This is a Schedule of Items for a Request for Quote (RFQ) issued by the USDA Forest Service for site improvements at Hopewell Lake on the Carson National Forest.
The primary scope of work (RFQ# 127EAX26Q0008) encompasses comprehensive site improvements including construction staking, mobilization, and removal of existing structures. Water infrastructure items include 2" and 3" HDPE waterlines totaling 4,250 linear feet, eight 2" daylight drain outlets, twelve 2-inch and three 3-inch valve boxes, four combination air release valves, three water hydrants (two Type B, one Type C), and chlorinator building plumbing. Sewerage components include 55 linear feet of 4" PVC gravity sewer line, one 4,000-gallon concrete septic tank with air vent, and one trailer sewer service hookup. Site development items encompass signage (two single-panel and one double-panel bulletin boards, 23 regulatory/directional signs, and two minor ID signs), recreational amenities (three fire rings, three picnic tables, and two fee tubes), clearing and grubbing, site preparation and grading, aggregate base and surface courses, riprap installation, seeding on 1.4 acres, parking pads (three family unit pads, six tent pads), 72 barrier rocks, precast concrete curb stops (19 six-foot and four eight-foot), three double road closure gates (14-foot and one 15-foot), and one 24-inch galvanized corrugated metal culvert pipe at 395 linear feet. An optional waterline extension (RFQ# 127EAX26Q0006) includes construction staking, mobilization, 950 linear feet of 2" HDPE waterline, one 2" daylight drain, one valve box, one Type B water hydrant, and clearing and grubbing. All items utilize lump sum and unit pricing structures with quantities specified for individual elements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service
ITEM
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY PRICE TOTAL
010250 Construction Staking LSQ LS Lump Sum
011900 Mobilization LSQ LS Lump Sum
024102 Removal and Disposal of Existing Structures & Site Features LSQ LS Lump Sum
101110-1 Single Panel Bulletin Board, including Concrete Footers AQ EA 2
101110-2 Double Panel Bulletin Board, including Concrete Footers AQ EA 1
101400 Signs - Regulatory & Directional w/ Wood Posts AQ EA 23
101415 Signs - Minor Site I.D. Sign (HDPE) AQ EA 2
129300-1 Fire Rings AQ EA 3
129300-2 Picnic Tables AQ EA 3
129700 Fee Tube AQ EA 2
221100-1 Waterline 2" HDPE, Including Trench, Pipe Zone & Bedding Material, Tracer Wire, Backfill and Compaction AQ LF 2,705
221100-2 Waterline 3" HDPE, Including Trench, Pipe Zone & Bedding Material, Tracer Wire, Backfill and Compaction AQ LF 1,545
221100-3
2" Daylight Drain Outlet, Including GSP, Strainer, Screen, Riprap, Trench, Pipe Zone & Bedding Material, Backfill and Compaction AQ EA 8
221102-1 Valve and Box - 2-inch AQ EA 12
221100-2 Valve and Box - 3-inch AQ EA 3
221103-1 Combination Air Release Valve and Valve Box AQ EA 4
221103-2 Chlorinator Building Plumbing LSQ LS Lump Sum
221105-1 Water Hydrant, Type B AQ EA 2
221105-2 Water Hydrant, Type C AQ EA 1
221300-1 Sewerline - Gravity, 4" PVC, Schedule 40, Including Trench, Tracer Wire, Backfill and Compaction AQ LF 55
221300-2 Septic Tank - 4,000 gallon (Concrete) with Air Vent AQ EA 1
221300-3 Trailer Sewer Service Hookup AQ EA 1
260500 Common Results for Electrical System LSQ LS Lump Sum
311000 Clearing and Grubbing LSQ LS Lump Sum
312100 Site Preparation and Grading LSQ LS Lump Sum
321204-1 Crushed Aggregate Base Course, Grading G, 6-inch depth, for roadways and parking areas DQ CY 1,465
321204-2
Crushed Aggregate Surface Course, 1/2-inch minus, 4-inch depth, for gathering areas (restroom and bulletin board / fee tube area) DQ SF 1,735
321206-1 Riprap, Class 1 (Slope Stabilization - Group Site) DQ CY 100
321206-2 Riprap, Class 2 (Outlet Dissipater at Culvert - 5'x5'x2') DQ CY 10
Schedule Of Items Hopewell Lake Site Improvements
RFQ# 127EAX26Q0008
Carson National Forest, USDA Forest Service
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY PRICE TOTAL
Schedule Of Items Hopewell Lake Site Improvements
RFQ# 127EAX26Q0008
Carson National Forest, USDA Forest Service
321460 Path 5-foot wide, Aggregate Surface Course, 1/2-inch minus gradation AQ LF 800
322100-1 Familt Unit Pad AQ EA 3
322100-2 Tent Pad AQ EA 6
322205 Barrier Rocks AQ EA 72
322622-1 Precast Concrete Curb Stop - 6 foot long AQ EA 19
322622-2 Precast Concrete Curb Stop - 8 foot long AQ EA 4
323116-1 Road Closure Gate, Double - (2) -14-foot AQ EA 3
323116-2 Road Closure Gate, Double - (2) -15-foot AQ EA 1
329206 Seeding DQ Acre 1.4
347113 Culvert - 24-inch Galvanized Corrugated Metal Pipe (16-gage), 2-2/3" x 1/2" corrugations AQ LF 395
Total
NUMBER DESCRIPTION
METHOD
OF MEAS UNIT QUANTITY PRICE TOTAL
010250 Construction Staking LSQ LS Lump Sum
011900 Mobilization LSQ LS Lump Sum
221100-1 Waterline 2" HDPE, Including Trench, Pipe Zone & Bedding Material, Tracer Wire, Backfill and Compaction AQ LF 950
221100-2
2" Daylight Drain, Including GSP, Strainer, Screen, Riprap, Trench, Pipe Zone & Bedding Material, Backfill and Compaction AQ EA 1
221102-1 Valve and Box - 2-inch AQ EA 1
221105 Water Hydrant, Type B AQ EA 1
311000 Clearing and Grubbing LSQ LS Lump Sum
Total
Schedule of Items: Option A Hopewell Lake Site Improvements Waterline to Group Site
RFQ# 127EAX26Q0006
Carson National Forest, USDA Forest Service
| SOI |
| SOI OPTION A |
File details come from the government source that posted it. Updated .