Attachment 2 BAY FURNACE FINAL_S_nc 8.18.2025.pdf

PDF 1 MB Posted

Attached to
GAOA Bay Furnace Campground Paving Project
Solicitation number
12445525B0015
Issued by

About this file

This document is a solicitation for the Bay Furnace Campground Repaving Project by the United States Department of Agriculture (USDA) Forest Service, located in the Hiawatha National Forest, Munising Ranger District, Alger County, Michigan. The project involves full depth reclamation of existing asphalt and base, with a total roadway area of 130,000 square feet and spurs totaling 22,600 square feet. The contract includes mobilization, gravel base preparation, compacted lifts of Type II asphalt concrete on roadway and spurs, and striping of parking areas.

Key project specifications include working hours from 0800-1700 Monday-Friday, excluding federal holidays, and conforming to FP-14 standard specifications for federal highway projects. The contractor must contact Miss Dig before excavation, implement soil erosion control measures, provide traffic control signage, and stop work if heritage resources are encountered. The project involves two parking areas (A and B) with parking spaces ranging from 9' to 11' wide and 18' deep, to be marked with Sherwin Williams traffic marking paint, with final layout subject to Forest Service approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOREST LOCATION MAP

PROJECT LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture

Forest Service

BAYFURNACE CAMPGROUND

REPAVING PROJECT

RECOMMENDED BY:

APPROVED:

WEST ZONE ENGINEERING

FOREST ENGINEER

8/1 8/2

5 0 7:

G

RE

GO

RY

GE

ND

RO

N C:

\U

SE

RS

\G

RE

GO

RY

GE

ND

RO

N\

BO

X\

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\B

AY

F

UR

NA

CE

\B

AY

FU

RN

AC

E

CO

NT

RA

CT

M

AP

.D

W G;

MICHIGAN

ALGER COUNTY

(R09) EASTERN REGION

HIAWATHA NATIONAL FOREST

MUNISING RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

MUNISING RANGER DISTRICT OFFICE

400 EAST MUNISING AVE

MUNISING, MI 49862

PROJECT LOCATION

DISTRICT RANGER

AutoCAD SHX Text The project is located at the Hiawatha National Forest Munising District Bay Furnace Campground at Bay Furnace Rd, M-28, Munising, MI 49862. From the Munising District Office turn left onto E. Munising Ave., at the traffic circle take the 1st exit onto M-28 W, travel 5.1 miles along M-28 W and turn right onto Bay Furnace Road. Coordinates:46.438315, -86.708335

AutoCAD SHX Text

AutoCAD SHX Text

COVERSHEET

AutoCAD SHX Text 2/28/2025

AutoCAD SHX Text

AutoCAD SHX Text

CONSTRUCTION NOTES

AutoCAD SHX Text 2/28/2025

AutoCAD SHX Text

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text 2/28/2025

AutoCAD SHX Text

AutoCAD SHX Text

STRIPING DETAIL

AutoCAD SHX Text 2/28/2025

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 8/2

5 0 6:

G

RE

GO

RY

GE

ND

RO

N C:

\U

SE

RS

\G

RE

GO

RY

GE

ND

RO

N\

BO

X\

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\B

AY

F

UR

NA

CE

\B

AY

FU

RN

AC

E

CO

NT

RA

CT

M

AP

.D

W G;

(R09)

EASTERN REGION

BAY FURNACE

PAVEMENT

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING DISTRICT

CONSTRUCTION NOTES

2/28/2025

G. GENDRON

G. GENDRON

X.XXX

002 4

NOTES:

HOURS OF OPERATION : 0800 - 1700 M-F, NO FED HOLIDAYS OR WEEKENDS UNLESS APPROVED BY THE CONTRACTING OFFICER.

1. THE WORK COVERED BY THESE PLANS SHALL INCLUDE FURNISHING OF MATERIALS AND EQUIPMENT TO COMPLETE A FULL DEPTH RECLAMATION OF THE EXISTING ASPHALT AND BASE. ALL WORK SHALL CONFORM TO THE FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGE ON FEDERAL HIGHWAY PROJECTS.

2. THE CONTRACTOR SHALL CONTACT MISS DIG AT 1-800-482-7171 OR 811 A MINIMUM OF THREE WORKING DAYS PRIOR TO ANY EXCAVATION. CONTRACTOR SHALL CONDUCT OPERATIONS IN SUCH A MANNER AS TO ENSURE THAT THOSE UTILITIES NOT REQUIRING RELOCATION WILL NOT BE DISTURBED.

3. THE WORK AREA SHALL BE CLOSED TO TRAFFIC DURING CONSTRUCTION.

4. ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO STARTING CONSTRUCTION.

5. WORK SHALL STOP IMMEDIATELY IF HERITAGE RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED AND THE CO IMMEDIATELY NOTIFIED.

6. CONTRACTOR SHALL FURNISH ALL TRAFFIC CONTROL SIGNAGE AND IS REQUIRED TO MAINTAIN ALL DETOUR AND HAUL ROUTES.

7. ANY QUANTITIES AND DIMENSIONS SHOWN IN THE PLANS ARE PROVIDED FOR INFORMATION ONLY. CONTRACTOR SHALL FIELD VERIFY PRIOR TO CONSTRUCTION. BACKFILL

MATERIAL IS AVAILABLE AT THE SAND STORAGE PIT.

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

BAY FURNACE CAMPGROUND REPAVING PROJECT

AutoCAD SHX Text

ITEM NO.

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

PAY UNIT

AutoCAD SHX Text

REMARKS

AutoCAD SHX Text 15101

AutoCAD SHX Text

MOBILIZATION

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text 30201

AutoCAD SHX Text

22A GRAVEL FOR BASE

AutoCAD SHX Text

AutoCAD SHX Text

CY

AutoCAD SHX Text 30601

AutoCAD SHX Text

FULL DEPTH RECLAMATION OF EXISTING ASPHALT AND BASE

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text 31101

AutoCAD SHX Text

PARKING SPUR BASE PREPARATION

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text 40301

AutoCAD SHX Text

TWO 1.5" COMPACTED LIFTS OF TYPE II ASPHALT CONCRETE ON ROADWAY AND SPURS

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text 63401

AutoCAD SHX Text

STRIPING OF PARKING AREA

AutoCAD SHX Text

LS

BAY FURNACE

CAMPGROUND

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 8/2

5 0 6:

G

RE

GO

RY

GE

ND

RO

N C:

\U

SE

RS

\G

RE

GO

RY

GE

ND

RO

N\

BO

X\

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\B

AY

F

UR

NA

CE

\B

AY

FU

RN

AC

E

CO

NT

RA

CT

M

AP

.D

W G;

(R09)

EASTERN REGION

BAY FURNACE

PAVEMENT

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING RANGER DISTRICT

PLAN VIEW

2/28/2025

G. GENDRON

G. GENDRON

X.XXX

3 4

Feet

1:1049.3201

2001000

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text M-28

AutoCAD SHX Text

PARKING AREA "A"

AutoCAD SHX Text

PARKING AREA "B"

AutoCAD SHX Text

BRIDGE

AutoCAD SHX Text

ROADWAY TOTAL AREA = 130,000 SQ FT

AutoCAD SHX Text

SPURS TOTAL AREA = 22,600 SQ FT

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

BLUE 2.0' CENTER TO

CENTER SPACING &

SYMBOL PAINTED BLUE

W H

I T

E

WHITE

PARKING SPACES ARE TO

BE 9' WIDE BY 18' DEEP

9'

PARKING SPACE

11' WIDE BY 18' DEEP

BLUE 2.0' CENTER TO

CENTER SPACING &

SYMBOL PAINTED BLUE

NOTE #1: ALL STRIPES AND LINES TO BE 4" WIDE UNLESS

NOTED. ALL PAVEMENT MARKINGS TO BE SHERWIN

WILLIAMS SETFAST ACRYLIC MODIFIED ALKYD TRAFFIC

MARKING PAINT OR APPROVED EQUIVALENT.

NOTE #2: ACTUAL DIMENSIONS MAY VARY,

LAYOUT FOR FOREST SERVICE APPROVAL

BEFORE PAINTING

BLUE

W

H

I

T

E

W

H

I

T

E

WHITE

CONTROL PT.

CONCRETE WALK

9'

PARKING SPACES ARE TO

BE 9' WIDE BY 18' DEEP

PARKING SPACES ARE TO

BE 9' WIDE BY 18' DEEP

PARKING SPACE

11' WIDE BY 18' DEEP

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

8/1 8/2

5 0 6:

G

RE

GO

RY

GE

ND

RO

N C:

\U

SE

RS

\G

RE

GO

RY

GE

ND

RO

N\

BO

X\

EN

GI

NE

ER

IN

G\ W

ES

T

ZO

NE

\C

AD

D

RA

W

IN

GS

\B

AY

F

UR

NA

CE

\B

AY

FU

RN

AC

E

CO

NT

RA

CT

M

AP

.D

W G;

(R09)

EASTERN REGION

BAY FURNACE

PAVEMENT

PROJECT

HIAWATHA NATIONAL

FOREST

MUNISING DISTRICT

DETAILS

2/28/2025

G. GENDRON

G. GENDRON

X.XXX

4 4

PARKING LOT "B" DETAILPARKING LOT "A" DETAIL

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

E

Bayfurnace Contract map-Cover2
Sheets and Views
Bayfurnace Contract map-Cover
Bayfurnace Contract map-NOTES2
Sheets and Views
Bayfurnace Contract map-NOTES
Bayfurnace Contract map-PLOT2
Sheets and Views
Bayfurnace Contract map-PLOT
Bayfurnace Contract map-DETAIL2
Sheets and Views
Bayfurnace Contract map-DETAIL
2025-08-18T08:02:24-0400
DAVID DEVET
2025-08-18T08:11:24-0400
GREGORY GARDNER
2025-08-18T08:19:37-0400
NATHAN CARLE

File details come from the government source that posted it. Updated .