Attachment 2 - Bldg 296 - 1st Floor Plan.pdf

PDF 160 KB Posted

Attached to
White Noise Security Device
Solicitation number
FA481426Q0041
Issued by

About this file

This is a floor plan for Building 296, 1st Floor at what appears to be a military installation (927 ARW - 927th Air Refueling Wing). The document details the spatial layout and room designations for administrative, training, and operational spaces within the facility. The plan indicates 147 rooms and spaces distributed across the floor, including administrative offices, classrooms, conference rooms, training facilities, storage areas, mechanical rooms, and support services.

Key features identified on the floor plan include FSS Operations (Room 111), 927 ARW/JA Paralegal Staff (Room 130), 927 ARW/CCO spaces (Rooms 127-128), testing center (Room 122), multiple classrooms (Rooms 120, 125, 135-136), training facilities (Room 120), counseling areas (Rooms 103-104, 129), and customer service (Room 106). The plan also specifies security and technology infrastructure requirements: double doors at both east and west fire entrances will be connected to a PACS (Physical Access Control System), an IP panoramic hallway camera will be positioned in the central corridor, and a sensitive information room with white noise machine and lighting accommodates confidential discussions. An elevator serves the building, with stairs providing alternative vertical circulation. The document was last printed on February 7, 2019.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FSS Operations

Classroom

Classroom

Classroom

Training

Men

Chaplain

Testing Center conference room

927 ARW/JA Paralegal Staff

118A Stairs

Customer Service

Women

111A office

111B office

Mail Room

Conference

Break Room 124

Mech Room

ID Card

Storage

927 ARW/JA

927 ARW/JA

Storage

Storage

Commander

927 ARW/JA

Comm Room

Superintendant

Counseling

Counseling

927 ARW/CCO

927 ARW/CCO

Counseling Room

Electrical Room

Mech Room

Janitor

Storage

0 8 164

Feet BUILDING 296 1st FLOOR PLAN

Last Printed: 2/7/2019

INSIDE DOUBLE DOORS AT BOTH ENTRANCES (EAST & WEST FIRE DOORS) WILL BE CONNECTED TO PACS SYSTEM

IT

1ST FLOOR IP PANORAMIC HALLWAY CAMERA WILL BE HERE

1ST FLOOR SENSATIVE

INFO ROOM WITH

WHITE NOISE MACHINE &

LIGHT

ELEVATOR

1182607807C Oval

1182607807C Oval

1182607807C Oval

1182607807C Oval

1182607807C Oval

1182607807C Oval

File details come from the government source that posted it. Updated .