This Statement of Work (SOW) details an HVAC automatic control system upgrade for the USDA-ARS Aquatic Animal Health Research Unit in Auburn, AL. The project involves replacing outdated controllers, sensors, and control modules for a 50-ton Carrier condensing unit and York air handling unit in Building 50, which serves multiple office and laboratory spaces across 5 thermostat-controlled zones. Key requirements include furnishing shop drawings, upgrading four universal programmable controllers, replacing 11 sensors, installing new wall thermostats, and implementing a web-based interface with network security capabilities. The SOW specifies brand-name Desigo and other components for the upgrade, with a comprehensive list of required parts including room units, automation stations, temperature sensors, and a network license. The period of performance is 60 days from contract award, and contractors are encouraged to conduct a site visit before submitting a bid.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1_Provisions and Clauses_Amendment 0001.pdf | ||
| Questions and Answers_Amendment 0001.pdf | ||
| Attachment 1_Provisions and Clauses.pdf | ||
| Attachment 4_52.225-2 Buy American Certificate.docx | DOCX document | |
| Attachment 3_Service Contract Act WD 2015-4589.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Upgrade Building 50 Air Handling Unit Automatic Controls USDA-ARS, Aquatic Animal Health Research Unit, 990 Wire Road, Auburn, AL 36862
1. REQUIREMENTS and SCOPE The current controllers and global control module on the HVAC air handling unit located in building 50 were installed in 2001. An upgrade is needed because this system is faulty, inefficient, and outdated. The HVAC system is comprised of a 50-ton Carrier condensing unit and a York air handling unit. Building 50 consists of multiple office and laboratory spaces on a single ground level floor, which air is provided to through 5 thermostat-controlled zones.
The required components and installation to upgrade the automatic controls include the following:
• Furnish shop drawings, wiring diagrams, and submittal
• Upgrade four universal programmable controllers, one global control module, and install new wire to inputs and outputs
• Replace all air handling unit sensors and wiring to control panel. New sensors will be compatible with new controllers and module. Return Air Sensor, Cooling Coil Temp, Heating Coil Temp, Supply Air Sensors for Zones 1-5, Hot Water Supply Temp, Hot Water Return Temp, and Outside Air Sensor. 11 sensors total
• Replace Hot Water Actuator and mount it in correct position
• Upgrade all 5 Zone Sensors with new wall thermostats
• Check for proper function of all control valves, valve actuators, dampers and damper actuators
• The new system will have the ability to be adjusted, controlled, and monitored through a network connected web interface that does not require a separate control computer. The web interface system must not be obsolete but must be fully supported by its manufacturer and capable of SSL certificate level network protocol security options.
• Proposals should include all the hardware, sensors, actuators, labor, programming of new systems to operate properly, configure user profiles, and train employees on using the new system
• Guarantee supplied equipment and its operation for at least 1 year after installation is complete
The Brand Name components to upgrade the automatic controls that meet the requirements include the following:
Qty Part Number Description 5 QAA2230.FWSN Room Unit, Temperature, Full HMI, 10k Ohm Type 2 Thermistor 1 PXC4.E16S-2 Automation Station, 16 Input/Outputs, BACnet/IP 1 PXC5.E24 Automation Station, 24 Input/Outputs, Modbus, BACnet/IP 1 134-1504 Thermostat, Electric Low Temp Detection, Cut-out and Alarm, Manual Reset 2 QAE2030.005 Immersion Temperature Sensor, 4 Inch Probe 1 QFA3171 OSA Humidity & Temperature Sensor,4-20mA, 2% Accuracy 1 TR100VA001 Transformer 100VA, 120 to 24 Vac 2 RIBXGTA Current Sensor 2 RIBU1C Relay 1 AFS-460 Differential Pressure Switch 3 QAM2030.045 Duct Point Temperature Sensor, 10K Ohm NTC Type 2, 18-Inch 2 QAM2130.040 Duct Point Temperature Sensor, 10k Ohm Type 2 Thermistor, 16 Inch Flexible Probe 1 FIN-0050- EMB Desigo Optic 500 point/100 histories license for embedded device
2. SITE VISIT
Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The purpose of a site visit is to observe first-hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions.
3. PERIOD OF PERFORMANCE
The period of performance is 60 days from the date of contract award.