This document is a technical specification and visual guide for renovation and replacement work on an industrial tank system and associated piping infrastructure. The project encompasses comprehensive demolition and installation tasks across multiple system components.
The scope of work includes: demolition and replacement of the complete drain pipe system using stainless steel (1.4401) with all associated valves, leverage mechanisms, and hand wheels; replacement of extraction lines (stainless steel 1.4001/1.4401) up to valve connections, including core drilling and sealing; installation of new overflow pipelines connected to the drain system (stainless steel 1.4401); installation of a new hydrostatic level/pressure measurement system per specifications in the Statement of Work; installation of a new flammable sampling valve; and replacement of the drain pipe with core drilling and sealing. Additional work includes demolition and closure of multiple wall penetrations, replacement of lighting with new LED fixtures, demolition and relocation of the ladder directly under the access point, demolition of old level indicators and filling lines with installation of new level indicators near the ladder, and fabrication of a stainless steel gutter to cover the drain (approximately 1.57m x 0.8m). The photographic documentation on pages 1-6 shows the existing equipment layout and identifies specific components requiring replacement, with annotated arrows and labels indicating work locations throughout the tank chamber and supporting pump systems.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Water Analysis.pdf | ||
| Attachment 5 - Site Visit 03 June 2025 Questions and Answers.xlsx | XLSX spreadsheet | |
| Attachment 3 - Chlorination System.pdf | ||
| SOW_ 26 May 2026.pdf | ||
| Attachment 1 - Overview and As-Builts.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
demolish old level indicator and install new level indicator near ladder
Replace old extraction line with shorter stainless steel (1.4401) line
(ca. 1m)
Replace lighting with new LED lights
Replace wall penetration with new sealing (incl.
core drilling) Replace old drain pipe with stainless steel pipe, incl. wall penetration, new sealing, and core drilling
Close wall penetration
Demolish pipelines and close wall penetration
Demolish pipeline and close wall penetration
Demolish old ladder, install new ladder directly under access point
Demolish pipeline and close wall penetration
Demoslish old overflow, close wall penetration
Demolish sheet metal
Demolish plastic cover and seal drillings
Install new overflow with new sealing (incl. core drilling) ca 80cm
Replace complete drain pipe system (stainless steel 1.4401) incl. all valves (incl. leverage + hand weel) and necessary peripherie
Demolish pipelines and close wall penetration
Install new overflow pipeline and connect to drain system (stainless steel 1.4401)
Install new overflow pipeline and connect to drain system (stainless steel 1.4401)
Replace extraction line (stainless steel 1.4001) up to valve, incl. core drilling, sealing and all asscoiated work
Replace extraction line (stainless steel 1.4401) up to valve, incl. core drilling, sealing and all asscoiated work
Demolish pipelines and close wall penetration
Replace complete drain pipe system (stainless steel 1.4401) incl. all valves (incl. leverage + hand weel) and necessary peripherie
Install new overflow pipeline and connect to drain system (stainless steel 1.4401)
Install new overflow pipeline and connect to drain system (stainless steel 1.4401)
Replace extraction line (stainless steel 1.4401) up to valve, incl. core drilling, sealing and all asscoiated work
Replace extraction line (stainless steel 1.4001) up to valve, incl. core drilling, sealing and all asscoiated work
Replace drain pipe (stainless steel 1.4401) incl. core drilling, sealing
Installation of new hydrostatic level/ pressure measurement system (specs see
SOW)
Installation of new flammable sampling valve
Replace valve incl.
steel leverage and hand weel
Demolish old level indicator filling line
R ep la ce pi pe lin e
(m at er ia ls ta in le ss st ee l1 .4 1)
Fa br ic at e St ee l gu tte rt o co ve rd ra in ca .1 .5 7m x 0.
8m
D em ol is h ol d le ve l in di ca to r
D em ol is h ol d le ve l in di ca to rf illi ng lin e