These construction documents detail a cart elevator replacement project for the Department of Veterans Affairs Central Texas Veterans Health Care System located in Temple, Texas. The project involves replacing two existing hydraulic cart elevators with new traction elevators in Building 163, specifically serving the Surgical Suite. The project is divided into two phases: Phase 1 will replace the dirty cart elevator, and Phase 2 will be further subdivided into creating a new doorway between the SPS Prep and Dispatch areas, followed by replacing the clean cart elevator. The project number is 674-22-107, and the documents are at 100% Construction Document review stage, released on 01/31/2023 by the architectural firm WestEast Design Group JV, LLC. The elevators will travel between the basement floor (SPS Department) and the 2nd floor (Surgical Suite), with careful considerations for maintaining hospital operations, infection control, and patient safety during construction.

View the file

Other files

File Type Posted
36C25726R0013 0003.docx DOCX document
36C25726R0013 0002.docx DOCX document
Cart Elevator Site Visit - 11-13-25.pdf PDF
36C25726R0013 0001.docx DOCX document
Attachment 3 Price Breakout Worksheet.xlsx XLSX spreadsheet
Attachment 2 674-22-107 VA Temple Replace Cart Elevators Specifications.pdf PDF
36C25726R0013_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of

Veterans Affairs

CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM

PROJECT: REPLACE CART ELEVATOR - SURGERY

BUILDING 163

OLIN E. TEAGUE VETERANS MEDICAL CENTER

1901 VETERANS MEMORIAL DRIVE TEMPLE, TEXAS

PROJECT NO.: 674-22-107

100% CONSTRUCTION DOCUMENTS

SHEET INDEX

GI0.00

GI0.10

GI0.20

AD1.10

AD1.20

AD2.00

AD3.00

A1.00 A1.10 A2.00 A3.00 A4.00 A5.00 S1.00 E1.1 E1.2 E2.1

COVER SHEET AND SHEET INDEX

GENERAL NOTES

GENERAL NOTES

BASEMENT FLOOR PHASING PLAN

SECOND FLOOR PHASING PLAN

ENLARGED DEMOLITION PLANS AND ELEVATIONS

ENLARGED DEMOLITION PLANS AND ELEVATIONS

NEW BASEMENT FLOOR PLAN

NEW SECOND FLOOR PLAN

CART ELEVATOR PLANS, SECTIONS AND DETAILS

DOOR SCHEDULE AND DETAILS

INTERIOR ELEVATIONS AND REFLECTED CEILING PLANS

CART ELEVATOR SAMPLE SHOP DRAWING

GENERAL STRUCTURAL NOTES, ELEVATOR ELEVATIONS AND PLAN

BASEMENT ELECTRICAL PLAN

SECOND FLOOR ELECTRICAL PLAN

ELECTRICAL SPECIFICATIONS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseDESIGNER OF RECORD A/E:

STAMPCONSULTANT

7 8 9 10 engineering discipline <EDIT TEXT>:

321 4 5 6

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

674 -22-107

163ELK Consortium + WestEast Design Group JV, LLC 200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Engineering Firm F-19531

100% CD REVIEW

C :\U se rs

\e va v\ D oc um en ts

\2

VA

TE

M

PL

E

C

AR

T R

EP

LA

C

EM

EN

T_ ev av

W

KU

AS

.rv t

/1 7/

:0

2:

PM

GI0.00

COVER SHEET AND SHEET INDEX

CENTRAL TEXAS VETERANS HEALTH CARE

SE

H.

K.

DO

DG

EN

LO

OP

E. ADAMS AVE

W. ADAMS AVE

AIRPORT RD.

W. CENTRAL AVE

1S T S

TS

ST

ST

W. ADAMS AVE

NE

H.K. DODGEN

LOOP

NW H.K. DODGEN LOOP

SW H.K. DODGEN LOOP

E AVENUE H

W AVENUE H

W AVE R

S 8T

H

ST

1901 Veterans Memorial Drive Temple, TX 76504-7451

NOTE:

THERE ARE NO WORK ON 1ST, 3RD, 4TH, 5TH AND 6TH FLOOR. THE SURGICAL SUITE CART

ELEVATORS TREVAL BETWEEN BASEMENT FLOOR, SPS DEPARTMENT TO 2ND FLOOR, SURGICAL

SUITE. THE EXISTING ELEVATORS ARE HYDRAULIC ELEVATORS. THIS ELEVATOR REPLACEMENT

PROJECT GOAL IS TO REPLACE EXISTING HYDRAULIC ELEVATORS TO NEW TRACTION ELEVATORS.

Revisions: Date: 10/17/2023

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES.

Dwg. 1 of 17

UP

UP

UP

UP DN

DN

DN

DN

DN

DN

DN

DN

UP

UP

DN

ABBREVIATIONS

@ AT

CENTERLINE

PROPERTY LINE

DIAMETER

# POUND OR NUMBER

(E) EXISTING

(N) NEW

AB ANCHOR BOLT

ABV ABOVE

ACC ACCESS

ACOUS ACOUSTICAL

ACP ASPHALT CONCRETE PAVING

ACS ACCESS PANEL

ACT ACOUSTICAL TILE

AD AREA DRAIN

ADA AMERICANS with DISABILITIES

ADJ ADJUSTABLE

AFF ABOVE FINISHED FLOOR

AGGR AGGREGATE

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATE

ARCH ARCHITECTURAL

ASPH ASPHALT

AUTO AUTOMATIC

BD BOARD

BITUM BITUMINOUS

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BO BOTTOM OF...

BOT BOTTOM

BRG BEARING

BSMT BASEMENT

BUR BUILT UP ROOFING

CAB CABINET

CB CATCH BASIN

CEM CEMENT

CER CERAMIC

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CLG CEILING

CLK CAULKING

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CNTR COUNTER

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CORR CORRIDOR

CPT CARPET; CARPETED

CRS COLD ROLLED STEEL

CSK COUNTERSUNK

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

DBL DOUBLE

DEMO DEMOLITION

DET DETAIL

DIA DIAMETER

DIM DIMENSION

DL DEAD LOAD

DN DOWN

DR DOOR

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSP DRY STANDPIPE

DT DRAIN TILE

DW DISHWASHER

DWG DRAWING

E EAST

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

ENCL ENCLOSURE

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATE

EW EACH WAY

EXH FN EXHAUST FAN

EXIST EXISTING

EXP EXPANDED; EXPANSION

EXP BT EXPANSION BOLT

EXPO EXPOSED

EXT EXTERIOR

FA FIRE ALARM

FB FLAT BAR

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF EL FINISH FLOOR ELEVATION

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FIN FLR FINISH FLOOR

FF FINISH TO FINISH

FIN FINISH

FLASH FLASHING

FLR FLOOR; FLOORING

FLUOR FLUORESCENT

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOIC FURNISHED BY OWNER -

INSTALLED BY CONTRACTOR

FOM FACE OF MASONRY

FOS FACE OF STUDS

FP FIREPROOF

FPL FIREPLACE

FR FRAME

FT FOOT; FEET

FTG FOOTING

FURR FURRING

FUT FUTURE

FW FULL WIDTH

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GL GLASS

GLAM GLUE-LAMINATED

GR GRADE

GWB GYPSUM WALL BOARD

GYP GYPSUM

HB HOSE BIBB

HC HOLLOW CORE

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDWD HARDWOOD

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HIGH POINT

HR HOUR

HT HEIGHT

HVAC HEATING/VENTILATING/AIR

CONDITIONING

HW HOT WATER

HWT HOT WATER TANK

ID INSIDE DIAMETER

IN INCH

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

INV INVERT

JB JUNCTION BOX

JF JOINT FILLER

JT JOINT

KIT KITCHEN

KO KNOCKOUT

LAM LAMINATE, LAMINATED

LAV LAVATORY

LBS POUNDS

LF LINEAR FOOT (FEET)

LH LEFT HAND

LL LIVE LOAD

LOC LOCATION

LP LOW POINT

LT LIGHT

SPEC SPECIFICATION

SQ FT SQUARE FOOT (FEET)

SQ IN SQUARE INCH(ES)

SST STAINLESS STEEL

STD STANDARD

STL STEEL

ST STONE

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRICAL

T TREAD

T&G TONGUE AND GROOVE

TEL TELEPHONE

TER TERRAZZO

TG TEMPERED GLASS

THK THICK

TO TOP OF...

TOB TOP OF BEAM

TOC TOP OF CONCRETE; CURB

TOF TOP OF FLOOR; FOOTING; FRAME

TOM TOP OF MASONRY

TOP TOP OF PARAPET; PAVEMENT

TOPO TOPOGRAPHY

TOS TOP OF SLAB; STEEL

TOW TOP OF WALL

TS TUBE STEEL

TSTAT THERMOSTAT

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VB VINYL BASE

VEN VENEER

VERT VERTICAL

VEST VESTIBULE

VG VERTICAL GRAIN

VHA VETERANS HEALTH ADMINISTRATION

VIF VERIFY IN FIELD

VT VINYL TILE

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WF BM WIDE FLANGE BEAM

WG WIRED GLASS

WH WATER HEATER

WL WATER LINE

WLD WELDED

WP WATERPROOF

WPM WATERPROOF MEMBRANE

WR WATER RESISTANT

WSCT WAINSCOT

WSG WIRE SAFETY GLASS

WTR WATER

WWF WELDED WIRE FABRIC

WWM WELDED WIRE MESH

WT WEIGHT

CL

PL

O/

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MB MACHINE BOLT

MC MEDICINE CABINET

MDF MEDIUM DENSITY FIBERBOARD

MDO MEDIUM DENSITY OVERLAY

MECH MECHANICAL

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURER

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MTD MOUNTED

MTL METAL

MUL MULLION

N NORTH

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER;

OVERFLOW DRAIN

OFF OFFICE

OH OVERHEAD

OHWM ORDINARY HIGH WATER MARK

OPNG OPENING

OPP OPPOSITE

OSB ORIENTED STRAND BOARD

PBD PARTICLE BOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PERF PERFORATED

PERP PERPENDICULAR

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLWD PLYWOOD

PNL PANEL

PNT POINT

PR PAIR

PRCST PRECAST

PSF POUNDS PER CUBIC FOOT

PSI POUNDS PER SQUARE INCH

PT PRESERVATIVE TREATED

PTN PARTITION

PVC POLYVINYL CHLORIDE

R RISER

RA RETURN AIR

RAD RADIUS

RD ROOF DRAIN

REF REFERENCE

REFR REFRIGERATOR

REG REGISTER

REINF REINFORCED

REM REMAINDER

REQ REQUIRED

RESIL RESILIENT

REV REVISION; REVISIONS; REVISED

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

RWL RAIN WATER LEADER

S SOUTH

SAF SELF-ADHERED FLASHING

SAM SELF-ADHERED MEMBRANE

SC SOLID CORE

SCHED SCHEDULE

SD SMOKE DETECTOR

SECT SECTION

SG SAFETY GLASS

SHV SHELF; SHELVING

SHR SHOWER

SHT SHEET

SHT MTL SHEET METAL

SHTG SHEATHING

SIM SIMILAR

SOG SLAB ON GRADE

TR

UE

NO

RT

H

PL

AN

NO

RT

H

D2

E2

B2C2

KEYNOTE

INTERIOR ELEVATION KEY

1-101-A

DOOR IDENTIFICATION TAG

A1

A1.00

X PARTITION TYPE REFERENCE

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE

REMOVED OR LINE OF CONSTRUCTION

BEYOND

NEW CONSTRUCTION

DETAIL OR ENLARGED PLAN

REFERENCE

ARCHITECTURAL DRAWING SYMBOLS AND LEGENDS:

HATCHED AREA NOT IN CONTRACT

SPS LOADING

DOCK

PROJECT LOCATION

GENERAL LOADING DOOK

LOADING

DOOK

ACCESS

ROAD

CONSTRUCTION ACCESS

DIRTY CART ELEVATOR CLEAN CART ELEVATOR

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

GI0.10

GENERAL NOTES

PARTIAL BASEMENT FLOOR

LOCATION PLAN OF BUILDING 163

TRUE NORTH PLAN NORTH

2 KEY PLAN

NTS

NTS

VETERANS MEMORIAL DRIVE

W .A

VE

U

AVENUE OF FLAGS

W .A

VE

R

R

RO

AD

RO

AD

8B

MAIN ENTRANCE

TEAGUE PLACE

TE

AG

UE

PL

AC

E

TE

AG

UE

PL

AC

E

TEAGUE PLACE

2 1710/17/2023

GENERAL PROJECT NOTES:

1. THE GENERAL PROJECT NOTES ARE PART OF THE CONTRACTOR'S SCOPE OF WORK. THEY SHALL BE FOLLOWED IN

CONJUNCTION WITH AND IN ADDITION TO VHA MASTER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND

MUST BE INCLUDED AS PART OF THE CONTRACTOR'S RESPONSIBILITIES AND BASE BID.

2. EXISTING HVAC SYSTEM LOCATED WITHIN THE HVAC ZONE TO BE TESTED AND BALANCED AFTER THE SPECIFIED TEMPORARY PARTITION SYSTEMS ARE IN PLACE AND THE CONSTRUCTION AREAS ARE TEMPORARILY DISCONNECT FROM

THE SYSTEM SUPPLY AND RETURN AIR FOR THE DURATION OF THE CONSTRUCTION.

3. RETURN HVAC BALANCING TO THE ORIGINAL SETTING ONCE CONSTRUCTION IS COMPLETE.

4. PROVIDE HEPA FILTERED VENTILATION SYSTEM TO RECIRCULATE AIR WITHIN THE CONSTRUCTION AREA TO CLEAN THE

CONSTRUCTION DUST FROM THE AIR DURING THE CONSTRUCTION PERIOD.

COORDINATION AND RESPONSIBILITIES:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND UNDERSTANDING ALL ASPECTS OF THE CONTRACT

DOCUMENTS INCLUDING COORDINATION BETWEEN THE DRAWINGS AND SPECIFICATIONS. ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE CONTRACTING OFFICER REPRESENTATIVE'S (COR) ATTENTION IN WRITING THROUGH RFI (REQUEST FOR INFORMATION). COORDINATION BETWEEN ALL ASPECTS OF THE CONSTRUCTION INCLUDING BUT NOT LIMITED TO TRADES, SUBCONTRACTORS, SUPPLIERS, AND CONTRACTOR'S WORKERS TO BE PROVIDED BY THE GC TO COMPLETE THIS

PROJECT.

2. IN THE EVENT A DISCREPANCY IS DISCOVERED BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE CONTRACTOR IS UNABLE TO RECEIVE CLARIFICATION PRIOR TO SUBMISSION OF THE BASE BID, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INCLUDING IN THE PRICING OF THE WORK OR ITEMS OF GREATEST VALUE. ANY OMISSION OR CLAIM OF OMISSION IN THIS PROJECT BECAUSE OF SUCH A DISCREPANCY WILL NOT, UNDER ANY CIRCUMSTANCES, BE GROUNDS FOR ADDITIONAL COST TO THE OWNER AFTER THE PROJECT IS AWARDED. SCOPE OF WORK INDICATED IN THE CONSTRUCTION DOCUMENTS WILL BE ASSUMED TO HAVE BEEN INCLUDED IN THE BASE BID. A GENERAL CONTRACTOR (G.C.) SHALL NOT CLAIM ADDITIONAL COST BASED ON UNINTENTIONAL OMISSION IN THE BASE BID ESTIMATES. AN ERROR OF ON THE PART OF THE G.C. OR IT'S SUBS IS NOT GROUNDS FOR ADDITIONAL FUNDS. THIS IS INAPPROPRIATE IN A COMPETITIVE BIDDING SITUATION. ANY ISSUE MUST BE ADDRESSED DURING CONTRACT NEGOTIATIONS WITH THE VA AND PRIOR THE AWARDING OF THE CONTRACT.

3. THE CONTRACTOR SHALL ENSURE THAT SERVICES TO ADJACENT AREAS AFFECTED BY CONSTRUCTION SHALL REMAIN FULLY OPERATIONAL DURING CONSTRUCTION. IF ANY DISRUPTION OF SERVICES IS NECESSARY, THE CONTRACTOR SHALL NOTIFY THE COR AT LEAST 7 DAYS IN ADVANCE PRIOR TO PROPOSED INTERRUPTION. REFER TO SPECIFICATION SECTION 01 00 00, 1.6 "OPERATIONS AND STORAGE AREAS", FOR EMERGENCY INTERRUPTION PROCEDURE. UNDER ANY CIRCUMSTANCES, THE

UTILITIES SHALL NOT SHUT DOWN, WITHOUT PRIOR NOTIFICATION.

4. ANY WORK REQUIRES SHUTTING OFF UTILITIES SHALL BE PERFORMED AFTER BUSINESS HOURS WITH AN APPROVAL BY COR

OR DURING THE PRE-WRITTEN ARRANGED HOURS.

5. CONTRACTOR TO COORDINATE WITH LOADING DOCK MANAGER WHEN USE IS REQUIRED. CONTRACTOR TO USE SPS LOADING

DOCK THROUGH ALL PHASES OF THE PROJECT.

6. USE ELEVATOR P-6 FOR ACCESSING THE CONSTRUCTION SITE. MOVEMENT OF CONSTRUCTION MATERIAL MUST BE LIMITED

BEFORE 7AM AND AFTER 5PM EVERYDAY, NO EXCEPTIONS.

7. CONTRACTOR TO COORDINATE WITH LOADING DOCK MANAGER WHEN USE IS REQUIRED. CONTRACTOR TO USE SPS LOADING

DOCK THROUGH ALL PHASES OF THE PROJECT.

8. USE ELEVATOR P-6 FOR ACCESSING THE CONSTRUCTION SITE. MOVEMENT OF CONSTRUCTION MATERIAL MUST BE LIMITED

BEFORE 7AM AND AFTER 5PM EVERYDAY, NO EXCEPTIONS.

EXISTING CONDITIONS:

1. THE CONTRACTOR SHALL FIELD VERIFY AND SURVEY EXISTING BUILDING CONDITIONS TO FAMILIARIZE THEMSELVES WITH

THE EXTENT OF DEMOLITION AND NEW CONSTRUCTION AS INDICATED IN CONTRACT DOCUMENTS. THE CONTRACTOR SHALL DETERMINE THE IMPACT THAT DEMOLITION AND NEW CONSTRUCTION WILL HAVE ON EXISTING BUILDING SYSTEMS INCLUDING BUT NOT LIMITED TO STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, COMMUNICATION, FIRE PROTECTION SYSTEMS AND ALL OTHER FACTORS THAT WILL AFFECT THE PROJECT AND THE OPERATIONS OF THE ADJACENT SPACES.

FAILURE TO DO SO WILL NOT BE GROUNDS FOR ADDITIONAL FUNDS AFTER PROJECT HAS BEEN AWARDED.

2. THE CONTRACTOR SHALL CONFIRM IN WRITING THE LOCATIONS OF ALL UNEXPOSED AND BARRIED UTILITY LINES WITH THE COR PRIOR TO PROCEEDING WITH ANY WORK. IF THE CONTRACTOR PROCEEDS WITHOUT SUCH PRIOR WRITTEN NOTICE AND DAMAGE OCCURS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING OR REPAIRING DAMAGE AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR IMAGERY THROUGH CONCRETE FLOOR DECK, BEAMS, AND SLAB PRIOR TO ANY CORE DRILLING. CONTRACTOR MUST COORDINATE CORE DRILLING EFFORT WITH THE

COR.

3. THE CONTRACTOR SHALL REPORT ALL UNFORESEEN CONDITIONS DISCOVERED DURING INSPECTIONS OR DURING CONSTRUCTION IMMEDIATELY TO THE COR FOR CLARIFICATION, BEFORE CONTINUING WITH THAT PORTION OF THE WORK.

UNFORESEEN CONDITIONS SHALL INCLUDE BUT NOT BE LIMITED TO CONDITIONS NOT VISUALLY DISTINGUISHABLE OR

DISCREPANCIES BETWEEN ACTUAL EXISTING CONDITIONS AND AS-BUILT INFORMATION.

4. THE CONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION OUTSIDE OF CONSTRUCTION LIMITS DAMAGED BY CONTRACTOR'S OPERATIONS AND CONSTRUCTION ACTIVITIES FOR ALL AREAS WITHIN THE CONSTRUCTION LIMITS DAMAGED AND NOT INDICATED IN THESE DOCUMENTS TO BE REMOVED. EXISTING CONSTRUCTION SHALL INCLUDE BUT NOT BE LIMITED TO EXPOSED OR UNEXPOSED UTILITIES, ADJACENT AREAS OF THE EXISTING BUILDING, WALLS, AND

FINISHES.

5. IN AREAS WHERE MODIFICATIONS OCCUR BY ACCESS THROUGH ANOTHER OCCUPIED AREA, THE CONTRACTOR SHALL INCLUDE IN THE BASE PROJECT ALL WORK ASSOCIATED WITH MAINTAINING, AND REPAIRING EXISTING CEILINGS, WALLS, MEP SYSTEMS, ETC. ITEMS AND OPERATIONS DAMAGED OR DISRUPTED AS A RESULT OF THIS ACCESS, SHALL BE REPAIRED

TO MATCH EXISTING FINISHES AND MATERIALS.

6. THE CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS INCLUDING FLOOR TO FLOOR HEIGHTS, FLOOR TO CEILING HEIGHTS, PRIOR TO PROCEEDING WITH WORK. ANY DISCREPANCIES OR CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO

THE COR'S ATTENTION FOR CLARIFICATION.

SAFETY / SECURITY:

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE AND LAWFUL REMOVAL AND OFF-SITE DISPOSAL OF TRASH, DEBRIS OR UNSALVAGED ITEMS REMOVED DURING DEMOLITION IN ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS INCLUDING CITY OF SAN ANTONIO, COUNTY AND STATE REGULATIONS. THE PROJECT SITE SHALL BE CLEANED ON A DAILY BASIS OR AS DIRECTED BY THE COR DURING CONSTRUCTION ACTIVITIES TO PREVENT ACCUMULATION. THIS INCLUDES COMPLIANCE WITH HOSPITALS INFECTION CONTROL REQUIREMENTS.

2. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS INCLUDING OSHA FOR

CONSTRUCTION SAFETY AND INSPECTION PROCEDURES.

3. THE CONTRACTOR SHALL CONFINE OPERATIONS WITHIN A CONSTRUCTION LIMIT LINE AS TO PREVENT WORKERS, MATERIALS OR EQUIPMENT FROM INTERACTING WITH OTHER AREAS OUTSIDE OF THE CONSTRUCTION LIMITS LINE OCCUPIED BY PATIENTS, STAFF OR IN AREAS OCCUPIED BY THE GENERAL PUBLIC UNLESS OTHERWISE REQUIRED BY

THESE DOCUMENTS.

4. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT AND PROVIDE SAFETY AND SECURITY FOR ALL OCCUPANTS. THE CONTRACTOR SHALL PROVIDE SECURITY MEASURES AS REQUIRED FOR PROTECTION FROM VANDALISM, THEFT, DAMAGE TO CONSTRUCTION SITE AND PROTECTION OF THE GENERAL PUBLIC FROM HAZARDOUS OR

DANGEROUS CONDITIONS AT ALL TIMES DURING CONSTRUCTION.

5. THE CONTRACTOR MAY ORDER MATERIALS ON AN "AS NEEDED" BASIS AS THE JOB PROGRESSES AND STORE ON SITE IN

THE DESIGNATED LAY DOWN AREA WHERE DIRECTED BY THE COR.

6. THE CONTRACTOR SHALL KEEP AND MAINTAIN A FIRE WATCH MONITOR LOG THAT SHALL BE KEPT ON AN HOURLY BASIS.

COORDINATE REQUIREMENTS WITH VA COR.

7. REFERENCE SECTION 01 35 26 AND 01 74 19

CONSTRUCTION:

THE CONTRACTOR SHALL KEEP AND MAINTAIN TWO COMPLETE AND UPDATED SETS OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS AT THE CONSTRUCTION SITE THROUGH THE DURATION OF CONSTRUCTION FOR REVIEW AND REFERENCE BY COR AND ARCHITECT. THIS SHALL INCLUDE ALL DOCUMENTS WHICH CHANGE, MODIFY OR REVISE THE SCOPE OF WORK AND/OR THE COST OF THE PROJECT. REFER TO SPECIFICATION SECTION 01 00 00, "AS BUILT DRAWINGS".

CORRESPONDENCE / INSTRUCTIONS:

ALL CORRESPONDENCE INCLUDING BUT NOT LIMITED TO CHANGES IN THE SCOPE OF WORK, CHANGES IN COST, REQUESTS FOR INFORMATION, DIRECTIONS, INSTRUCTIONS, APPROVALS, CLARIFICATIONS, GENERAL CORRESPONDENCE, ETC.. SHALL BE DIRECTED TO THE COR'S IN WRITTING.

USE PROPER APPROVED FORMS FOR ALL COMMUNICATIONS.

INFECTION PREVENTION NOTES:

1. THE ICRA (INFECTION CONTROL RISK ASSESSMENT SHALL BE WRITTEN AND AMENDED INTO THE CONTRACT AND SPECIFICATIONS FOR

CONSTRUCTION PROJECT TO PREVENT COST) DISCREPANCIES.

2. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL PRE-CONSTRUCTION MEETINGS. REFERENCE SECTION 00 73 19.

3. INFECTION PREVENTION OFFICE MUST BE NOTIFIED OF ALL WASTE SHUT-OFF OR INTERRUPTIONS.

4. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED IF THE HVAC MUST BE INTERRUPTED IN AREA THAT AFFECTS PATIENT CARE.

5. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ANY ANTICIPATED ALTERATIONS TO THE ACCESS ROUTES USED DURING

CONSTRUCTION ACTIVITIES.

6. CONSTRUCTION WORKERS SHALL WEAR DUPONT TYVEK OVERALLS OR EQUIVALENT OVER CLOTHING AND SHOE COVERS IN MODERATE TO HIGH DUST AREAS TO PREVENT CONTAMINATION OF EMPLOYEE CLOTHES AND TRACKING DUST AND DIRT INTO THE EXISTING SURROUNDING FACILITY. CONSTRUCTION WORKERS SHALL REMOVE COVERALLS BEFORE LEAVING THE AREA.

7. THE CONTRACTOR SHALL CLEAN THE WHEELS AND OUTSIDE OF ALL CARTS AND EQUIPMENT GOING IN AND OUT OF THE

CONSTRUCTION SITE.

8. THE CONTRACTOR SHALL WET MOP HEAVY TRAFFIC AREAS AT LEAST TWO (2) TIMES A DAY OR MORE IF THE SITE HAS AN ICRA CLASS OF 3 OR 4 AND/IF THE AREA HAS HIGH VOLUME OF DUST. WATER SHALL BE CHANGED DAILY. DO NOT LEAVE STANDING WATER

OVERNIGHT.

9. ALL ICRA CLASS 4 PROJECT SITES MUST HAVE AN ANTE-ROOM TO MAINTAIN NEGATIVE AIRFLOW AND BE LARGE ENOUGH TO REMOVE COVERALLS AND HAVE A TRASH CONTAINER. THE ANTE-ROOM WILL BE CLEARLY IDENTIFIED ON THE DRAWINGS.

10. AIR FILTRATION DEVICES WITH HEPA FILTERS SHALL BE USED ON SITE FOR SMALL CLEAN-UPS IN PATIENT CARE AREAS THAT HAVE AN

ICRA CLASS OF 1 OR 2.

11. THE CONTRACTOR SHALL PROVIDE A DAILY LOG FOR THE VA STAFF LOCATED ON SITE THAT CONTAINS UPDATES NOTING THE READING ON THE PRESSURE SENSOR, CERTIFYING THAT THE SITE HAS BEEN CONTINUALLY MAINTAINING NEGATIVE AIR PRESSURE

DURING CONSTRUCTION.

12. CONTRACTORS SHALL COMPLETE AN INFECTION CONTROL TRAINING PER VHA GUIDELINES. A COPY OF TUBERCULOSIS PAPERWORK SHALL BE PROVIDED TO INFECTION CONTROL OFFICER IN ORDER TO OBTAIN IC STICKER. ANY WORKERS MISSING THE STICKER MAY

BE REMOVED AT INFECTION CONTROL OFFICER OR COR'S DISCRETION.

13. CONTRACTORS SHALL HAVE AN ANNUAL FLU SHOT. A COPY OF FLU SHOT PAPERWORK SHALL BE PROVIDED TO INFECTION CONTROL

OFFICER.

CONSTRUCTION SAFETY NOTES:

1. CONSTRUCTION BARRIER SHALL CONSIST OF: FLAME RETARDANT POLYETHYLENE SHEATHING. REFERENCE PHASING PLANS FOR ALL

FLOOR PLANS WHERE TEMPORARY MODULAR PARTITION WILL BE USED FOR ONGOING WORK ACROSS MULTIPLE DAYS.

2. DIRECTIONAL SIGNS INCLUDING EXIT SIGNS MUST BE POSTED TO DISPLAY MEANS OF EGRESS AND LIFE SAFETY INFORMATION.

3. EXISTING ILLUMINATED EXIT SIGNS SHALL BE RELOCATED WHEN OBSTRUCTED BY CONSTRUCTION.

4. GENERAL CONTRACTOR SHALL WORK CLOSELY WITH THE COR WHEN LIFE SAFETY HAZARDS ARE PRESENT. THE COR SHALL

COMMUNICATE ALL SAFETY CONCERNS TO THE SAFETY OFFICE.

5. GENERAL CONTRACTOR SHALL KEEP DUST CONTAINMENT BARRIER-PRESSURE AT NEGATIVE AT ALL TIMES. HVAC EXHAUST RETURN AND SUPPLY DUCT OPENINGS SHALL BE COVERED AND SEALED DURING ALL CONSTRUCTION UNTIL FINISHES ARE INSTALLED. GC SHALL PROVIDE RECIRCULATING FAN SYSTEM WITH HEPA FILTER TO REMOVE DUST WITHIN THE EACH CONSTRUCTION AREA.

LOCATE THE AIR FILTER SYSTEM NEAR THE MUST DUST GENERATING CONSTRUCTION. REPLACE HEPA FILTER AS DIRECTED BY THE

FILTER MANUFACTURER, BUT MINIMUM REPLACEMENT MONTHLY.

6. GENERAL CONTRACTOR SHALL MEASURE CONSTRUCTION DUST CONTAINMENT BARRIER PRESSURE ON A DAILY BASIS, AND SHALL

REPORT READING TO THE COR AND INFECTION CONTROL OFFICE.

7. WORK SITE SHALL BE SECURED BY LOCK WHEN NO EMPLOYEES ARE PRESENT ON SITE.

8. FLOOR STICKY MATS LOCATED AT BOTH SIDES OF THE ENTRANCE TO THE CONSTRUCTION AREA SHALL BE REPLACED AS NEEDED

(AT APPROXIMATELY 75% USED).

9. GOOD HOUSEKEEPING - TRASH AND DEBRIS SHALL BE REMOVED PROMPTLY, AT LEAST DAILY.

10. HAZARDOUS MATERIALS SHALL BE STORED APPROPRIATELY TO MAINTAIN LIFE SAFETY AND CODE REQUIREMENTS.

11. ALL MSDS (MATERIALS SAFETY AND DATA SHEETS) SHALL BE POSTED ON JOB SITE.

12. ICRA (INFECTION CONTROL RISK ASSESSMENT) SHALL BE POSTED ON JOB SITE.

13. SMOKING REGULATIONS SHALL BE FOLLOWED.

14. FIRE EXTINGUISHERS SHALL BE READILY AVAILABLE IN THE CONSTRUCTION AREA AT ALL TIMES. MONTHLY INSPECTION REQUIRED.

15. HOT WORK PERMITS SHALL BE OBTAINED FROM COR WHEN NECESSARY DEDICATED FIRE SAFETY INDIVIDUAL TO BE ON SITE WITH

APPROPRIATE FIRE EXTINGUISHER.

16. SAFETY AND TEMPORARY SIGNAGE SHALL BE IN PLACE AT ALL TIMES THROUGH DURATION OF CONSTRUCTION.

17. SUBCONTRACTORS SHALL BE AWARE OF AND TRAINED IN SAFETY AND ENVIRONMENTAL ISSUES FOR A MINIMUM 30 HOURS FOR

SUPERINTENDENT AND 10 HOURS FOR WORKERS. PROVIDE OSHA CARDS.

18. MEANS OF EGRESS SHALL BE CLEARLY DESIGNATED IN BOTH CONSTRUCTION AND ADJACENT AREAS. ACCESS FOR THE FIRE DEPARTMENT AND EMERGENCY SERVICES SHALL BE CLEAR. STATUS OF THE FIRE DETECTION/ SPRINKLER SYSTEM SHALL BE:

a. FIRE SPRINKLER SYSTEM IS ACTIVE

b. FIRE ALARM SYSTEM IS ACTIVE

c. SMOKE DETECTORS ARE ACTIVE

d. TEMPORARY SYSTEMS ARE IN PLACE

19. EXTENSION CORDS SHALL BE PROTECTED DURING THE WORK HOURS AND DISCONNECTED AT THE END OF EACH DAY. WHERE POSSIBLE, FEED EXTENSION CORDS FROM A DEDICATED TEMPORARY CONSTRUCTION PANEL TURN OFF AND LOCK OUT DURING NO

WORK PERIODS.

20. REFERENCE SECTION 01 35 26.

DOCUMENT ORGANIZATION:

THIS SET OF CONSTRUCTION DOCUMENTS IS PRESENTED IN TWO PARTS: A SET OF TECHNICAL SPECIFICATIONS AND A SET

OF 30" X 42" DRAWINGS.

DRAWINGS:

DRAWINGS ARE ORGANIZED ACCORDING TO DISCIPLINES, WITH EACH DISCIPLINE DESCRIBING A GENERAL ASPECT OF

THE CONSTRUCTION. DISCIPLINES ARE ARRANGED AS FOLLOWS:

GI - GENERAL INFORMATION:

WORK RELATED TO THE PROJECT AS A WHOLE.

AD - ARCHITECTURAL DEMOLITION

WORK RELATED TO THE DEMOLITION OF THE BUILDING AND SYSTEMS.

A - ARCHITECTURAL:

WORK RELATED TO THE BASIC BUILDING ENVELOPE AND FINISHES, INCLUDING: FLOOR PLAN(S), INTERIOR

ELEVATIONS, WALL SECTIONS, INTERIOR DETAILS, &

CEILING FINISHES.

E - ELECTRICAL:

WORK RELATED TO THE ELECTRICAL SYSTEM.

M - MECHANICAL:

WORK RELATED TO THE MECHANICAL SYSTEM.

P - PLUMBING:

WORK RELATED TO THE PLUMBING SYSTEM.

PROJECT SPECIFIC NOTES:

1. GC SHALL PERFORM TESTING AND BALANCING OF THE ADJACENT SPACES WHICH SHARES THE HVAC SYSTEM AT THE CONSTRUCTION SITE AFTER THE HVAC EXHAUST, SUPPLY AND RETURN OPENINGS ARE SEALED WITHING THE WORK AREAS.

TESTING AND BALANCING IS TO MAINTAIN PROPER OPERATIONS OF THE ADJACENT SPACES.

2. ALL ELECTRICAL BRACKERS FOR THE ELECTRICAL SYSTEMS WITHIN THE WORK AREA MUST BE CLEARLY MARKED AT EACH ELECTRICAL PANEL PRIOR TO START OF THE PROJECT. IF ANY ELECTRICAL CIRCUITS ARE SHARED WITHIN THE AREAS TO REMAIN OPERATIONAL, GC SHALL DISCONNECT THE CIRCUITS WITHIN THE WORKING AREA FOR THE DURATION OF THE CONSTRUCTION. AT NO TIME, GC SHALL DISCONNECT ANY UTILITIES WITHOUT NOTIFYING COR. ALL NOTIFICATIONS MUST BE GIVEN AS SHOWN IN SECTION 01 00 00 GENERAL REQUIREMENTS PRIOR TO WORK AND TH NOTIFICATION MUST INCLUDE ALL THE AREAS AFFECTED BY

THE ACTIVITY.

3. THIS PROJECT HAS TWO PHASES.

A. PHASE 1: REPLACE THE DIRTY CART ELEVATOR , AND REPLACE THE CLEAN CART ELEVATOR IN SECOND PHASE

B. PHASE 2: THE SECOND PHASE WILL BE DIVIDED INTO TWO STEP WORK.

PHASE 2A: CREATE NEW 6'-0" X 7'-0" DOORWAY BETWEEN SPS PREP AREA AND DISPATCH AREA.

PHASE 2B: REPLACE THE CLEAR CART ELEVATOR.

THE FIRST PHASE WORK MUST BE COMPLETE AND THE REPLACED ELEVATOR MUST BE OPERATIONAL PRIOR TO BEGINNING THE

PHASE 2B WORK.

SPECIFICATIONS:

SPECIFICATIONS ARE ORGANIZED ACCORDING TO THE MASTER FORMAT 2004 (MF04) AS FOLLOWS. NOT ALL SECTIONS APPLY

TO THIS JOB AND NOT ALL SECTIONS ARE LISTED.

DIVISION 12 FURNISHINGS

DIVISION 13 N/A

DIVISION 14 N/A

DIVISION 21 N/A

DIVISION 22 PLUMBING

DIVISION 23 MECHANICAL

DIVISION 26 ELECTRICAL

DIVISION 27 N/A

DIVISION 28 N/A

DIVISION 31 N/A

DIVISION 32 N/A

DIVISION 33 N/A

DIVISION 0 PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 1 GENERAL REQUIREMENTS

DIVISION 2 EXISTING CONDITIONS

DIVISION 3 CONCRETE

DIVISION 4 N/A

DIVISION 5 METALS

DIVISION 6 WOOD, PLASTICS AND COMPOSITES

DIVISION 7 THERMAL AND MOISTURE PROTECTION

DIVISION 8 OPENINGS

DIVISION 9 FINISHES

DIVISION 10 SPECIALTIES

DIVISION 11 N/A

MISCELLANEOUS:

1. THE TERM "PROVIDE" AS USED IN THESE CONTRACT DOCUMENTS MEANS ALL WORK TO BE ACCOMPLISHED BY THE

CONTRACTOR TO INCLUDE FURNISHING, INSTALLING, MODIFYING AND CONNECTING ALL SPECIFIED ITEMS IN ACCORDANCE

WITH THE PLANS AND SPECIFICATIONS.

ALL WORK MUST BE COMPLETE AND FUNCTION AS INTENDED PER THE CONSTRUCTION DOCUMENTS.

2. THE TERMS "APPROVED EQUAL", "EQUAL TO", "ACCEPTABLE", "MATCH EXISTING" OR OTHER GENERAL QUALIFYING TERMS MEAN THAT MATERIALS SPECIFIED HAVE BEEN SUBSTITUTED BY THE GENERAL CONTRACTOR WITH MATERIALS SIMILAR IN QUALITY AND PERFORMANCE THAT THE ARCHITECT HAS DETERMINED ARE WITHIN THE GUIDELINES ESTABLISHED BY THESE CONTRACT DOCUMENTS. WHEN THERE IS ANY DISAGREEMENT BETWEEN GC AND THE ARCHITECT IN THE SUBJECT

MATTER, THE ARCHITECT'S DETERMINATION PREVAILS.

3. THE TERM "TYPICAL" AS USED IN THESE DOCUMENTS MEANS THAT A SPECIFIC CONDITION, INCLUDING DIMENSIONS, THE USE OF MATERIALS, THE INTEGRATION OF MATERIALS OR OTHER ASPECTS OF CONSTRUCTION ARE CONSISTENTLY

DUPLICATED ELSEWHERE IN THESE DOCUMENTS.

4. REPAIR ALL SPRAY ON FIRE PROOFING DAMAGED AND ALTERED DURING CONSTRUCTION ACTIVITIES TO THE ORIGINAL

SPECIFICATION AND DESIGN.

5. PARKING IS EXTREMELY LIMITED ON THE VA CAMPUS. A LIMITED NUMBER OF CONTRACTOR PARKING PERMITS WILL BE ISSUED FOR ON DESIGNATED ON SITE PARKING WILL BE AVAILABLE DURING THE DURATION OF THE CONSTRUCTION PROJECT. CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN SUBMITTING BIDS. REFERENCE SECTION 01 00 00.

6. ALL WORK GENERATING LOUD NOISES AND VIBRATION TO BE PERFORMED AFTER NORMAL HOSPITAL HOURS OF OPERATION. WORK SHALL BE PERFORMED BETWEEN 1800 AND 0600, MONDAY THRU THURSDAY AND BEGINNING AT 1800 ON FRIDAY'S THRU 0600 MONDAYS-UNLESS NOTED OTHERWISE. REFER TO PHASING PLANS FOR WORK DESIGNATIONS.

HOLIDAYS ARE EXCEPTIONS.

COORDINATE ALL WORK HOURS AND ACTIVITIES FOR EACH WEEK WITH COR FOR APPROVAL.

7. VA HAVE RIGHT TO STOP AND START OF ANY WORK WITHIN THE VA CAMPUS DUR TO CERTAIN FEDERAL AND LOCAL ACTIVITIES . GC SHALL ABIDE BY THESE ACTIVITIES AND ADJUST THE CONSTRUCTION SCHEDULE ACCORDINGLY.

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

GI0.20

GENERAL NOTES

3 1710/17/2023

UP

DN

DN

DN

DN

DN

OFFICE

BD104

OFFICE

BD108B

SPS

DECONTAMINATION

BD103

MSD&E BULK

STOCK

BD100

SPS PREP

AREA

BD108C

DISPATCH

BD108

SPS CHIEF

BD105

SPS

BD106

SPS ASST.

CHIEF/RME

COORD.

BD106A

SUPPLY

ROOM

BD106

ANTE

BD108G

VESTIBULE

BD108F

MEDIVATOR

T-5

ELEVATOR

LOBBY

T-38

MECHANICAL

ROOM

BC101

ELEVATOR

EQUIPMENT

BC102

MSD&E

PURCHASERS

BC104

SPS FEMALE

DECON/CHANGE

ROOM

BD102

SPS MALE

DECON/CHANGE

ROOM

BD101

ANTE

BD103E

IDF

BC103

HAC

BC105

ELECTRICAL

ROOM

BC106

SUPPLY

ROOM

BB130

PT OFFICE

BB127A

PHYSICAL

THERAPY

BB127

SUPERVISOR

MSD&E

BB126B

SUPERVISOR

MSD&E

BB126A

MSD&E

ADMIN

BB126

CORRIDOR

CB21

CORRIDOR

CB22

A5 OFFICE

BD111A

TRASH ROOM

BD112

SOILED

LINEN

BD114

IDF

BD108N

CORRIDOR

CB23

MSD&E

DISTRIBUTION

BD108A

LMS

RECEIVING

BD115

MSD&E

SUPPLY

STORAGE

BD108H

TRAINING/BREAK

AREA

BD108E

STAIR 7

T-31

GAS

STORAGE

BD116

ELECTRICAL

ROOM

BD116A

EMERGANCY

GEN.

BD116B

MECHANICAL

ROOM

BD111

ELEC. ROOM

BD110

ELE.

BD109

RESTROOM,

MEN

BB127B

HOUSEKEEPING

BD103A

MECHANICAL

BD108M

OFFICE

BD106B

AD2.00

1F

AD2.00

1C

SPS

LOADING

DOCK

DIRTY CART

ELEVATOR

T-1

PHASE 1 ACCESS ROUTE

PHASE 2 ACCESS ROUTE

PHASE 1 AND 2 ACCESS THROUGH SPS

LOADING DOCK

PROTECT FLOOR SURFACES ALONG THE PATH

WITH HARD BOARDS, COORDINATE LOCATION

WITHIN THE CORRIDORS WITH THE COR

PHASE 1 ACCESS ROUTE TO 2ND FLOOR

PHASE 2 ACCESS ROUTE TO 2ND FLOOR

PH

AS

E 1A

CC

ES

S

RO

UT

E

PH

AS

E 2A

CC

ES

S

RO

UT

E

CLEAN CART

ELEVATOR

T-2

PH

AS

E

PH

AS

E

AD2.00

4C

AD2.00

4F

LOCATION FOR ELECTRICAL

CONNECTIONS, V.I.F.)

LOCATION FOR IT

CONNECTIONS, V.I.F.)

LOCATION FOR

ELECTRICAL

CONNECTIONS, V.I.F.)

LOCATION FOR IT

CONNECTIONS, V.I.F.)

SUB-PHASE A SUB-PHASE B

NOTE:

1. GC SHALL COORDINATE THE FINAL LAYDOWN AREA WITH THE COR PRIOR TO

COMMERCING WORK. THE LAYDOWN AREA SHALL BE FENCED WITH 6' HIGH

CHAIN LINK AND GATES AS REQUIRED IN THE MAN GATES AND VEHICLE GATES

SHALL BE LOCKED WHEN SUPERVISION IS NOT AVAILABLE.

2. GC SHALL BE RESPONSIBLE FOR MATERIALS STORED FROM THE FT OR

DAMAGES.

3. IF A JOB TRAILER IS REQUIRED COORDINATE ALL TEMPORARY UTILITIES WITH

THE COR.

4. PHASE 2 CONSTRUCTION IS DIVIDED INTO SUB-PHASE.

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

AD1.10

BASEMENT FLOOR PHASING PLAN

SCALE: 1/8" = 1'-0"D1 BASEMENT FLOOR DEMOLITON PLAN

DEMOLITION CANNOT HAPPEN WITHOUT

TEMPORARY PARTITION/DUST BARRIERS IN PLACE!

4 1710/17/2023

CORRIDOR

C2-22

CORRIDOR

C2-21

STAFF

ANESTHESIOLOGIST

2D102

MECHANICAL

ROOM

2D101

STAIR 7

2S-7

FROZEN

SPECIMENS

2D106

SUB-STERILE

STORAGE

2D107B

OPERATING

ROOM

2D107

ORTHOPEDIC

O.R.

2D110EYE/ENT O.R.

2D108

INSTRUMENT

STORAGE

2D109

OR/SPD

EDUCATOR

PROGRAM

SPECIALIST

CLEAN

STORAGE

2D103

CLEAN UP

2D127A

MENS

LOCKERS

2D102A

FLOW LAB

2C103A

SCRUB

2D107CHAC

2D104

STAIR 6

2S-6 ANESTHESIA

2D127

STORAGE

2D112

STORAGE

2D111

CO

RR

ID

OR

C2 -2

ELEVATOR

LOBBY

C2-17

PLASTER

STORAGE &

SUB-STERILE

2D110B

SCRUB

ROOM

2D110A

HAC

2D113HOLDING

2D126 SCRUB

2D122C

SCRUB

2D124A

STORAGE

2D114

WOMENS

LOCKERS

2D128

SCRUB

ROOM

2D119B

S. LINEN

2D115

INSTRUMENT

PREP

2D122B

HAC

2C101 SUB-STERILE

2D119A

GENERAL

O.R.

2D121

OPERATING

ROOM

2D122

OPERATING

ROOM

2D124

ENDOSCOPY

2C104

GENERAL

OPERATING

ROOM

2D119

VASCULAR /

THORACIC

O.R.

2D118

ENDOSCOPY

2C102

CLEAN

SUPPLY

2D126B

CONTROL

2D122A TRASH

2D116ELEC.

2D120

CORRIDOR

MECHANICAL

ROOM

2D117

CORRIDOR

C2-25

BREAK ROOM

2C110

COMM

CLOSET

2C111

TOILET,

UNISEX

2C108

EQUIPMENT

RACK

AP205A EQUIPMENT

ROOM

AP205

BRONCHOSCOPY

2C107

ENDOSCOPY

2C106 SUPERVISOR

OFFICE

2C109

STORAGE

2C107A

STAIR 3

2S-3

CLOSET,

ELECTRICAL

2C112

CORRIDOR

2M106

OFFICE

2M122 CATH. LAB

2M123

PHYSICIAN

OFFICE

2M124

EQUIPMENT

CLEAN-UP

2M125

CHF OFFICE

2M126

CONTROL

2M127

CHF OFFICE

2M128

ECHO

STRESS

TEST

2M130

HYBRID

OPERATING

ROOM

2M131

SECRETARY

2M132 ELEC.

2M134

CLEAN

CORRIDOR

2M135

BRONCHOSCOPY

STORAGE

2C105

W.C.

2D124B

SURGICAL

CLEAN CORE

SUPPORT

2D105

CLEAN CART

STORAGE

2D105

CO

OR

ID

OR

C2 -2

CLEAN CART

STORAGE

2D105

ELE.

2M122B

IDF

2M122A

MECHANICAL

2D132

CONTROL

ROOM

2M131A

COMPONENT

ROOM

2M135A

DIRTY CART

ELEVATOR

T-1

STAIR 6

T-315

SCRUB

T-594

CLEAN CART

ELEVATOR

T-2

AD3.00

1B

AD3.00

F1

PHASE 1 ACCESS ROUTE

PHASE 2 ACCESS ROUTE

PH

AS

E

PH

AS

E

PH

AS

E 1A

CC

ES

S

RO

UT

E

FR

OM

BA

SE

ME

NT

FL

OO

R

PH

AS

E 2A

CC

ES

S

RO

UT

E

FR

OM

BA

SE

ME

NT

FL

OO

R

PHASE 1 STAGING AREA

AD3.00

6B

AD3.00

6F

LOCATION FOR ELECTRICAL

CONNECTIONS, V.I.F.)

LOCATION FOR ELECTRICAL &

IT CONNECTIONS, V.I.F.)

PHASE 2

STAGING

AREA

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

AD1.20

SECOND FLOOR PHASING PLAN

SCALE: 1/8" = 1'-0"D1 SECOND FLOOR DEMOLITION PLAN

DEMOLITION CANNOT HAPPEN WITHOUT

TEMPORARY PARTITION/DUST BARRIERS IN PLACE!

5 1710/17/2023

3C

AD2.00

DIRTY CART

ELEVATOR

T-1

CART

STORAGE

BD103C

OFFICE

BD104

ANTE

BD103E

CORRIDOR

CB21

SPS

DECONTAMINATION

BD103

V.I.F.

4' - 11 1/2"

V.

I.F

5'

-1

/2"

CHASE

4"

CORRIDOR

T-51

HOUSEKEEPING

BD103A

SPS FEMALE

DECON/CHANGE

ROOM

BD102

RAMP

DN

NEW OPENING

3' - 8" CLEAR

EXISTING DOOR TO REMAIN,

PROVIDE TEMPORARY LATCH

AND STRIKE AS REQUIRED

TO LATCH AND LOCK THE

DOOR

TEMPORARY 2X4 WOOD

FRAME PARTITION, EXTEND

TO TOP OF EXISTING DOOR

FRAME

2'-6" X 7'-0" TEMPORARY LOCKABLE

WOOD CONSTRUCTION DOOR,

PAINTED PER THE HOSPITAL

STANDARD

PROVIDE TEMPORARY H.M.

DOOR FRAME TO FIT WITHIN

EXISTING DOOR FRAME

5/8" GYPSUM BOARD, PAINTED

6"

2"

CONSTRUCTION

AREA

ANTE ROOM

(BD103E)

CORRIDOR

T-51

11' - 6"

5' -0

AD2.00

7C

8C

AD2.00

AD2.00

7A

11 17

OFFICE

BD104

CONSTRUCTION

AREA DIRTY CART

ELEVATOR

T-1

10 4

27 27

3F

AD2.00

OFFICE

BD108B

DISPATCH

BD108

SPS PREP

AREA

BD108C

V.

I.F

4'

-1

/2"

V.I.F.

5' - 10 3/4"

CLEAN CART

ELEVATOR

T-2

DISPATCH

BD108

4"

DN

NE

W

OP

EN

IN

G

3' -8

"C

LE

AR

6' - 0" 6"

EXISTING DOOR TO REMAIN,

PROVIDE TEMPORARY LATCH

AND STRIKE AS REQUIRED

PROVIDE TEMPORARY 2" H.M.

DOOR FRAME TO FIT WITHIN

EXISTING DOOR FRAME

TEMPORARY 2X4 WOOD FRAME

PARTITION, EXTEND TO TOP OF

EXISTING DOOR FRAME

TEMPORARY PARTITION SYSTEM AS

SPECIFIED SEAL ALL JOINTS INCLUDING

TOP AND BOTTOM OF THE WALL

5/8" GYPSUM BOARD, PAINTED

INSTALL TEMPORARY RUBBER

BASE TO MATCH EXISTING

CONSTRUCTION

AREA

ANTE ROOM

(BD103E)

SPS

DECONTAMINATION

(BD103)

5/8" GYP. BD. PAINTED SEAL

ALL JOINTS INCLUDING TOP

AND BOTTOM OF THE WALL

STADS @ 16"

TEMPORARY 2" H.M. DOOR FRAME TO FIT

UNDER EXISTING DOOR FRAME

EXISTING DOOR AND HARDWARE

TO REMAIN. PROVIDE TEMPORARY

HARDWARE TO LATCH AND LOCK

TEMPORARY PLYWOOD

CONSTRUCTION DOOR WITH

DOOR PULL AND PADLOCK HASP

AND PADLOCK COORDINATE KEY

REQUIREMENTS WITH VA

EXISTING OPENING

4' - 6"

7C / AD2.00

3' - 0" 6" 2' - 6"

DISPATCH

BD108

SPS PREP

AREA

BD108C

CLEAN CART

ELEVATOR

T-2

OFFICE

BD108B

CONSTRUCTION

AREA

8' - 0"

3' -0

5'

-7

1. REMOVE CART ELEVATOR IN ITS ENTIRETY INCLUDING DOORS, FRAMES,

HYDRAULIC PISTOL, INFRASTRUCTURES, ETC. REFER TO A5.00 CART

ELEVATOR SAMPLE SHOP DRAWING FOR EXTEND OF OPENING.

2. REMOVE EXISTING FLOORING IN FRONT OF DOORS 24" WIDE BY 72" LONG

3. REMOVE RUBBER BASE COORDINATE WITH FLOOR REMOVAL

4. REMOVE CART ELEVATOR ASSOCIATED HARDWARE AND ACCESSORIES

5. REMOVE HOSPITAL EQUIPMENT AND STORE FOR RE-INSTALLATION

6. REMOVE SS. CORNER GUARD AND STORE FOR RE-INSTALLATION

7. LIGHTING CONTROL TO REMAIN

8. EXISTING COLUMN

9. REMOVE ALL MATERIALS ASSOCIATED WITH EXISTING CART ELEVATOR:

PUMPS, CONTROLLERS, ELECTRICAL DISCONNECTS, CONDUITS, ETC.

REFER TO ELECTRICAL DEMOLITION NOTES FOR FURTHER DIRECTIONS

10. REMOVE WALL INCLUDING DRYWALL, STUDS, CMU, BASE, ETC., TO

CREATE 3'-8" x 7'-4" CLEAR OPENING. REFER TO A2.00 CART ELEVATOR

PLANS, SECTIONS AND DETAILS AND A5.00 CART ELEVATOR SAMPLE SHOP

DRAWING AND S1.00 STRUCTURAL DRAWING

11. EXISTING DOOR TO REMAIN

12. EXISTING CONSTRUCTION TO REMAIN

13. REMOVE CONCRETE RAMP

14. REMOVE AND STORE EXISTING DOOR AND HARDWARE FOR RE-

INSTALLATION

15. REMOVE EXISTING HOLLOW METAL DOOR FRAME, DOOR, AND HARDWARE

16. REMOVE WALL INCLUDING DRYWALL, STUDS, BASE, ETC., AS REQUIRED

FOR NEW 3'-0 X 7'-0" DOUBLE DOORS INCLUDING H.M. DOOR FRAME

(PHASE 2A)

17. INSTALL TEMPORARY LOCKABLE PLYWOOD CONSTRUCTION DOOR 2'-6" W

X 7'-0"H

18. TEMPORARY 2X4 WOOD FRAME PARTITION WITH 1 SIDED GYPSUM BOARD,

EXTEND FLOOR TO CEILING AND SEAL AT TOP AND BOTTOM OF WALL

19. FULL HEIGHT TEMPORARY DUST BARRIER PARTITION SYSTEM AS

SPECIFIED, SEAL BOTTOM AND TOP OF WALL (PHASE 2A)

20. FULL HEIGHT TEMPORARY DUST BARRIER PARTITION SYSTEM AS

SPECIFIED, SEAL BOTTOM AND TOP OF WALL (PHASE 2B)

21. TEMPORARY PARTITION SYSTEM TO REMAIN THROUGHOUT PHASE 2B

CONSTRUCTION

22. REMOVE TEMPORARY PARTITION SYSTEM ONCE NEW DOUBLE DOORS

HAVE BEEN INSTALLED (PHASE 2A)

23. EDGE OF CONCRETE FLOOR DROP

24. SALVAGE EXISTING FIRE EXTINGUISHER AND RETURN TO OWNER

25. REMOVE ROOM SIGN AND RETURN TO OWNER

26. VERIFY WITH THE ELEVATOR MANUFACTURES

27. REMOVE GFRP TO NEXT JOINT WITHOUT CUT

28. PROTECT ALL CEILING MOUNT EQUIPMENT AND DEVICES WITH CLEAR

PLASTIC DUST COVER AND SEAL WITH TAPE, INCLUDING LAYING CEILING

LIGHTS, PROTECT ALL EXISTING FLOORINGS AND SEAL ALL SUPPLY AND

RETURN AIR GRILLES UNTIL THE CONSTRUCTION IS COMPLETE.

KEYED NOTES #

LEGEND

AREA NOT IN CONTRACT

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

AD2.00

ENLARGED DEMOLITION PLANS

AND ELEVATIONS

SCALE: 1/4" = 1'-0"1C ENLARGED BASEMENT FLOOR DEMOLITION PLAN

SCALE: 1 1/2" = 1'-0"7C

TEMPORARY FRAMING DETAIL AT

BR103E

SCALE: 1/4" = 1'-0"4C

ENLARGED BASEMENT FLOOR

TEMPORARY CONSTRUCTION

PARTITION PLAN3C

EXISTING CONDITION PHOTO OF

DIRTY CART ELEVATOR T-1 AT

BASEMENT FLOOR

3F

EXISTING CONDITION PHOTO OF

CLEAN CART ELEVATOR T-2 AT

BASEMENT FLOOR

SCALE: 1/4" = 1'-0"1F ENLARGED BASEMENT FLOOR DEMOLITION PLAN

SCALE: 1 1/2" = 1'-0"7A

TEMPORARY FRAMING DETAIL AT

BD103

SCALE: 1/2" = 1'-0"8C TEMPORARY DOOR ELEVATION AT ANTE BD103E

SCALE: 1/4" = 1'-0"4F

ENLARGED BASEMENT FLOOR

TEMPORARY CONSTRUCTION

PARTITION PLAN

TEMPORARY PLYWOOD

CONSTRUCTION DOOR

WITH DOOR PULL AND PAD LOCK HASP

EXISTING 2" H.M. DOOR

FRAME TO REMAIN

PHASE 1:

PHASE 1: PHASE 1:

PHASE 1:

PHASE 1:

PHASE 2:

PHASE 2: PHASE 2:

NOTE:

TEMPORARY 2" H.M. DOOR FRAME TO INSTALLED AND

PAINTED TO MATCH EXISTING DOOR FRAME

PHASE 1:

PROVIDE SIGN

"CONSTRUCTION ACCESS ONLY"

6 1710/17/2023

4B

AD3.00

CORRIDOR

C2-22

OPERATING

ROOM

2D124

WOMENS

LOCKERS

2D128

W.C.

2D124B

V.I.F.

4' - 11 1/2"

DIRTY CART

ELEVATOR

T-1

V.

I.F

5'

-1

/4"

NEW OPENING

3' - 8" CLEAR

9 9

4F

AD3.00

V.

I.F

4'

-1

/2"

V.I.F.

5' - 11 1/2"

CLEAN CART

ELEVATOR

T-2

CLEAN CART

STORAGE

2D105

GENERAL

O.R.

2D121

CLEAN CART

STORAGE

2D105

SUB-STERILE

2D119A

SCRUB

ROOM

2D119B

ELEC.

2D120

CORRIDOR

C2-25

OPERATING

ROOM

2D122

SCRUB

2D122C

INSTRUMENT

PREP

2D122B

SURGICAL

CLEAN CORE

SUPPORT

2D105

11 11

NE

W

OP

EN

IN

G

3' -8

"C

LE

AR

1 54

CLEAN CART

ELEVATOR

T-2

CLEAN CART

STORAGE

2D105

GENERAL

O.R.

2D121

CLEAN CART

STORAGE

2D105

4' -6

4' - 0"

OPERATING

ROOM

2D122

INSTRUMENT

PREP

2D122B

CONTROL

2D122A

SUB-STERILE

2D119A

SCRUB

ROOM

2D119B

CORRIDOR

C2-25

TELEPHONE

CLOSET

2D123

SURGICAL

CLEAN CORE

SUPPORT

2D105

SCRUB

2D122C

26' - 0"

CONSTRUCTION AREA

16 15

TEMPORARY

CONSTRUCTION

STAGING AREA

CORRIDOR

C2-22

OPERATING

ROOM

2D124

WOMENS

LOCKERS

2D128

W.C.

2D124B

DIRTY CART

ELEVATOR

T-1

MI

N.

5' -0

14' - 6"

3' - 6"

CONSTRUCTION

AREA

INSTRUMENT

PREP

2D122B

CONTROL

2D122A

TELEPHONE

CLOSET

2D12316

1. REMOVE CART ELEVATOR IN ITS ENTIRETY INCLUDING DOORS, FRAMES,

INFRASTRUCTURES, ETC. REFER TO A5.00 CART ELEVATOR SAMPLE

SHOP DRAWING FOR EXTEND OF OPENING.

2. REMOVE EXISTING FLOORING IN FRONT OF DOORS 24'' WIDE X 72'' LONG

3. REMOVE RUBBER BASE COORDINATE WITH FLOOR REMOVAL

4. REMOVE CART ELEVATOR HARDWARE AND ACCESSORIES

5. REMOVE HOSPITAL EQUIPMENT AND STORE FOR RE-INSTALLATION

6. REMOVE EXISTING FLOORING AS INDICATED IN HATCH

7. REMOVE SIGN AND STORE FOR REINSTALLATION

8. ELECTRICAL OUTLET TO REMAIN

9. VERIFY WITH THE ELEVATOR MANUFACTURES

10. REMOVE WALL INCLUDING DRYWALL, STUDS, CMU, BASE, ETC., TO

CREATE 3'-8" x 7'-4" CLEAR OPENING. REFER TO A2.00 CART ELEVATOR

PLANS, SECTIONS AND DETAILS AND A5.00 CART ELEVATOR SAMPLE

SHOP DRAWING AND S1.00 STRUCTURAL DRAWING

11. EXISTING DOOR TO REMAIN

12. EXISTING CONSTRUCTION TO REMAIN

13. EXISTING WINDOW TO REMAIN. PROTECT GLASS WINDOWS FROM

DAMAGES

14. PROTECT ALL CEILING MOUNT EQUIPMENT AND DEVICES WITH CLEAR

PLASTIC DUST COVE AND SEAL WITH TAPE, INCLUDING LAYING CEILING

LIGHTS.

15. PROTECT ALL EXISTING WALLS IN CONSTRUCTION AREA

16. PROTECT ALL EXISTING DOORS FROM DAMAGES

17. INSTALL TEMPORARY LOCKABLE PLYWOOD CONSTRUCTION DOOR AND

PADLOCK HASP COORDINATE KEY REQUIREMENTS WITH VA

18. PROTECT ALL EXISTING FLOORINGS

19. FULL HEIGHT TEMPORARY PARTITION SYSTEM AS SPECIFIED, SEAL

BOTTOM AND TOP OF WALL

20. 4'-0" x 7'-0" DOOR BY SPECIFIED TEMPORARY PARTITION SYSTEM WITH

PANIC H.W. AND FLUORESCENT EXIT SIGN " EMERGENCY EXIT ONLY"

21. PROVIDE A SIGN "EMERGENCY DOOR USED BY STAFF ONLY NOT

ENTER."

22. CLOSE DOOR AND SEAL ALL 4 SIDES OF DOOR WITH TAPE AND APPLY

PLASTIC POLYETHYLENE BARRIER (10 MIL MIN.) OVER DOOR DURING

CONSTRUCTION

23. SEAL ALL SUPPLY AND RETURN AIR GRILLES UNTIL THE CONSTRUCTION

IS COMPLETE

KEYED NOTES #

LEGEND

AREA NOT IN CONTRACT

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs

AD3.00

ENLARGED DEMOLITION PLANS

AND ELEVATIONS

SCALE: 1/4" = 1'-0"1B ENLARGED SECOND FLOOR DEMOLITION PLAN

SCALE: 1/4" = 1'-0"F1 ENLARGED SECOND FLOOR DEMOLITION PLAN

4B

EXISTING CONDITION PHOTO OF

DIRTY CART ELEVATOR T-1 AT

SECOND FLOOR

4F

EXISTING CONDITION PHOTO OF

DIRTY CART ELEVATOR T-2 AT

SECOND FLOOR

SCALE: 1/4" = 1'-0"6F ENLARGED SECOND FLOOR TEMPORARY CONSTRUCTION PARTITION PLAN

SCALE: 1/4" = 1'-0"6B ENLARGED SECOND FLOOR TEMPORARY CONSTRUCTION PARTITION PLAN

PHASE 1: DIRTY CART ELEVATOR

PHASE 2: CLEAN CART ELEVATORPHASE 2: CLEAN CART ELEVATOR

PHASE 1: DIRTY CART ELEVATOR

PHASE 1:

7 1710/17/2023

UP

DN

DN

DN

DN

DN

HOUSEKEEPING

BD108DMEDIVATOR

T-5

GAS

STORAGE

BD116

ELECTRICAL

ROOM

BD116A

EMERGANCY

GEN.

BD116BTRAINING/BREAK

AREA

BD108E

STAIR 7

T-31

MSD&E BULK

STOCK

BD100

STAIR 6

T-34 LMS

RECEIVING

BD115

OFFICE

BD108B

MSD&E

DISTRIBUTION

BD108AELEVATOR

LOBBY

T-38

CORRIDOR

CB23

AUTOMATIC

CART

WASHER

T-40

SPS MALE

DECON/CHANGE

ROOM

BD101

SPS

DECONTAMINATION

BD103

SPS FEMALE

DECON/CHANGE

ROOM

BD102

SOILED

LINEN

BD114CART

STORAGE

BD103C

IDF

BD108N

HOUSEKEEPING

BD103A

MECHANICAL

ROOM

BD111TRASH ROOM

BD112

ELEC. ROOM

BD110

CORRIDOR

T-51ELEVATOR

EQUIPMENT

BC102

MECHANICAL

ROOM

BC101

CORRIDOR

CB22

SPS CHIEF

BD105

OFFICE

BD104

SUPPLY

ROOM

BD106

SPS ASST.

CHIEF/RME

COORD.

BD106A

SPS

BD106

ELE.

BD109

A5 OFFICE

BD111ACORRIDOR

CB21

IDF

BC103

PROSTETICS

OFFICE

T-64

SUPERVISOR

MSD&E

BB126B

CONTROL

ROOM

BA108A

MSD&E

PURCHASERS

BC104

HAC

BC105 MECHANICAL

ROOM

BA108B

PT OFFICE

BB127A

PHYSICAL

THERAPY

BB127

SUPPLY

ROOM

BB130

MSD&E

ADMIN

BB126

RESTROOM,

MEN

BB127B

SUPERVISOR

MSD&E

BB126A

ELECTRICAL

ROOM

BC106

CORRIDOR

CB-10

STAIR 3

BS-3

CORRIDOR

CB-14

CORRIDOR

CB-12

CORRIDOR

CB-13

LOCKER

ROOM, MEN

BC127

KINESIOTHERAPY

OFFICE

BB124

PM&RS

STORAGE

BB129B

STAFF

PHYSIATRIST

BC128

PHYSIATRY

CLINIC

BC108

PM&RS

STORAGE

BB129A

OCCUPATIONAL

THERAPY

BC109

KINESIOTHERAPY

BB128

WAITING/RECEPTION

BB120

CANTEEN

RETAIL

BA112

DISPATCH

BD108

MECHANICAL

BD108M

CORRIDOR

CB4

BC122E

ANTE

BD103E

OFFICE

BD106B

VESTIBULE

BD108F

ANTE

BD108G

MSD&E

SUPPLY

STORAGE

BD108H

DIRTY CART

ELEVATOR

T-1

SPS PREP

AREA

BD108C

CLEAN CART

ELEVATOR

T-2

TEMPORARY

PARTITION

SYSTEM AS

SPECIFIED

6' - 0" 6"

SPS

LOADING

DOCK

BD

8E

CONSTRUCTION ACCESS ROUTE SEE GENERAL NOTES REGARDING

ACCESS COORDINATION AND LAYDOWN YARD LOCATION

PHASE 1

PHASE 2

A2.00 F6

A2.00 F1

1. PHASE I STAGING AREA

2. PHASE 2 STAGING AREA

3. FULL HEIGHT TEMPORARY PARTITION SYSTEM AS SPECIFIED, SEAL

BOTTOM AND TOP OF WALL

KEYED NOTES #

LEGEND

AREA NOT IN CONTRACT

Approved: Chief of StaffApproved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Approved: Service Chief

Concur Safety

Concur M & O

Concur Bio-Med

100% CD REVIEW

01/31/2023

674 -22-107

REPLACE CART ELEVATORS

Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504

THIS DOCUMENT IS RELEASED FOR INTERIM

REVIEW UNDER THE AUTHORITY OF:

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

ARCHITECT:

Management

CONSULTANTS:

Office of Facilities o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

F

E

MIGUEL A. GARCIA, P.E.

TEXAS LIC. NO. 71024

RELEASED ON:

01/31/2023

IN ACCORDANCE WITH TEXAS ENGINEERING

PRACTICE AND ACT RULE, §137.33E.

IT IS NOT TO BE USED FOR

CONSTRUCTION OR BIDDING PURPOSES. Department of

Veterans Affairs A1.00

NEW BASEMENT FLOOR PLAN

SCALE: 1/8" = 1'-0"D1 BASEMENT LEVEL PLAN

8 1710/17/2023

CORRIDOR

C2-21

STAFF

ANESTHESIOLOGIST

2D102

MECHANICAL

ROOM

2D101

STAIR 7

2S-7

FROZEN

SPECIMENS

2D106

SUB-STERILE

STORAGE

2D107B

OPERATING

ROOM

2D107

ORTHOPEDIC

O.R.

2D110EYE/ENT O.R.

2D108

INSTRUMENT

STORAGE

2D109

OR/SPD

EDUCATOR

PROGRAM

SPECIALIST

CLEAN

STORAGE

2D103

CLEAN UP

2D127A

MENS

LOCKERS

2D102A

FLOW LAB

2C103A CORRIDOR

C2-22 SCRUB

2D107C

HAC

2D104

STAIR 6

2S-6 ANESTHESIA

2D127

STORAGE

2D112

STORAGE

2D111

CORRIDOR

C2-24ELEVATOR

LOBBY

C2-17

PLASTER

STORAGE &

SUB-STERILE

2D110B

SCRUB

ROOM

2D110A

HAC

2D113HOLDING

2D126 SCRUB

2D122C

SCRUB

2D124A

STORAGE

2D114

WOMENS

LOCKERS

2D128

CORRIDOR

T-3

SCRUB

ROOM

2D119B

S. LINEN

2D115

INSTRUMENT

PREP

2D122B

HAC

2C101 SUB-STERILE

2D119A

GENERAL

O.R.

2D121

OPERATING

ROOM

2D122

OPERATING

ROOM

2D124

ENDOSCOPY

2C104

GENERAL

OPERATING

ROOM

2D119

VASCULAR /

THORACIC

O.R.

2D118

ENDOSCOPY

2C102

CLEAN

SUPPLY

2D126B

CONTROL

2D122A TRASH

2D116ELEC.

2D120TELEPHONE

CLOSET

2D123CORRIDOR

MECHANICAL

ROOM

2D117

CORRIDOR

C2-25

BREAK ROOM

2C110

COMM

CLOSET

2C111

TOILET,

UNISEX

2C108

EQUIPMENT

RACK

AP205A EQUIPMENT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .