Attachment 2 - CDRL FLASH (28 May 2021)v2.docx
DOCX document 85 KB Posted
- Solicitation number
- W91CRB-21-R-0018
About this file
This document contains a Contract Data Requirements List (CDRL) for a flexible litigation augmentation support contract opportunity with the U.S. Army. The CDRL outlines thirteen required contract deliverables including a Quality Control Plan, Transition Plan, Small Business Participation Report, various training materials and manuals, monthly status and financial reports, and more. Deliverables are to be submitted on recurring schedules or as needed, with government review periods ranging from one to fifteen days. This CDRL also specifies document formatting requirements and that instructions may be modified by the Contracting Officer or Contracting Officer's Representative.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A001 |
| Quality Control Plan (QCP) |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-QCIC-81794 |
| PWS Para. 1.6.1 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
Reg
Repro
16. REMARKS:
The contractor shall deliver a QCP IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The QCP shall be in contractor format after Government approval.
Blocks 10,11,12,13: The initial QCP shall be submitted within 30 calendar days after the contract award. Copies of changes made to the QCP shall be submitted within 5 working days of when the changes are made. The Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
CONTRACTING OFFICER’S REPRESENTATIVE
CONTRACTING OFFICER
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor eDiscovery Division U.S. Army Legal Services Agency
DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| Transition Plan |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 1.6.19 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| SEE BLK 16 |
| SEE BLK 16 |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver a Transition Plan IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The Transition Plan shall be in contractor format after Government approval.
Blocks 10,11,12,13: The Transition Plan shall be submitted within 20 calendar days after the contract award, and the transition-in period shall not exceed 60 days. Copies of changes made to the Transition Plan shall be submitted within 5 working days of when the changes are made. The Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| Small Business Participation Report |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 1.6.20 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| ANNUALLY |
| 1 YR AFT K AWARD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver a Small Business Participation Report IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. Contractor shall use current version of Microsoft Word®. The Report shall be in contractor format after Government approval.
Format. Small Business Participation Plan Report shall be in contractor format or as specified in the contract, and include: (1) Name of the small business subcontractor(s), whether the subcontractor(s) is: (a) Small Business; (b) Veteran-Owned Small Business; (c) Service Disabled Veteran-Owned Small Business; (d) HUBZONE Small Business; (e) Small Disadvantaged Business; (f) Women-Owned Small Business.
Content. The contractor shall report actual achievements relative to proposed small business utilization in performance of the contract (including subcontracting dollars/percentages), and the results of efforts to:
The report shall be sent electronically annually one (1) year after the period of performance start date. It will be sent to the Contracting Officer, Contracting Officer Representative (COR), and the Contract Specialist. The Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
CONTRACTING OFFICER/SPECIALIST
| 15. TOTAL |
| 1 |
| 3 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| Project Kick-off / Planning Session and Meeting Minutes |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81505 |
| PWS Para. 5.2.1 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| SEE BLK 16 |
| 5 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall provide and support a kick-off meeting / planning session IAW the contract, PWS, this CDRL and DID instructions. The contractor shall conduct the kick-off meeting / planning session in-person, or via Microsoft Teams®, Zoom®, or other video conferencing platforms after Government approval.
The contractor shall deliver meeting minutes for the kick-off meeting / planning session IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. Contractor shall use current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The Meeting Minutes shall be in contractor format after Government approval.
Blocks 10,11,12,13: The project kick-off meeting / planning session shall be hosted within 5 calendar days after the contract award. The meeting minutes shall be submitted within 5 calendar days after the meeting. The Government requires 5 calendar days for review and comment of the meeting minutes. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| Prioritization Plan |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.2.2 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| MONTHLY |
| 20 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver a Prioritization Plan IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The Prioritization Plan shall be in contractor format after Government approval.
Blocks 10,11,12,13: The Prioritization Plan shall be submitted within 20 calendar days after the contract award, and shall be updated monthly thereafter. The Government requires 5 calendar days for review and comment of the initial Prioritization Plan. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| System Security Plan (SSP) |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.4.1 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| ASREQ, BUT AT LEAST EVRY 3 YEARS |
| 30 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver a System Security Plan (SSP) IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The SSP shall be in contractor format after Government approval.
Blocks 10,11,12,13: The SSP shall be submitted within 30 calendar days after the contract award, and shall be updated whenever there is significant change in processing, but at least every 3 years, thereafter. The Government requires 10 calendar days for review and comment of the initial SSP. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| Legal Review Tool User Guide |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.4.9.1 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| AS RQD |
| 10 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| AS RQD |
16. REMARKS:
The contractor shall deliver Legal Review Tool User Guide IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of current version of Microsoft Word®, Microsoft Excel®, Microsoft Project®, and/or Adobe Acrobat PDF®. The Legal Review Tool User Guide shall be in contractor format.
Blocks 10,11,12,13: The Legal Review Tool User Guide shall be submitted within 10 calendar days after the contract award. Supplemental User Guide(s) shall be submitted, as required.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| Training Materials / Sessions |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-SESS-8153B |
| PWS Para. 5.4.14 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| AS RQD |
| AS RQD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| AS RQD |
16. REMARKS:
The contractor shall deliver Training Material(s) and Training Session(s) IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of current version of Microsoft Word®, Microsoft Excel®, Microsoft Project®, and/or Adobe Acrobat PDF® for the Training Material(s). The Training Material(s) shall be in contractor format after Government approval. Contractor shall also conduct training session(s) in-person, or via Microsoft Teams®, Zoom®, or other video conferencing platforms after Government approval.
Blocks 10,11,12,13: Training Material(s) and Training Session(s) shall be submitted, as required. Supplemental Training Material(s) and Training Session(s) shall be submitted, as required.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A009 |
| Managed Review Manual |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.4.18.2 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| AS RQD |
| AS RQD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| AS RQD |
16. REMARKS:
The contractor shall deliver a managed Review Manual IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. Contractor shall use the current version of Microsoft Word®, and/or Adobe Acrobat PDF®. The Managed Review Manual shall be in contractor format after Government approval.
Blocks 10,11,12,13: A Managed Review Manual shall be submitted as required but within 2 calendar days after issuance of a task order requiring managed review services. The Government requires 1 working day for review and comment. A final copy shall be submitted NLT 1 calendar day after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A010 |
| Change Management and Communication Plan |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.6 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| SEE BLK 16 |
| LST DAY OF PERF PD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver a Change Management and Communication Plan IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The Change Management and Communication Plan shall be in contractor format after Government approval.
Blocks 10,11,12,13: The Change Management and Communication Plan shall be submitted on the last day of each period of performance. The Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A011 |
| Written Reports |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MISC-80508B |
| PWS Para. 5.7 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| AS RQD |
| AS RQD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| AS RQD |
16. REMARKS:
The contractor shall deliver Written Reports IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®, and/or Adobe Acrobat PDF®. The Written Reports shall be in contractor format after Government approval.
Blocks 10,11,12,13: Written Reports shall be submitted, as required.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A012 |
| Contractor’s Status and Management Report |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-80227 |
| PWS Para. 5.8 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| MONTHLY |
| 30 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver the Contractor’s Status and Management Report IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Word®, Microsoft Excel®, and/or Microsoft Project®. The Contractor’s Status and Management Report shall be in contractor format after Government approval.
Blocks 10,11,12,13: The Contractor’s Status and Management Report shall be submitted 30 days after the contract award date, and monthly thereafter. The Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor
CONTRACT DATA REQUIREMENTS LIST
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information it does not display a currently valid OMB control number. Please DO NOT RETURN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| N/A |
| N/A |
| TDP TM OTHER MNGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FLASH
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A013 |
| Contract Financial Status Report (CFSR) |
| NA |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81468 |
| PWS Para. 5.9 |
| USALSA |
INSERT IN SECTION B
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
| LT |
| N/A |
| MONTHLY |
| 45 DAYS AFTR K AWD |
b. COPIES
| 8. AP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
D
| SEE BLK 16 |
| SEE BLK 16 |
16. REMARKS:
The contractor shall deliver the Contract Financial Status Report (CFSR) IAW the contract, PWS, this CDRL and DID instructions. DID instructions may be waived and/or modified by the COR or Contracting Officer. The PWS instructions take precedence. The contractor shall use the current version of Microsoft Excel®. The CFSR may be in contractor format after Government approval.
Blocks 10,11,12,13: The CFSR shall be submitted 45 days after the contract award date, and monthly by the 15th of each month thereafter. As required, the Government requires 10 calendar days for review and comment. A final copy shall be submitted NLT 5 calendar days after receipt of Government comments. If the Contractor receives no response to the CDRL submission from the Government within the review time period specified above, the CDRL shall be considered accepted and approved by the Government.
| 15. TOTAL |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
J. DATE
Gazala A. Shaikh Attorney Advisor image1.wmf
File details come from the government source that posted it. Updated .