Attachment 2 - Bid Schedule - 47PH0522R0036.xlsx

XLSX spreadsheet 146 KB Posted

Attached to
U. S. Post Office Elevator Modernization Federal contract opportunity
Solicitation number
47PH0522R0036
Issued by
General Services Administration Public Buildings Service Central Office Office of Acquisition Management

About this file

This document contains a bid schedule template and details for a federal solicitation to modernize an elevator at a U.S. Post Office building. Bidders are required to use the provided two-page bid schedule template to itemize costs by division for materials, labor, equipment and total for each work item. The solicitation seeks to modernize one existing passenger elevator with a new AC motor, solid state microprocessor controls, cab, doors and all associated work. A pre-bid site visit is scheduled for June 1st and requests for information are due by June 7th with responses by June 13th. The General Services Administration Public Buildings Service has issued this solicitation with a magnitude between $500,000 to $1,000,000.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

Name of bidder herePage 1 of 2
PREPARED BY:DATE:BASE
Attachement 2: Bid Schedule
Project Number and Name:
Building Number and Name:
RFP Number:
DIVISIONDESCRIPTIONMATERIALLABOREQUIPMENTTOTAL
Division 01General Requirements$ - 0$ - 0$ - 0$ - 0
Division 02Existing Conditions$ - 0$ - 0$ - 0$ - 0
Division 03Concrete$ - 0$ - 0$ - 0$ - 0
Division 04Masonry$ - 0$ - 0$ - 0$ - 0
Division 05Metals$ - 0$ - 0$ - 0$ - 0
Division 06Wood, Plastics and Composites$ - 0$ - 0$ - 0$ - 0
Division 07Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0
Division 08Openings$ - 0$ - 0$ - 0$ - 0
Division 09Finishes$ - 0$ - 0$ - 0$ - 0
Division 10Specialties$ - 0$ - 0$ - 0$ - 0
Division 11Equipment$ - 0$ - 0$ - 0$ - 0
Division 12Furnishings$ - 0$ - 0$ - 0$ - 0
Division 13Special Construction$ - 0$ - 0$ - 0$ - 0
Division 14Conveying Equipment$ - 0$ - 0$ - 0$ - 0
Division 21Fire Suppression$ - 0$ - 0$ - 0$ - 0
Division 22Plumbing$ - 0$ - 0$ - 0$ - 0
Division 23Heating, Ventilation and Air Conditioning$ - 0$ - 0$ - 0$ - 0
Division 25Integrated Automation$ - 0$ - 0$ - 0$ - 0
Division 26Electrical$ - 0$ - 0$ - 0$ - 0
Division 27Communications$ - 0$ - 0$ - 0$ - 0
Division 28Electronic Safety and Security$ - 0$ - 0$ - 0$ - 0
Division 31Earthwork$ - 0$ - 0$ - 0$ - 0
Division 32Exterior Improvements$ - 0$ - 0$ - 0$ - 0
Division 33Utilities$ - 0$ - 0$ - 0$ - 0
Division 33Utilities$ - 0$ - 0$ - 0$ - 0
Division 34Transportation$ - 0$ - 0$ - 0$ - 0
Division 35Waterway and marine construction$ - 0$ - 0$ - 0$ - 0
Division 41Material Processing and Handling Equipment$ - 0$ - 0$ - 0$ - 0
Division 44Pollution and Waste Control Equipment$ - 0$ - 0$ - 0$ - 0
Division 46Water and Wastewater Equipment$ - 0$ - 0$ - 0$ - 0
Division 48Electrical Power Generation$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0

Subtotal$ - 0
Overhead%
Subtotal$ - 0
Profit%
Subtotal$ - 0
Bonds%

Submitt final Bid Schedule in both spreadsheet and PDF format.

Bid Schedule shall be no less than 2 sheets. Grand Total

Bidders are required to use this Bid Schedule provided by GSA.

BASE Division Details

Name of bidder herePage 2 of 2
PREPARED BY:DATE:BASE
Attachement 2: Bid Schedule
Project Number and Name:
Building Number and Name:
RFP Number:Enter RFP Number Here
Offeror shall provide detailed break out of the work in each division to allow GSA to identify the work effort.
Offeror shall insert additional line(s) in each division to expand divisions as needed to provide adequate detail.
DIVISIONDESCRIPTIONMATERIALLABOREQUIPMENTTOTAL
Division 01General Requirements$ - 0$ - 0$ - 0$ - 0

Division 02 Existing Conditions $ - 0 $ - 0 $ - 0 $ - 0

Division 03 Concrete $ - 0 $ - 0 $ - 0 $ - 0

Division 04 Masonry $ - 0 $ - 0 $ - 0 $ - 0

Division 05 Metals $ - 0 $ - 0 $ - 0 $ - 0

Division 06 Wood, Plastics and Composites $ - 0 $ - 0 $ - 0 $ - 0

Division 07 Thermal and Moisture Protection $ - 0 $ - 0 $ - 0 $ - 0

Division 08 Openings $ - 0 $ - 0 $ - 0 $ - 0

Division 09 Finishes $ - 0 $ - 0 $ - 0 $ - 0

Division 10 Specialties $ - 0 $ - 0 $ - 0 $ - 0

Division 11 Equipment $ - 0 $ - 0 $ - 0 $ - 0

Division 12 Furnishings $ - 0 $ - 0 $ - 0 $ - 0

Division 13 Special Construction $ - 0 $ - 0 $ - 0 $ - 0

Division 14 Conveying Equipment $ - 0 $ - 0 $ - 0 $ - 0

Division 21 Fire Suppression $ - 0 $ - 0 $ - 0 $ - 0

Division 22 Plumbing $ - 0 $ - 0 $ - 0 $ - 0

Division 23 Heating, Ventilation and Air Conditioning $ - 0 $ - 0 $ - 0 $ - 0

Division 25 Integrated Automation $ - 0 $ - 0 $ - 0 $ - 0

Division 26 Electrical $ - 0 $ - 0 $ - 0 $ - 0

Division 27 Communications $ - 0 $ - 0 $ - 0 $ - 0

Division 28 Electronic Safety and Security $ - 0 $ - 0 $ - 0 $ - 0

Division 31 Earthwork $ - 0 $ - 0 $ - 0 $ - 0

Division 32 Exterior Improvements $ - 0 $ - 0 $ - 0 $ - 0

Division 33 Utilities $ - 0 $ - 0 $ - 0 $ - 0

Division 33 Utilities $ - 0 $ - 0 $ - 0 $ - 0

Division 34 Transportation $ - 0 $ - 0 $ - 0 $ - 0

Division 35 Waterway and marine construction $ - 0 $ - 0 $ - 0 $ - 0

Division 41 Material Processing and Handling Equipment $ - 0 $ - 0 $ - 0 $ - 0

Division 44 Pollution and Waste Control Equipment $ - 0 $ - 0 $ - 0 $ - 0

Division 46 Water and Wastewater Equipment $ - 0 $ - 0 $ - 0 $ - 0

Division 48 Electrical Power Generation $ - 0 $ - 0 $ - 0 $ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0