Attachment 2 A-10 Section J Equipment Cleaning Inspection and Verification Form.pdf

PDF 350 KB Posted

Attached to
Road Construction MATOC for Alaska Federal contract opportunity
Solicitation number
1240BJ22R0003
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

This document outlines a Multiple Award Task Order Contract opportunity for road construction services in Alaska. The Forest Service is seeking contractors to perform various types of highway, street, trail, and bridge construction work such as new road construction, road reconstruction, culvert installation, erosion control, and bridge building. The contract is a MATOC through which task orders will be issued for specific projects. These will include details supplementing the base contract terms, such as payment items, specifications, drawings, inspection requirements, performance periods, and other project-level needs. Work will involve clearing, earthwork, drainage, aggregate production, road surfacing, demolition, and emergency reconstruction. Contractors must have qualified personnel and equipment to complete tasks to specifications. The agency intends to award multiple contracts under which contractors will then bid on individual task orders.

View the file

Other files for this federal contract opportunity

Other files attached to Road Construction MATOC for Alaska, newest first.
File Type Posted
88-96 TL2 4BM Steel Superstructure_APP B.pdf PDF
48-72 TL2 4BM Steel Substructure_APP A.pdf PDF
1240BJ22R0003P0001.pdf PDF
Trail_Specifications.pdf PDF
90-100 TL1 4BM Steel Abutment_APP A.pdf PDF
60-80 TL1 4BM Steel Abutment_APP A.pdf PDF
30-50 TL1 4BM Steel Superstructure_APP B.pdf PDF
90-100 TL1 4BM Steel Superstructure_APP B.pdf PDF
road_typicals_MATOC.pdf PDF
Forest Service Supplemental Specs_FSSS_MATOC.pdf PDF
48-64 TL2 4BM Steel Superstructure_APP B.pdf PDF
80-104 TL2 4BM Steel Substructure_APP A.pdf PDF
Answers to formal questions.pdf PDF
Filliable Attachment 4 A-10 Section J Past Performance Questionnaire.pdf PDF
Section B Fillable.pdf PDF
72-80 TL2 4BM Steel Superstructure_APP B.pdf PDF
30-50 TL1 4BM Steel Abutment_APP A.pdf PDF
60-80 TL1 4BM Steel Superstructure_APP B.pdf PDF
sd-320_glulam_slab_bridge_20051202.pdf PDF
Standard Trail Drawings.pdf PDF
104 TL2 4BM Steel Superstructure_APP B.pdf PDF
Road Construction for Alaska Solicitation 1240BJ22R0003.pdf PDF
Attachment 3 A-10 Section J Maps.pdf PDF
Attachment 4 A-10 Section J Past Performance Questionnaire.pdf PDF
1240BJ22R0003 (3).pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQUIPMENT CLEANING INSPECTION/VERIFICATION FORM

Contract #:

Contract Title:

Contractor Representative:

USFS COR/Inspector:

Type of Equipment:

How was the Equipment Cleaned?

Where was the Equipment Cleaned?

LOCATION OF LAST OPERATIONS

State:

Federal Location:

Non-Federal Location:

I certify that all requirements as outlined in the equipment cleaning contract provisions have been met and that all equipment has been thoroughly cleaned of soil, seeds, and vegetative material. I also certify that the above information is true to the best of my knowledge.

Contractor Signature:

Date:

File details come from the government source that posted it. Updated .