Attachment 2 - Bill of Quantities.pdf
PDF 913 KB Posted
- Attached to
- MSB Chiller Replacement, Rome, Italy Federal contract opportunity
- Solicitation number
- 191T7025Q0012
- Issued by
- Department of State
About this file
The document is a Bill of Quantities (BoQ) for a chiller replacement project at the Mel Sembler Building within the U.S. Embassy compound in Rome, Italy. The BoQ details 15 line items for comprehensive HVAC system replacement, including site preparation, removal of existing equipment, and installation of new components. Key technical specifications include a new air-cooled reversible heat pump with 68 kW heating/cooling capacity, using R454B refrigerant, along with associated piping, valves, insulation, expansion tanks, control panels, and electrical infrastructure upgrades.
The scope of work encompasses complete system replacement with detailed requirements for equipment installation, electrical work, system configuration, and commissioning. Specific requirements include installing flexible closed-cell insulation with antimicrobial protection, new electrical distribution panels, cable replacements, and system integration with the existing Building Automation System (BAS). All work must be performed by manufacturer-authorized technicians, with the contractor required to provide disposal certificates and complete final system testing and cleaning. The document is marked "Sensitive But Unclassified" and is part of a Request for Quotation (RFQ) issued by the Department of State.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - 191T7025Q0012.pdf | ||
| Questions and Answers - 191T7025Q0012.pdf | ||
| Amendment 0001 - 191T7025Q0012.pdf | ||
| Attachment 1 - Technical Specifications_v2.pdf | ||
| Attachment 2 - Bill of Quantities_v2.pdf | ||
| SF-1442 - 191T7025Q0012.docx | DOCX document | |
| RFQ - 191T7025Q0012.docx | DOCX document | |
| Cover Letter - 191T7025Q0012.pdf | ||
| Attachment 3 - Form E.O.14173.pdf | ||
| Attachment 1 - Technical Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. DESCRIPTION QUANTITY
UNITY COST
TOTAL COST
Site preparation including fences, provisional staging area, protection of materials and furniture, protection of floors and walls lump sum
Removal and disposal of the existing the existing air‐cooled chiller and associated buffer tank. The
Contractor will provide disposal certificates to the COR.
lump sum
Supply and installation of new piping, manifolds, valves, strainers, thermometers (scale range: 0‐90 C, Class 1), pressure gauges (scale range: 0‐6 bar, Class 1), expansion tanks as per drawings. Piping shall be treated with anti‐rust. All equipment shall be PN16
Supply and install of new flexible, closed‐cell insulation material with built‐in Microban® antimicrobial protection to protect the piping (AF/Armaflex Class 0) and of aluminum finishing lump sum
Supply and installation of a new air‐cooled reversible heat pump, with 2 scroll compressors and have a heating/cooling capacity of 68 kW. The new unit shall be equipped with built‐in pumps and buffer tank.
Refrigerant gas shall be R454B.
lump sum
6 Supply and installation of a new 100 liters expansion tank on the return pipe. lump sum
Supply and installation of an automatic make‐up water filling unit with pressure gauge and hydraulic disconnector (BA type) to be connected to the return piping of the systems lump sum
8 Supply a new TRACER SC+ and an UC600 control panel lump sum
Create new graphic pages and configure the new reversible heat pump on the BAS as per table below. All the IT work needed to configure the reversible heat pump on the existing BAS (graphic pages, equipment operation rules, etc.) shall be performed by a TRANE authorized technician lump sum
10 Remove existing electrical cables and EMT lump sum
Supply and installation of a new cable FG16OM16 0,6/1 kV, Cca‐s1,d1,a1, 5G16 from the P3/D distribution panel located at the third floor to the new Chiller DP to be installed on the roof.
lump sum
12 Supply and installation of a new EMT for the new cable lump sum
Supply and installation on the roof of a new wall mounted IP 65, with terminals and solid door, electrical distribution panel. Supply and install the new electrical cables as described below. The new panel shall be composed of:
oDisconnector: 4 poles 63 A oMagneto thermic and GFCI serving the Heat Pump: 4 poles, type C, In: 63A, Ith:63A, Idn: 0.50 (AC type), Im: 630A, Icu/Icn: 10kA – electrical cable: FG16OM16 0,6/1 kV, , Cca‐s1,d1,a1, 5G16 lump sum
Test and balance of the system. Start‐up of the unit must be performed by Manufacturer’s authorized technicians lump sum
15 Final cleaning of the premises. lump sum
Total
SENSITIVE BUT UNCLASSIFIED
File details come from the government source that posted it. Updated .