Amendment 5 Attachment 2 Substitution Request form.pdf

PDF 61 KB Posted

Attached to
Building 62 Renovation Federal contract opportunity
Solicitation number
75F40122R00086
Issued by
Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services

About this file

This document is a substitution request form for a school construction project. The form is to be completed by contractors requesting to substitute alternative products specified in the project specifications. It requires information on how the proposed substitution would impact the project design, other trades, and warranties. Contractors must also agree to pay any additional costs resulting from design changes needed to accommodate the substitution. The form is to be submitted to the architect for review and approval or rejection of the requested substitution.

The related federal contract opportunity is a solicitation to renovate Building 62 for the Food and Drug Administration. Offerors should see the attached solicitation documents for requirements and site visit information. The opportunity type is listed as a solicitation and the agency is identified as the Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services.

View the file

Other files for this federal contract opportunity

Other files attached to Building 62 Renovation, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 5 Attachment 1 revised Sol Doc bldg 62 renovation.docx DOCX document
Amendment 5 Attachment 3 as-builts 1962 Pilot Line Facilities - 03-01-62.pdf PDF
amendment 4.pdf PDF
amendment 3.pdf PDF
Amendment 3 Attachment 3 Section 280746-CAT 6.pdf PDF
Amendment 3 Attachment 1 Campus 1991-1992 - Street Lighting System - 11-24-92.pdf PDF
Amendment 3 Attachment 2 Table of Contents_10.03.2022.pdf PDF
Amendment 2 Attachment 2 updated Attachment J-3 Wage Decision.pdf PDF
Amendment 2 Attachment 3 09 6700-RESINOUS AGGREGATE FLOORING 09.30.2022.pdf PDF
Amendment 2 Attachment 1 revised Sol Doc bldg 62 renovation.pdf PDF
amendment 2.pdf PDF
Amendment 1 Attachment 3 Site Light cutsheet.pdf PDF
Amendment 1 Attachment 4 Adaptor cutsheet.pdf PDF
Amendment 1.pdf PDF
Amendment 1 Attachment 1 updated Specifications.pdf PDF
Amendment 1 Attachment 2 A1.02 22.09.12 UPDATE.pdf PDF
Attachment 2 D Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 E Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 G Drawings Bldg 62 Renovation.pdf PDF
Attachment 4 - Form FDA 3398.pdf PDF
Attachment 1 Project Manual Bldg 62 Renovation.pdf PDF
Attachment 2 C Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 F Drawings Bldg 62 Renovation.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Sol Doc 75F40122R00086 bldg 62 renovation.pdf PDF
Attachment 2 A Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 B Drawings Bldg 62 Renovation.pdf PDF
Attachment 5 Sample Client Authorization Letter.docx DOCX document
Attachment 6 Past Performance Evaluation Questionnaire.docx DOCX document
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JACKNP15.09 00 6325 - 1 SUBSTITUTION REQUEST FORM

JNPSD New Elementary School 03/02/2020

SECTION 00 6325

SUBSTITUTION REQUEST FORM

SEND TO:

WER ARCHITECTS / PLANNERS ATTN: MATTHEW SWAIM

901 W. 3RD STREET

LITTLE ROCK, AR 72201

PHONE: 501-374-5300 FAX: 501-374-5247

SECTION:___________PARAGRAPH:_________SPECIFIED ITEM:________________________

PROPOSED SUBSTITUTE:_______________________________________________

ATTACH, COMPLETE DESCRIPTION, DESIGNATION, CATALOG OR MODEL NUMBER, SPEC DATA

SHEET, AND OTHER TECHNICAL DATA, INCLUDING LABORATORY TESTS IF APPLICABLE.

ANSWER THE FOLLOWING QUESTIONS:

WILL SUBSTITUTION AFFECT DIMENSIONS INDICATED ON DRAWINGS? IS THE SIZE

DIFFERENT PHYSICAL SIZE?

WILL SUBSTITUTION AFFECT WIRING, PIPING, DUCTWORK, ETC. INDICATED ON DRAWINGS?

THIS INCLUDES LOWER OR HIGHER ELECTRICAL LOAD AND/OR VOLTAGE; DIFFERENT BTU

HEAT LOAD AND/OR OR VENTING; REQUIRED CLEARANCES, ETC.

WHAT AFFECT WILL SUBSTITUTION HAVE ON OTHER TRADES?

LIST ANY DIFFERENCES BETWEEN PROPOSED SUBSTITUTION AND SPECIFIED ITEM:

IF NECESSARY, WILL THE UNDERSIGNED PAY FOR ARCHITECTS/ENGINEER'S COSTS,

REQUIRED TO REVISE WORKING DRAWINGS, THAT ARE CAUSED BY SUBSTITUTION?

MANUFACTURER'S WARRANTY OF PROPOSED ITEMS ARE [ ] SAME [ ] DIFFERENT

PROPOSED COST SAVINGS USING SUBSTITUTION PRODUCT:_____________________________

REVIEW COMMENTS:

[ ] APPROVED

[ ] APPROVED AS NOTED (SEE ATTACHED EXPLAINATION)

[ ] NOT APPROVED / REJECTED

[ ] REJECTED / RECEIVED TOO LATE / NOT REVIEWED

REMARKS: ________________________________________REVIEWED BY: _________________

SUBMITTED BY:

FIRM: _______________________________________________

ADDRESS: ____________________________________________

SIGNATURE: ___________________________________________

DATE: _______________________________________________

PHONE/EMAIL: ________________________________________

END OF SECTION