughing-in and setting diagrams.
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.
f. Notation of dimensions established by field measurement.
2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
D. Contractor's Construction Schedule: The contractor shall submit a Construction Schedule, for approval by CO, in accordance with the contract provisions within 5 day of commencement of work.
E. Samples: Prepare physical units of materials or products, including the following:
1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.
2.2 INFORMATIONAL SUBMITTALS (Submittals NOT requiring CO approval)
A. General: Prepare and submit Informational Submittals required by other Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will not return copies.
2. Certificates and Certifications: Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
3. Test and Inspection Reports: Comply with requirements in Section 014100 "Quality Control."
B. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.
C. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.
SUBMITTAL PROCEDURES 013300-4
D. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment.
E. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.
3.1 GENERAL
A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
E. Substitutions Whenever materials, products, and equipment are listed by name or brand in the specifications and/or on the drawings, it is used as a measure of quality, utility, or standard. If the Contractor prefers to use any other brand or manufacturer of same quality, appearance, and utility to that specified, he shall request substitution as provided below, not less than 30 days before the planned installation of the item. The Contracting Officer will approve or disapprove the request for substitution.
F. Requests for substitutions will only be considered if contractor submits the following:
1. Complete technical data including drawings, complete performance specifications, test data, samples and performance tests of the article proposed for substitution. Submit additional information if required by Contracting Officer.
All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally specified item.
2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.
3. A statement by the Contractor that the proposed substitution is in full compliance with the contract documents, applicable codes, and laws.
4. The Contractor shall be responsible for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.
SUBMITTAL PROCEDURES 013300-5
3.2 SUBMITTAL SCHEDULE Submittals shall be made as required by and called for in the drawings and specifications. The following table is a summary of the required submittals for the project - the table is to assist the Contractor and may not be all inclusive additional submittals may be required by specific specifications:
TABLE 013000-1
Spec.
Section
Section Title Subsec-tion Required Submittal
C General Specifications 1.4A Traffic Control Plan 010250 Construction Staking 3.6A Survey Notes 013300 Submittal Procedures 2.1D Construction Schedule 014100 Quality Control 1.3A Contractor quality control plan 014100 Quality Control 1.3B Permits, Licenses, and Certificates 014100 Quality Control 1.3C Test and inspection reports 014100 Quality Control 1.3D As-Built drawings
023701 Sediment & Erosion Control
Measures 1.2A Sediment & Erosion Control Plan
033000 Cast In-Place Concrete 1.3A Product Data 033000 Cast In-Place Concrete 1.3B Design Mixtures 033000 Cast In-Place Concrete 1.3C Shop Drawings 033000 Cast In-Place Concrete 1.3D Field quality-control test reports 101400 Signs 1.2A Sign List Submittal 101415 Minor Site I.D. Sign 1.3A Sample Sign Mock-up 129300 Site Furnishings 1.2A Product Data 133402 Utility Boxes 1.3A Product Data 133402 Utility Boxes 1.3B Shop Drawings 133402 Utility Boxes 1.3C Product Certifications 221100 Water Distribution Systems 1.3A Product Data
221100 Water Distribution Systems 1.3B Plan for Disposal of Water Used for Testing and Disinfection
221100 Water Distribution Systems 1.3C Operation and Maintenance Man-ual 221100 Water Distribution Systems 1.3D Disinfection Report 221103 Plumbing Appurtenances 1.3A Product Data 221103 Plumbing Appurtenances 1.3B Operation and Maintenance Data
221105 Water Hydrants 1.3A Literature &
Maintenance Data 221105 Water Hydrants 1.3B Certifications 221105 Water Hydrants 1.3C Maintenance Information 221105 Water Hydrants 1.3D Stain Color Sample
221300 Onsite Wastewater Treatment Sys-tems 1.3A Product Data
221300 Onsite Wastewater Treatment Sys-tems 1.3B Shop Drawings
SUBMITTAL PROCEDURES 013300-6
221300 Onsite Wastewater Treatment Sys-tems 1.3C Coordination Drawings
Spec.
Section
Section Title Subsec-tion Required Submittal
221300 Onsite Wastewater Treatment Sys-tems 1.3D Certificates
260500 Common Work Results for Electri-cal 1.2A Product Data
260519 Low-Voltage Electrical Power Con-ductors and Cables 1.3A Product Data
260519 Low-Voltage Electrical Power Con-ductors and Cables 1.3B Field Quality Control Reports
262716 Walk-In Enclosure 1.3A Shop Drawings
262716 Walk-In Enclosure 1.3B Installation In-structions
262716 Walk-In Enclosure 1.3C Operation and
Maintenance Instructions
312000
Earthwork
1.3A Approval Source of Aggregates and Backfill Materials and Certi-fied Sieve Results
321204 Crushed Aggregate Base or Surface
Course 1.2A
Aggregate Source, Gradation and Material Properties
321204 Crushed Aggregate Base or Surface
Course 1.2B
Compaction Density Test Results and Proctor
332228 Culvert Pipe and Pipe Arches 1.3A Certification 332228 Culvert Pipe and Pipe Arches 1.4A Culvert Locations and Lengths
END OF SECTION 013300
QUALITY CONTROL SECTION 014100-1
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 014100 QUALITY CONTROL
PART 1 - GENERAL
1.1 This work shall consist of providing quality control in conformance with the inspection, testing, and product certification requirements of this contract to ensure compliance with the drawings and specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of the contract.
1.2 QUALITY CONTROL
A. The Contractor shall provide and maintain a quality control system that will ensure all services, supplies, and construction work required under this contract conforms to the contract requirements. The Contractor shall perform, or cause to be performed, the sampling, inspection, and testing required to substantiate that all services, supplies, and construction conform to the contract requirements.
B. Special Tests and Inspections: Contractor will engage a testing agency to conduct required special tests and inspections. The Contractor shall authorize the testing agency to perform the required testing and inspections on the work completed. The authority shall include:
1. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.
2. Testing agency will re-test and re-inspect corrected work.
C. Retesting/Reinspecting: Contractor shall provide quality-control services for retesting and reinspection for replaced construction work or for work that failed to comply with the requirements under the contract.
1.3 SUBMITTALS
A. Contractor Quality Control Plan
B. Permits, Licenses, and Certificates
C. Test and Inspection Reports
D. As-Built Drawings
1.4 MEASUREMENT AND PAYMENT
A. No separate payment will be made for the work included under this section; rather payment shall be included in the items of work listed in the Schedule of Items.
QUALITY CONTROL SECTION 014100-2
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION
3.1 QUALITY CONTROL SYSTEM
A. General: Perform required testing, inspections, sampling, and similar services per direction specified in the contract drawings and specifications and in accordance with established industry standards.
3.2 CONTRACTOR QUALITY CONTROL PLAN
A. At the time of the preconstruction conference, the Contractor shall submit for approval a written Contractor Quality Control Plan.
1. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days.
2. The Government reserves the right to require changes in the plan during the contract period as necessary.
3. No change in the approved plan may be made without written concurrence by the Contracting Officer.
4. At a minimum, the plan shall include the following:
a. A list of personnel responsible for quality control and assigned duties.
Include each person's qualifications.
b. A copy of a letter of direction to the Contractor's Quality Control Supervisor outlining assigned duties.
c. Names, qualifications, and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
d. Methods of performing, documenting, and enforcing quality control of all work.
e. Methods of monitoring and controlling environmental pollution and contamination as required by all applicable regulations and laws.
3.3 TEST AND INSPECTION REPORTS
A. Submit three copies of complete test results no later than three calendar days after the test was performed.
B. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
C. Testing and Inspection Reports shall include the following:
1. Date of issue.
2. Project title and number.
3. Name, address, and telephone number of testing agency.
4. Dates and locations of samples, tests, or inspections.
5. Names of individuals performing tests and inspections.
QUALITY CONTROL SECTION 014100-3
6. Reference Specification Section(s).
7. Complete test or inspection data.
8. Test and inspection results and an interpretation of test results.
9. Ambient conditions at time sample was taken, tested, or inspected.
10. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.
11. Name and signature of laboratory inspector.
12. Recommendations on retesting and reinspecting.
3.4 PERMITS, LICENSES, AND CERTIFICATES
A.
inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations relevant to the on performance of the work.
3.5 AS-BUILT DRAWINGS
A. The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from the original contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as-built drawings shall be submitted to the Contracting Officer.
3.6 SAMPLING, TESTING, AND CERTIFICATION REQUIREMENTS
A. Sampling, testing, and Certification requirements and frequency for specific items shall be as specified in the drawings and specification. The following table is a summary of the required sampling, testing, and certification for the project - the table is to assist the Contractor, but may not be all inclusive additional submittals may be required by specific specification section:
B.
TABLE 014100-1
Item
Subsection
Certification or Test Required
Frequency
033000 2.12 Mixing and Delivery Each Truck 033000 3.12 B Concrete Slump, Air, Tempera-ture 1 composite every two (2) truck loads delivered 033000 3.12 B Concrete - Compression Test Spec-imens at 7 days and 28 days (see spec)
221100 3.2O HDPE Pipe - Bent Strap Test Once Daily 221100 3.5A Hydrostatic Testing of Water Sys-tem See Spec.
221100 3.5B Pressure and Leakage Test Water Line
See Spec.
QUALITY CONTROL SECTION 014100-4
TABLE 014100-1
Item
Subsection
Certification or Test Required
Frequency 221100 3.6A Bacteriological Examination After disinfection, before use 221300 3.6 A Hydrostatic Testing See Spec 221300 3.6 A Flushing Pipelines See Spec 312000 3.14C &
3.19C Compaction Test at Pipe Zone One per 600 Feet of
Trench 312000 3.14D &
3.19C Compaction Test above Pipe
Zone One per 600 Feet of
Trench 312000 3.14I Tracer Wire Conductivity Test Until Passing 312000 3.19C Moisture-Density Relationship One test every soil type encountered 312225 3.12B Compaction Road Embankment
(Method 4) One test every 300
sq. yd. of embank-ment per lift 321204 3.4 A Compaction Tests Road Base and
Surface Course One test for every
300 sq. yd. of aggregate
321204 3.4A Compaction Tests Aggregate Base for Concrete Slabs
One test for each family unit or con-crete slab 332228 3.7C Compaction Tests One test for every
12 inches of lift placed
END OF SECTION 014100
SEDIMENT AND EROSION CONTROL MEASURES 023701-5
HOPEWELL LAKE SITE IMPROVEMENTS
SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES
PART 1 - GENERAL
1.1 The work under this section consists of furnishing all necessary labor, equipment, materials, and performing all operations in connection with construction sediment and control measures.
A. General
1. All erosion and sediment control measures are to be placed prior to any disturbance caused by grading and or excavation and shall conform to the requirements of the appropriate regulatory agency for the State.
2. The Contractor shall be solely responsible for ensuring that erosion and sediment control measures are implemented and maintained at the site.
3. Soil disturbing activities include but are not limited to: Clearing and grubbing, excavation for utilities and foundations, roadway and parking lot construction, construction or modification of site drainage, grading, and preparation for final seeding.
1.2 SUBMITTALS
A. The Contractor shall be required to submit a stormwater pollution prevention plan (SWPPP) in accordance with this specification and state/local requirements. Submit plan to the Contracting Officer no less than two (2) prior to the planned start of work for approval (note: work cannot commence until permits have been obtained and SWPPP has been approved). The plan shall demonstrate an understanding of all laws, regulations, permits and orders that govern stormwater, including but not limited to the following:
1. New Mexico Environmental Department (NMED)
2. Applicable National Pollutant Discharge Elimination System (NPDES) permits.
1.3 PERMITS
A. The Contractor shall apply for and pay for a National Pollutant Discharge Elimination System (NPDES) permit.
1.4 MEASUREMENT AND PAYMENT
A. No separate measurement and/or payment will be made for this section. Payment for work in associated with this section shall be included under Project Site Prep and Grading under the schedule of items.
2.1 SYNTHETIC FILTER FABRIC FOR SILT FENCES.
SEDIMENT AND EROSION CONTROL MEASURES 023701-6
A. Pervious sheet of polypropylene, nylon, or polyethylene fabric conforming to the following physical and hydraulic characteristics:
Physical Properties (Min.)
Requirement Test Method
Grab Tensile, lbs. W120/F100 ASTM-D-4632 Grab Elongation, % 15 ASTM-D-4632 Mullen Burst, psi 275 ASTM-D-3786 Puncture, lbs. 65 ASTM-D-4833 Trapezoidal Tear, lbs. 50 ASTM-D-4533 UV Resistance, % 80 ASTM-D-4355 AOS, US Sieve # 30/40 ASTM-D-4751 Permittivity gal/min-sq. ft. 90 ASTM-D-4491
B. Filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F.
C. Support Posts: 4 foot - 2 x 2 wood.
2.2 STRAW BALES
A. Oat or wheat straw, free from weeds, viable weed seeds, foreign matter detrimental to plant life, and dry.
1. Grass hay bales are not acceptable.
2. In order to prevent deterioration of the bindings, all bales shall be either wire-bound or string-tied so that bindings are oriented around the sides rather than along the tops and bottoms of the bales.
2.3 STRAW WATTLES OR ROLLS
A. Furnish straw wattles or rolls that are manufactured from weed free straw and wrapped in a tubular photodegradable plastic netting made from 85% high density polyethylene, 14% ethyl vinyl acetate and 1% color for UV inhibition. Conform to the following:
1. Diameter 9 inches min.
2. Netting strand thickness 0.030 inches
3. Netting knot thickness 0.055 inches
4. Mass of netting 0.315 to 0.385 ounces per foot
PART 3 - EXECUTION
3.1 CONSTRUCTION
A. Install straw bales at local drainage ways to prevent silt intrusion upon adjacent drainage courses. Remove straw bales following establishment of vegetation cover and utilize as mulch at swales or on steep slopes.
B. Prior to construction, install silt fence along the downhill construction limits to prevent
SEDIMENT AND EROSION CONTROL MEASURES 023701-7
silt intrusion upon adjacent land.
C. Install sediment and erosion control measures on the down slope toe of all topsoil stockpiles.
D. Maintain and remove all erosion controls as specified.
E. Temporary seeding shall be placed on exposed surfaces that will not be brought to final grading or permanent cover treatment within 30 days of the exposure to reduce erosion and sedimentation by stabilizing exposed soils. Seeded areas shall be checked regularly for bare spots, washouts, and healthy growth to assure that a good stand of grass is being maintained. Reseed areas that fail to establish vegetation cover as soon as such areas are identified.
3.2 DUST CONTROL
A. In areas subject to surface and air movement of dust, where on-site or off-site damage is likely to occur, one or more of the following preventive measures shall be taken for dust control:
1. Minimize the period of soil exposure by utilizing temporary ground cover and other temporary stabilization practices.
2. Sprinkle the site with water until surface is wet. Repeat as needed.
3.3 SILT FENCE
A. Silt fences are appropriate for the following general locations:
1. Immediately upstream of the point(s) of runoff discharge from a site before flow becomes concentrated. Below disturbed areas where runoff may occur in the form of overland flow.
2. Along the down slope toe of all topsoil stockpiles.
B. Materials.
1. Utilize standard strength synthetic filter fabric for sediment barriers. The filter fabric shall be purchased in a continuous roll cut to the length of the barrier to avoid the use of joints. When joints are necessary, filter cloth shall be spliced together only at a support post, with a minimum 6-inch overlap, and securely sealed.
2. The standard strength filter fabric shall be stapled or wired to the fence and 6 inches of the fabric shall be extended into the ground. Filter fabric shall not be stapled to existing trees.
3. Support posts shall be spaced at a maximum 6 feet and driven securely into the ground a minimum of 24 inches.
4. Filter fabric shall be buried a minimum of 12 inches.
5. The height of a silt fence shall not exceed 36 inches. Higher fences may impound volumes of water sufficient to cause failure of the structure.
C. Maintenance.
1. Silt fences and filter barriers shall be inspected immediately after each rainfall and at least daily during prolonged rainfall.
SEDIMENT AND EROSION CONTROL MEASURES 023701-8
2. Silt fences shall be inspected for depth of sediment, tears, and to see if the fabric is securely attached to the fence posts, and to see that the fence posts are firmly in the ground. Any deficiencies shall be repaired immediately.
3. Should the fabric on a silt fence of filter barrier decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly.
4. Sediment deposits should be removed after each storm event and/or when deposits reach approximately 1/3 the height of the barrier or when the sediments limit or prevent the flow of water through the fabric hydraulic.
5. Any sediment deposits remaining in place after the silt fence or filter barrier is no longer required shall be dressed to conform with the existing grade, prepared, and seeded.
3.4 STRAW BALE EROSION CONTROL FENCE
A. Straw bale erosion control fences are appropriate for the following general locations:
1. Sheet flow applications: Straw bales shall be placed in a single row, lengthwise on the contour with ends of adjacent bales tightly abutting one another.
2. Channel flow applications: Straw bales shall be placed in a single row, lengthwise and oriented perpendicular to the direction of flow with ends of adjacent bales tightly abutting one another.