This solicitation is for building renovation services at the Building 62 facility located at 3900 NCTR Road in Jefferson, Arkansas. The Food and Drug Administration seeks to renovate areas within the building including animal holding rooms, corridors, and exterior walls. Offerors must visit the site before submitting a proposal. The solicitation includes plans outlining the scope of demolition and new construction work. The award is a firm-fixed-price contract. The period of performance is 270 calendar days. Proposals are due by August 15, 2022. This opportunity is set aside for small businesses.
The summary focuses on key details such as the type of requirement, location, scope of work, contract terms, response date, and small business set-aside designation. It groups related information together and presents only the most salient points without unnecessary context or framing language.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 62
NCTR ROAD
NCTR PROPERTY
NCTR ROAD
NCTR ROAD
NCTR ROAD
NCTR ROAD
STAGECOACH
ROAD
NCTR CAMPUS
Copyright
Architect
WITSELL EVANS RASCO
901 West Third Street
Little Rock, Arkansas 72201
501.374.5300 www.WERarch.com
/1
/2
:0
:2
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson Laboratories
BLDG. 62 RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
03/24/22
A0.01 LIFE SAFETY AND SITE INFORMATION
A1.00 OVERALL, PHASING, CONNECTOR
A1.01 DEMOLITION PLAN
A1.02 NEW CONSTRUCTION PLANS
A1.03 ROOF PLAN
A1.11 CEILING PLAN, AND DETAILS
A4.02 ENLARGED VIEWS
A6.01 PARTITION SCHEDULE
A6.02 PARTITION FRAMING DETAILS
A7.02 SCHEDULES
A8.01 REFERENCE PHOTOS
A8.02 REFERENCE PHOTOS
A8.03 REFERENCE PHOTOS
A8.04 REFERENCE PHOTOS
A8.05 ROOF DETAILS
A8.06 ROOF DETAILS
A9.00 REFERENCE DRAWINGS
A9.01 REFERENCE DRAWINGS
A9.02 REFERENCE DRAWINGS
A9.03 REFERENCE DRAWINGS
A9.04 REFERENCE DRAWING
A0.00 TITLE SHEET
ARCHITECTURAL
INDEX OF DRAWINGS:CAMPUS MAP
VICINITY MAP
M1.01 MECHANICAL DEMOLITION PLAN
M1.02 MECHANICAL DEMOLITION PLAN
M2.01 MECHANICAL PLAN
M3.01 MECHANICAL ROOMS
M4.01 MECHANICAL DETAILS
M5.01 MECHANICAL CONTROLS
M6.01 MECHANICAL SCHEDULES
MECHANICAL
P1.01 PLUMBING DEMOLITION PLAN
P2.01 PLUMBING PLAN
P3.01 PLUMBING DETAILS
PLUMBING
E0.01 ELECTRICAL SITE PLAN
E0.02 ELECTRICAL SITE PLAN WEST
E1.01 ELECTRICAL DEMOLITION PLAN
E2.01 LIGHTING PLAN
E2.02 POWER AND SYSTEMS PLAN
ELECTRICAL
UP
F.E.C.
F.E.C.
F.E .C
F.E .C
I HOUR WALL
LIFE SAFETY LEGEND
FIRE
EXTINGUISHER
CABINET
FEC
EXIT SIGN - HATCH
INDICATES DIRECTION
5A 5D 85A85B85C85D
B62 B50
B26
B10
B14 B54
B
B
A
B
B
B
C
B
D
B
E
B17
B16
B11
B46
B44
B45
B07
B02
B06
5B 5C
BUILDING 62
POSSIBLE
LOCATION OF
CONSTRUCTION
DUMPSTER - COORDINATION
WITH COR
PATH OF TRAVEL FOR
MATERIAL DELIVERY
CONTRACTOR
PARKING/LAYOUT - PROVIDE
6' TALL CONSTRUCTION
FENCE AROUND LAYOUT
AREA(S)
CONTRACTOR'S GATE
SECURITY CHECKPOINT
PROPOSED
CONNECTOR
BETWEEN 62 AND 85
CAMPUS ENTRANCE
MAIN SECURITY
CHECKPOINT. COORDINATE
USE OF EAST SECURITY
CHECKPOINT FOR PRIMARY
CONTRACTOR ACCESS
NEW 4 HEAD SITE
LIGHTING - REF ELEC,
COORD. W/ COR FOR
EXACT LOCTION
DUMPSTER PAD
50'-0"
REPLACE EXTERIOR
LIGHTS - REFERENCE
ELECTRICAL
DRAWINGS -REF
SQUARE SYMBOL
A0.01
GENERAL CONSTRUCTION NOTES
1. CONTRACTOR TO MAINTAIN CLEAR AND SAFE ROUTES FOR VEHICULAR AND PEDESTRIAN TRAFFIC
AT ALL TIMES.
2. COORDINATE ALL WORK AND CONSTRUCTION FENCING AND GATES WITH OWNER AND ENGINEER
PRIOR TO ANY CONSTRUCTION.
3. ALL ITEMS TO BE REMOVED AND DISPOSED OF SHALL BE REMOVED OFFSITE AND DISPOSED AT
AN APPROPRIATE FACILITY AT THE CONTRACTOR'S EXPENSE.
4. ALL STREETS, WALKS, DRIVES, DRAINAGE STRUCTURES, FENCES, UTILITIES, ETC. THAT ARE
DISTRUBED DURING CONSTRUCTION EITHER INSIDE OR OUTSIDE THE PROPTERTY LINE OR
DESIGNATED WORK LIMITS SHALL BE RESTORED TO THEIR ORIGINAL OR BETTER CONDITION USING
LIKE MATERIALS. COST OF SUCH REPAIRS SHALL BE TO THE CONTRACTOR.
5. CONTRACTOR SHALL COORDINATE THE WORK CLOSELY WITH CONCURRENT AND ADJACENT
WORK BY OTHERS.
6. CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAG MEN, OR OTHER DEVICES
NECESSARY TO PROVIDE PUBLIC SAFETY IN ACCORDANCE WITH THE CURRENT MANUAL FOR
UNIFORM TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY
RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK.
COORIDORS 1
HOUR WALLS
AND CEILINGS
ASSUMED 2
HOUR WALL
EXIT
EXIT
EXIT
EXIT
ACT Acoustical Ceiling Tile ADJ Adjacent AFF Above Finished Floor AGGR Aggregate ALUM Aluminum ALT Alternate ANOD Anodized AP Access Panel APPROX Approximate ARCH Architectural AWP Acoustical Wall Panel BB Bulletin Board B.M. Bench Mark BD Board BETW Between BF Backface BG Bumper Guard BL Bed Locator BL Building Line BLDG Building BLKG Blocking BM Beam BOT Bottom BR Bumper Rail BRD Marker Board/ Chalk Board BRG Bearing BRK Brick BSMT Basement BU ROD Back-Up Rod BUR Built-Up Roof BW Bearing Wall C Compact Parking Space CDR Card Reader CEM Cement CGD Corner Guard CJ Control Joint CL Center Line CLG Ceiling CLR Clear CMB Concrete Masonry Base CMTS Cementitious CMU Concrete Masonry Unit COL Column COMM Communications CONC Concrete CONN Connection CONST Construction CONT Continuous COORD Coordinate CORR Corridor CPT Carpet CR Crash Rail CRJ Construction Joint CRT Ceramic Tile CSK Countersunk CTD Centered CTR Center CW Curtain Wall D Depth DBA Deformed Bar Anchor DET Detail DF Drinking Fountain DIA Diameter DIAPH Diaphragm DIM Dimension
RBB Rubber Base RBT Rubber Tile RCP Reflected Ceiling Plan RD Roof Drain REBAR Reinforcing Bar RECP Receptacle REF Refer or Reference REINF Reinforcing RELOC Relocate/ Relocated REQ'D Required RFVC Recessed Fire Valve Cab RM Room RO Rough Opening SAB Sound Attenuation Blanket SCHED Schedule SECT Section SHT Sheet SHWR Shower SIM Similar SLC Sealed Concrete SO Structural Opening SOG Slab on Grade SP Stand Pipe SPA Space or Spacing SPEC Specification SQ Square SSC Solid Surface SS Stainless Steel STA Station STC Sound Transmission Class STC Stained Concrete STD Standard STIFF Stiffener STIR Stirrup STL Steel STRUC Structural SWC Specialty Wall Covering SYM Symmetrical SVL - Sheet Vinyl SYS System T Tread T&B Top and Bottom TB Twin Bed TC Top of Curb TEL Telephone TEMP Temperature TH Threshold THK Thick TLP Toilet Partition TLT Toilet TOB Top of Beam TOC Top of Concrete TOF Top of Footing TOP Top of Parapet TOS Top of Slab TOSTL Top of Steel TRZ Poured Terrazzo TT Treatment Table TW Top of Wall TYP Typical UNO Unless Noted Otherwise VCT Vinyl Composition Tile VIF Verify In Field VWC Vinyl Wall Covering W Width WWF Welded Wire Fabric
DRAWING ABBREVIATIONS
DISP Dispenser DJ Deflection Joint DK Desk DL Dead Load DN Down DS Down Spout DS Dishwasher DWG Drawing DWGS Drawings DWLS Dowels EA Each EF Each Face EIFS Exterior Insulation and Finish System EJ Expansion Joint EL Elevation ELEC Electric ELEV Elevator EQ Equal EQUIP Equipment ESC Escalator EW Each Way EWC Electric Water Cooler EXP BLT Expansion Bolt EXT Exterior FD Floor Drain FDN Foundation FE Fire Extinguisher FEC Fire Extinguisher Cabinet FF Finish Floor FHC Fire Hose Cabinet FIN Finish FLR Floor FMH Fume Hoods FOS Face of Stud FS Far Side FT Foot FTG Footing FV Field Verify FVC Fire Valve Cabinet FXS Fixed Seating GA Gauge GALV Galvanized GB Grade Beam GDC Ground Concrete GEN General GFRC Glass-Fiber Reinforced Concrete GI Galvanized Iron GL Glass GLS Glass Mosaic Tile GND Ground GRG Glass- Reinforced Gypsum GRT Grout GBD Gypsum Board HB Hose Bib HDW Hardware HDWD Hardwood HK Hook HM Hollow Metal HOR Horizontal HP High Point HR Hour INSUL Insulation IPC Interior Paint Color IPT Interior Paint
LL Live Load LLH Long Leg Horizontal LLV Long Leg Vertical LOC Location LP Low Point LT Light LVT Luxury Vinyl Tile LWC Lightweight Concrete MAS Masonry MAT'L Material MAX Maximum MBL Marble MECH Mechanical MEMB Membrane MFG Manufacturer MISC Miscellaneous MO Masonry Opening MOD BIT Modified Bitumen MOD Modified MSL Mean Sea Level MTL Metal MW Microwave N/A Not Applicable NA Not Available NIC Not in Contract NOM Nominal NS Near Side NTS Not to Scale NWC Normal Weight Concrete OA Over All OC On Center OD Outside Diameter OD Overflow Drain OFCI Owner Furnished, Contractor Installed OFOI Owner Furnished, Owner Installed OH Opposite Hand OPNG Opening OPP Opposite OSF Outside Face PL Plastic Laminate PC Precast Concrete PCF Pounds per Cubic Foot PCT Porcelain Tile PENT Penthouse PL Property Line PL Plate PLUMB Plumbing PLYWD Plywood PP Push Plate POL Polished PORT CEM Portland Cement PR Pair PREFAB Prefabricated PRP Plastic Resin Panel PSF Pounds per Square Foot PSI Pounds per Square Inch PT Point PTB Porcelain Tile Base PTD Painted R Riser RAD Radius RAF Rubberized Asphalt Flashing RAM Rubberized Asphalt Membrane RAU Rubberized Asphalt Underlayment RB Rubber Base
50'-0" 6'-0"
8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"
CONCRETE FILLED
STEEL PIPE
BOLLARD
- 10' x 50' - 6" THICK 4000 PSI CONCRETE #4
REBAR @ 6" O.C. EACH WAY 4" SB-2-
TURNDOWN PERIMETER EDGE 12"
CONTINUOUS 1/2" EXPANSION JOINT W/
SEALANT
VERIFY ALL UTILITIES
A0.01
FACE OF EXISTING
CONSTRUCTION
6"
9"
#4 BARS 6" O.C.
C L
R
CRUSHED AGGREGATE BASE COURSE
COMPACTED SUBGRADE
2'-0"
6"
6" SCHEDULE 40 PIPE
FILL WITH GROUT AND DOME TOP, PAINT
BRING CONCRETE FOUNDATION UP TO
GRADE IN LANDSCAPE AREAS, SLOPE
TOP AWAY FROM PIPE FOR DRAINAGE
EXPANSION JOINT
MATERIAL AT PAVING
REINFORCED CONCRETE FOUNDATION
AND SURROUNDING SLAB (RE: CIVIL &
STRUCTURAL)
FINISH SCHEDULE LEGEND
ACF ACOUSTICAL FABRIC
ACT ACOUSTIC CEILING TILE
BRD MARKER BOARD/ CHALKBOARD
CGD CORNER GUARD
CPT CARPET
CRT CERAMIC TILE
CTB CERAMIC TILE BASE
EPC EPOXY RESIN COUNTER SURFACE
EPX QUARTZ EPOXY RESINOUS FLOORING
EXS EXISTING FINISH
FMH FUME HOODS
FXS FIXED SEATING
GDC GROUND CONCRETE
GRT GROUT
HPL PLASTIC LAMINATE
IPT INTERIOR PAINT
IPX INTERIOR EPOXY PAINT
LVT LUXURY VINYL TILE
MBL MARBLE
PCT PORCELAIN TILE
PRP PLASTIC RESIN PANEL
PTB PORCELAIN TILE BASE
RBB RUBBER BASE
RBT RUBBER TILE
SDC STATIC DISSIPATIVE CONCRETE
SDT STATIC DISSIPATIVE TILE
SLC SEALED CONCRETE
SPF SPORTS FLOOR
SSC SOLID SURFACE
SWC SPECIALTY WALL COVERING
TLP TOILET PARTITION
VCT VINYL COMPOSITION TILE
VWC VINYL WALL COVERING
WDF WOOD FLOORING
WDM WOOD MILLWORK
WKM WALK-OFF MAT
WNB WINDOW BLINDS
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:4
:0
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A0.01
LIFE SAFETY AND
SITE
INFORMATION
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1" = 200'-0"
CAMPUS PLAN
1/16" = 1'-0"
GROUND FLOOR LIFE SAFETY
1/8" = 1'-0"
DUMPSTER PAD PLAN
1/2" = 1'-0"
CONCRETE PAD AT DUMPSTER
1/2" = 1'-0"
PIPE BOLLARD
No. Issue Date
NOTE:
FLOOR PLAN IS NOT SIGNIFICANLY MODIFIED FROM ORIGINAL LAYOUT.
BUSINESS OCCUPANCY
289 OCCUPANTS AT FIRST FLOOR
1 HOUR CORRIDOR WALLS
F.E.C.
F.E.C.
F.E .C
F.E .C
DEBRIS REMOVAL AND ACCESS FOR
CONCRETE WORK.
CONTRACTOR
ACCESS TO
BASEMENT LEVEL
A1.004A1.00 5
NOT IN SCOPE
OF WORK-
OCCUPIED AREA
NOT IN SCOPE
OF WORK
GENERATOR - COORDINATE WITH MCC
PROJECT- PROTECT EQUIPMENT
COORDINATE ROOM ACCESS
DURING CONSTRUCTION WITH
OCCUPANTS - TREATMENT,
RECOVER, SURGERY PREP,
NECROPSY.
DUST PARTITION
DUST PARTITION - OR
SEAL DOORS AIR TIGHT
DUST PARTITION OR
SEAL DOORS AIR TIGHT
DUST
PARTITION
CONSTRUCTION
PARTITION
CONSTRUCTION
PARTITION
CONSTRUCTION
PARTITION W/ TEMPORARY
ACCESS DOOR
COORIDOR IS LAST
AREA OF RENOV
COORIDOR IS LAST
AREA OF RENOV TO
ALLOW ACCESS AS
REQUIRED
DUST PARTITION - OR
SEAL DOORS AIR TIGHT
CONSTRUCTION PARTITION
W/ TEMPORARY ACCESS
DOOR
COORDINATECONSTRUCTION
PARTITION W/ COR AND
OCCUPANT'S SCHEDULE FOR USE
OF TREATMENT, RECOVERY,
SURGERY PREP, NECROPSY,
6'-0"
COORDINATE BUILDING ACCESS
AND CLOSURE OF OPENINGS WITH
COR AND OCCUPANT'S OF
BUILDING
CONTRACTOR TO PROVIDE
TEMPORARY ENCLOSURE FOR EGRESS
OF CONSTRUCTION. ENCLOSURE
SHALL BE ROOFED AND WALL
ENCLOSURE, PROVIDE LOCKING
CONSTRUCTION DOOR
*NOTE:
COMPLETE CONNECTING
CORRIDOR AND ASSOCIATED WORK
WITHIN THIS AREA BEFORE
CLOSING OFF ANY OTHER AREAS IN
BUILDING 62
THE AHU ABOVE THIS SPACE TO BE FULLY
OPERATIONAL AND PUNCHED BEFORE
CONTINUING WITH WORK AT HOLDING
ROOMS. ALLOW A (2) WEEK PERIOD FROM
CLOSE OUTS OF THIS AHU BEFORE
COMMENCING TO NEXT PHASE.
PHASING ORDER TO BE DEVELOPED AND COORDINATED WITH COR
PRIOR TO CONTRACTOR MOBILIZATION.
THE MAJOR PHASES ARE:
AHU REPLACEMENT AT ANIMAL QUARANTINE
BUILDING 62 AND BUILDING 85 CONNECTOR
RE-ROOFING
EXTERIOR WALL RENOVATIONS
HOLDING ROOM RENOVATIONS
DEMOLITION OF EXISTING
CANOPY AND CONSTRUCTION
OF NEW ENCLOSURE SEE ADD
ALTERNATES
SEWER LINING AND MANHOLE
REHABILITATION SEE ADD
ALTERNATES
NO MAJOR
WORK. COORD.
WITH MECH AND
ELECTRICAL
A1.11
PREFINISHED METAL GUTTER
PREFINISHED METAL WALL PANEL
ALUMINUM FRAMED STOREFRONT SYSTEM
EXPANSION JOINT
PREFINISHED METAL DOWNSPOUT
FIXTURE - REF ELEC
COORDINATE OPENINGS WITH
DIAGONAL FLAT STRAPPING AS
REQUIRED BY METAL STUD
MANUF. DESIGN
EXISTING CONSTRUCTION
A1.11
PREFINISHED METAL ROOF
EDGE TRIM
EXPANSION JOINT
EXPANSION JOINT
HOLLOW METAL
DOOR AND FRAME
PREFINISHED METAL WALL PANEL
DIAGONAL FLAT STRAPPING AS
REQUIRED BY METAL STUD
MANUF. DESIGN
PLAN
BASE
HEAD
UNDERSIDE OF CEILING
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @
GWB AND 2 BEADS @ RUNNER. TYPICAL)
METAL RUNNER FASTENED 24" O.C. MAX
SOUND ATTENUATION BLANKET
5/8" GYPSUM BOARD WITH TAPED JOINTS
METAL RUNNER FASTENED 24" O.C. MAX
VISQUEEN - TAPE/SEAL TO FLOOR AND AT JOINTS
T.O. SLAB
METAL STUDS
VISQUEEN - TAPE/SEAL TO CEILING AND AT JOINTS
PLAN
BASE
HEAD
UNDERSIDE OF EXISTING CEILING
METAL RUNNER BRACED TO
ABOVE STRUCTURE AS
NECESSARY
SOUND ATTENUATION BLANKET
5/8" GYPSUM BOARD WITH TAPED JOINTS
METAL RUNNER FASTENED 24" O.C. MAX
T.O. SLAB
3 5/8" METAL STUD FRAMING
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:5
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.00
OVERALL,
PHASING,
CONNECTOR
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
3/32" = 1'-0"
GROUND FLOOR_OVERALL AND PHASING
1/4" = 1'-0"
CORRIDOR EAST ELEVATION
1/4" = 1'-0"
CORRIDOR WEST ELEVATION
1" = 1'-0"
DUST PARTITION - REFER TO DASHED DOT LINE TYPE
1" = 1'-0"
CONSTRUCTION PARTITION - REFER TO DOT LINE TYPE
CLEAN
CLEANCLEAN
DIRTY
TREATMENT SURGERY
SURGERY PREPRECOVERY
NECROPSY
No. Issue Date
F.E .C
TLT JAN TLT TLT UTILITY STOR
ELEVW/DSTAIR
NH - PRIMATE
FOOD STORAGE
DIRTY PROCESSING
CLEAN PRCESSING
OPEN PIT
DOSING
OFFICE
OFFICE
OFFICE
OFFICE
NECROPSY
TREATMENT SURGERY
RECOVERY SURGERY PREP
CLEAN CORRIDOR
CORRIDOR
DIRTY
CLEAN
CLEAN
BEHAVIOR LAB
PET LAB
WET LAB
RECYLCING
CORRIDOR
CLEAN
CLEAN
DIRTY
AIR LOCK
A B C D EX
TLT OFFICE
DIRTY WASH
CLEAN WASH
DIRTY CORR VESTIBULE
NH-PRIMATE
CLEAN CORR
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE (2ND
BEHAVIOR LAB)
LAB GEN
LAB SUPT
LAB SUPT
LAB SUPT
LAB CIRC
LAB GEN
FEED/BED
GOWN
NH-PRIMATE
NH-PRIMATE
STOR STOR
SHORE UP EXISTING FRAMING AS NECESSARY SEE REFERENCE DRAWINGS. A9.01,A9.02
27'-6 5/8" 27'-2 1/2"
EXISTING CMU WALLS TO
REMAIN - PROTECT
1. DEMOLITION SCOPE IS DESCRIBED IN CIVIL, ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS, CONTRACTOR SHALL REFER TO ALL DRAWINGS TO
DETERMINE THE COMPLETE DEMOLITION SCOPE REQUIRED.
2. CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO COMMENCING DEMOLITION AND
NOTIFY THE ARCHITECT AND OWNER OF ANY MAJOR DISCREPANCIES BETWEEN DEMOLITION
DRAWINGS AND EXISTING CONDITIONS.
3. REMOVE DEMOLITION MATERIALS PROMPTLY AND DISPOSE OF LEGALLY OFF SITE. DEBRIS TO
BE REMOVED FROM WORK AREA TO A DUMPSTER. PROTECT ROUTE AS REQUIRED. REMOVE AND
TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND
AREAS. CONTRACTOR TO VERIFY PROPOSED LOCATION OF DUMPSTER WITH FACILITIES.
4. ITEMS ON THE DEMOLITION PLANS SHOWN DASHED ARE INTENDED TO BE DEMOLISHED.
5. REMOVAL OF FINISHES SHALL INCLUDE REMOVAL OF ADHESIVES, BACKINGS, FASTENINGS, ETC.
ASSOCIATED WITH THE FINISHED MATERIAL TO BE REMOVED.
6. DEMOLISH ALL ELECTRICAL DEVICES, CONDUIT AND CONDUCTORS IN WALLS TO BE REMOVED.
ALL FEEDER CIRCUIT CONDUCTORS SHALL BE DEMOLISHED BACK TO PANEL UNLESS OTHERWISE
NOTED. CONDUIT ABOVE CEILING BACK TO PANEL MAY BE REUSED AS COORDINATED WITH WORK
FROM OTHER TRADES.
7. EXISTING MATERIALS TO REMAIN SHALL BE PROTECTED FROM DAMAGE AT ALL TIMES. EXISTING
BUILDING MATERIALS AND/OR FINISHES THAT ARE DAMAGED SHALL BE REPAIRED AND/OR
REPLACED TO SATISFACTION OF THE OWNER AND ARCHITECT AT NO ADDITIONAL COST TO THE
OWNER.
8. ANY HIDDEN STRUCTURAL COLUMNS OR SUPPORT IS TO BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT PRIOR TO REMOVAL. ANY BUILDING SUPPORT WHICH DEVIATES FROM THAT
SHOWN OR IS IN QUESTION IS TO BE BROUGHT TO ARCHITECT'S ATTENTION IMMEDIATELY.
9. ERECT AND MAINTAIN TEMPORARY BRACING, SHORING, LIGHTS, BARRICADES, WARNING SIGNS
AND GUARDS NECESSARY TO PROTECT THE PUBLIC AND ADJOINING PROPERTY FROM DAMAGE,
ALL IN ACCORDANCE WITH APPLICABLE REGULATION
10. PROVIDE FINAL CLEANING THROUGHOUT.
11. REFERENCE SHEETS A9.00 THROUGH A9.03 FOR INFORMATION ON EXISTING CONDITIONS AND
MATERIALS
DEMOLITION - GENERAL NOTES:
A B C D EX
4" CONCRETE TOPPING
AND EPOXY FINISH -
REMOVE COMPONENETS
DOWN TO EXISTING
BUILDING SLAB
SLAB ON GRADE.
REMOVE FLOORING
DOWN TO EXISTING
SLAB
TLT JAN TLT TLT UTILITY STOR
NH - PRIMATE
FOOD STORAGE
DIRTY PROCESSING
CLEAN PRCESSING
OPEN PIT
DOSING
NECROPSY
TREATMENT SURGERY
RECOVERY SURGERY PREP
CLEAN CORRIDOR
DIRTY
CLEAN
CLEAN
BEHAVIOR LAB
PET LAB
WET LAB
RECYLCING
CLEAN
CLEAN
DIRTY
AIR LOCK
CLEAN WASH
CLEAN CORR
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE
NH - PRIMATE (2ND BEHAVIOR LAB)
FEED/BED
STOR STOR
CMU CONSTRUCTION CMU CONSTRUCTION
METAL STUD FRAME
CONSTRUCTION
DOUBLE WYTHE 6" CMU
CONSTRUCTION
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:1
:2
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.01
DEMOLITION PLAN
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1/8" = 1'-0"
GROUND FLOOR DEMOLITION
KEYNOTE - DEMOLITION
01 METAL STUD FRAMED WALLS IDENTIFIED WITH DASH - REMOVE
02 EPOXY WALL BASE TO 48" AFF - REMOVE
03 SAW CUT TRENCH AT CONCRETE FLOOR SLAB AS REQUIRED FOR PLUMBING EXTENT
04 DOOR AND FRAME - REMOVE
06 GYPSUM CEILING AND ACOUSTIC INSULATION - REMOVE. COORDINATE WITH REFERENCE
DRAWINGS A9.02
07 CMU PARTITION AND SPLAYED FLOOR BASE - REMOVE CMU AND PORTION AS REQUIRED FOR
INSTALLATION OF NEW DOOR.COORDINATE NEW LINTEL INSTALLATION AT CMU
08 VERIFY IN FIELD LOCATION OF NEW DOOR - REMOVE DOUBLE WYTHE CMU PORTION AS REQUIRED
FOR INSTALLATION OF NEW DOOR AND LINTEL.
09 STRUCTURAL STEEL COLUMNS - PROTECT - TYP.
11 SWITCHGEAR AND ENCLOSURE - COORDINATE WITH MCC PROJECT SCOPE
12 GENERATOR AND GENERATOR ACCESS- COORDINATE WITH MCC PROJECT SCOPE
13 REMOVE EXISTING WALL COATINGS AND PREP FOR NEW FINISHES
14 EXISTING FLOOR EPOXY COATING ON CONCRETE UNDERLAYMENT - REMOVE AS NECESSARY
DOWN TO ORIGINAL CONCRETE SLAB SURFACE AND AS REQUIRED TO MEET DESIGN IN NEW
CONSTRUCTION. SEE LOCATIONS OF 4" CONCRETE TOPPING SLAB ON
15 WALLS TO REMAIN - REMOVE FINISHES DOWN TO SUBSTRATE. COORDINATE PATCHING LOCATIONS
WITH MEP SCOPE OF DEMOLISHING WALL MOUNTED EQUIPMENT
16 FABRICATED POST SUPPORTED CANOPY, STEEL RAILING AND CONCRETE SLAB - REMOVE
1" = 10'-0" M10
EXISTING CONDITIONS
F.E .C
A B C D EX
A4.02
G14
LARGE HOLDING
BEHAVIOR
LAB/HOLDING
LRG BREEDING
LRG FARROW
LRG HOLD
PROCESSING
STAIR
RECORDS
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
TLT
D GOWN
173A
CIRC
196B
HOLDING
HOLDING
HOLDING
CIRC
170B
CLEAN CORR
170A
CLEAN WASH
ISOLATION
DOSING
LAB SUPT
JAN
FOOD STOR
GOWN
SURGERY
SURGERY PREP
RECOVERY
NECROPSY
AIR LOCK
BEHAVIOR
WET LAB
PET LAB
MRI PREP
DIRTY CORR
CLEAN CORR
UTILITY
TLT
JAN
TLT
STOR
PROCESSING
STOR
TREATMENT
MRI
LAB GAS
MECHANICAL
EQUIP
WAITING
CONTROL
CORRIDOR
100A
TLT
DIRTY CORR
196A
DIRTY WASH
ELEV
E
NHP HOLDING
02 02
149A
149B
152A 152B
151B
150B150A
151A
15'-3 3/4" 1'-4" 54'-10" 7'-6"
A1.004A1.00 5
A1.11
C3C
C3D
/4
AFX-1
11'-1"
6'-4 5/8" 11'-5 1/2"
43'-5 1/4"
13FFE 274.19'
FFE 274.74'
EXISTING AREA/YARD
DRAIN - REPAIRED. SEE
MEP
S L O
P E
SLOPE
CORRIDOR
C3
MH
C3A
C3B
3A
3A
C4
8'-0"
6B
6B
S L O
P E
2A
C1
141A 141B
143A 143B
6B 6B
6B 6B
/4
S L O
P E
D O
W N
T O
B U
IL
D
IN
G
SLOPE
1. ALL MASONRY DIMENSIONS ARE NOMINAL, NOT ACTUAL.
2. ALL OTHER DIMENIONS ARE TO FACE OF STUD (F.O.C.) OR GRIDLINE UNLESS NOTED
OTHERWISE. CONTRACTOR IS TO VERIFY ALL DIMENIONS PRIOR TO CONSTRUCTION. COORDINATE ALL TRADES TO AVOID ANY DIMENSIONAL DISCREPANCIES. CONTACT ARCHITECT FOR DIMENSIONS NOT SHOWN.
3. AT EXPOSED SEALED OR POLISHED CONCRETE FLOORS, VERIFY CONTROL JOINT LOCATIONS/PATTERN
WITH ARCHITECT.
4. REFER TO ENLARGED PLANS FOR ADDITIONAL DIMENSION INFORMATION.
5. REFER TO FLOOR PATTERN PLANS AND FINISH SCHEDULE FOR FINISHES AND FLOOR FINISH PATTERNS
FLOOR PLAN - GENERAL NOTES:
/1 A101
ROOM NAME
DOOR NUMBER
ROOM NUMBER
VIEW NUMBER / SHEET
LOCATION
A101
SIM
SECTION NUMBER
SHEET
LOCATION
A.F.F.
1i
1'-0"
A101
SIM
COLUMN
GRID
CEILING
MATERIAL
CEILING
HEIGHT
DETAIL
NUMBER
SHEET
LOCATION
REFERENCE
ELEVATION
FLOOR PLAN LEGEND
AL-XX FRAME
TYPE
Level Name
Elevation
1 REVISION
TAG
A100 A1 ELEVATION
TAG
1A PARTITION
TYPE
B.B.
FIRE EXTINGUISHER
CABINET
BULLETIN
BOARD
C.G. CORNER
GUARD
FIRE
EXTINGUISHER
F.E.
TOILET ACCESSORY
TYPE
TA-1
FEC
ROOM
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:0
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.02
NEW
CONSTRUCTION
PLANS
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1/8" = 1'-0"
GROUND FLOOR NEW
KEYNOTE - PLAN
# User Keynote Text
01 TEMPORARY CONSTRUCTION BARRIER - SEE DETAILS
02 STAINLESS STEEL WALL PROTECTION - CONTINUOUS ON ALL CORRIDOR WALLS
WITH RADIUS CORNERS. PROVIDE FASTENING AS REQUIRED BY MANUF FOR
VARIED WALL TYPES.-MOUNT AT 36" AFF TO CENTER.
03 4" CONCRETE STOOP ON GRADE - SLOPE AWAY FROM BUILDING
04 PATCH WALL AT DOOR DEMO LOCATION. FINISH FLUSH WITH ADJACENT
SURFACES
05 INFILL WITH CMU WALL AND ALIGN W/ ADJACENT WALLS.RECONFIGURE STEEL
LINTEL FOR NEW OPENING. REFER TO A9.01 AND 9.02 FOR EXISTING
CONDITIONS.
06 GENERATOR AND GENERATOR ACCESS- COORDINATE WITH MCC PROJECT
SCOPE
07 THIS AREA GRAVELED AS PART OF ANOTHER PROJECT - PROTECT
08 EXPANSION JOINT -SIM. OR EQUAL TO JOINTMASTER 615 2"
09 6"x6" PREFINISHED ALUMINUM DOWNSPOUT AND CONCRETE SPLASH BLOCK -
COORDINATE W/ SEPARATE PROJECT IN THIS AREA FOR GRADING. SLOPE SO
WATER MOVES AWAY FROM BUILDING
10 CONCRETE LANDING - PROTECT
11 INLET DRAIN - PROTECT
12 SWITCHGEAR AND ENCLOSURE- COORDINATE WITH MCC PROJECT SCOPE
13 #4 x 2'-0" DOWELS @ 12" O.C. INTO EXISTING SLAB WITH HILTI HIT-HY200
ADHESIVE. IMBED 8" MIN., GREASE/OIL OPPOSITE END
14 DUCTILE IRON YARD DRAIN BASIN 2' x 2' GRATE ASSEMBLY. - TIE INTO EXISTING
STORM DRAIN VIF INLET AND OUTLET OF EXISTING STORM MANHOLES AND
INLETS TO ASSURE PROPER DRAINAGE
15 DOWNSPOUT CONNECTOR ONTO EXISTING DOWNSPOUT LEADER - TIE INTO
UNDERGROUND INLET
18 GRAVEL TO MATCH SITE GRAVEL FINISH ON EAST SIDE OF CORRIDOR
19 ROOF DRAIN CONNECTION - RELOCATE ROOF DRAIN CONNECTION TO EAST
SIDE OF CORRIDOR AND TIE INTO UNDERGROUND INLET
20 6"x6" PREFINISHED ALUMINUM DOWNSPOUT - TIE INTO UNDERGROUND STORM
DRAIN DOWNSPOUT ADAPTER AND 8" ADS N-12 ST PIPE
100 NO WORK THIS AREA
.C
A1.004A1.00 5
1/4" / 12"
BLDG 62
A1.03
Sim
BLDG 62
RD
RD RD
RD RD
CONDENSING UNIT
VTR EF
VTR VTR VTR VTR
RD
VTR
EXISTING ROOF LADDER
VTR VTR
VTR
EF
DUCT/ROOF
PENETRATION
GUTTER
VTR
VTR
RD
RD
ROOF LADDER
EXHAUST
EXHAUST
RD
RD
VTR
VTR
RDRD
RD
RD
RD
RD
CURB
CONDENSING UNIT
GUTTER
DS
DS
EXISTING ROOF LADDER
EXISTING ROOF LADDER
CONDENSING UNIT
VTR
EQUIPMENT CURB/POCKET
CONDENSING UNIT
RD
VTR
VTR
VTR
RDRD
RD
RD
RD
EQUIPMENT CURB/POCKET
DS
DS
PIPES DOWN AND PITCH POCKET
VTR
EXISTING ROOF
LADDER
DS
DS
DS
DS
PIPES ON RACKS
WITH PITCH POCKETS
PIPES ABOVE ROOF
INTO BUILDING 50
STANDING SEAM ROOF 'DOG HOUSE'- NO WORK
DS
REPLACE EXISTING GUTTER
DS
ELECTRICAL CONDUIT - COORDINATE
WITH MCC PROJECT
PHOTO 12
P H
O T O
P H O
TO
P H
O T
O
STANDING SEAM ROOF -
NO WORK
+/- 14'-8" AFF
+/- 30'-0" AFF
+/- 36'-0" AFF
+/- 12'-8" AFF
+/- 42'-0" AFF
+/- 18'-0" AFF
+/- 58'-0" AFF
+/- 67'-0" AFF
+/- 59'-0" AFF
+/- 10'-0" AFF
EXTERIOR METAL STAIR
+/- 12'-8" AFF
EXTERIOR METAL STAIR
LANDING
+/- 13'-8" AFF
EXISTING ROOF LADDER
RD
RD
RD
CANOPY - NOT IN
SCOPE OF WORK
CANOPY - NOT IN
SCOPE OF WORK
CANOPY - NOT IN SCOPE OF WORK
CANOPY - NOT IN SCOPE OF WORKCANOPY - NOT IN SCOPE OF WORK
P H
O T O
P H
O T
O
P H
O T
O
A1.03
Sim
PHOTO 3
P H
O T
O
PH
O
TO
PHOTO 8
P H
O T O
EXISTING DOWNSPOUT - RE-ROUTE
DOWNSPOUT TO DRAIN ONTO NEW
ROOF
P H
O T O
P H
O T
O
P H
O T
O
P H
O T
O
P H
O T
O
PHOTO 18
PHOTO 19
P H
O T
O
P H
O T
O
P H
O T
O
RD
P H
O T
O
P H
O T
O
P H
O T
O
P H
O T
O
P H
O T
O
P H
O T
O
P H
O T
O
PHOTO 31
HATCHED BUILDING 85 NOT IN SCOPE
EXISTING O.F. SCUPPER - EXTEND
8" BEYOND FACE OF BRICK
EXISTING O.F. SCUPPER - EXTEND
8" BEYOND FACE OF BRICK
EXISTING O.F. SCUPPER - EXTEND
8" BEYOND FACE OF BRICK
EXISTING O.F.
SCUPPER - EXTEND
8" BEYOND FACE OF
BRICK
EXISTING O.F. SCUPPER - EXTEND
8" BEYOND FACE OF BRICK
EXISTING O.F. SCUPPER - EXTEND
8" BEYOND FACE OF BRICK
HATCHED BUILDING NOT IN SCOPE
EXISTING ROOF
LADDER
EXISTING ROOF
LADDER
DS
DSDOOR TO ACCESS
THIS ROOF
AREA A
AREA A
AREA B
AREA C
AREA D
AREA E AREA F AREA G AREA H
AREA J AREA K
AREA L
AREA M
ROOFTOP DUCTWORK & PIPING WHICH IS TO REMAIN
IS NOT SHOWN. REFER TO PHOTOS 30, 31 & 32.
REFLASH ALL PENETRATIONS.
PROVIDE TUCKPOINTING AT COMPROMISED
MORTAR JOINTS PRIMARILY AT AREAS
IDENTIFIED BY DASHED LINES AND
INDICATED ON PHOTOS.
PROVIDE TUCKPOINTING AT
COMPROMISED MORTAR JOINTS
PRIMARILY AT AREAS IDENTIFIED BY
DASHED LINES AND INDICATED ON
PHOTOS.
P H
O T
O
PHOTO 35
P H
O T O
P H
O T
O
CONDENSING UNIT FOR CONNECTING
CORRIDOR
P H
O T
O
A
REPLACE EXISTING DOWNSPOUT
REPLACE EXISTING DOWNSPOUT
EXISTING OVERHANG. SEE PHOTO 29A/A8.03
REMOVE AND REPLACE EXISTING
EXPANSION JOINT COVER AT
ROOF-TO-WALL E.J. - TYP.
REMOVE AND REPLACE EXISTING
EXPANSION JOINT COVER AT
ROOF-TO-WALL E.J. - TYP.
PROVIDE TUCKPOINTING AT COMPROMISED
MORTAR JOINTS PRIMARILY AT AREAS
IDENTIFIED BY DASHED LINES AND
INDICATED ON PHOTOS.
MODIFIED BITUMEN
ROOFING SYSTEM
PREFINISHED MTL. GUTTER
AND DOWNSPOUTS
A14
A8.05
A14
A8.05
F9
A8.05
F9
A8.05
F9
A8.05
F9
A8.05
M10
A8.06
TYP
F9
A8.05
F9
A8.05
M10
A8.06
TYP
F9
A8.05
F9
A8.05
F14
A8.06
CAUTION: CONSTRUCTION CREWS ARE
NOT PERMITTED TO WALK ON THIS ROOF.
CONFIRM WITH OWNER EXACTLY WHICH
AREAS ARE OFF LIMITS PRIOR TO
CONSTRUCTION.
EXISTING MECH BRIDGE AND
PIPTING - PROTECT
ROOF SLOPE
TAPERED INSULATION
ROOF ASSEMBLY NOTE:
1. ENTIRELY REMOVE EXISTING ROOFING SYSTEM DOWN TO
EXISTING GYPSUM DECK AND/OR STEEL DECK.
2. FULLY ADHERE NEW INSULATION TO EXISTING DECK WITH
ADHESIVE APPROVED AND WARRANTED BY ROOFING
MANUFUACTURER. PULL TEST FOR EACH TYPE OF DECK
REQUIRED.
3. REFER TO DETAILS AND SPECIFICATION FOR COVERBOARD
AND BASE AND CAP SHEET MEMBRANES.
MECHANICAL, ELECTRICAL & PLUMBING WORK ON ROOF
ALL MEP WORK, INCLUDING DEMOLITION AND
INSTALLATION OF PIPING, MECHANICAL EQUIPMENT AND
DUCTWORK, AS RELATED TO THIS PROJECT IS TO BE
COMPLETED BEFORE THE ROOF REPLACEMENT
COMMENCES IN ORDER TO PROTECT THE NEW ROOF.
CONTRACTOR VERIFICATION
CONTRACTOR TO COORDINATE WITH ROOFING
MANUFACTURER FOR REQUIREMENTS OF PASSING PULL
TEST AND REMEDIATION OF ANY AREAS THAT HAVE NOT
PASSED THE PULL TEST.
PATCHING AND REPAIR OF GYPSUM ROOF DECK
REPAIR AND PATCH LIGHT WEIGHT GYPSUM ROOF DECK
WITH SIPLAST SONOPLAST OR EQUAL PER
MANUFACTURER’S RECOMMENDATIONS. PROVIDE A UNIT
PRICE PER SQUARE FOOT FOR REPAIR AND PATCHING
OF DECK. DOCUMENT LOCATIONS AND QUANTITIES.
REPORT FINDINGS TO OWNER. INCLUDE IN THE BASE BID
A QUANTITY OF 300 SQUARE FEET OF REPAIR AND
PATCHING
ROOF SCOPE OF WORK - BUILDING 62
1.EXISTING ROOF DRAINS TO REMAIN. REFLASH PER
DETAILS. REPORT ANY EXISTING DETERIORATION TO
ARCHITECT. SLOPE IS BUILT INTO EXISTING DECK.
MAINTAIN POSITIVE DRAINAGE.
2.REPLACE ALL EXISTING PREFINISHED ROOF EDGE
METAL, GRAVEL GUARDS, FASCIAS, ETC. TYPICAL AT ALL
PERIMETER LOCATIONS. SUBMITTALS REQUIRED. COLOR
TO BE SELECTED BY ARCHITECT FROM
MANUFACTURER'S STANDARD COLOR LINE.
3.REFLASH ALL NEW AND EXISTING ROOFTOP
EQUIPMENT INCLUDING, BUT NOT LIMITED TO, METAL
FLUES, VTR's, EXHAUST FAN/AHU CURBS, PIPE AND
CONDUIT PENETRATIONS, BUILT-IN LADDER SUPPORTS,
STRUCTURAL SUPPORT PENETRATIONS AND OTHER
MISC. ROOFTOP ITEMS. REFER TO ROOF DETAILS.
4.TEMPORARILY RAISE ANY EXISTING ROOFTOP
EQUIPMENT, PIPING, CONDUITS ETC, AND ASSOCIATED
SUPPORTS AS REQUIRED TO ACCOMPLISH ROOF TEAR-
OFF AND ROOF INSTALLATION. REINSTALL AND REUSE
EXISTING SUPPORTS.
5.PROVIDE CRICKETS AT 1/2" PER FOOT SLOPE IF AND
WHERE REQUIRED FOR POSITIVE DRAINAGE.
6.THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE
MEANS AND METHODS OF DEMOLITION AND THE SAFETY
OF THE EXISTING STRUCTURE.
7.COORDINATE ANY ELECTRICAL SHUTDOWNS WHICH
MIGHT BE NECESSARY WITH OWNER 15 DAYS IN
ADVANCE. COORDINATE STAGING OF CRANES AND
OTHER LIFTING EQUIPMENT WITH OWNER 5 DAYS IN
ADVANCE.
8.ONLY TEAR-OFF EXISTING ROOFING IN QUANTITIES AS
CAN BE WEATHERPROOFED THE SAME DAY. SCHEDULE
INSTALLATION APPLICATIONS SO THAT NO PARTIALLY
COMPLETED SECTIONS OF ROOF ARE LEFT EXPOSED AT
THE END OF THE WORKDAY.
9.EVERY EFFORT HAS BEEN MADE TO GENERALLY
IDENTIFY EXISTING FLASHING CONDITIONS AND
PENETRATIONS - ROOF DRAINS, VTR'S, MASONRY FLUES,
ROUND OR SQUARE GALV. FLUES AND PIPE
PENETRATIONS. ANY ROOFTOP ITEMS NOT SPECIFICALLY
IDENTIFIED ARE TO BE FLASHED PER SIMILAR DETAILS
AND NOTES AND PER MFR'S RECOMMENDATIONS.
CONTRACTOR IS RESPONSIBLE FOR QUANTITIES.
10.CONTRACTOR IS TO VERIFY EXISTING CONDITIONS,
DIMENSIONS, AND QUANTITIES PRIOR TO BIDDING.
CONTINUOUS SANTOPRENE SEAL
SIM OR EQUAL TO JOINTMASTER
A611
CONTINUOUS ALUMINUM FRAME
ACOUSTICAL CEILING
TILE AND TEE GRID
EXISTING MASONRY WALL
WALL TO ROOF EXPANSION JOINT
EXISTING MASONRY
CONSTRUCTION
MEMBRANE
ROOFING SYSTEM
M
IN
TERMINATION BAR AND
SEALANT
TURN UP ROOFING
MEMBRANE SYSTEM
2".
CONTRACTOR TO SURVEY EXISTING CONDITIONS AND COORDINATE WITH REQUIREMENTS INDICATED TO DETERMINE EXTENT OF SELECTIVE DEMOLITION REQUIRED.
WHEN UNANTICIPATED MECHANICAL, ELECTRICAL, OR STRUCTURAL ELEMENTS ARE ENCOUNTERED, INVESTIGATE AND MEASURE THE NATURE AND EXTENT OF THE CONFLICT. NOTIFY ARCHITECT IMMEDIATELY.
ALL EXISTING STRUCTURE THAT IS SHOWN IS FOR REFERENCE ONLY AND IS TO BE FIELD VERIFIED BY THE CONTRACTOR.
THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE SAFETY OF THE EXISTING STRUCTURE.
CONDUCT DEMOLITION OPERATIONS TO PREVENT INJURY TO PEOPLE. ENSURE SAFE PASSAGE OF PEOPLE AROUND SELECTIVE DEMOLITION AREAS.
PROTECT WALLS, CEILINGS, FLOORS, AND OTHER EXISTING FINISH WORK THAT IS TO REMAIN AND/OR IS EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS.
DEBRIS TO BE REMOVED FROM WORK AREA TO A DUMPSTER. PROTECT ROUTE AS REQUIRED. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. CONTRACTOR TO VERIFY
PROPOSED LOCATION OF DUMPSTER WITH NCTR.
LOCATIONS OF ALL STRUCTURAL ELEMENTS ARE SCHEMATIC/ DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY. NO STRUCTURAL MEMBERS SHALL BE CUT, ALTERED, WITHOUT PRIOR APPROVAL BY THE ARCHITECT/STRUCTURAL ENGINEER.
NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES.
PROTECT ADJACENT EXTERIOR MATERIAL TO REMAIN DURING DEMOLITION.
FOR ALL DEMOLITION PLANS REFER TO DEMOLITION KEY NOTES TO DETERMINE THE FULL EXTENT OF SELECTIVE DEMOLITION.
DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT INDICATED ON DEMOLITION PLAN AND/OR AS REQUIRED TO INSTALL NEW WORK SHOWN/SPECIFIED ELSEWHERE. USE METHODS REQUIRED TO COMPLETE WORK WITHIN
LIMITATIONS OF GOVERNING REGULATIONS.
CONTRACTOR SHALL BE RESPONSIBLE FOR PRE-DEMOLITION ASBESTOS SAMPLING. SEE SPEC FOR DETAIL REGARDING REPORT AND COST ESTIMATION.
GENERAL ROOF DEMOLITION NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
AREA A 3,670 S.F.
AREA B 1,060 S.F
AREA C 3,200 S.F.
AREA D 4,800 S.F.
AREA E 1,720 S.F.
AREA F 3,060 S.F.
AREA G 850 S.F.
AREA H 4,250 S.F.
AREA J 1,480 S.F.
AREA K 4,420 S.F.
AREA L 490 S.F.
AREA M 160 S.F.
ROOF AREA SIZES
SIZES ARE APPROXIMATE.
VERIFY IN FIELD
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:0
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.03
ROOF PLAN
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1" = 10'-0"
ROOF PLAN FOR ROOF REPLACEMENT SCOPE - SEE ADD ALTERNATE SPECIFICATION
1 1/2" = 1'-0"
EXPANSION JOINT SECTION
A B C D EX
A1.11
A.F.F.
GBD 1HR
9'-0" A.F.F.
GBD 1HR
9'-0"
A.F.F.
GBD
9'-0"
A.F.F.
GBD
9'-0"
A.F.F.
GBD 1HR
9'-0"
A1.03
A1.03
Sim
A.F.F.
GBD
9'-0" A.F.F.
GBD
9'-0"
A.F.F.
GBD
9'-0"
A.F.F.
GBD
9'-0"
A.F.F.
GBD 1HR
8'-8"
A.F.F.
ACT-1
9'-11"
A.F.F.
GBD 1HR
9'-0"
TYP. VERIFY CEILING
HEIGHT. MATCH
EXISTING CEILING
HEIGHTS
GROUND FLOOR
277'-2"
A1.11
K2
A1.11
K5
A1.11
P2
A1.11
P5
A1.03
4" SLAB ON GRADE REINFORCED WITH #4 BARS @ 18" O.C.
SUPPORTED ON CHAIRS AND CENTERED IN SLAB
VAPOR BARRIER
6" DRAINAGE FILL
COMPACTED EARTH
GRAVEL FILL - VERIFY
WITH EXISTING PROJECT
METAL WALL PANEL
MINERAL FIBER BOARD
INSULATION
EXTERIOR SHEATHING
FIBERGLASS BATT
INSULATION
ALUMINUM FRAMED
STOREFRONT SYSTEM
PREFINISHED METAL 6"
x6" GUTTER AND
DOWNSPOUT
MEMBRANE ROOFING
SYSTEM
REFERE TO CEILING
PLAN
6" LOAD BEARING METAL
STUD FRAMING
COLD FORMED METAL
JOIST ROOF FRAMING AT
16" O.C. MIN.
PROVIDE 1/2" EXPANSION JOINT FILLER AT
ALL CONDITIONS WHERE NEW CONCRETE
MEETS EXISTING CONCRETE
PROVIDE (2) #6 LONGITUDINAL BARS TOP & BOTT.
w/ #4 TIES @ 48" O.C.
PREFIN. MTL EDGE TRIM
PREFIN. MTL EDGE TRIM
/8
1/4" / 12"
METAL WALL PANEL SYSTEM
MINERAL FIBER BOARD
INSULATION
WEATHER BARRIER
EXTERIOR SHEATHING
6" FIBERGLASS BATT INSULATION
6" COLD-FORMED METAL
FRAMING (CFMF), 16" O.C. MAX
5/8" GYPSUM WALLBOARD
ALUMINUM FRAMED
STOREFRONT SYSTEM W/ HIGH
PERFORMANCE SILL, TYP.
FRTW BLOCKING (CONTINUOUS
ON ALL SIDES OF OPENING, TYP.)
CONTINUOUS SEALANT AT
PERIMETER (SEAL TO WEATHER
BARRIER)
PREFINISHED METAL SILL
FLASHING TO MATCH WALL PANEL,
SLOPED TO DRAIN
1/2" SOLID SURFACE WINDOW
SILL WITH EASED EDGE, BASIS
OF DESIGN: CORIAN, COLOR
TBD CONTINUOUS "J" TRIM &
CLEAT
3 1/8" 4 1/2"
WEATHER BARRIER
1" RIGID BD. INSULATION
(CONT. TYP.)
PREFIN.. MTL. GUTTER AND
DOWNSPOUT SYSTEM (FINISH
TO MATCH MTL. PNL.)
MEMBRANE ROOFING
SYSTEM
ROOF MEMBRANE
FLASHING AT GUTTERS
CONT. TREATED
BLOCKING
METAL WALL PANEL
R-20 RIGID BOARD ROOF
INSULATION
1 1/2" METAL DECK x 20 GA
GALV "B" DECK
FOAM IN PLACE INSULATION
5/8" EXTERIOR
SHEATHING
6" FIBERGLASS BATT INSULATION
6" COLD-FORMED METAL
FRAMING (CFMF), 16" O.C. MAX
5/8" GYPSUM WALLBOARD
FRTW BLOCKING (CONTINUOUS
ON ALL SIDES OF OPENING, TYP.)
CONTINUOUS SEALANT AT
PERIMETER (SEAL TO WEATHER
BARRIER, TYP.)
PREFINISHED METAL "J"
TRIM (FINISH TO MATCH
METAL WALL PANEL, TYP.)
METAL WALL PANEL SYSTEM
(VERTICAL PANEL)
MINERAL FIBER BOARD
INSULATION
WEATHER BARRIER
EXTERIOR SHEATHING
PREFINISHED METAL HEAD
FLASHING TO MATCH WALL PANEL
(SEAL AND FLASH TO WEATHER
BARRIER, TYP.)
SEALANT AND BACKER ROD
SLOPE FRTW BLOCKING
EXISTING GRAVEL SURFACE -
REMOVE AND REPLACE AS
REQUIRED
LIGHT GAUGE SUPPORT ANGLE
BY LIGHT GAUGE MANUF. (SEAL
TO FOUNDATION AND
EXTERIOR SHEATHING)
WEATHER BARRIER
MINERAL FIBER BOARD
INSULATION
PREFIN. MTL. WALL PANEL
SYSTEM
EXTERIOR SHEATHING
PREFIN. MTL. BASE TRIM BY
MTL. PANEL MANUF.(FINISH
TO MATCH MTL. WALL PANEL)
6" FIBERGLASS BATT
INSULATION
6" METAL STUD FRAMING
(CFMF), 16" O.C. MAX
5/8" GYPSUM WALLBOARD
BASE AS SCHEDULED
4" CONC SLAB REINF. W/ #4
@ 18" O.C. EA WAY
CLOSURE (PANEL FILLER)
BASE FLASHING
CONT. "Z" FURRING AT 16" O.C.
(OR AS REQ'D BY MANUF., TYP.)
VAPOR BARRIER
(2) #6 BARS TOP & BOTT. w/ #
4 TIES @ 48" O.C.
COMPACTED GRAVEL FILL
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:1
:2
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A1.11
CEILING PLAN,
AND DETAILS
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1/8" = 1'-0"
REFLECTED CEILING - NEW CONSTRUCTION
3/4" = 1'-0"
EXTERIOR SECTION
1 1/2" = 1'-0" P2
WINDOW SILL
1 1/2" = 1'-0"
K2
PARAPET NEW CONNECTOR
1 1/2" = 1'-0" K5
WINDOW HEAD
1 1/2" = 1'-0" P5
SILL DETAIL
A B C DX
71'-6" 6" 8'-5"
A4.02
A2
LARGE
HOLDING
BEHAVIOR
LAB/HOLDING
LRG
BREEDING
LRG HOLD
F2
SLOPE
SLOPE
CLEAN CLEAN DIRTY
K2
A11
A4.02
SLOPE
SLOPE
SLOPE
SLOPE
NHP
HOLDING
LRG
FARROW
SLOPE
SLOPE
C L
E A
R
C L
E A
R
C L
E A
R
SLOPE
SLOPE
152A
152B
151B151A
150A 150B
149B
149A
M .O
M .O
M .O
M .O
SLOPE
SLOPE
A4.02
A2
Sim
A4.02
A3
FULL LENGTH SLOPING
TRENCH AND GRATE.
TYP. AT ALL HOLDING
ROOMS
INFILL AT DOOR DEMO
6B
6C
6B
6B
6B
6B
6B
6B
6B
6B
6B
6B
6B5
8'-4" 1'-4"
/2
DOOR IN EXISTING
MASONRY OPENING
DOOR IN EXISTING
MASONRY OPENING DOOR IN EXISTING
MASONRY OPENING
DOOR IN EXISTING
MASONRY OPENING
DOOR IN EXISTING
MASONRY OPENING
DOOR IN NEW
MASONRY OPENING
TYP HOLDING ROOM ELEVATIONS
6B
C4
INFILL WITH DOUBLE WYTH
8" CMU REFER TO A9.01
DETAIL G4 AND A9.02 H1
FOR SIMILIAR CONDITION.
EXTEND LINTEL FOR NEW
OPENING LOCATION
6B
6B
141A 141B
143B143A
A14
A4.02
SimTYP.
6B
6B
C1
C L E
A R
/4
PROVIDE SMOOTH
TRANSISTION
BETWEEN
CORRIDOR AND
FINISHES - TYP.
EPOXY FLOORING SELF
COVE BASE - TURN UP
WALL 8"
A11
A4.02
STAINLESS STEEL
WALL PROTECTION
RAIL
RETURN VENTS -
COORD WITH MEP
CONTINUOUS TRENCH DRAIN
2" 4'-0" 2"
CAGE WASH WATER
SUPPLY/FLUSHING CONTROL
PANEL - COORDINATE WITH MEP
EXISTING CMU WALL WITH NEW
FINISHES
STAINLESS STEEL DOOR AND
FRAME W/ PROTECTION PANEL
LEVER PROTECTION AND RED
FILM GLASS AT DOOR LITE - SEE
HARDWARE SPECIFICATIONS
STAINLESS STEEL
WALL PROTECTION
RAIL
*ALL HOLDING ROOMS ARE SIMILIAR CONTINUOUS TRENCH DRAIN
EXISTING CMU WALL WITH NEW
FINISHES
STAINLESS STEEL DOOR AND
FRAME W/ PROTECTION PANEL
LEVER PROTECTION AND RED
FILM GLASS AT DOOR LITE - SEE
HARDWARE SPECIFICATIONS
MECHANICAL/STRUCTURAL
CHASE/NOISE ISOLATION
TRENCH SPRAY NOZZLE
SLOPED CONCRETE FLOOR
TOPPING
EXISTING CONCRETE
FLOOR
STEEL C JOIST
SOUND ATTENUATING
INSULATION
CONCRETE MASONRY
UNIT - 2 COATS BLOCK
FILLER AND IPX FINISH
2 LAYERS OF WR GYPSUM BOARD
CEILING W/ 2 STAGE IPX FINISH
INSULATION RETAINER
SLOPE TRENCH TO DRAIN
GRATE - REF MEP
A4.02
A14
EXISTING
WALL PROTECTION RAIL
4"
SLOPE
TRENCH DRAIN COVER FLUSH
WITH FLOOR FINISH - REF
PLUMBING
NOTCH BACK UNDERLAYMENT
AS NECESSARY FOR FLUSH
TRENCH COVER INSTALLATION
TYPICAL TRENCH DRAIN
SUPPORT SYSTEM BY TRENCH
DRAIN MANUF.
WALL CONSTRUCTION - REF
PARTITION SCHEDULE
FLOOR DRAIN AND STRAINER
ASSEMBLY BEYOND
TRENCH SPRAY NOZZLE
TOPPING SLAB - SIM OR EQUAL
TO SIKA QUICK 1,000
8"
EXISTING FLOOR SLAB
(WHERE OCCURS)
TURN UP EPOXY FLOOR
COATING +/- 6" TO MATCH
EXISTING SLOPED BASE
DETAILS
4"4"
0"
4"
0"
4"4"
4"
0"
4"
TROUGH -1"
TROUGH (DRAIN) -3"
TROUGH -1"
5/8" / 12"
5/8" / 12"
B.O. DOOR THRESHOLD TO
BE FLUSH WITH COORIDOR
AND HIGH POINT OF HOLDING
ROOM
NOTE:
-TROUGH (DRAIN) SLOPES TO DRAIN
-DOOR THRESHOLDS ARE ASSUMED AT +4" TO BE FLUSH WITH
TOP OF TOPPING SLAB
-1"
0"
TROUGH
ROOM
DRAIN
SLOPE SLOPE
SLOPESLOPE SLOPE
-3" Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:1
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A4.02
ENLARGED VIEWS
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
1/4" = 1'-0" G14
ENLARGED HOLDING
1/4" = 1'-0" A2
INTERIOR ELEV - PEN WALL
1/4" = 1'-0"
F2
INTERIOR ELEV - HOLDING TO DIRTY
1/4" = 1'-0" K2
INTERIOR ELEV - HOLDING TO CLEAN
1/2" = 1'-0" A11
TYPICAL WALL SECTION AT TOPPING SLAB HOLDING ROOM LOCATIONS
3" = 1'-0" A14
TRENCH DRAIN DETAIL
A6
TYPICAL HOLDING ROOM SLOPE LAYOUT
1/2" = 1'-0" A3
ENLARGED PLAN TRENCH SLOPE PLAN
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT
2 BEADS @ GWB AND 2 BEADS @ RUNNER. TYPICAL)
EDGE TRIM. TYPICAL WHERE VISIBLE
METAL RUNNER FASTENED 24" O.C. MAX
METAL STUDS (SEE SCHEDULE BELOW)
SOUND ATTENUATION BLANKET WHERE SCHED
5/8" GYPSUM BOARD U.N.O.
ADDITIONAL LAYER OF GWB WHERE SCHED
METAL RUNNER FASTENED 24" O.C. MAX
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @
GWB AND 2 BEADS @ RUNNER. TYPICAL)
T.O. SLAB
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT
(2 BEADS @ GWB AND 2 BEADS @ RUNNER. TYPICAL)
EDGE TRIM. TYPICAL WHERE VISIBLE
LINE OF CEILING. SEE REFLECTED CEILING PLAN
METAL RUNNER FASTENED 24" O.C. MAX
METAL STUDS (SEE SCHEDULE BELOW)
SOUND ATTENUATION BLANKET WHERE SCHED
5/8" GYPSUM BOARD U.N.O.
ADDITIONAL LAYER OF GWB WHERE SCHED
METAL RUNNER FASTENED 24" O.C. MAX
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT
(2 BEADS @ GWB AND 2 BEADS @ RUNNER. TYPICAL)
T.O. SLAB
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @
GWB AND 2 BEADS @ RUNNER. TYPICAL)
EDGE TRIM. TYPICAL WHERE VISIBLE
LINE OF CEILING. SEE REFLECTED CEILING PLAN
METAL RUNNER FASTENED 24" O.C. MAX
SOUND ATTENUATION BLANKET WHERE SCHED
5/8" GYPSUM BOARD U.N.O.
ADDITIONAL LAYER OF GWB WHERE SCHED
METAL RUNNER FASTENED 24" O.C. MAX
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @ GWB
AND 2 BEADS @ RUNNER. TYPICAL)
T.O. SLAB
SHIM SPACE WITH BRACES AS REQD
METAL STUDS (SEE SCHEDULE BELOW)
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
PERIMETER APPLICATION OF CONT. BEADS OF
SEALANT (2 BEADS @ GWB AND 2 BEADS @ RUNNER.
TYPICAL)
SOUND ATTENUATION BLANKET
WHERE SCHEDULED
5/8" GYPSUM BOARD U.N.O.
ADDITIONAL LAYER OF GWB
WHERE SCHEDULED
PERIMETER APPLICATION OF CONT. BEADS
OF SEALANT (2 BEADS @ GWB AND 2 BEADS
@ RUNNER. TYPICAL)
T.O. SLAB
METAL STUDS (SEE SCHEDULE BELOW)
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
LINE OF CEILING. SEE REFLECTED CEILING PLAN
HORIZONTAL JOINT REINFORCING
AT THE TOP AND BOTTOM COURSES
AND 16" O.C. VERTICALLY
CMU FOR EACH THICKNESS AND RATING
LISTED - SEE SCHEDULE BELOW
T.O. SLAB
COMPRESSIBLE FILLER
FILL CORES AS SCHEDULED BELOW
SEE STRUCTURAL FOR
REINFORCING REQUIREMENTS
1. SEE PARTITION DETAIL DRAWINGS AND PROJECT SPECIFICATIONS
FOR SEISMIC DETAILS AND PERFORMANCE CRITERIA FOR ALL STUD
AND MASONRY PARTITIONS
2. INSTALL CEMENTITIOUS BACKER BOARD IN LIEU OF GYPSUM WALL
BOARD AT LOCATIONS INDICATED TO RECEIVE WALL TILE
3. INSTALL WATER RESISTANT WALL BOARD AT ALL WALL SURFACES IN
TOILET ROOMS, JANITORS CLOSETS, AND SIMILAR WET AREAS NOT
INDICATED TO RECEIVE WALL TILE. INSTALL MINIMUM 2" PAST EDGE OF
FIXTURE AND 24" VERTICALLY ABOVE FIXTURE AT SINGLE FIXTURE
LOCATIONS
4. INSTALL TYPE "X" FIRE RATED GYPSUM BOARD AT ALL FIRE RATED
PARTITIONS
5. INSTALL "BLUEBOARD" GYPSUM WALL BOARD AT PARTITIONS INDICATED
TO RECEIVE VENEER PLASTER
6. STC RATINGS PROVIDE ONLY A GENERAL INDICATION OF ACOUSTIC
PERFORMANCE UNDER LABORATORY TEST CONDITIONS. CONSTRUCTION
DETAILS DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS DEFINE THE
SPECIFIC REQUIREMENTS FOR THE WORK
7. THE EXTRA LAYER OF GYPSUM WALL BOARD AT ASYMMETRICAL
PARTITIONS IS TO BE INSTALLED ON THE SIDE OF THE PARTITION ON
WHICH THE TYPE KEY IS SHOWN
8. SEE SPECIFICATION FOR ALL FIRE RESISTANT JOINT SYSTEMS FOR
LOCATIONS ABUTTING METAL DECK & /OR CONCRETE STRUCTURE
OVERHEAD
9. UNLESS INDICATED OTHERWISE, WALLS NOT SPECIFICALLY TAGGED
SHALL ACQUIRE THE TYPE PROPERTIES OF ADJACENT PARTITIONS.
10. REFER TO STRUCTURAL FOR DEFLECTION CRITERIA
WHEN DETERMINING GAUGE SIZES.
11. THE STC TEST RESULTS REFERENCED FOR INTERIOR PARTITIONS
TYPICALLY
INDICATE A METAL STUD SPACING OF 24" O.C.. WER PURPOSELY INDICATES
METAL STUD SPACING TO BE 16" O.C. AT INTERIOR PARTITIONS FOR
IMPROVED IMPACT RESISTANCE AND DURABILITY OF THE PARTITION. IT IS
EXPECTED THAT THE ACOUSTIC PERFORMANCE OF THE PARTITION WILL BE
MINUTELY REDUCED BY THIS CHANGE IN STUD SPACING, HOWEVER WE
KNOW OF NO TEST RESULTS AVAILABLE TO SPECIFICALLY QUANTIFY THAT
REDUCTION.
12. REFERENCE SPECIFICATIONS FOR TREATMENT OF WALL PENETRATIONS
13. COMPLY WITH THE SPECIFICATIONS, ASTM C 754-04 AND THE
MANUFACTURER'S RECOMMENDATIONS FOR METAL STUD PARTITIONS AND
WALL BRACING INSTALLATION REQUIREMENTS. REFER TO MANUFACTURER'S
NON-COMPOSITE LIMITING HEIGHT TABLES FOR THE MAXIMUM ALLOWABLE
PARTITION HEIGHTS FOR NON-COMPOSITE WALL ASSEMBLIES.
14. REFER TO STRUCTURAL FOR THE STRUCTURAL DESIGN PARAMETERS
FOR MASONRY WALL ASSEMBLY INSTALLATION REQUIREMENTS AND LIMITS.
GENERAL NOTES
PLAN
BASE
HEAD
UNDERSIDE OF STRUCTURE
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @
GWB AND 2 BEADS @ RUNNER. TYPICAL)
EDGE TRIM. TYPICAL WHERE VISIBLE
LINE OF CEILING. SEE REFLECTED CEILING PLAN
CONT FIRE RETARDANT BLOCKING
SOUND ATTENUATION BLANKET WHERE SCHED
5/8" GYPSUM BOARD U.N.O.
ADDITIONAL LAYER OF GWB WHERE SCHED
CONT FIRE RETARDANT BLOCKING
PERIMETER APPLICATION OF CONT. BEADS OF SEALANT (2 BEADS @
GWB AND 2 BEADS @ RUNNER. TYP)
T.O. SLAB
METAL CHANNELS (SEE SCHEDULE BELOW)
SHIM SPACE WITH BRACES AS REQD
STUD WALL
FURRING WALL
FURRING CHANNELS
SHAFT WALL
CHASE WALL
5 CMU
LINE OF CEILING. SEE REFLECTED CEILING PLAN
1" LINER PANEL
15'-4" 3"3 5/8"
5/8"
16" O.C. 20 49
SA-870717
5/8"
1A
(TOTAL WALL WIDTH: 4 7/8")
15'-4" NONE3 5/8"
5/8"
16" O.C. 20 40
USG-860808
5/8"
1B
(TOTAL WALL WIDTH: 4 7/8")
15'-4" NONE EXTEND GYP. BD. 6"
ABOVE CEILING, SEE
GENERAL NOTE 13
3 5/8"
5/8"
16" O.C. 20 40
USG-860808
5/8"
1C
(TOTAL WALL WIDTH: 4 7/8")
19'-9" 3"6"
5/8"
16" O.C. 20 49
SA-870717
5/8"
1D
(TOTAL WALL WIDTH: 7 1/4")
15'-4" 3"
SEE GENERAL NOTE 7
3 5/8"
1/2" RESILIENT CHANNEL
16" O.C. 20 54
RAL-TL-83-216
5/8"
1E
5/8"
(TOTAL WALL WIDTH: 5 3/8")
19'-9" 3"
SEE GENERAL NOTE 7
6"
1/2" RESILIENT CHANNEL
16" O.C. 20 54
RAL-TL-83-216
5/8"
1F
5/8"
(TOTAL WALL WIDTH: 7 3/4")
15'-4" 3" 1 HR
SEE GENERAL NOTE 7
3 5/8"
1/2" RESILIENT CHANNEL
16" O.C. 20 54
RAL-TL-83-216
UL-U419
5/8"
1G
5/8"
(TOTAL WALL WIDTH: 5 3/8")
15'-4" NONE 1 HR3 5/8"
5/8"
16" O.C. 20 40
USG-860808
UL-U419
5/8"
1H
(TOTAL WALL WIDTH: 4 7/8")
15'-4" 3" 1 HR3 5/8"
5/8"
16" O.C. 20 49
SA-870717
UL-U419
5/8"
1J
(TOTAL WALL WIDTH: 4 7/8")
15'-4" NONE 2 HR3 5/8"
5/8"
16" O.C. 20 N/A UL-U419
5/8"
1K
5/8" 5/8"
(TOTAL WALL WIDTH: 6 1/8")
15'-4" 3" 2 HR3 5/8"
5/8"
16" O.C. 20 N/A UL-U419
5/8"
1L
5/8" 5/8"
(TOTAL WALL WIDTH: 6 1/8")
MAX
HEIGHT
INSUL.
THICKNESS
FIRE
RATING
REMARKS
STUD SIZE
1ST LAYER
SPACING MIN.
GAUGE
STC
TEST
TEST
DESIGN
1ST LAYER
TYPE
2ND LAYER 2ND LAYER
(TOTAL WALL WIDTH: "INCHES")
17'-6" 3 1/2" (1 SIDE) 1 HR2 1/2
5/8"
16" O.C. 20 48
RAL-TL-76-155
UL-U420
5/8"
5A
(TOTAL WALL WIDTH: 24")
2 1/2
16" O.C.
1' - 5 3/4"
MAX
HEIGHT
INSUL.
THICKNESS NONE
REMARKS
STUD SIZE
1ST LAYER
SPACING MIN.
GAUGE
STC TEST TEST
DESIGN
1ST LAYER
TYPE
(TOTAL WALL WIDTH: "VARIES")
STUD SIZE
SPACING
AIR SPACE
N/A NONE NONE EXTEND GYP. BD. 6"
ABOVE CEILING. SEE
GENERAL NOTE 13
2 1/2"
5/8"
16" O.C. 20 N/A N/A 2B
(TOTAL WALL WIDTH: 3 1/8")
N/A NONE NONE EXTEND GYP. BD. 6"
ABOVE CEILING. SEE
GENERAL NOTE 13
3 5/8"
5/8"
16" O.C. 20 N/A N/A 2A
(TOTAL WALL WIDTH: 4 1/4")
MAX
HEIGHT
INSUL.
THICKNESS
FIRE
RATING
REMARKS
STUD SIZE
1ST LAYER
SPACING MIN.
GAUGE
STC
TEST
TEST
DESIGN
TYPE
(TOTAL WALL WIDTH: "VARIES")
MAX
HEIGHT
INSUL.
THICKNESS
FIRE
RATING
REMARKS
STUD SIZE
1ST LAYER
SPACING MIN.
GAUGE
STC
TEST
TEST
DESIGN
TYPE
(TOTAL WALL WIDTH: "VARIES")
N/A NONE NONE EXTEND GYP. BD. 6"
ABOVE CEILING. SEE
GENERAL NOTE 13
7/8"
5/8"
16" O.C. 20 N/A N/A 3A
(TOTAL WALL WIDTH: "1 1/2")
MAX
HEIGHT
INSUL.
THICKNESS
FIRE
RATING
REMARKS
NOMINAL
SIZESPACING MIN.
GAUGE
STC
TEST
TEST
DESIGN
TYPE
(TOTAL WALL WIDTH: "INCHES")
NONE SEE GENERAL NOTE
8"
N/A N/A N/A N/A 6A
(TOTAL WALL WIDTH: 7 5/8"")
12'-0" 1" 1 HR2 1/2" C-H
5/8"
24" O.C. 20 48
RAL-0T-04-022
UL-U415
1" LINER PANEL
4A
(TOTAL WALL WIDTH: 3 1/8")
NONE SEE GENERAL NOTE
6"
N/A N/A N/A N/A 6B
(TOTAL WALL WIDTH: 5 5/8"")
NONE SEE GENERAL NOTE
4"
N/A N/A N/A N/A 6C
(TOTAL WALL WIDTH: 3 5/8"")
MAX
HEIGHT
INSUL.
THICKNESS
FIRE
RATING
REMARKS
STUD SIZE
1ST LAYER
SPACING MIN.
GUAGE
STC
TEST
TEST
DESIGN
LINER PANEL
TYPE
(TOTAL WALL WIDTH: "VARIES")
14'-0" 1 1/2" 1 HR4" C-H
5/8"
24" O.C. 20 48
RAL-0T-04-019
UL-U415
1" LINER PANEL
4B
(TOTAL WALL WIDTH: 4 5/8")
15'-4"
EXTEND STUDS & G.B.
AT ONE SIDE TO DECK.
SEAL SMOKE TIGHT.
SEE GENERAL NOTE 7.
SEE GENERAL NOTE
3 5/8"
5/8"
16" O.C. 20 N/A
5/8"
1M
(TOTAL WALL WIDTH: 4 7/8")
2" MIN
SEE PLAN
5/8" GYP. GUSSET
(NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED) (NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED) (NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED)
(NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED)
(NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED)
(NOTE: SOME PARTITION TYPES LISTED MAY NOT BE USED)
Copyright
Date
Title
Sheet No.
901 West Third Street Little Rock, Arkansas 72201 501.374.5300
Seal
Job No.
www.WERarch.com
SRQPNMLKJHGFEDCBA
A B C D E F G H J K L M N P Q R S
ARCHITECT
WER Architects/Planners
/1
/2
:0
:1
A
M
C U s e rs
\a s a n d e rs o n
\D o c u m e n ts \F
D A
ID
I2
.0
-F
D A
B u ild in g
C o n s t D o c s v a s a n d e rs o n
W E
.r v t
FDA Jefferson
Laboratories
BLDG. 62
RENOVATIONS
3900 NCTR Road, HFT_324
Jefferson, AR 72079
MEPFP ENGINEERS
Energy Engineering Consultants, Inc 10 Corporate Hill Dr Little Rock, AR 72205 501-244-0511
A6.01
PARTITION
SCHEDULE
03/24/22
FDAIDI21.01
OWNER
FDA
Jefferson Laboratories
OAGS - Field Operations Branch 3900 NCTR Road Jefferson, AR 72079
P ro je c t
N a m e
ISSUE FOR CONSTRUCTION
NOTES:
1. REFER TO PARTITION SCHEDULE FOR SPECIFIC STUD FRAMING DETAILS
2. ALL STUDS ARE SPACED 16" O.C. MAXIMUM.
3. ALL STUDS SHALL BE "C" STUDS WITH 1/4" MINIMUM FLANGE
4. DENOTES SHELVING OR CABINETRY.
5. DENOTES MASONRY VENEER.
6. REFER TO SPECIFICATIONS FOR STUD TYPE AND GAUGE
7. IN NO CASE SHALL DOUBLE STUDS AT SIDES OF OPENING BE CUT FOR DUCTWORK OR OTHER MECHANICAL SYSTEMS.
8. IN PROJECTS IN SEISMIC ZONES, MINIMUM STUD GAUGE IS 20 GA. - DETAILS TO BE MODIFIED ACCORDINGLY.
MOUNTING
DETAIL B
TYPICAL STUD FRAMING ELEVATIONS
PROVIDE DIAGONAL BRACING OF TOP
TRACK AT 48" O.C. MAX BETWEEN NON FULL
HEIGHT STUDS.
BELOW
CEILING
OPENING
LARGE BELOW
CEILING
OPENINGDOUBLE
DOOR
OPENING
DOOR
OPENING
DOUBLE
STUDS, FULL
HEIGHT.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .