Attachment 2 674-22-107 VA Temple Replace Cart Elevators Specifications.pdf
PDF 1 MB Posted
- Solicitation number
- 36C25726R0013
About this file
This document is a detailed technical specification for replacing cart elevators at the Central Texas Veterans Healthcare System's Building 163 Surgical Suite in Temple, Texas. The project involves completely demolishing and removing existing cart elevator components, including cab, doors, wall/floor finishes, and associated electrical and mechanical equipment, and installing new lift equipment. The specification covers comprehensive requirements for asbestos abatement, site preparation, construction barriers, negative air pressure systems, worker safety protocols, personal protective equipment, decontamination procedures, and final testing/clearance requirements.
The specification is extensively structured across multiple sections detailing technical and safety requirements, including precise instructions for regulated area preparations, ACM removal, lockdown encapsulation, waste disposal, and project decontamination. Key technical specifications mandate specific procedures for wetting asbestos-containing materials, packaging waste, maintaining negative air pressure, and conducting final visual inspections and air clearance testing. The project will require specialized contractors with extensive asbestos abatement experience, comprehensive safety training, medical surveillance, and compliance with federal, state, and local regulations governing hazardous material removal and construction activities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0013 0003.docx | DOCX document | |
| 36C25726R0013 0002.docx | DOCX document | |
| Cart Elevator Site Visit - 11-13-25.pdf | ||
| 36C25726R0013 0001.docx | DOCX document | |
| Attachment 3 Price Breakout Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 1 674-22-107 VA Temple Replace Cart Elevators Drawings.pdf | ||
| 36C25726R0013_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
674-22-107
REPLACE CART ELEVATORS
- SURGERY
Central Texas Veteran’s Healthcare System Building 163 Surgical Suite Temple, Texas a
October 17, 2023
100% CD
REVIEW
Engineers
ELK CONSORTIUM
2797 Valencia Lane Schertz, Texas 78154 940.642.9158
Seals
SPECIFICATIONS ARE FOR
REVIEW ONLY.
NOT FOR REGULATORY APPROVAL,
PERMITING OR CONSTRUCTION.
REPLACE CART ELEVATORS - SURGERY 674-22-107
Building 163 Surgical Suite VAMC Temple, TX
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
05-01-22
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 00 Cover Sheet 00 01 07 Seal Page 00 01 10 Table of Contents 00 73 19 Health and Safety Requirements 00 73 19A ICRA 2.0 ICRA Permit 00 73 19B ICRA 2.0 Matrix of Precautions for Construction
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 25 00 Substitution Procedures 01 25 00A Substitution Request Form 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 00 Submittal Procedures 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 08-17
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21 08 31 13 Access Doors and Frames 04-22
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-21
DIVISION 10 – SPECIALTIES
10 26 00 Wall and Door Protection 01-21
DIVISION 11 – EQUIPMENT
Not used
DIVISION 12 – FURNISHINGS
Not used
DIVISION 13 - SPECIAL CONSTRUCTION
Not used
DIVISION 14– CONVEYING EQUIPEMENT
14 46 11 Material Cartlift
DIVISION 21- FIRE SUPPRESSION
DIVISION 22 – PLUMBING
Not used
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
Not used
DIVISION 26 – ELECTRICAL
Specifications in drawings
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 27 – COMMUNICATIONS (DATA)
Not used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
Not used
00 01 10-4
THIS PAGE INTENTIONALLY LEFT BLANK
00 73 19 - 1
SECTION 00 73 19
HEALTH AND SAFETY REQUIREMENTS
SEE ATTACHED
00 73 19A ICRA-2.0 ICRA Permit
00 73 19B ICRA 2.0 Matrix of Precautions for Construction
00 73 19 - 2
This page intentionally left blank
©2022. American Society for Health Care Engineering of the American Hospital Association
ICRA 2.0 Infection Control Risk Assessment and Permit
Project Name:
ICRA Number: Requested by
Location of Work Activity Project Start Date Estimated Duration Completion Date
Foreman/Supervisor Phone Contractor Performing Work Phone
Approving Authority Phone Please note that the above signature is approval of the work activity as described and assessed documented here.
Should the scope of work change or the discovery of additional toxic or biological substances.
STOP WORK and seek additional approval and guidance before proceeding.
1. Type of Activity Explain this reasoning for this assessment Type A: Non-invasive Type B: Small-scale, short duration Type C: Large-scale, longer duration Type D: Major demolition, construction
2. Patient Risk Area Describe key patient risks Low: Non-patient care areas Medium: Patient care support areas High: Patient care areas Highest: Invasive, sterile or highly compromised care
3. Class of Precautions Type A TYPE B TYPE C TYPE D
Low I II II III Medium I II III IV
High I III IV V Highest III IV V V
4. Surrounding Area
Unit Below: Above: Lateral: Behind: In Front:
Risk group Contact
Phone Controls Noise
Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Noise Vibration Dust Ventilation Pressurization
Systems impacted:
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Data Mechanical Med Gas Hot/Cold Water Other
Were there discoveries in surrounding areas that would serve as cause to increase the class of precautions and necessitate additional controls? If so, please summarize.
©2022. American Society for Health Care Engineering of the American Hospital Association
5. Detailed Plan of ICRA Controls for this Work Final Class of Precautions being applied I II III IV V
Controls required for this project Specifications/ Materials Verification method and frequency
Exceptions/Additions to this permit Date and Initials are noted by attached memoranda
Initials Date
Permit Request By Date
Permit Authorized By Date
Approval Signature
©2022 The American Society for Health Care Engineering of the American Hospital Association Disclaimer: This document is provided by ASHE as a service to its members. The information provided may not apply to a reader’s specific situation and is not a substitute for application of the reader’s own independent judgment or the advice of a competent professional. ASHE does not make any guaranty or warranty as to the accuracy or completeness of any information contained in this document. ASHE and the authors disclaim liability for personal injury, property damage, or other damages of any kind, whether special, indirect, consequential, or compensatory, that may result directly or indirectly from use of or reliance on this document.
Class I
©2022 American Society for Health Care Engineering of the American Hospital Association
Infection Control Risk Assessment 2.0 Matrix of Precautions for Construction, Renovation and Operations
Step One:
Using Table 1, Identify the Activity Type (A-D).
Table 1 - Activity Type:
Type A
Inspection and non-invasive activities.
Includes but is not limited to:
Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.
Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.
Clean plumbing activity limited in nature.
Type B
Small-scale, short duration activities that create minimal dust and debris.
Includes but is not limited to:
Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).
Fan shutdown/startup.
Installation of electrical devices or new flooring that produces minimal dust and debris.
The removal of drywall where minimal dust and debris is created.
Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.
Type C
Large-scale, longer duration activities that create a moderate amount of dust and debris.
Includes but is not limited to:
Removal of preexisting floor covering, walls, casework or other building components.
New drywall placement.
Renovation work in a single room.
Non-existing cable pathway or invasive electrical work above ceilings.
The removal of drywall where a moderate amount of dust and debris is created.
Dry sanding where a moderate amount of dust and debris is created.
Work creating significant vibration and/or noise.
Any activity that cannot be completed in a single work shift.
Type D
Major demolition and construction activities.
Includes but is not limited to:
Removal or replacement of building system component(s).
Removal/installation of drywall partitions.
Invasive large-scale new building construction.
Renovation work in two or more rooms.
Step Two:
Using Table 2, identify the Patient Risk Group(s) that will be affected. If more than one risk group will be affected, select the higher risk group.
Table 2 - Patient Risk Group:
Low Risk
Non-patient care areas such as:
Medium Risk
Patient care support areas such as:
High Risk
Patient care areas such as:
Highest Risk
Procedural, invasive, sterile support and highly compromised patient care areas such as:
Public hallways and gathering areas not on clinical units.
Office areas not on clinical units.
Breakrooms not on clinical units.
Bathrooms or locker rooms not on clinical units.
Mechanical rooms not on clinical units.
EVS closets not on clinical units.
Waiting areas.
Clinical engineering.
Materials management.
Sterile processing department - dirty side.
Kitchen, cafeteria, gift shop, coffee shop, and food kiosks.
Patient care rooms and areas
All acute care units
Emergency department
Employee health
Pharmacy - general work zone
Medication rooms and clean utility rooms
Imaging suites:
diagnostic imaging
Laboratory.
All transplant and intensive care units.
All oncology units.
OR theaters and restricted areas.
Procedural suites.
Pharmacy compounding.
Sterile processing department
- clean side.
Transfusion services.
Dedicated isolation wards/units.
Imaging suites: invasive imaging.
Step Three:
Match the Patient Risk Group (Low, Medium, High, Highest) from Step Two with the planned Construction Activity Project Type (A, B, C, D) from Step One using Table 3 to find the Class of Precautions (I, II, III, IV or V) or level of infection control activities required. The activities are listed in Table 5 – Minimum Required Infection Control Precautions by Class.
Table 3 - Class of Precautions:
Construction Project Type
Patient Risk Group TYPE A TYPE B TYPE C TYPE D
LOW Risk Group I II II III*
MEDIUM Risk Group I II III* IV
HIGH Risk Group I III IV V
HIGHEST Risk Group III IV V V
Infection control permit and approval will be required when Class of Precautions III (Type C) and all Class of Precautions IV or V are necessary.
Environmental conditions that could affect human health, such as sewage, mold, asbestos, gray water and black water will require Class of Precautions IV for LOW and MEDIUM Risk Groups and Class of Precautions V for HIGH and HIGHEST Risk Groups.
*Type C [Medium Risk groups] and Type D [Low Risk Groups] work areas [Class III precautions] that cannot be sealed and completely isolated from occupied patient care spaces should be elevated to include negative air exhaust requirements as listed in Class IV Precautions.
Step Four:
Assess potential risk to areas surrounding the project. Using Table 4, identify the surrounding areas that will be affected and the type of impact that will occur. If more than one risk group will be affected, select the higher risk group using Table 2 - Patient Risk Group.
Table 4 - Surrounding Area Assessment
Unit Below: Unit Above: Unit Lateral: Unit Behind: Unit in Front:
Risk Group: Risk Group: Risk Group: Risk Group: Risk Group:
Contact: Contact: Contact: Contact: Contact:
Phone: Phone: Phone: Phone: Phone:
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Additional Controls:
Noise Vibration Dust control Ventilation Pressurization Vertical Shafts Elevators/Stairs
Systems impacted:
Data Mechanical Med Gases Hot/Cold Water
Noise & Vibration Mitigation Strategies Use diamond drills instead of powder-actuated fasteners.
Schedule noise-making periods with adjacent spaces.
Use beam clamps instead of shot.
Prefab where possible.
Use tin snips to cut metal studs instead of using a chop saw.
Install metal decking with vent tabs, then use cellular floor deck hangers.
Consider compression style fittings instead of soldering, brazing or welding.
Wet core drill instead of dry core or percussion.
Instead of jackhammering concrete, use wet diamond saws.
Use HEPA vacuums instead of standard wet/dry vacuums.
Use mechanical joining system sprinkler fittings instead of threaded.
Where fumes are tolerated, use chemical adhesive remover (flooring glue) instead of mechanical.
To remove flooring, consider abrasive blasting instead of using a floor scraper.
Use electric sheers instead of reciprocating saw for ductwork cutting.
Install exterior man/material lifts.
Ventilation & Pressurization Mitigation Strategies
HEPA to exterior.
Install temporary ductwork.
Utilize temporary HVAC equipment.
Vacate the area.
Install temporary partitions.
Use carbon filtration to filter odors.
Impact to Other Systems Mitigation Strategies
Schedule outages.
Provide temporary systems.
Back-feed electricity or medical gases.
Table 5 - Minimum Required Infection Control Precautions by Class | Before and During Work Activity
Class of Precautions
Mitigation Activities (Performed Before and During Work Activity)
Class I 1. Perform noninvasive work activity as to not block or interrupt patient care.
2. Perform noninvasive work activities in areas that are not directly occupied with patients.
3. Perform noninvasive work activity in a manner that does not create dust.
4. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.
Class II
1. Perform only limited dust work and/or activities designed for basic facilities and engineering work.
2. Perform limited dust and invasive work following standing precautions procedures approved by the organization.
3. This Class of Precautions must never be used for construction or renovation activities.
Class III
1. Provide active means to prevent airborne dust dispersion into the occupied areas.
2. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.
3. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.
4. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,
5. If work area is contained, then it must be neutrally to negatively pressurized at all times.
6. Seal all doors with tape that will not leave residue.
7. Contain all trash and debris in the work area.
8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
9. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.
Class IV
1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling or, if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).
4. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.
5. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
7. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
8. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
9. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
10. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.
11. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
12. Contain all trash and debris in the work area.
13. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
14. Worker clothing must be clean and free of visible dust before leaving the work area. HEPA vacuuming of clothing or use of cover suits is acceptable.
15. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
16. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
17. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Class V 1. Construct and complete critical barriers meeting NFPA 241 requirements including: Barriers must extend to the ceiling, or if ceiling tile is removed, to the deck above, and all penetrations through the barrier shall meet the appropriate fire rating requirements.
2. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.
3. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).
4. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.
5. Personnel will be required to wear disposable coveralls at all times during Class V work activities.
Disposable coveralls must be removed before leaving the anteroom.
6. Remove or isolate return air diffusers to avoid dust entering the HVAC system.
7. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.
8. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.
9. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.
10. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.
11. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.
12. Install device on exterior of work containment to continually monitor negative pressurization. To assure proper pressure is continuously maintained, it is recommended that the device(s) have a visual pressure indicator.
13. Contain all trash and debris in the work area.
14. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.
15. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.
16. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.
17. Install an adhesive (dust collection) mat at entrance of contained work area based on facility policy.
Adhesive mats must be changed routinely and when visibly soiled.
18. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.
Table 6 - Minimum Required Infection Control Precautions | Upon Completion of Work Activity
Class of Precautions
Mitigation Activities (Performed upon Completion of Work Activity)
Classes I, II and III
Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
HVAC Systems:
1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.
2. Verify the HVAC systems meet original airflow and air exchange design specifications.
Classes III, IV and V
Class III (Type C Activities only), IV, and V precautions require inspection and documentation for downgraded ICRA precautions.
Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.
Work Area Cleaning:
1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.
2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.
Removal of Critical Barriers:
1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.
2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:
i. Carefully remove screws and painter tape.
ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.
iii. Drywall cutting is prohibited during removal process.
iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.
v. Use a plastic barrier to enclose area if dust could be generated.
Negative Air Requirements:
1. The use of negative air must be designed to remove contaminates from the work area.
2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.
HVAC systems:
1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.
2. Verify that HVAC systems are clean and operational.
3. Verify the HVAC systems meets original airflow and air exchange design specifications.
©2022 The American Society for Health Care Engineering of the American Hospital Association Disclaimer: This document is provided by ASHE as a service to its members. The information provided may not apply to a reader’s specific situation and is not a substitute for application of the reader’s own independent judgment or the advice of a competent professional. ASHE does not make any guaranty or warranty as to the accuracy or completeness of any information contained in this document. ASHE and the authors disclaim liability for personal injury, property damage, or other damages of any kind, whether special, indirect, consequential, or compensatory, that may result directly or indirectly from use of or reliance on this document.
01 00 00 - 1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for upgrade two existing cart elevators including replacing lift doors, associated electrical, new finishes to patch existing and associated work as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer or Contracting Officer.
C. Offices of WestEast Design Group, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. BASE BID:
1. Demolition/ Removal of the existing Cart elevator cabs, lift doors and wall, floor and wall finishes, and acoustical ceiling tile.
Removal of associated electrical and mechanical equipment.
2. Installation of new lift cab, lift doors, patch finishes existing removed and damaged during construction.
3. Upgrade electrical for new equipment.
4. Convert service equipment room into Office Storage. Float floor level, provide new finishes and acoustical ceiling.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
01 00 00 - 2
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install all permanent cores at completion of the work turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
01 00 00 - 3
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of (2 to 5) permits shall be issued for General Contractor and its employees for parking in designated areas only.
Contractor to coordinate with VA Medical Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
01 00 00 - 4
D. Working space and space available for storing materials shall be as determined by the COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan including order of phasing and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.
The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, example phasing sequence as follows:
Phase I: Work at Administration areas and related hallways.
Phase II: Work at Patient Rooms and related hallways.
3. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking
01 00 00 - 5 surfaces, lighting etc. to facilitate patient and staff access.
Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
4. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.
H. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.
Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 10 degrees C (50 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
J. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.
Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR and Chief of Facilities Management. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification in MEP drawings for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
01 00 00 - 6
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. No public utility permits are required for this project.
K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
L. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
01 00 00 - 7
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall
01 00 00 - 8 conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.11 LAYOUT OF WORK
A. The Contractor shall lay out the work indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall also be responsible for maintaining and preserving all marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
1.12 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR and Chief of Facilities Management within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.13 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it
01 00 00 - 9 suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names,…