amendment 3.pdf

PDF 90 KB Posted

Attached to
Building 62 Renovation Federal contract opportunity
Solicitation number
75F40122R00086
Issued by
Department of Health and Human Services Food and Drug Administration Office of Acquisition and Grant Services

About this file

This is an amendment to a solicitation providing answers to questions from potential offerors, updated specifications, and additional specification sections. Key details include answers to questions on access to laboratory areas during demo and reconstruction work, confirmation of circuit sources for lighting poles to connect to campus automation system, and addition of specification sections for computer network systems and category 6 cabling. The amendment does not extend the response date. The related federal contract opportunity is for building renovation services at the Department of Health and Human Services Food and Drug Administration building located at NCTR.

View the file

Other files for this federal contract opportunity

Other files attached to Building 62 Renovation, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 5 Attachment 2 Substitution Request form.pdf PDF
Amendment 5 Attachment 1 revised Sol Doc bldg 62 renovation.docx DOCX document
Amendment 5 Attachment 3 as-builts 1962 Pilot Line Facilities - 03-01-62.pdf PDF
amendment 4.pdf PDF
Amendment 3 Attachment 1 Campus 1991-1992 - Street Lighting System - 11-24-92.pdf PDF
Amendment 3 Attachment 2 Table of Contents_10.03.2022.pdf PDF
Amendment 3 Attachment 3 Section 280746-CAT 6.pdf PDF
amendment 2.pdf PDF
Amendment 2 Attachment 1 revised Sol Doc bldg 62 renovation.pdf PDF
Amendment 2 Attachment 2 updated Attachment J-3 Wage Decision.pdf PDF
Amendment 2 Attachment 3 09 6700-RESINOUS AGGREGATE FLOORING 09.30.2022.pdf PDF
Amendment 1.pdf PDF
Amendment 1 Attachment 1 updated Specifications.pdf PDF
Amendment 1 Attachment 2 A1.02 22.09.12 UPDATE.pdf PDF
Amendment 1 Attachment 3 Site Light cutsheet.pdf PDF
Amendment 1 Attachment 4 Adaptor cutsheet.pdf PDF
Attachment 1 Project Manual Bldg 62 Renovation.pdf PDF
Attachment 2 C Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 F Drawings Bldg 62 Renovation.pdf PDF
Attachment 3 Wage Determination.pdf PDF
Sol Doc 75F40122R00086 bldg 62 renovation.pdf PDF
Attachment 2 A Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 B Drawings Bldg 62 Renovation.pdf PDF
Attachment 5 Sample Client Authorization Letter.docx DOCX document
Attachment 6 Past Performance Evaluation Questionnaire.docx DOCX document
Attachment 2 G Drawings Bldg 62 Renovation.pdf PDF
Attachment 4 - Form FDA 3398.pdf PDF
Attachment 2 D Drawings Bldg 62 Renovation.pdf PDF
Attachment 2 E Drawings Bldg 62 Renovation.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

75F40122R00086 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

HFT-323

JEFFERSON AR 72079

3900 NCTR ROAD

OAGS - Field Operations Branch

FDA/OO/OFBA/OAGS/DAP

10/04/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

09/12/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide the following:

A. Provide answers to questions received.

B. Provided updated Specifications.

A. Questions and Answers

1. Can we obtain access for us inside the main area of the laboratory where we are going to be doing demo and reconstruction? It?s very important that we lay eyes on this area if possible.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

75F40122R00086/0003

Response: No.

2. Please reference plan sheets E0.01 and E0.02 (Electrical Site Plans East & West), Keyed Notes 1,2 & 3. Can NCTR provide the ?Circuit Source? (panel # and Bldg. #) for each of the 28 lighting poles shown on the plans that are to be connected to the campus automation system?

Response: See reference drawings Amendment 3 Attachment 1.

3. Spec Section 14 2201, subsection 1.06 QUALITY ASSURANCE, lists ?Approved Contractors: 1. Geared Elevator: KONE, Otis, Schindler, ThyssenKrupp, Hollister-Whitney.? Will the government add Arkansas Elevator to this list of

Approved Contractors?

Response: No, refer to specifications section 01 2500 SUBSTITUTION PROCEDURES.

B. Replace Table of Contents from Amendment 1 Attachment 1 updated Specifications with Amendment 3 Attachment 2 updated Table of Contents. Add Specification Section

280746 Computer Network System- Category 6 to Amendment 1 Attachment 1 updated

Specifications with Amendment 3 Attachment 3 Section 280746 Category 6.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .