47PH0522R0036_SF1442.pdf
PDF 2 MB Posted
- Attached to
- U. S. Post Office Elevator Modernization Federal contract opportunity
- Solicitation number
- 47PH0522R0036
About this file
This document package includes a scope of work and solicitation for a federal elevator modernization project. The scope of work calls for modernizing one existing Simplex traction passenger elevator at the Helena Post Office/Federal Building in Helena, Arkansas. The modernization is to include a new AC motor, solid state microprocessor controls, cab, doors and all associated work to provide a completely new passenger elevator meeting the latest ASME A17.1 and UFAS accessibility standards. The period of performance is 365 calendar days. The solicitation requests proposals to provide all labor, materials and equipment for the modernization work with a site visit scheduled for June 1, 2022 and RFIs due no later than June 7, 2022. The General Services Administration Public Buildings Service is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PBS Past Performance Questionnaire.docx | DOCX document | |
| Wage Determination AR20220018 - 02-25-2022.pdf | ||
| SBSA_GC_Solicitation_Helena Arkansas Elevator Moderinization.pdf | ||
| SBSA_GC_Agreement_Helena AR Elevator Modernization_final.pdf | ||
| 70141 SPEC 14210 AR HELENA JACOB TRIEBER FEDERA GSA Elevator Modernization RAR10546 AR0066ZZ.docx | DOCX document | |
| 70141 SOW F AR HELENA JACOB TRIEBER FEDERA GSA_Elevator Modernization RAR10546 AR0066ZZ 30822.docx.pdf | ||
| Attachment 2 - Bid Schedule - 47PH0522R0036.xlsx | XLSX spreadsheet | |
| GC Reps and Certs -Sol 47PH0522R0036.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Of Contents
Section Description Page Number Standard Form Standard Form 1 Volume 2 - Specifications Volume 2 - Specifications 4 Volume 4 - Other Attachments Volume 4 - Other Attachments 13
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
47PH0522R0036, Standard Form Page 1
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
47PH0522R0036, Standard Form Page 2
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
0001 __________
Repair Code and the Uniform Federal Accessibility Standards.
Place of Performance: 617 WALNUT ST HELENA, AR 72342-3258 transportation and insurance to modernize simplex elevator contract shall meet or exceed the latest ASME-A17.1 Elevator
Contractor to provide all labor, material, equipment, PoP: 08/01/2022 - 08/01/2023 new passenger elevator. All work performed under this
Contract Type: Firm Fixed Price
Construction fixtures, and all associated work to provide a completely microprocessor controls, door operators, landing systems, EA
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Deliverable traction passenger elevator. Provide new: solid state
47PH0522R0036, Standard Form Page 3
U.S. General Services Administration Public Buildings Service Greater Southwest Region
1 3/8/2022
March 8, 2022
Scope of Work
1. Project Title: 70141 AR HELENA JACOB TRIEBER FEDERA GSA Elevator
Modernization RAR10546 AR0066ZZ
2. Project Location: AR0066ZZ Helena Post Office/Federal Building 617 Walnut Helena, AR
3. Building Location Hours: To the greatest extent possible work is to be performed during normal business hours Monday – Friday 6:00 AM to 6:00 PM. Coordination and approval from GSA COR is required for work performed other than normal hours. Any disruptive work, (i.e., noise, demolition of existing equipment, etc. is to be performed during other than normal working hours.
4. Pre-Bid Site Visit: Site visits shall be conducted with a maximum of 10 people present to prevent exposure to and spread of the COVID-19 virus. If necessary, multiple site visits will be scheduled to accommodate prospective bidders.
5. Purpose: Modernize One (1) existing Simplex (or equivalent) operation, traction Passenger elevators. Provide new: AC motor, solid state microprocessor controls, cab, doors, and all associated work to provide a completely new passenger elevator. All work performed under this contract shall meet or exceed the latest ASME-A17.1 Elevator Code and the Uniform Federal Accessibility Standards.
6. Points of Contact:
6.1 Contracting Officer: Roderick Blouin
500 Poydras St.
New Orleans, LA. 70130 Phone #: 713-875-0632
6.2 Contract Specialist: Mark Blanco
500 Poydras St.
New Orleans, LA. 70130 Phone #: 504-432-9239
6.3 Planning PM: John Knight
700 W. Capitol Ave
Little Rock, AR 72201 Phone #: (501)-258-0305
DocuSign Envelope ID: C8016109-7F2B-4904-8CC2-98E3AAA340CF 47PH0522R0036, Volume 2 - Specifications Page 4
2 3/8/2022
6.4 Delivery PM John Knight
700 W. Capitol Ave Little Rock, AR 72201 Phone #: (501)-258-0305
6.5 Supervisory Property Manager: Mark Freedle
700 W. Capitol Ave.
Little Rock, Arkansas 72201
Phone #: (501)-554-1467
6.6 Elevator SME Scott Cumby
819 Taylor St.
Fort Worth, TX 76102 Phone #: 817.850.8368
6.7 Other R7 Security Clearance Coordinators
r7clearance@gsa.gov
7. Notice to Proceed:
7.1 The Contracting Officer is the ONLY individual from the Government that can give the contractor a notice to proceed.
7.2 Before any of the work within the scope of the contract is started, the Contractor shall confer with the COR (Contracting Officer’s Representative) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications;
and the location partitions, eating spaces for Contractor’s employees and the like.
7.3 After a Notice to Proceed is given the Contractor has 7 days to provide schedule.
8. Period of Performance: The total period of performance for this task order is 365 days and includes 45 calendar days for required security clearances, pre-work submittals, and material ordering. Actual construction period of performance is 320 calendar days.
8.1 Contractor must initiate fitness determination process (security clearance) within 10 days of Zone B HSPD-12 instructional email.
Project Background: This building is three stories. The building was constructed in 1959.The is one elevator in the building.
47PH0522R0036, Volume 2 - Specifications Page 5
3 3/8/2022
9. Description of Work: Contractor shall provide all materials, labor, tools, equipment and daily supervision to accomplish tasks as outlined in contract documents. Contractor is also responsible for all necessary safety measures.
9.1 Work Sequence – Provide critical path method schedule
9.2 Daily clean up - All workspace, staging areas, areas used for moving materials, trash, tools, etc. are to be always kept clean. All trash from the day’s work is to be removed and work site clean and orderly.
9.3 Protection - Contractor is responsible for protection of existing finishes, utilities, etc. in the facility, and must maintain a separation of work area from adjacent spaces. Site is to be secured at end of day. Contactor shall be responsible for the security of the work site.
9.4 Agency security/access requirements
9.5 All work performed for the passenger elevator shall conform to specification number 14210
(Attachment 14.3)
9.6 Division 1: General Requirements
9.6.1 Daily clean up - All workspace, staging areas, areas used for moving materials, trash, tools, etc. are to be always kept clean. All trash from the day’s work is to be removed and work site clean and orderly.
9.6.2 Protection - Contractor is responsible for protection of existing finishes, utilities, etc.
in the facility, and must maintain a separation of work area from adjacent spaces.
Site is to be secured at the end of day. Contactor shall be responsible for the security of the work site.
9.6.3 Move/relocate furniture within the chambers area as needed to accomplish work.
9.7 Division 2: Existing Conditions
9.7.1 All demolished material must be recycled/re-purposed to the maximum extent possible. If materials cannot be recycled/re-purposed, contractor is responsible for the proper disposal of the materials. No on-site dumpsters may be used.
9.8 Division 3: Concrete
9.8.1 N/A
9.9 Division 4: Masonry
9.9.1 N/A
9.10 Division 5: Metals
9.10.1 N/A
9.11 Division 6: Wood, Plastics, and Composites
9.11.1 N/A
9.12 Division 7: Thermal and Moisture Protection
9.12.1 N/A
9.13 Division 8: Openings
9.13.1 N/A
9.14 Division 9: Finishes
9.15 All holes from relocated devices will be repaired and painted to match existing conditions.
47PH0522R0036, Volume 2 - Specifications Page 6
4 3/8/2022
9.16 Paint will be approved through the submittal process.
9.17 All ceiling system replacement will be per the RCP plan.
9.18 Division 10: Specialties
9.18.1 N/A
9.19 Division 11: Equipment
9.19.1 N/A
9.20 Division 12: Furnishings
9.20.1 N/A
9.21 Division 13: Special Construction
9.21.1 NA.
9.22 Division 14: Conveying Equipment
9.22.1 N/A
9.23 Division 21: Fire Suppression
9.24 Any fire barrier wall penetrations must be properly sealed per UL listed sealant.
9.25 Division 22: Plumbing
9.25.1 N/A
9.26 Division 23: Heating, Ventilation, and Air Conditioning
9.26.1 NA
9.27 Division 25: Integrated Automation
9.27.1 N/A
9.28 Division 26: Electrical
9.28.1 NA
9.29 Division 27: Communications
9.29.1 Install communications lines as required.
9.30 Division 28: Electronic Safety and Security
9.30.1 NA
9.31 Division 31: Earthwork
9.31.1 N/A
10. Liquidated Damages: In accordance with FAR 52.211-12, Failure to complete the work in a timely manner will result in assessment of liquidated damages in the amount of $250.00 per calendar day beyond the contract completion date, inclusive of properly executed contract modifications
11. Sustainability:
11.1 Green Purchasing: See attachment 1: Green Purchasing requirements
11.2 Waste Diversion: Fourteen days from Notice to Proceed, the Contractor shall submit to the
Project Manager an updated Non-Hazardous Solid Waste Management Plan attachment 2:
Waste Diversion Plan, to include (not limited to):
47PH0522R0036, Volume 2 - Specifications Page 7
5 3/8/2022
a) List of materials Contractor will reuse
b) List of materials the Contractor will donate and name and address of donation recipient.
c) List of materials the Contractor will recycle and the name and address of the recycler. If Contractor receives recycling revenue, Contractor shall keep revenue and provide receipt for GSA for reference.
d) Name and location of solid waste landfill for non-diverted material.
12. Other Requirements:
12.1 Purchase of Equipment
12.2 Building Specific Requirements
12.2.1 Parking
12.2.2 Building Specific Access Requirements
12.2.3 After-Hours Coordination
12.2.4 Loading Dock Use (During Duty & After-Hours)
12.2.5 Common Area Cleaning
12.2.6 Utility Outages
12.2.7 Hot Work Permits
12.2.8 Key Control
13. Submittals:
13.1 Critical Path Method Schedule
13.2 Waste Diversion Submittal: Preconstruction
13.3 Waste Diversion Submittal: Post Construction
13.4 Green Purchasing items
13.5 Product Brochure information
13.6 Safety Plan
13.7 Submittal plan for modernizing the Simplex operations.
13.8 Plan to modernize traction passenger elevator.
13.9 Submittal for the new AC motor.
13.10 Submittal for the solid-state microprocessor controls.
13.11 Submittal for the modernization of the elevator cab.
13.12 Submittal for the modernization of the elevator doors.
13.13 Submittal for work to provide a completely new passenger elevator.
14. Attachments:
14.1 Attachment 1: Green Purchasing
14.2 Attachment 2: Waste Diversion Plan
14.3 Attachment 3: SPEC 14210
15. Closeout Plan:
47PH0522R0036, Volume 2 - Specifications Page 8
6 3/8/2022
15.1 Final Punch list complete
15.2 Customer Acceptance
15.3 Dimensioned Redline Drawing
15.4 Close Out Documents (O&M Manuals, Warranty, Certified payrolls and Release of Claims, Waste Diversion documentation); Return of access badges
15.5 Final Invoice
47PH0522R0036, Volume 2 - Specifications Page 9
7 3/8/2022
Attachment 1: Green Purchasing
Sustainability:
● Green Purchasing:
o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.
o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.
▪ Nylon Carpet: NSF-140 Platinum or Cradle to Cradle Bronze.
▪ Resilient Flooring (e.g., vinyl and linoleum): NSF-332 (any level) or Cradle to
Cradle (any level)
▪ Interior Latex Paint: Master Painters Institute (MPI) Extreme Green or Green
Seal 11.
▪ Acoustical Ceiling Tiles: > 15% post-consumer recycled content.
▪ Water-Consuming Equipment: WaterSense Certified.
A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.
B. If the KSP materials listed above are 1) not reasonably available within a reasonable period; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases, the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.
47PH0522R0036, Volume 2 - Specifications Page 10
8 3/8/2022
Attachment 2: Waste Diversion Plan
1. Submittal Type: Pre-Construction or Final (Circle Appropriate Type)
2. ePMX Number: ___________________ (Should receive from GSA PM)
3. Field Office: Circle Appropriate Field Office: (Oklahoma City, Tulsa, New Mexico, Little Rock, Shreveport, Tyler, New Orleans, Baton Rouge, Dallas, Fort Worth, Lubbock, Houston, Austin, San Antonio, McAllen, El Paso)
4. GSA Project Manager: _________________
5. Contract Number: ______________________
6. Categories to Track:
6.1 Carpet: (rolled or tiled) Weight (lbs.):_____ Recover Method: ___________
6.2 Architectural :( doors, windows, frames, millwork) Weight (lbs.):_____ Recover Method:___________
6.3 Ferrous Metals: (structural steel, studs, rebar) Weight (lbs.): _____ Recover Method: ___________
6.4 Non-Ferrous: (wire, piping, duct) Weight (lbs.):_____ Recover Method:___________
6.5 Aggregate: (concrete, brick, blocks) Weight (lbs.):_____ Recover Method: ___________
6.6 Plumbing Fixtures: (sinks, toilets, urinals) Weight (lbs.):_____ Recover Method: ___________
6.7 Furniture: (Systems, casual, equip.) Weight (lbs.): _____ Recover Method: ___________
6.8 Ceiling/Wall: (gypsum, tiles) Weight (lbs.): _____ Recover Method: ___________
6.9 Roofing: (Shingles, Paper, membrane) Weight (lbs.):_____ Recover Method: ___________
7. Landfill Hauler: ___________________
8. Landfill Waste: ____________________
END OF SOW
47PH0522R0036, Volume 2 - Specifications Page 11
9 3/8/2022
Scope of Work Signature Page
Project Title: 70141 AR HELENA JACOB TRIEBER FEDERA GSA Elevator
Modernization RAR10546 AR0066ZZ
16. Project Location: AR0066ZZ Helena Post Office/Federal Building 617 Walnut Helena, AR
Approvals
GSA Project Manager- John F. Knight
Signature Date
GSA Supervisory Property Manager- Mark Freedle
Signature Date
GSA Elevator SME – Scott Cumby
Signature Date
GSA Supervisory Project Manager- Jeff Chiavetta
Signature Date
DocuSign Envelope ID: C8016109-7F2B-4904-8CC2-98E3AAA340CF
3/8/2022
3/8/2022
3/10/2022
3/9/2022
47PH0522R0036, Volume 2 - Specifications Page 12
47PH0522R0036 - Volume 4 - Other Attachments - List of Attachments Documents Table of Contents
Attachment Number
Document Title ECF
Wage Determination
AR20220018 - 02-25-2022
5 - Wage Determinations,Labor Agreements
Attachment 2 - Bid Schedule -
47PH0522R0036
10 - Solicitation and Amendments
47PH0522R0036, Volume 4 - Other Attachments Page 13
| topmostSubform[0]: |
| Page2[0]: |
| USC10[0]: |
| TelephoneNo\: |
| [0]: |
| Date31c[0]: |
| CheckBox29[0]: Off |
| AmendmentNo4[0]: |
| AdministeredBy[0]: ACQUISITION NON-PROSPECTUS |
500 POYDRAS ST Room: 1010
NEW ORLEANS, LA 70113 USA
| FacilityCode[0]: |
| AmendmentDate4[0]: |
| AmendmentNo7[0]: |
| AuthorizedSignature[0]: |
| Date30c[0]: |
| Amounts[0]: |
| AmendmentNo5[0]: |
| AmendmentDate8[0]: |
| AmendmentNo1[0]: |
| AccountingData[0]: |
| AmendmentDate3[0]: |
| Amount[0]: |
| AmendmentNo10[0]: |
| AmendmentDate7[0]: |
| PaymentMadeBy[0]: PBS PAYMENTS BRANCH -https://finance.ocfo.gsa.gov/ |
P.O. BOX 17181
https://finance.ocfo.gsa.gov/
FORT WORTH, TX 76102-0181 USA
| AmendmentNo8[0]: |
| NameofOfferor[0]: |
| NameContractingOfficer[0]: Roderick Blouin |
| Copies28[0]: |
| NameTitleSign[0]: |
| NameandTitle[0]: |
| OfferDate[0]: |
| Signature30b[0]: |
| AmendmentDate9[0]: |
| AmendmentNo6[0]: |
| ItemsAccepted[0]: |
| AmendmentDate2[0]: |
| AmendmentNo2[0]: |
| AmendmentDate6[0]: |
| RemittanceAddress[0]: |
| USC41[0]: |
| CalendarDays2[0]: |
| AmendmentNo9[0]: |
| CheckBox1[0]: Off |
| AmendmentDate10[0]: |
| CodeField[0]: |
| AmendmentNo3[0]: |
| AdministeredByCode[0]: 7PQCNO |
| CheckBox28[0]: Off |
| Item[0]: |
| AmendmentDate1[0]: |
| AmendmentDate5[0]: |
| CheckBox2[0]: Off |
| Signature31b[0]: |
| Page1[0]: |
| Code[0]: 7PQCNO |
| Sealed[0]: Off |
| PurchaseRequestNo[0]: EQ7PACS-22-0066 |
| Mandatory[0]: 1 |
| AddressOfferTo[0]: 7PQCNO |
ACQUISITION NON-PROSPECTUS
500 POYDRAS ST Room: 1010
NEW ORLEANS, LA 70113 USA
| Is[0]: 1 |
| Yes[0]: 1 |
| NumberofCopies[0]: |
| Award[0]: Off |
| Pages[0]: 3 |
| WorkDescribed[0]: Project Title: 70141 Helena Jacob Trieber Federal GSA Elevator Modernization Project, Scope of Work Document dated March 8, 2022. |
| PhoneNo[0]: 504-432-9239 |
| Hour[0]: 5:00 PM (CST) |
| Proceed[0]: 1 |
| See[0]: |
| SolicitationNo[0]: 47PH0522R0036 |
| CalendarDays[0]: |
| CalendarDaysComplete[0]: 365 |
| Name9a[0]: Mark Blanco |
| Page[0]: 1 |
| Negotiated[0]: 1 |
| By[0]: |
| Negotiable[0]: Off |
| IsNot[0]: Off |
| ProjectNo[0]: 70141 |
| DateDue[0]: 7/13/2022 |
| IssuedBy[0]: ACQUISITION NON-PROSPECTUS |
500 POYDRAS ST Room: 1010
NEW ORLEANS, LA 70113 USA
| ContractNo[0]: |
| No[0]: Off |
| CalendarDaysStart[0]: 10 |
| LessCalendarDays[0]: 120 |
| DateIssued[0]: 5/20/2022 |
File details come from the government source that posted it. Updated .