These construction documents detail a cart elevator replacement project for the Department of Veterans Affairs Central Texas Veterans Health Care System located in Temple, Texas. The project involves replacing two existing hydraulic cart elevators with new traction elevators in Building 163, specifically serving the Surgical Suite. The project is divided into two phases: Phase 1 will replace the dirty cart elevator, and Phase 2 will be further subdivided into creating a new doorway between the SPS Prep and Dispatch areas, followed by replacing the clean cart elevator. The project number is 674-22-107, and the documents are at 100% Construction Document review stage, released on 01/31/2023 by the architectural firm WestEast Design Group JV, LLC. The elevators will travel between the basement floor (SPS Department) and the 2nd floor (Surgical Suite), with careful considerations for maintaining hospital operations, infection control, and patient safety during construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25726R0013 0003.docx | DOCX document | |
| 36C25726R0013 0002.docx | DOCX document | |
| Cart Elevator Site Visit - 11-13-25.pdf | ||
| 36C25726R0013 0001.docx | DOCX document | |
| Attachment 3 Price Breakout Worksheet.xlsx | XLSX spreadsheet | |
| Attachment 2 674-22-107 VA Temple Replace Cart Elevators Specifications.pdf | ||
| 36C25726R0013_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of
Veterans Affairs
CENTRAL TEXAS VETERANS HEALTH CARE SYSTEM
PROJECT: REPLACE CART ELEVATOR - SURGERY
BUILDING 163
OLIN E. TEAGUE VETERANS MEDICAL CENTER
1901 VETERANS MEMORIAL DRIVE TEMPLE, TEXAS
PROJECT NO.: 674-22-107
100% CONSTRUCTION DOCUMENTS
SHEET INDEX
GI0.00
GI0.10
GI0.20
AD1.10
AD1.20
AD2.00
AD3.00
A1.00 A1.10 A2.00 A3.00 A4.00 A5.00 S1.00 E1.1 E1.2 E2.1
COVER SHEET AND SHEET INDEX
GENERAL NOTES
GENERAL NOTES
BASEMENT FLOOR PHASING PLAN
SECOND FLOOR PHASING PLAN
ENLARGED DEMOLITION PLANS AND ELEVATIONS
ENLARGED DEMOLITION PLANS AND ELEVATIONS
NEW BASEMENT FLOOR PLAN
NEW SECOND FLOOR PLAN
CART ELEVATOR PLANS, SECTIONS AND DETAILS
DOOR SCHEDULE AND DETAILS
INTERIOR ELEVATIONS AND REFLECTED CEILING PLANS
CART ELEVATOR SAMPLE SHOP DRAWING
GENERAL STRUCTURAL NOTES, ELEVATOR ELEVATIONS AND PLAN
BASEMENT ELECTRICAL PLAN
SECOND FLOOR ELECTRICAL PLAN
ELECTRICAL SPECIFICATIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANT
7 8 9 10 engineering discipline <EDIT TEXT>:
321 4 5 6
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
674 -22-107
163ELK Consortium + WestEast Design Group JV, LLC 200 E. Grayson Street, Suite 207 San Antonio, Texas 78215 210.530.0755 www.westeastdesign.com Texas Registered Engineering Firm F-19531
100% CD REVIEW
C :\U se rs
\e va v\ D oc um en ts
\2
VA
TE
M
PL
E
C
AR
T R
EP
LA
C
EM
EN
T_ ev av
W
KU
AS
.rv t
/1 7/
:0
2:
PM
GI0.00
COVER SHEET AND SHEET INDEX
CENTRAL TEXAS VETERANS HEALTH CARE
SE
H.
K.
DO
DG
EN
LO
OP
E. ADAMS AVE
W. ADAMS AVE
AIRPORT RD.
W. CENTRAL AVE
1S T S
TS
ST
ST
W. ADAMS AVE
NE
H.K. DODGEN
LOOP
NW H.K. DODGEN LOOP
SW H.K. DODGEN LOOP
E AVENUE H
W AVENUE H
W AVE R
S 8T
H
ST
1901 Veterans Memorial Drive Temple, TX 76504-7451
NOTE:
THERE ARE NO WORK ON 1ST, 3RD, 4TH, 5TH AND 6TH FLOOR. THE SURGICAL SUITE CART
ELEVATORS TREVAL BETWEEN BASEMENT FLOOR, SPS DEPARTMENT TO 2ND FLOOR, SURGICAL
SUITE. THE EXISTING ELEVATORS ARE HYDRAULIC ELEVATORS. THIS ELEVATOR REPLACEMENT
PROJECT GOAL IS TO REPLACE EXISTING HYDRAULIC ELEVATORS TO NEW TRACTION ELEVATORS.
Revisions: Date: 10/17/2023
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES.
Dwg. 1 of 17
UP
UP
UP
UP DN
DN
DN
DN
DN
DN
DN
DN
UP
UP
DN
ABBREVIATIONS
@ AT
CENTERLINE
PROPERTY LINE
DIAMETER
# POUND OR NUMBER
(E) EXISTING
(N) NEW
AB ANCHOR BOLT
ABV ABOVE
ACC ACCESS
ACOUS ACOUSTICAL
ACP ASPHALT CONCRETE PAVING
ACS ACCESS PANEL
ACT ACOUSTICAL TILE
AD AREA DRAIN
ADA AMERICANS with DISABILITIES
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AGGR AGGREGATE
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AUTO AUTOMATIC
BD BOARD
BITUM BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF...
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
BUR BUILT UP ROOFING
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CER CERAMIC
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLK CAULKING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CORR CORRIDOR
CPT CARPET; CARPETED
CRS COLD ROLLED STEEL
CSK COUNTERSUNK
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
DBL DOUBLE
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DL DEAD LOAD
DN DOWN
DR DOOR
DR OPNG DOOR OPENING
DS DOWNSPOUT
DSP DRY STANDPIPE
DT DRAIN TILE
DW DISHWASHER
DWG DRAWING
E EAST
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EW EACH WAY
EXH FN EXHAUST FAN
EXIST EXISTING
EXP EXPANDED; EXPANSION
EXP BT EXPANSION BOLT
EXPO EXPOSED
EXT EXTERIOR
FA FIRE ALARM
FB FLAT BAR
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF EL FINISH FLOOR ELEVATION
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FIN FLR FINISH FLOOR
FF FINISH TO FINISH
FIN FINISH
FLASH FLASHING
FLR FLOOR; FLOORING
FLUOR FLUORESCENT
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOIC FURNISHED BY OWNER -
INSTALLED BY CONTRACTOR
FOM FACE OF MASONRY
FOS FACE OF STUDS
FP FIREPROOF
FPL FIREPLACE
FR FRAME
FT FOOT; FEET
FTG FOOTING
FURR FURRING
FUT FUTURE
FW FULL WIDTH
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GL GLASS
GLAM GLUE-LAMINATED
GR GRADE
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIBB
HC HOLLOW CORE
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDWD HARDWOOD
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HT HEIGHT
HVAC HEATING/VENTILATING/AIR
CONDITIONING
HW HOT WATER
HWT HOT WATER TANK
ID INSIDE DIAMETER
IN INCH
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INV INVERT
JB JUNCTION BOX
JF JOINT FILLER
JT JOINT
KIT KITCHEN
KO KNOCKOUT
LAM LAMINATE, LAMINATED
LAV LAVATORY
LBS POUNDS
LF LINEAR FOOT (FEET)
LH LEFT HAND
LL LIVE LOAD
LOC LOCATION
LP LOW POINT
LT LIGHT
SPEC SPECIFICATION
SQ FT SQUARE FOOT (FEET)
SQ IN SQUARE INCH(ES)
SST STAINLESS STEEL
STD STANDARD
STL STEEL
ST STONE
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
T TREAD
T&G TONGUE AND GROOVE
TEL TELEPHONE
TER TERRAZZO
TG TEMPERED GLASS
THK THICK
TO TOP OF...
TOB TOP OF BEAM
TOC TOP OF CONCRETE; CURB
TOF TOP OF FLOOR; FOOTING; FRAME
TOM TOP OF MASONRY
TOP TOP OF PARAPET; PAVEMENT
TOPO TOPOGRAPHY
TOS TOP OF SLAB; STEEL
TOW TOP OF WALL
TS TUBE STEEL
TSTAT THERMOSTAT
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VEN VENEER
VERT VERTICAL
VEST VESTIBULE
VG VERTICAL GRAIN
VHA VETERANS HEALTH ADMINISTRATION
VIF VERIFY IN FIELD
VT VINYL TILE
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WF BM WIDE FLANGE BEAM
WG WIRED GLASS
WH WATER HEATER
WL WATER LINE
WLD WELDED
WP WATERPROOF
WPM WATERPROOF MEMBRANE
WR WATER RESISTANT
WSCT WAINSCOT
WSG WIRE SAFETY GLASS
WTR WATER
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
WT WEIGHT
CL
PL
O/
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MDF MEDIUM DENSITY FIBERBOARD
MDO MEDIUM DENSITY OVERLAY
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MTD MOUNTED
MTL METAL
MUL MULLION
N NORTH
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER;
OVERFLOW DRAIN
OFF OFFICE
OH OVERHEAD
OHWM ORDINARY HIGH WATER MARK
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLWD PLYWOOD
PNL PANEL
PNT POINT
PR PAIR
PRCST PRECAST
PSF POUNDS PER CUBIC FOOT
PSI POUNDS PER SQUARE INCH
PT PRESERVATIVE TREATED
PTN PARTITION
PVC POLYVINYL CHLORIDE
R RISER
RA RETURN AIR
RAD RADIUS
RD ROOF DRAIN
REF REFERENCE
REFR REFRIGERATOR
REG REGISTER
REINF REINFORCED
REM REMAINDER
REQ REQUIRED
RESIL RESILIENT
REV REVISION; REVISIONS; REVISED
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
RWL RAIN WATER LEADER
S SOUTH
SAF SELF-ADHERED FLASHING
SAM SELF-ADHERED MEMBRANE
SC SOLID CORE
SCHED SCHEDULE
SD SMOKE DETECTOR
SECT SECTION
SG SAFETY GLASS
SHV SHELF; SHELVING
SHR SHOWER
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
TR
UE
NO
RT
H
PL
AN
NO
RT
H
D2
E2
B2C2
KEYNOTE
INTERIOR ELEVATION KEY
1-101-A
DOOR IDENTIFICATION TAG
A1
A1.00
X PARTITION TYPE REFERENCE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE
REMOVED OR LINE OF CONSTRUCTION
BEYOND
NEW CONSTRUCTION
DETAIL OR ENLARGED PLAN
REFERENCE
ARCHITECTURAL DRAWING SYMBOLS AND LEGENDS:
HATCHED AREA NOT IN CONTRACT
SPS LOADING
DOCK
PROJECT LOCATION
GENERAL LOADING DOOK
LOADING
DOOK
ACCESS
ROAD
CONSTRUCTION ACCESS
DIRTY CART ELEVATOR CLEAN CART ELEVATOR
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
GI0.10
GENERAL NOTES
PARTIAL BASEMENT FLOOR
LOCATION PLAN OF BUILDING 163
TRUE NORTH PLAN NORTH
2 KEY PLAN
NTS
NTS
VETERANS MEMORIAL DRIVE
W .A
VE
U
AVENUE OF FLAGS
W .A
VE
R
R
RO
AD
RO
AD
8B
MAIN ENTRANCE
TEAGUE PLACE
TE
AG
UE
PL
AC
E
TE
AG
UE
PL
AC
E
TEAGUE PLACE
2 1710/17/2023
GENERAL PROJECT NOTES:
1. THE GENERAL PROJECT NOTES ARE PART OF THE CONTRACTOR'S SCOPE OF WORK. THEY SHALL BE FOLLOWED IN
CONJUNCTION WITH AND IN ADDITION TO VHA MASTER SPECIFICATION SECTION 01 00 00 - GENERAL REQUIREMENTS AND
MUST BE INCLUDED AS PART OF THE CONTRACTOR'S RESPONSIBILITIES AND BASE BID.
2. EXISTING HVAC SYSTEM LOCATED WITHIN THE HVAC ZONE TO BE TESTED AND BALANCED AFTER THE SPECIFIED TEMPORARY PARTITION SYSTEMS ARE IN PLACE AND THE CONSTRUCTION AREAS ARE TEMPORARILY DISCONNECT FROM
THE SYSTEM SUPPLY AND RETURN AIR FOR THE DURATION OF THE CONSTRUCTION.
3. RETURN HVAC BALANCING TO THE ORIGINAL SETTING ONCE CONSTRUCTION IS COMPLETE.
4. PROVIDE HEPA FILTERED VENTILATION SYSTEM TO RECIRCULATE AIR WITHIN THE CONSTRUCTION AREA TO CLEAN THE
CONSTRUCTION DUST FROM THE AIR DURING THE CONSTRUCTION PERIOD.
COORDINATION AND RESPONSIBILITIES:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING AND UNDERSTANDING ALL ASPECTS OF THE CONTRACT
DOCUMENTS INCLUDING COORDINATION BETWEEN THE DRAWINGS AND SPECIFICATIONS. ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE CONTRACTING OFFICER REPRESENTATIVE'S (COR) ATTENTION IN WRITING THROUGH RFI (REQUEST FOR INFORMATION). COORDINATION BETWEEN ALL ASPECTS OF THE CONSTRUCTION INCLUDING BUT NOT LIMITED TO TRADES, SUBCONTRACTORS, SUPPLIERS, AND CONTRACTOR'S WORKERS TO BE PROVIDED BY THE GC TO COMPLETE THIS
PROJECT.
2. IN THE EVENT A DISCREPANCY IS DISCOVERED BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE CONTRACTOR IS UNABLE TO RECEIVE CLARIFICATION PRIOR TO SUBMISSION OF THE BASE BID, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INCLUDING IN THE PRICING OF THE WORK OR ITEMS OF GREATEST VALUE. ANY OMISSION OR CLAIM OF OMISSION IN THIS PROJECT BECAUSE OF SUCH A DISCREPANCY WILL NOT, UNDER ANY CIRCUMSTANCES, BE GROUNDS FOR ADDITIONAL COST TO THE OWNER AFTER THE PROJECT IS AWARDED. SCOPE OF WORK INDICATED IN THE CONSTRUCTION DOCUMENTS WILL BE ASSUMED TO HAVE BEEN INCLUDED IN THE BASE BID. A GENERAL CONTRACTOR (G.C.) SHALL NOT CLAIM ADDITIONAL COST BASED ON UNINTENTIONAL OMISSION IN THE BASE BID ESTIMATES. AN ERROR OF ON THE PART OF THE G.C. OR IT'S SUBS IS NOT GROUNDS FOR ADDITIONAL FUNDS. THIS IS INAPPROPRIATE IN A COMPETITIVE BIDDING SITUATION. ANY ISSUE MUST BE ADDRESSED DURING CONTRACT NEGOTIATIONS WITH THE VA AND PRIOR THE AWARDING OF THE CONTRACT.
3. THE CONTRACTOR SHALL ENSURE THAT SERVICES TO ADJACENT AREAS AFFECTED BY CONSTRUCTION SHALL REMAIN FULLY OPERATIONAL DURING CONSTRUCTION. IF ANY DISRUPTION OF SERVICES IS NECESSARY, THE CONTRACTOR SHALL NOTIFY THE COR AT LEAST 7 DAYS IN ADVANCE PRIOR TO PROPOSED INTERRUPTION. REFER TO SPECIFICATION SECTION 01 00 00, 1.6 "OPERATIONS AND STORAGE AREAS", FOR EMERGENCY INTERRUPTION PROCEDURE. UNDER ANY CIRCUMSTANCES, THE
UTILITIES SHALL NOT SHUT DOWN, WITHOUT PRIOR NOTIFICATION.
4. ANY WORK REQUIRES SHUTTING OFF UTILITIES SHALL BE PERFORMED AFTER BUSINESS HOURS WITH AN APPROVAL BY COR
OR DURING THE PRE-WRITTEN ARRANGED HOURS.
5. CONTRACTOR TO COORDINATE WITH LOADING DOCK MANAGER WHEN USE IS REQUIRED. CONTRACTOR TO USE SPS LOADING
DOCK THROUGH ALL PHASES OF THE PROJECT.
6. USE ELEVATOR P-6 FOR ACCESSING THE CONSTRUCTION SITE. MOVEMENT OF CONSTRUCTION MATERIAL MUST BE LIMITED
BEFORE 7AM AND AFTER 5PM EVERYDAY, NO EXCEPTIONS.
7. CONTRACTOR TO COORDINATE WITH LOADING DOCK MANAGER WHEN USE IS REQUIRED. CONTRACTOR TO USE SPS LOADING
DOCK THROUGH ALL PHASES OF THE PROJECT.
8. USE ELEVATOR P-6 FOR ACCESSING THE CONSTRUCTION SITE. MOVEMENT OF CONSTRUCTION MATERIAL MUST BE LIMITED
BEFORE 7AM AND AFTER 5PM EVERYDAY, NO EXCEPTIONS.
EXISTING CONDITIONS:
1. THE CONTRACTOR SHALL FIELD VERIFY AND SURVEY EXISTING BUILDING CONDITIONS TO FAMILIARIZE THEMSELVES WITH
THE EXTENT OF DEMOLITION AND NEW CONSTRUCTION AS INDICATED IN CONTRACT DOCUMENTS. THE CONTRACTOR SHALL DETERMINE THE IMPACT THAT DEMOLITION AND NEW CONSTRUCTION WILL HAVE ON EXISTING BUILDING SYSTEMS INCLUDING BUT NOT LIMITED TO STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, COMMUNICATION, FIRE PROTECTION SYSTEMS AND ALL OTHER FACTORS THAT WILL AFFECT THE PROJECT AND THE OPERATIONS OF THE ADJACENT SPACES.
FAILURE TO DO SO WILL NOT BE GROUNDS FOR ADDITIONAL FUNDS AFTER PROJECT HAS BEEN AWARDED.
2. THE CONTRACTOR SHALL CONFIRM IN WRITING THE LOCATIONS OF ALL UNEXPOSED AND BARRIED UTILITY LINES WITH THE COR PRIOR TO PROCEEDING WITH ANY WORK. IF THE CONTRACTOR PROCEEDS WITHOUT SUCH PRIOR WRITTEN NOTICE AND DAMAGE OCCURS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING OR REPAIRING DAMAGE AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR IMAGERY THROUGH CONCRETE FLOOR DECK, BEAMS, AND SLAB PRIOR TO ANY CORE DRILLING. CONTRACTOR MUST COORDINATE CORE DRILLING EFFORT WITH THE
COR.
3. THE CONTRACTOR SHALL REPORT ALL UNFORESEEN CONDITIONS DISCOVERED DURING INSPECTIONS OR DURING CONSTRUCTION IMMEDIATELY TO THE COR FOR CLARIFICATION, BEFORE CONTINUING WITH THAT PORTION OF THE WORK.
UNFORESEEN CONDITIONS SHALL INCLUDE BUT NOT BE LIMITED TO CONDITIONS NOT VISUALLY DISTINGUISHABLE OR
DISCREPANCIES BETWEEN ACTUAL EXISTING CONDITIONS AND AS-BUILT INFORMATION.
4. THE CONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION OUTSIDE OF CONSTRUCTION LIMITS DAMAGED BY CONTRACTOR'S OPERATIONS AND CONSTRUCTION ACTIVITIES FOR ALL AREAS WITHIN THE CONSTRUCTION LIMITS DAMAGED AND NOT INDICATED IN THESE DOCUMENTS TO BE REMOVED. EXISTING CONSTRUCTION SHALL INCLUDE BUT NOT BE LIMITED TO EXPOSED OR UNEXPOSED UTILITIES, ADJACENT AREAS OF THE EXISTING BUILDING, WALLS, AND
FINISHES.
5. IN AREAS WHERE MODIFICATIONS OCCUR BY ACCESS THROUGH ANOTHER OCCUPIED AREA, THE CONTRACTOR SHALL INCLUDE IN THE BASE PROJECT ALL WORK ASSOCIATED WITH MAINTAINING, AND REPAIRING EXISTING CEILINGS, WALLS, MEP SYSTEMS, ETC. ITEMS AND OPERATIONS DAMAGED OR DISRUPTED AS A RESULT OF THIS ACCESS, SHALL BE REPAIRED
TO MATCH EXISTING FINISHES AND MATERIALS.
6. THE CONTRACTOR SHALL VERIFY EXISTING ELEVATIONS INCLUDING FLOOR TO FLOOR HEIGHTS, FLOOR TO CEILING HEIGHTS, PRIOR TO PROCEEDING WITH WORK. ANY DISCREPANCIES OR CONFLICTS SHALL BE BROUGHT IMMEDIATELY TO
THE COR'S ATTENTION FOR CLARIFICATION.
SAFETY / SECURITY:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFE AND LAWFUL REMOVAL AND OFF-SITE DISPOSAL OF TRASH, DEBRIS OR UNSALVAGED ITEMS REMOVED DURING DEMOLITION IN ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS INCLUDING CITY OF SAN ANTONIO, COUNTY AND STATE REGULATIONS. THE PROJECT SITE SHALL BE CLEANED ON A DAILY BASIS OR AS DIRECTED BY THE COR DURING CONSTRUCTION ACTIVITIES TO PREVENT ACCUMULATION. THIS INCLUDES COMPLIANCE WITH HOSPITALS INFECTION CONTROL REQUIREMENTS.
2. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS INCLUDING OSHA FOR
CONSTRUCTION SAFETY AND INSPECTION PROCEDURES.
3. THE CONTRACTOR SHALL CONFINE OPERATIONS WITHIN A CONSTRUCTION LIMIT LINE AS TO PREVENT WORKERS, MATERIALS OR EQUIPMENT FROM INTERACTING WITH OTHER AREAS OUTSIDE OF THE CONSTRUCTION LIMITS LINE OCCUPIED BY PATIENTS, STAFF OR IN AREAS OCCUPIED BY THE GENERAL PUBLIC UNLESS OTHERWISE REQUIRED BY
THESE DOCUMENTS.
4. THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT AND PROVIDE SAFETY AND SECURITY FOR ALL OCCUPANTS. THE CONTRACTOR SHALL PROVIDE SECURITY MEASURES AS REQUIRED FOR PROTECTION FROM VANDALISM, THEFT, DAMAGE TO CONSTRUCTION SITE AND PROTECTION OF THE GENERAL PUBLIC FROM HAZARDOUS OR
DANGEROUS CONDITIONS AT ALL TIMES DURING CONSTRUCTION.
5. THE CONTRACTOR MAY ORDER MATERIALS ON AN "AS NEEDED" BASIS AS THE JOB PROGRESSES AND STORE ON SITE IN
THE DESIGNATED LAY DOWN AREA WHERE DIRECTED BY THE COR.
6. THE CONTRACTOR SHALL KEEP AND MAINTAIN A FIRE WATCH MONITOR LOG THAT SHALL BE KEPT ON AN HOURLY BASIS.
COORDINATE REQUIREMENTS WITH VA COR.
7. REFERENCE SECTION 01 35 26 AND 01 74 19
CONSTRUCTION:
THE CONTRACTOR SHALL KEEP AND MAINTAIN TWO COMPLETE AND UPDATED SETS OF CONSTRUCTION DRAWINGS AND SPECIFICATIONS AT THE CONSTRUCTION SITE THROUGH THE DURATION OF CONSTRUCTION FOR REVIEW AND REFERENCE BY COR AND ARCHITECT. THIS SHALL INCLUDE ALL DOCUMENTS WHICH CHANGE, MODIFY OR REVISE THE SCOPE OF WORK AND/OR THE COST OF THE PROJECT. REFER TO SPECIFICATION SECTION 01 00 00, "AS BUILT DRAWINGS".
CORRESPONDENCE / INSTRUCTIONS:
ALL CORRESPONDENCE INCLUDING BUT NOT LIMITED TO CHANGES IN THE SCOPE OF WORK, CHANGES IN COST, REQUESTS FOR INFORMATION, DIRECTIONS, INSTRUCTIONS, APPROVALS, CLARIFICATIONS, GENERAL CORRESPONDENCE, ETC.. SHALL BE DIRECTED TO THE COR'S IN WRITTING.
USE PROPER APPROVED FORMS FOR ALL COMMUNICATIONS.
INFECTION PREVENTION NOTES:
1. THE ICRA (INFECTION CONTROL RISK ASSESSMENT SHALL BE WRITTEN AND AMENDED INTO THE CONTRACT AND SPECIFICATIONS FOR
CONSTRUCTION PROJECT TO PREVENT COST) DISCREPANCIES.
2. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ALL PRE-CONSTRUCTION MEETINGS. REFERENCE SECTION 00 73 19.
3. INFECTION PREVENTION OFFICE MUST BE NOTIFIED OF ALL WASTE SHUT-OFF OR INTERRUPTIONS.
4. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED IF THE HVAC MUST BE INTERRUPTED IN AREA THAT AFFECTS PATIENT CARE.
5. THE INFECTION PREVENTION OFFICE SHALL BE NOTIFIED OF ANY ANTICIPATED ALTERATIONS TO THE ACCESS ROUTES USED DURING
CONSTRUCTION ACTIVITIES.
6. CONSTRUCTION WORKERS SHALL WEAR DUPONT TYVEK OVERALLS OR EQUIVALENT OVER CLOTHING AND SHOE COVERS IN MODERATE TO HIGH DUST AREAS TO PREVENT CONTAMINATION OF EMPLOYEE CLOTHES AND TRACKING DUST AND DIRT INTO THE EXISTING SURROUNDING FACILITY. CONSTRUCTION WORKERS SHALL REMOVE COVERALLS BEFORE LEAVING THE AREA.
7. THE CONTRACTOR SHALL CLEAN THE WHEELS AND OUTSIDE OF ALL CARTS AND EQUIPMENT GOING IN AND OUT OF THE
CONSTRUCTION SITE.
8. THE CONTRACTOR SHALL WET MOP HEAVY TRAFFIC AREAS AT LEAST TWO (2) TIMES A DAY OR MORE IF THE SITE HAS AN ICRA CLASS OF 3 OR 4 AND/IF THE AREA HAS HIGH VOLUME OF DUST. WATER SHALL BE CHANGED DAILY. DO NOT LEAVE STANDING WATER
OVERNIGHT.
9. ALL ICRA CLASS 4 PROJECT SITES MUST HAVE AN ANTE-ROOM TO MAINTAIN NEGATIVE AIRFLOW AND BE LARGE ENOUGH TO REMOVE COVERALLS AND HAVE A TRASH CONTAINER. THE ANTE-ROOM WILL BE CLEARLY IDENTIFIED ON THE DRAWINGS.
10. AIR FILTRATION DEVICES WITH HEPA FILTERS SHALL BE USED ON SITE FOR SMALL CLEAN-UPS IN PATIENT CARE AREAS THAT HAVE AN
ICRA CLASS OF 1 OR 2.
11. THE CONTRACTOR SHALL PROVIDE A DAILY LOG FOR THE VA STAFF LOCATED ON SITE THAT CONTAINS UPDATES NOTING THE READING ON THE PRESSURE SENSOR, CERTIFYING THAT THE SITE HAS BEEN CONTINUALLY MAINTAINING NEGATIVE AIR PRESSURE
DURING CONSTRUCTION.
12. CONTRACTORS SHALL COMPLETE AN INFECTION CONTROL TRAINING PER VHA GUIDELINES. A COPY OF TUBERCULOSIS PAPERWORK SHALL BE PROVIDED TO INFECTION CONTROL OFFICER IN ORDER TO OBTAIN IC STICKER. ANY WORKERS MISSING THE STICKER MAY
BE REMOVED AT INFECTION CONTROL OFFICER OR COR'S DISCRETION.
13. CONTRACTORS SHALL HAVE AN ANNUAL FLU SHOT. A COPY OF FLU SHOT PAPERWORK SHALL BE PROVIDED TO INFECTION CONTROL
OFFICER.
CONSTRUCTION SAFETY NOTES:
1. CONSTRUCTION BARRIER SHALL CONSIST OF: FLAME RETARDANT POLYETHYLENE SHEATHING. REFERENCE PHASING PLANS FOR ALL
FLOOR PLANS WHERE TEMPORARY MODULAR PARTITION WILL BE USED FOR ONGOING WORK ACROSS MULTIPLE DAYS.
2. DIRECTIONAL SIGNS INCLUDING EXIT SIGNS MUST BE POSTED TO DISPLAY MEANS OF EGRESS AND LIFE SAFETY INFORMATION.
3. EXISTING ILLUMINATED EXIT SIGNS SHALL BE RELOCATED WHEN OBSTRUCTED BY CONSTRUCTION.
4. GENERAL CONTRACTOR SHALL WORK CLOSELY WITH THE COR WHEN LIFE SAFETY HAZARDS ARE PRESENT. THE COR SHALL
COMMUNICATE ALL SAFETY CONCERNS TO THE SAFETY OFFICE.
5. GENERAL CONTRACTOR SHALL KEEP DUST CONTAINMENT BARRIER-PRESSURE AT NEGATIVE AT ALL TIMES. HVAC EXHAUST RETURN AND SUPPLY DUCT OPENINGS SHALL BE COVERED AND SEALED DURING ALL CONSTRUCTION UNTIL FINISHES ARE INSTALLED. GC SHALL PROVIDE RECIRCULATING FAN SYSTEM WITH HEPA FILTER TO REMOVE DUST WITHIN THE EACH CONSTRUCTION AREA.
LOCATE THE AIR FILTER SYSTEM NEAR THE MUST DUST GENERATING CONSTRUCTION. REPLACE HEPA FILTER AS DIRECTED BY THE
FILTER MANUFACTURER, BUT MINIMUM REPLACEMENT MONTHLY.
6. GENERAL CONTRACTOR SHALL MEASURE CONSTRUCTION DUST CONTAINMENT BARRIER PRESSURE ON A DAILY BASIS, AND SHALL
REPORT READING TO THE COR AND INFECTION CONTROL OFFICE.
7. WORK SITE SHALL BE SECURED BY LOCK WHEN NO EMPLOYEES ARE PRESENT ON SITE.
8. FLOOR STICKY MATS LOCATED AT BOTH SIDES OF THE ENTRANCE TO THE CONSTRUCTION AREA SHALL BE REPLACED AS NEEDED
(AT APPROXIMATELY 75% USED).
9. GOOD HOUSEKEEPING - TRASH AND DEBRIS SHALL BE REMOVED PROMPTLY, AT LEAST DAILY.
10. HAZARDOUS MATERIALS SHALL BE STORED APPROPRIATELY TO MAINTAIN LIFE SAFETY AND CODE REQUIREMENTS.
11. ALL MSDS (MATERIALS SAFETY AND DATA SHEETS) SHALL BE POSTED ON JOB SITE.
12. ICRA (INFECTION CONTROL RISK ASSESSMENT) SHALL BE POSTED ON JOB SITE.
13. SMOKING REGULATIONS SHALL BE FOLLOWED.
14. FIRE EXTINGUISHERS SHALL BE READILY AVAILABLE IN THE CONSTRUCTION AREA AT ALL TIMES. MONTHLY INSPECTION REQUIRED.
15. HOT WORK PERMITS SHALL BE OBTAINED FROM COR WHEN NECESSARY DEDICATED FIRE SAFETY INDIVIDUAL TO BE ON SITE WITH
APPROPRIATE FIRE EXTINGUISHER.
16. SAFETY AND TEMPORARY SIGNAGE SHALL BE IN PLACE AT ALL TIMES THROUGH DURATION OF CONSTRUCTION.
17. SUBCONTRACTORS SHALL BE AWARE OF AND TRAINED IN SAFETY AND ENVIRONMENTAL ISSUES FOR A MINIMUM 30 HOURS FOR
SUPERINTENDENT AND 10 HOURS FOR WORKERS. PROVIDE OSHA CARDS.
18. MEANS OF EGRESS SHALL BE CLEARLY DESIGNATED IN BOTH CONSTRUCTION AND ADJACENT AREAS. ACCESS FOR THE FIRE DEPARTMENT AND EMERGENCY SERVICES SHALL BE CLEAR. STATUS OF THE FIRE DETECTION/ SPRINKLER SYSTEM SHALL BE:
a. FIRE SPRINKLER SYSTEM IS ACTIVE
b. FIRE ALARM SYSTEM IS ACTIVE
c. SMOKE DETECTORS ARE ACTIVE
d. TEMPORARY SYSTEMS ARE IN PLACE
19. EXTENSION CORDS SHALL BE PROTECTED DURING THE WORK HOURS AND DISCONNECTED AT THE END OF EACH DAY. WHERE POSSIBLE, FEED EXTENSION CORDS FROM A DEDICATED TEMPORARY CONSTRUCTION PANEL TURN OFF AND LOCK OUT DURING NO
WORK PERIODS.
20. REFERENCE SECTION 01 35 26.
DOCUMENT ORGANIZATION:
THIS SET OF CONSTRUCTION DOCUMENTS IS PRESENTED IN TWO PARTS: A SET OF TECHNICAL SPECIFICATIONS AND A SET
OF 30" X 42" DRAWINGS.
DRAWINGS:
DRAWINGS ARE ORGANIZED ACCORDING TO DISCIPLINES, WITH EACH DISCIPLINE DESCRIBING A GENERAL ASPECT OF
THE CONSTRUCTION. DISCIPLINES ARE ARRANGED AS FOLLOWS:
GI - GENERAL INFORMATION:
WORK RELATED TO THE PROJECT AS A WHOLE.
AD - ARCHITECTURAL DEMOLITION
WORK RELATED TO THE DEMOLITION OF THE BUILDING AND SYSTEMS.
A - ARCHITECTURAL:
WORK RELATED TO THE BASIC BUILDING ENVELOPE AND FINISHES, INCLUDING: FLOOR PLAN(S), INTERIOR
ELEVATIONS, WALL SECTIONS, INTERIOR DETAILS, &
CEILING FINISHES.
E - ELECTRICAL:
WORK RELATED TO THE ELECTRICAL SYSTEM.
M - MECHANICAL:
WORK RELATED TO THE MECHANICAL SYSTEM.
P - PLUMBING:
WORK RELATED TO THE PLUMBING SYSTEM.
PROJECT SPECIFIC NOTES:
1. GC SHALL PERFORM TESTING AND BALANCING OF THE ADJACENT SPACES WHICH SHARES THE HVAC SYSTEM AT THE CONSTRUCTION SITE AFTER THE HVAC EXHAUST, SUPPLY AND RETURN OPENINGS ARE SEALED WITHING THE WORK AREAS.
TESTING AND BALANCING IS TO MAINTAIN PROPER OPERATIONS OF THE ADJACENT SPACES.
2. ALL ELECTRICAL BRACKERS FOR THE ELECTRICAL SYSTEMS WITHIN THE WORK AREA MUST BE CLEARLY MARKED AT EACH ELECTRICAL PANEL PRIOR TO START OF THE PROJECT. IF ANY ELECTRICAL CIRCUITS ARE SHARED WITHIN THE AREAS TO REMAIN OPERATIONAL, GC SHALL DISCONNECT THE CIRCUITS WITHIN THE WORKING AREA FOR THE DURATION OF THE CONSTRUCTION. AT NO TIME, GC SHALL DISCONNECT ANY UTILITIES WITHOUT NOTIFYING COR. ALL NOTIFICATIONS MUST BE GIVEN AS SHOWN IN SECTION 01 00 00 GENERAL REQUIREMENTS PRIOR TO WORK AND TH NOTIFICATION MUST INCLUDE ALL THE AREAS AFFECTED BY
THE ACTIVITY.
3. THIS PROJECT HAS TWO PHASES.
A. PHASE 1: REPLACE THE DIRTY CART ELEVATOR , AND REPLACE THE CLEAN CART ELEVATOR IN SECOND PHASE
B. PHASE 2: THE SECOND PHASE WILL BE DIVIDED INTO TWO STEP WORK.
PHASE 2A: CREATE NEW 6'-0" X 7'-0" DOORWAY BETWEEN SPS PREP AREA AND DISPATCH AREA.
PHASE 2B: REPLACE THE CLEAR CART ELEVATOR.
THE FIRST PHASE WORK MUST BE COMPLETE AND THE REPLACED ELEVATOR MUST BE OPERATIONAL PRIOR TO BEGINNING THE
PHASE 2B WORK.
SPECIFICATIONS:
SPECIFICATIONS ARE ORGANIZED ACCORDING TO THE MASTER FORMAT 2004 (MF04) AS FOLLOWS. NOT ALL SECTIONS APPLY
TO THIS JOB AND NOT ALL SECTIONS ARE LISTED.
DIVISION 12 FURNISHINGS
DIVISION 13 N/A
DIVISION 14 N/A
DIVISION 21 N/A
DIVISION 22 PLUMBING
DIVISION 23 MECHANICAL
DIVISION 26 ELECTRICAL
DIVISION 27 N/A
DIVISION 28 N/A
DIVISION 31 N/A
DIVISION 32 N/A
DIVISION 33 N/A
DIVISION 0 PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 1 GENERAL REQUIREMENTS
DIVISION 2 EXISTING CONDITIONS
DIVISION 3 CONCRETE
DIVISION 4 N/A
DIVISION 5 METALS
DIVISION 6 WOOD, PLASTICS AND COMPOSITES
DIVISION 7 THERMAL AND MOISTURE PROTECTION
DIVISION 8 OPENINGS
DIVISION 9 FINISHES
DIVISION 10 SPECIALTIES
DIVISION 11 N/A
MISCELLANEOUS:
1. THE TERM "PROVIDE" AS USED IN THESE CONTRACT DOCUMENTS MEANS ALL WORK TO BE ACCOMPLISHED BY THE
CONTRACTOR TO INCLUDE FURNISHING, INSTALLING, MODIFYING AND CONNECTING ALL SPECIFIED ITEMS IN ACCORDANCE
WITH THE PLANS AND SPECIFICATIONS.
ALL WORK MUST BE COMPLETE AND FUNCTION AS INTENDED PER THE CONSTRUCTION DOCUMENTS.
2. THE TERMS "APPROVED EQUAL", "EQUAL TO", "ACCEPTABLE", "MATCH EXISTING" OR OTHER GENERAL QUALIFYING TERMS MEAN THAT MATERIALS SPECIFIED HAVE BEEN SUBSTITUTED BY THE GENERAL CONTRACTOR WITH MATERIALS SIMILAR IN QUALITY AND PERFORMANCE THAT THE ARCHITECT HAS DETERMINED ARE WITHIN THE GUIDELINES ESTABLISHED BY THESE CONTRACT DOCUMENTS. WHEN THERE IS ANY DISAGREEMENT BETWEEN GC AND THE ARCHITECT IN THE SUBJECT
MATTER, THE ARCHITECT'S DETERMINATION PREVAILS.
3. THE TERM "TYPICAL" AS USED IN THESE DOCUMENTS MEANS THAT A SPECIFIC CONDITION, INCLUDING DIMENSIONS, THE USE OF MATERIALS, THE INTEGRATION OF MATERIALS OR OTHER ASPECTS OF CONSTRUCTION ARE CONSISTENTLY
DUPLICATED ELSEWHERE IN THESE DOCUMENTS.
4. REPAIR ALL SPRAY ON FIRE PROOFING DAMAGED AND ALTERED DURING CONSTRUCTION ACTIVITIES TO THE ORIGINAL
SPECIFICATION AND DESIGN.
5. PARKING IS EXTREMELY LIMITED ON THE VA CAMPUS. A LIMITED NUMBER OF CONTRACTOR PARKING PERMITS WILL BE ISSUED FOR ON DESIGNATED ON SITE PARKING WILL BE AVAILABLE DURING THE DURATION OF THE CONSTRUCTION PROJECT. CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN SUBMITTING BIDS. REFERENCE SECTION 01 00 00.
6. ALL WORK GENERATING LOUD NOISES AND VIBRATION TO BE PERFORMED AFTER NORMAL HOSPITAL HOURS OF OPERATION. WORK SHALL BE PERFORMED BETWEEN 1800 AND 0600, MONDAY THRU THURSDAY AND BEGINNING AT 1800 ON FRIDAY'S THRU 0600 MONDAYS-UNLESS NOTED OTHERWISE. REFER TO PHASING PLANS FOR WORK DESIGNATIONS.
HOLIDAYS ARE EXCEPTIONS.
COORDINATE ALL WORK HOURS AND ACTIVITIES FOR EACH WEEK WITH COR FOR APPROVAL.
7. VA HAVE RIGHT TO STOP AND START OF ANY WORK WITHIN THE VA CAMPUS DUR TO CERTAIN FEDERAL AND LOCAL ACTIVITIES . GC SHALL ABIDE BY THESE ACTIVITIES AND ADJUST THE CONSTRUCTION SCHEDULE ACCORDINGLY.
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
GI0.20
GENERAL NOTES
3 1710/17/2023
UP
DN
DN
DN
DN
DN
OFFICE
BD104
OFFICE
BD108B
SPS
DECONTAMINATION
BD103
MSD&E BULK
STOCK
BD100
SPS PREP
AREA
BD108C
DISPATCH
BD108
SPS CHIEF
BD105
SPS
BD106
SPS ASST.
CHIEF/RME
COORD.
BD106A
SUPPLY
ROOM
BD106
ANTE
BD108G
VESTIBULE
BD108F
MEDIVATOR
T-5
ELEVATOR
LOBBY
T-38
MECHANICAL
ROOM
BC101
ELEVATOR
EQUIPMENT
BC102
MSD&E
PURCHASERS
BC104
SPS FEMALE
DECON/CHANGE
ROOM
BD102
SPS MALE
DECON/CHANGE
ROOM
BD101
ANTE
BD103E
IDF
BC103
HAC
BC105
ELECTRICAL
ROOM
BC106
SUPPLY
ROOM
BB130
PT OFFICE
BB127A
PHYSICAL
THERAPY
BB127
SUPERVISOR
MSD&E
BB126B
SUPERVISOR
MSD&E
BB126A
MSD&E
ADMIN
BB126
CORRIDOR
CB21
CORRIDOR
CB22
A5 OFFICE
BD111A
TRASH ROOM
BD112
SOILED
LINEN
BD114
IDF
BD108N
CORRIDOR
CB23
MSD&E
DISTRIBUTION
BD108A
LMS
RECEIVING
BD115
MSD&E
SUPPLY
STORAGE
BD108H
TRAINING/BREAK
AREA
BD108E
STAIR 7
T-31
GAS
STORAGE
BD116
ELECTRICAL
ROOM
BD116A
EMERGANCY
GEN.
BD116B
MECHANICAL
ROOM
BD111
ELEC. ROOM
BD110
ELE.
BD109
RESTROOM,
MEN
BB127B
HOUSEKEEPING
BD103A
MECHANICAL
BD108M
OFFICE
BD106B
AD2.00
1F
AD2.00
1C
SPS
LOADING
DOCK
DIRTY CART
ELEVATOR
T-1
PHASE 1 ACCESS ROUTE
PHASE 2 ACCESS ROUTE
PHASE 1 AND 2 ACCESS THROUGH SPS
LOADING DOCK
PROTECT FLOOR SURFACES ALONG THE PATH
WITH HARD BOARDS, COORDINATE LOCATION
WITHIN THE CORRIDORS WITH THE COR
PHASE 1 ACCESS ROUTE TO 2ND FLOOR
PHASE 2 ACCESS ROUTE TO 2ND FLOOR
PH
AS
E 1A
CC
ES
S
RO
UT
E
PH
AS
E 2A
CC
ES
S
RO
UT
E
CLEAN CART
ELEVATOR
T-2
PH
AS
E
PH
AS
E
AD2.00
4C
AD2.00
4F
LOCATION FOR ELECTRICAL
CONNECTIONS, V.I.F.)
LOCATION FOR IT
CONNECTIONS, V.I.F.)
LOCATION FOR
ELECTRICAL
CONNECTIONS, V.I.F.)
LOCATION FOR IT
CONNECTIONS, V.I.F.)
SUB-PHASE A SUB-PHASE B
NOTE:
1. GC SHALL COORDINATE THE FINAL LAYDOWN AREA WITH THE COR PRIOR TO
COMMERCING WORK. THE LAYDOWN AREA SHALL BE FENCED WITH 6' HIGH
CHAIN LINK AND GATES AS REQUIRED IN THE MAN GATES AND VEHICLE GATES
SHALL BE LOCKED WHEN SUPERVISION IS NOT AVAILABLE.
2. GC SHALL BE RESPONSIBLE FOR MATERIALS STORED FROM THE FT OR
DAMAGES.
3. IF A JOB TRAILER IS REQUIRED COORDINATE ALL TEMPORARY UTILITIES WITH
THE COR.
4. PHASE 2 CONSTRUCTION IS DIVIDED INTO SUB-PHASE.
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
AD1.10
BASEMENT FLOOR PHASING PLAN
SCALE: 1/8" = 1'-0"D1 BASEMENT FLOOR DEMOLITON PLAN
DEMOLITION CANNOT HAPPEN WITHOUT
TEMPORARY PARTITION/DUST BARRIERS IN PLACE!
4 1710/17/2023
CORRIDOR
C2-22
CORRIDOR
C2-21
STAFF
ANESTHESIOLOGIST
2D102
MECHANICAL
ROOM
2D101
STAIR 7
2S-7
FROZEN
SPECIMENS
2D106
SUB-STERILE
STORAGE
2D107B
OPERATING
ROOM
2D107
ORTHOPEDIC
O.R.
2D110EYE/ENT O.R.
2D108
INSTRUMENT
STORAGE
2D109
OR/SPD
EDUCATOR
PROGRAM
SPECIALIST
CLEAN
STORAGE
2D103
CLEAN UP
2D127A
MENS
LOCKERS
2D102A
FLOW LAB
2C103A
SCRUB
2D107CHAC
2D104
STAIR 6
2S-6 ANESTHESIA
2D127
STORAGE
2D112
STORAGE
2D111
CO
RR
ID
OR
C2 -2
ELEVATOR
LOBBY
C2-17
PLASTER
STORAGE &
SUB-STERILE
2D110B
SCRUB
ROOM
2D110A
HAC
2D113HOLDING
2D126 SCRUB
2D122C
SCRUB
2D124A
STORAGE
2D114
WOMENS
LOCKERS
2D128
SCRUB
ROOM
2D119B
S. LINEN
2D115
INSTRUMENT
PREP
2D122B
HAC
2C101 SUB-STERILE
2D119A
GENERAL
O.R.
2D121
OPERATING
ROOM
2D122
OPERATING
ROOM
2D124
ENDOSCOPY
2C104
GENERAL
OPERATING
ROOM
2D119
VASCULAR /
THORACIC
O.R.
2D118
ENDOSCOPY
2C102
CLEAN
SUPPLY
2D126B
CONTROL
2D122A TRASH
2D116ELEC.
2D120
CORRIDOR
MECHANICAL
ROOM
2D117
CORRIDOR
C2-25
BREAK ROOM
2C110
COMM
CLOSET
2C111
TOILET,
UNISEX
2C108
EQUIPMENT
RACK
AP205A EQUIPMENT
ROOM
AP205
BRONCHOSCOPY
2C107
ENDOSCOPY
2C106 SUPERVISOR
OFFICE
2C109
STORAGE
2C107A
STAIR 3
2S-3
CLOSET,
ELECTRICAL
2C112
CORRIDOR
2M106
OFFICE
2M122 CATH. LAB
2M123
PHYSICIAN
OFFICE
2M124
EQUIPMENT
CLEAN-UP
2M125
CHF OFFICE
2M126
CONTROL
2M127
CHF OFFICE
2M128
ECHO
STRESS
TEST
2M130
HYBRID
OPERATING
ROOM
2M131
SECRETARY
2M132 ELEC.
2M134
CLEAN
CORRIDOR
2M135
BRONCHOSCOPY
STORAGE
2C105
W.C.
2D124B
SURGICAL
CLEAN CORE
SUPPORT
2D105
CLEAN CART
STORAGE
2D105
CO
OR
ID
OR
C2 -2
CLEAN CART
STORAGE
2D105
ELE.
2M122B
IDF
2M122A
MECHANICAL
2D132
CONTROL
ROOM
2M131A
COMPONENT
ROOM
2M135A
DIRTY CART
ELEVATOR
T-1
STAIR 6
T-315
SCRUB
T-594
CLEAN CART
ELEVATOR
T-2
AD3.00
1B
AD3.00
F1
PHASE 1 ACCESS ROUTE
PHASE 2 ACCESS ROUTE
PH
AS
E
PH
AS
E
PH
AS
E 1A
CC
ES
S
RO
UT
E
FR
OM
BA
SE
ME
NT
FL
OO
R
PH
AS
E 2A
CC
ES
S
RO
UT
E
FR
OM
BA
SE
ME
NT
FL
OO
R
PHASE 1 STAGING AREA
AD3.00
6B
AD3.00
6F
LOCATION FOR ELECTRICAL
CONNECTIONS, V.I.F.)
LOCATION FOR ELECTRICAL &
IT CONNECTIONS, V.I.F.)
PHASE 2
STAGING
AREA
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
AD1.20
SECOND FLOOR PHASING PLAN
SCALE: 1/8" = 1'-0"D1 SECOND FLOOR DEMOLITION PLAN
DEMOLITION CANNOT HAPPEN WITHOUT
TEMPORARY PARTITION/DUST BARRIERS IN PLACE!
5 1710/17/2023
3C
AD2.00
DIRTY CART
ELEVATOR
T-1
CART
STORAGE
BD103C
OFFICE
BD104
ANTE
BD103E
CORRIDOR
CB21
SPS
DECONTAMINATION
BD103
V.I.F.
4' - 11 1/2"
V.
I.F
5'
-1
/2"
CHASE
4"
CORRIDOR
T-51
HOUSEKEEPING
BD103A
SPS FEMALE
DECON/CHANGE
ROOM
BD102
RAMP
DN
NEW OPENING
3' - 8" CLEAR
EXISTING DOOR TO REMAIN,
PROVIDE TEMPORARY LATCH
AND STRIKE AS REQUIRED
TO LATCH AND LOCK THE
DOOR
TEMPORARY 2X4 WOOD
FRAME PARTITION, EXTEND
TO TOP OF EXISTING DOOR
FRAME
2'-6" X 7'-0" TEMPORARY LOCKABLE
WOOD CONSTRUCTION DOOR,
PAINTED PER THE HOSPITAL
STANDARD
PROVIDE TEMPORARY H.M.
DOOR FRAME TO FIT WITHIN
EXISTING DOOR FRAME
5/8" GYPSUM BOARD, PAINTED
6"
2"
CONSTRUCTION
AREA
ANTE ROOM
(BD103E)
CORRIDOR
T-51
11' - 6"
5' -0
AD2.00
7C
8C
AD2.00
AD2.00
7A
11 17
OFFICE
BD104
CONSTRUCTION
AREA DIRTY CART
ELEVATOR
T-1
10 4
27 27
3F
AD2.00
OFFICE
BD108B
DISPATCH
BD108
SPS PREP
AREA
BD108C
V.
I.F
4'
-1
/2"
V.I.F.
5' - 10 3/4"
CLEAN CART
ELEVATOR
T-2
DISPATCH
BD108
4"
DN
NE
W
OP
EN
IN
G
3' -8
"C
LE
AR
6' - 0" 6"
EXISTING DOOR TO REMAIN,
PROVIDE TEMPORARY LATCH
AND STRIKE AS REQUIRED
PROVIDE TEMPORARY 2" H.M.
DOOR FRAME TO FIT WITHIN
EXISTING DOOR FRAME
TEMPORARY 2X4 WOOD FRAME
PARTITION, EXTEND TO TOP OF
EXISTING DOOR FRAME
TEMPORARY PARTITION SYSTEM AS
SPECIFIED SEAL ALL JOINTS INCLUDING
TOP AND BOTTOM OF THE WALL
5/8" GYPSUM BOARD, PAINTED
INSTALL TEMPORARY RUBBER
BASE TO MATCH EXISTING
CONSTRUCTION
AREA
ANTE ROOM
(BD103E)
SPS
DECONTAMINATION
(BD103)
5/8" GYP. BD. PAINTED SEAL
ALL JOINTS INCLUDING TOP
AND BOTTOM OF THE WALL
STADS @ 16"
TEMPORARY 2" H.M. DOOR FRAME TO FIT
UNDER EXISTING DOOR FRAME
EXISTING DOOR AND HARDWARE
TO REMAIN. PROVIDE TEMPORARY
HARDWARE TO LATCH AND LOCK
TEMPORARY PLYWOOD
CONSTRUCTION DOOR WITH
DOOR PULL AND PADLOCK HASP
AND PADLOCK COORDINATE KEY
REQUIREMENTS WITH VA
EXISTING OPENING
4' - 6"
7C / AD2.00
3' - 0" 6" 2' - 6"
DISPATCH
BD108
SPS PREP
AREA
BD108C
CLEAN CART
ELEVATOR
T-2
OFFICE
BD108B
CONSTRUCTION
AREA
8' - 0"
3' -0
5'
-7
1. REMOVE CART ELEVATOR IN ITS ENTIRETY INCLUDING DOORS, FRAMES,
HYDRAULIC PISTOL, INFRASTRUCTURES, ETC. REFER TO A5.00 CART
ELEVATOR SAMPLE SHOP DRAWING FOR EXTEND OF OPENING.
2. REMOVE EXISTING FLOORING IN FRONT OF DOORS 24" WIDE BY 72" LONG
3. REMOVE RUBBER BASE COORDINATE WITH FLOOR REMOVAL
4. REMOVE CART ELEVATOR ASSOCIATED HARDWARE AND ACCESSORIES
5. REMOVE HOSPITAL EQUIPMENT AND STORE FOR RE-INSTALLATION
6. REMOVE SS. CORNER GUARD AND STORE FOR RE-INSTALLATION
7. LIGHTING CONTROL TO REMAIN
8. EXISTING COLUMN
9. REMOVE ALL MATERIALS ASSOCIATED WITH EXISTING CART ELEVATOR:
PUMPS, CONTROLLERS, ELECTRICAL DISCONNECTS, CONDUITS, ETC.
REFER TO ELECTRICAL DEMOLITION NOTES FOR FURTHER DIRECTIONS
10. REMOVE WALL INCLUDING DRYWALL, STUDS, CMU, BASE, ETC., TO
CREATE 3'-8" x 7'-4" CLEAR OPENING. REFER TO A2.00 CART ELEVATOR
PLANS, SECTIONS AND DETAILS AND A5.00 CART ELEVATOR SAMPLE SHOP
DRAWING AND S1.00 STRUCTURAL DRAWING
11. EXISTING DOOR TO REMAIN
12. EXISTING CONSTRUCTION TO REMAIN
13. REMOVE CONCRETE RAMP
14. REMOVE AND STORE EXISTING DOOR AND HARDWARE FOR RE-
INSTALLATION
15. REMOVE EXISTING HOLLOW METAL DOOR FRAME, DOOR, AND HARDWARE
16. REMOVE WALL INCLUDING DRYWALL, STUDS, BASE, ETC., AS REQUIRED
FOR NEW 3'-0 X 7'-0" DOUBLE DOORS INCLUDING H.M. DOOR FRAME
(PHASE 2A)
17. INSTALL TEMPORARY LOCKABLE PLYWOOD CONSTRUCTION DOOR 2'-6" W
X 7'-0"H
18. TEMPORARY 2X4 WOOD FRAME PARTITION WITH 1 SIDED GYPSUM BOARD,
EXTEND FLOOR TO CEILING AND SEAL AT TOP AND BOTTOM OF WALL
19. FULL HEIGHT TEMPORARY DUST BARRIER PARTITION SYSTEM AS
SPECIFIED, SEAL BOTTOM AND TOP OF WALL (PHASE 2A)
20. FULL HEIGHT TEMPORARY DUST BARRIER PARTITION SYSTEM AS
SPECIFIED, SEAL BOTTOM AND TOP OF WALL (PHASE 2B)
21. TEMPORARY PARTITION SYSTEM TO REMAIN THROUGHOUT PHASE 2B
CONSTRUCTION
22. REMOVE TEMPORARY PARTITION SYSTEM ONCE NEW DOUBLE DOORS
HAVE BEEN INSTALLED (PHASE 2A)
23. EDGE OF CONCRETE FLOOR DROP
24. SALVAGE EXISTING FIRE EXTINGUISHER AND RETURN TO OWNER
25. REMOVE ROOM SIGN AND RETURN TO OWNER
26. VERIFY WITH THE ELEVATOR MANUFACTURES
27. REMOVE GFRP TO NEXT JOINT WITHOUT CUT
28. PROTECT ALL CEILING MOUNT EQUIPMENT AND DEVICES WITH CLEAR
PLASTIC DUST COVER AND SEAL WITH TAPE, INCLUDING LAYING CEILING
LIGHTS, PROTECT ALL EXISTING FLOORINGS AND SEAL ALL SUPPLY AND
RETURN AIR GRILLES UNTIL THE CONSTRUCTION IS COMPLETE.
KEYED NOTES #
LEGEND
AREA NOT IN CONTRACT
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
AD2.00
ENLARGED DEMOLITION PLANS
AND ELEVATIONS
SCALE: 1/4" = 1'-0"1C ENLARGED BASEMENT FLOOR DEMOLITION PLAN
SCALE: 1 1/2" = 1'-0"7C
TEMPORARY FRAMING DETAIL AT
BR103E
SCALE: 1/4" = 1'-0"4C
ENLARGED BASEMENT FLOOR
TEMPORARY CONSTRUCTION
PARTITION PLAN3C
EXISTING CONDITION PHOTO OF
DIRTY CART ELEVATOR T-1 AT
BASEMENT FLOOR
3F
EXISTING CONDITION PHOTO OF
CLEAN CART ELEVATOR T-2 AT
BASEMENT FLOOR
SCALE: 1/4" = 1'-0"1F ENLARGED BASEMENT FLOOR DEMOLITION PLAN
SCALE: 1 1/2" = 1'-0"7A
TEMPORARY FRAMING DETAIL AT
BD103
SCALE: 1/2" = 1'-0"8C TEMPORARY DOOR ELEVATION AT ANTE BD103E
SCALE: 1/4" = 1'-0"4F
ENLARGED BASEMENT FLOOR
TEMPORARY CONSTRUCTION
PARTITION PLAN
TEMPORARY PLYWOOD
CONSTRUCTION DOOR
WITH DOOR PULL AND PAD LOCK HASP
EXISTING 2" H.M. DOOR
FRAME TO REMAIN
PHASE 1:
PHASE 1: PHASE 1:
PHASE 1:
PHASE 1:
PHASE 2:
PHASE 2: PHASE 2:
NOTE:
TEMPORARY 2" H.M. DOOR FRAME TO INSTALLED AND
PAINTED TO MATCH EXISTING DOOR FRAME
PHASE 1:
PROVIDE SIGN
"CONSTRUCTION ACCESS ONLY"
6 1710/17/2023
4B
AD3.00
CORRIDOR
C2-22
OPERATING
ROOM
2D124
WOMENS
LOCKERS
2D128
W.C.
2D124B
V.I.F.
4' - 11 1/2"
DIRTY CART
ELEVATOR
T-1
V.
I.F
5'
-1
/4"
NEW OPENING
3' - 8" CLEAR
9 9
4F
AD3.00
V.
I.F
4'
-1
/2"
V.I.F.
5' - 11 1/2"
CLEAN CART
ELEVATOR
T-2
CLEAN CART
STORAGE
2D105
GENERAL
O.R.
2D121
CLEAN CART
STORAGE
2D105
SUB-STERILE
2D119A
SCRUB
ROOM
2D119B
ELEC.
2D120
CORRIDOR
C2-25
OPERATING
ROOM
2D122
SCRUB
2D122C
INSTRUMENT
PREP
2D122B
SURGICAL
CLEAN CORE
SUPPORT
2D105
11 11
NE
W
OP
EN
IN
G
3' -8
"C
LE
AR
1 54
CLEAN CART
ELEVATOR
T-2
CLEAN CART
STORAGE
2D105
GENERAL
O.R.
2D121
CLEAN CART
STORAGE
2D105
4' -6
4' - 0"
OPERATING
ROOM
2D122
INSTRUMENT
PREP
2D122B
CONTROL
2D122A
SUB-STERILE
2D119A
SCRUB
ROOM
2D119B
CORRIDOR
C2-25
TELEPHONE
CLOSET
2D123
SURGICAL
CLEAN CORE
SUPPORT
2D105
SCRUB
2D122C
26' - 0"
CONSTRUCTION AREA
16 15
TEMPORARY
CONSTRUCTION
STAGING AREA
CORRIDOR
C2-22
OPERATING
ROOM
2D124
WOMENS
LOCKERS
2D128
W.C.
2D124B
DIRTY CART
ELEVATOR
T-1
MI
N.
5' -0
14' - 6"
3' - 6"
CONSTRUCTION
AREA
INSTRUMENT
PREP
2D122B
CONTROL
2D122A
TELEPHONE
CLOSET
2D12316
1. REMOVE CART ELEVATOR IN ITS ENTIRETY INCLUDING DOORS, FRAMES,
INFRASTRUCTURES, ETC. REFER TO A5.00 CART ELEVATOR SAMPLE
SHOP DRAWING FOR EXTEND OF OPENING.
2. REMOVE EXISTING FLOORING IN FRONT OF DOORS 24'' WIDE X 72'' LONG
3. REMOVE RUBBER BASE COORDINATE WITH FLOOR REMOVAL
4. REMOVE CART ELEVATOR HARDWARE AND ACCESSORIES
5. REMOVE HOSPITAL EQUIPMENT AND STORE FOR RE-INSTALLATION
6. REMOVE EXISTING FLOORING AS INDICATED IN HATCH
7. REMOVE SIGN AND STORE FOR REINSTALLATION
8. ELECTRICAL OUTLET TO REMAIN
9. VERIFY WITH THE ELEVATOR MANUFACTURES
10. REMOVE WALL INCLUDING DRYWALL, STUDS, CMU, BASE, ETC., TO
CREATE 3'-8" x 7'-4" CLEAR OPENING. REFER TO A2.00 CART ELEVATOR
PLANS, SECTIONS AND DETAILS AND A5.00 CART ELEVATOR SAMPLE
SHOP DRAWING AND S1.00 STRUCTURAL DRAWING
11. EXISTING DOOR TO REMAIN
12. EXISTING CONSTRUCTION TO REMAIN
13. EXISTING WINDOW TO REMAIN. PROTECT GLASS WINDOWS FROM
DAMAGES
14. PROTECT ALL CEILING MOUNT EQUIPMENT AND DEVICES WITH CLEAR
PLASTIC DUST COVE AND SEAL WITH TAPE, INCLUDING LAYING CEILING
LIGHTS.
15. PROTECT ALL EXISTING WALLS IN CONSTRUCTION AREA
16. PROTECT ALL EXISTING DOORS FROM DAMAGES
17. INSTALL TEMPORARY LOCKABLE PLYWOOD CONSTRUCTION DOOR AND
PADLOCK HASP COORDINATE KEY REQUIREMENTS WITH VA
18. PROTECT ALL EXISTING FLOORINGS
19. FULL HEIGHT TEMPORARY PARTITION SYSTEM AS SPECIFIED, SEAL
BOTTOM AND TOP OF WALL
20. 4'-0" x 7'-0" DOOR BY SPECIFIED TEMPORARY PARTITION SYSTEM WITH
PANIC H.W. AND FLUORESCENT EXIT SIGN " EMERGENCY EXIT ONLY"
21. PROVIDE A SIGN "EMERGENCY DOOR USED BY STAFF ONLY NOT
ENTER."
22. CLOSE DOOR AND SEAL ALL 4 SIDES OF DOOR WITH TAPE AND APPLY
PLASTIC POLYETHYLENE BARRIER (10 MIL MIN.) OVER DOOR DURING
CONSTRUCTION
23. SEAL ALL SUPPLY AND RETURN AIR GRILLES UNTIL THE CONSTRUCTION
IS COMPLETE
KEYED NOTES #
LEGEND
AREA NOT IN CONTRACT
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs
AD3.00
ENLARGED DEMOLITION PLANS
AND ELEVATIONS
SCALE: 1/4" = 1'-0"1B ENLARGED SECOND FLOOR DEMOLITION PLAN
SCALE: 1/4" = 1'-0"F1 ENLARGED SECOND FLOOR DEMOLITION PLAN
4B
EXISTING CONDITION PHOTO OF
DIRTY CART ELEVATOR T-1 AT
SECOND FLOOR
4F
EXISTING CONDITION PHOTO OF
DIRTY CART ELEVATOR T-2 AT
SECOND FLOOR
SCALE: 1/4" = 1'-0"6F ENLARGED SECOND FLOOR TEMPORARY CONSTRUCTION PARTITION PLAN
SCALE: 1/4" = 1'-0"6B ENLARGED SECOND FLOOR TEMPORARY CONSTRUCTION PARTITION PLAN
PHASE 1: DIRTY CART ELEVATOR
PHASE 2: CLEAN CART ELEVATORPHASE 2: CLEAN CART ELEVATOR
PHASE 1: DIRTY CART ELEVATOR
PHASE 1:
7 1710/17/2023
UP
DN
DN
DN
DN
DN
HOUSEKEEPING
BD108DMEDIVATOR
T-5
GAS
STORAGE
BD116
ELECTRICAL
ROOM
BD116A
EMERGANCY
GEN.
BD116BTRAINING/BREAK
AREA
BD108E
STAIR 7
T-31
MSD&E BULK
STOCK
BD100
STAIR 6
T-34 LMS
RECEIVING
BD115
OFFICE
BD108B
MSD&E
DISTRIBUTION
BD108AELEVATOR
LOBBY
T-38
CORRIDOR
CB23
AUTOMATIC
CART
WASHER
T-40
SPS MALE
DECON/CHANGE
ROOM
BD101
SPS
DECONTAMINATION
BD103
SPS FEMALE
DECON/CHANGE
ROOM
BD102
SOILED
LINEN
BD114CART
STORAGE
BD103C
IDF
BD108N
HOUSEKEEPING
BD103A
MECHANICAL
ROOM
BD111TRASH ROOM
BD112
ELEC. ROOM
BD110
CORRIDOR
T-51ELEVATOR
EQUIPMENT
BC102
MECHANICAL
ROOM
BC101
CORRIDOR
CB22
SPS CHIEF
BD105
OFFICE
BD104
SUPPLY
ROOM
BD106
SPS ASST.
CHIEF/RME
COORD.
BD106A
SPS
BD106
ELE.
BD109
A5 OFFICE
BD111ACORRIDOR
CB21
IDF
BC103
PROSTETICS
OFFICE
T-64
SUPERVISOR
MSD&E
BB126B
CONTROL
ROOM
BA108A
MSD&E
PURCHASERS
BC104
HAC
BC105 MECHANICAL
ROOM
BA108B
PT OFFICE
BB127A
PHYSICAL
THERAPY
BB127
SUPPLY
ROOM
BB130
MSD&E
ADMIN
BB126
RESTROOM,
MEN
BB127B
SUPERVISOR
MSD&E
BB126A
ELECTRICAL
ROOM
BC106
CORRIDOR
CB-10
STAIR 3
BS-3
CORRIDOR
CB-14
CORRIDOR
CB-12
CORRIDOR
CB-13
LOCKER
ROOM, MEN
BC127
KINESIOTHERAPY
OFFICE
BB124
PM&RS
STORAGE
BB129B
STAFF
PHYSIATRIST
BC128
PHYSIATRY
CLINIC
BC108
PM&RS
STORAGE
BB129A
OCCUPATIONAL
THERAPY
BC109
KINESIOTHERAPY
BB128
WAITING/RECEPTION
BB120
CANTEEN
RETAIL
BA112
DISPATCH
BD108
MECHANICAL
BD108M
CORRIDOR
CB4
BC122E
ANTE
BD103E
OFFICE
BD106B
VESTIBULE
BD108F
ANTE
BD108G
MSD&E
SUPPLY
STORAGE
BD108H
DIRTY CART
ELEVATOR
T-1
SPS PREP
AREA
BD108C
CLEAN CART
ELEVATOR
T-2
TEMPORARY
PARTITION
SYSTEM AS
SPECIFIED
6' - 0" 6"
SPS
LOADING
DOCK
BD
8E
CONSTRUCTION ACCESS ROUTE SEE GENERAL NOTES REGARDING
ACCESS COORDINATION AND LAYDOWN YARD LOCATION
PHASE 1
PHASE 2
A2.00 F6
A2.00 F1
1. PHASE I STAGING AREA
2. PHASE 2 STAGING AREA
3. FULL HEIGHT TEMPORARY PARTITION SYSTEM AS SPECIFIED, SEAL
BOTTOM AND TOP OF WALL
KEYED NOTES #
LEGEND
AREA NOT IN CONTRACT
Approved: Chief of StaffApproved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Approved: Service Chief
Concur Safety
Concur M & O
Concur Bio-Med
100% CD REVIEW
01/31/2023
674 -22-107
REPLACE CART ELEVATORS
Department of Veterans Affairs Central Texas Veterans Health Care System 1901 Veterans Memorial Drive, Temple, Texas 76504
THIS DOCUMENT IS RELEASED FOR INTERIM
REVIEW UNDER THE AUTHORITY OF:
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
ARCHITECT:
Management
CONSULTANTS:
Office of Facilities o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
MIGUEL A. GARCIA, P.E.
TEXAS LIC. NO. 71024
RELEASED ON:
01/31/2023
IN ACCORDANCE WITH TEXAS ENGINEERING
PRACTICE AND ACT RULE, §137.33E.
IT IS NOT TO BE USED FOR
CONSTRUCTION OR BIDDING PURPOSES. Department of
Veterans Affairs A1.00
NEW BASEMENT FLOOR PLAN
SCALE: 1/8" = 1'-0"D1 BASEMENT LEVEL PLAN
8 1710/17/2023
CORRIDOR
C2-21
STAFF
ANESTHESIOLOGIST
2D102
MECHANICAL
ROOM
2D101
STAIR 7
2S-7
FROZEN
SPECIMENS
2D106
SUB-STERILE
STORAGE
2D107B
OPERATING
ROOM
2D107
ORTHOPEDIC
O.R.
2D110EYE/ENT O.R.
2D108
INSTRUMENT
STORAGE
2D109
OR/SPD
EDUCATOR
PROGRAM
SPECIALIST
CLEAN
STORAGE
2D103
CLEAN UP
2D127A
MENS
LOCKERS
2D102A
FLOW LAB
2C103A CORRIDOR
C2-22 SCRUB
2D107C
HAC
2D104
STAIR 6
2S-6 ANESTHESIA
2D127
STORAGE
2D112
STORAGE
2D111
CORRIDOR
C2-24ELEVATOR
LOBBY
C2-17
PLASTER
STORAGE &
SUB-STERILE
2D110B
SCRUB
ROOM
2D110A
HAC
2D113HOLDING
2D126 SCRUB
2D122C
SCRUB
2D124A
STORAGE
2D114
WOMENS
LOCKERS
2D128
CORRIDOR
T-3
SCRUB
ROOM
2D119B
S. LINEN
2D115
INSTRUMENT
PREP
2D122B
HAC
2C101 SUB-STERILE
2D119A
GENERAL
O.R.
2D121
OPERATING
ROOM
2D122
OPERATING
ROOM
2D124
ENDOSCOPY
2C104
GENERAL
OPERATING
ROOM
2D119
VASCULAR /
THORACIC
O.R.
2D118
ENDOSCOPY
2C102
CLEAN
SUPPLY
2D126B
CONTROL
2D122A TRASH
2D116ELEC.
2D120TELEPHONE
CLOSET
2D123CORRIDOR
MECHANICAL
ROOM
2D117
CORRIDOR
C2-25
BREAK ROOM
2C110
COMM
CLOSET
2C111
TOILET,
UNISEX
2C108
EQUIPMENT
RACK
AP205A EQUIPMENT
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .