Attachment 2 - 663A4-23-201 - Drawings 20250425.pdf

PDF 4 MB Posted

Attached to
N041--CON-NRM-663A4-23-201 Replace 40 Ton Condenser BLDG 200
Solicitation number
36C26026R0035_1
Issued by

About this file

This is a bid document set comprising architectural, mechanical, and electrical drawings for a construction project to replace a 40-ton condenser unit at Building 200 of the American Lake VA Medical Center in Tacoma, Washington. The project is identified as VA Project #663A4-23-201, with bid documents numbered 24-050.

The scope of work involves demolishing an existing exterior walk-in freezer and replacing the refrigeration systems serving eight interior freezer and refrigerator units. The project is divided into three phasing phases to maintain operational continuity: Phase 1 includes demolition of the exterior freezer and provision of a temporary diesel-powered dual-temperature portable cooler; Phase 2 involves installation of new rooftop condensing units and refrigerant piping for Freezer #1 and Freezer #7; and Phase 3 includes installation of a new condensing unit to service Refrigerators #2, #3, #4, #5, #6, and #8. The new condensing units utilize R448A refrigerant and are configured with "N+1" redundancy for critical freezer applications. The work requires compliance with infection control and life safety measures including Class III or IV ICRA (Infection Control Risk Assessment) precautions, with detailed specifications for barriers, negative air pressure requirements, HEPA filtration, and post-construction cleaning protocols. Electrical work includes provision of new dedicated circuits and disconnects for each unit with NEMA 3R rated equipment enclosures. The architectural drawings indicate existing roof-mounted equipment curbs will be utilized with new flashing and membrane work to ensure water-tight conditions. All work must comply with applicable codes, VA standards, and the Buy American Act.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/2

/2

:5

:1

P

M C

U s e rs \a p u lle n

\D o c u m e n ts

\A

-0

-V A

A m e r

L a k e

-R e p l

T o n

C o n d -W

A

R a p u lle n V

D X

T .r v t

G-001

COVER

1 5ANP

REPLACE 40 TON

CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493 APRIL 30, 2025

BID DOCUMENTS

663A4-23-20124-050

REPLACE 40 TON CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493

VA PROJECT #: 663A4-23-201

DJR

DRAWING LIST

GENERAL

G-001 COVER 1 5

G-002 GENERAL INFORMATION, NFPA 101 CODE SUMMARY, AND SITE PLAN 2 5

G-003 ICRA INFORMATION AND DETAILS 3 5

G-004 BUILDING 200 OVERALL PLAN 4 5

G-005 FIRST FLOOR COLD STORAGE ICRA PLAN 5 5

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 2

A-104 ROOF PLAN AND EXTERIOR FREEZER DEMOLITION PLAN 2 2

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 4

MD101 FIRST FLOOR, ATTIC, AND ROOF MECHANICAL DEMOLITION PLAN 2 4

M-101 MECHANICAL PLANS AND DETAILS 3 4

M-601 MECHANICAL SCHEDULES AND DIAGRAMS 4 4

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGEND AND ABBREVIATIONS 1 5

E-101 FIRST FLOOR KITCHEN POWER PLAN 2 5

E-401 ELECTRICAL ENLARGEMENTS 3 5

E-601 SINGLE LINE DIAGRAM, ELECTRICAL SCHEDULES AND DETAILS 4 5

E-602 ELECTRICAL SCHEDULES 5 5

BUILDING LOCATION

PROJECT LOCATION

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

Docusign Envelope ID: 81D59A72-40F7-4645-9234-06EB2341B394

4/25/2025

V A

N

M U

S

SE

R C

T.

E N

G

LE

W A

Y

C

UST

IS

D

R.

M A

K S P

L.

E N

G

LE

C T.

E N

G

LE

W A

Y

VETERANS DR.

M U

SS

ER

A

V E

C

HA

SE D

R.

C H A

SE

L N

P A

R K

IN

G

P A

R K

IN

G

PARKING

LOT #9

LOT #6

L O

T

L O

T

LO

T

#5

LOT #10

LOT #11

LOT #12

L O

T

LOT #1

LOT #1A

LOT #2

LOT #3

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

GENERAL SYMBOL LEGENDCODE SUMMARY - NFPA

DESIGNER FIRM NAME LIC.# PHONE#

BUILDING DATA (NFPA 220):

FIRE DISTRICT:

SPRINKLERS:

ALLOWABLE BUILDING HEIGHT:

CONSTRUCTION TYPE:

LEAD DESIGN PROFESSIONAL:

STANDPIPES:

OCCUPANCY

PRIMARY OCCUPANCY:

CONSTRUCTED:

RENOVATED:

ORIGINAL USE(S) (CH.3):

CURRENT USE(S) (CH.3):

PROPOSED USE(S) (CH.3):

LIFE SAFETY PLAN REQUIREMENTS

IV (2HH)

I (442)

III (211)

II (222)I (332)

III (200)

II (111)

V (111)

MECHANICAL:

ELECTRICAL:

PLUMBING:

CODE ENFORCEMENT JURISDICTION:

ARCHITECTURAL:

OWNER OR

OWNED BY: FEDERAL CITY/COUNTY PRIVATE STATE

NAME OF PROJECT:

PROPOSED USE:

ADDRESS:

NO NFPA 13YES NFPA 13R NFPA 13D

NO CLASSYES

NO YES

FEET # STORIES

ASSEMBLY

BUSINESS EDUCATIONAL

INDUSTRIALHEALTHCARE MERCANTILE

RESIDENTIAL BOARD AND CARESTORAGE

DETENTION AND CORRECTIONAL

STATE

COUNTY

AUTHORIZED AGENT

NFPA 13 NFPA 13R NFPA 13D

REPLACE 40 TON CONDENSER AT B200

9600 VETERANS DRIVE SW, TACOMA, WA ZIP CODE: 98493

HEALTHCARE

EMAIL:

ROBERT YODY

CITY

APOGEE CONSULTING DAVID REICHARD 5070 (919) 858-7420

NEW CONSTRUCTION ADDITION UPFIT

RECONSTRUCTION ALTERATION REPAIR RENOVATION

[date]

N/A

FIRE AND/OR SMOKE RATED WALL LOCATIONS

ASSUMED AND REAL PROPERTY LINE LOCATIONS

EXTERIOR WALL OPNEING AREA WITH RESPECT TO DISTANCE TO ASSUMED

PROPERTY LINES

EXISTING STRUCTURES WITHIN 30' OF THE PROPOSED BUILDING

OCCUPANCY TYPES FOR EACH AREA

OCCUPANT LOADS FOR EACH AREA

EXIT ACCESS TRAVEL DISTANCES

COMMON PATH OF TRAVEL DISTANCE

DEAD END LENGTHS

CLEAR EXIT WIDTHS FOR EACH EXIT DOOR

MAXIMUM CALCULATED OCCUPANT LOAD CAPACITY EACH EXIT DOOR CAN

ACCOMMODATE BASED ON EGRESS WIDTH

ACTUAL OCCUPANT LOAD FOR EACH EXIT DOOR

A SEPARATE SCHEMATIC PLAN INDICATING WHERE FIRE RATED FLOOR/

CEILING AND/OR ROOF STRUCTURE IS PROVIDED FOR PURPOSES OF

OCCUPANCY SEPARATION

LOCATION OF DOORS WITH PANIC HARDWARE

LOCATION OF DOORS WITH DELAYED EGRESS LOCKS AND THE AMOUNT OF

DELAY

LOCATION OF DOORS WITH ELECTROMAGNETIC EGRESS LOCKS

LOCATION OF DOORS EQUIPPED WITH HOLD-OPEN DEVICES

LOCATION OF EMERGENCY ESCAPE WINDOWS

THE SQUARE FOOTAGE OF EACH FIRE AREA

THE SQUARE FOOTAGE OF EACH SMOKE COMPARTMENT

NOTE ANY CODE EXCEPTIONS OR TABLE NOTES THAT MAY HAVE BEEN

UTILIZED REGARDING THE ITEMS ABOVE

N/A N/A

PHONE:

EMERGENCY LIGHTING:

EXIT SIGNS:

FIRE ALARM:

SMOKE DETECTION SYSTEMS:

PANIC HARDWARE:

LIFE SAFETY SYSTEM REQUIREMENTS

NO YES

NO YES

NO YES

NO YES

NO YES

PARTIAL

[LIST USE]

TACOMA, WASHINGTON

206-579-1252

Robert.Yody@va.gov

FEDERAL DEPT OF VETERAN AFFAIRS

APOGEE CONSULTING WILLIAM XIA (919) 535-3965PE11900852

APOGEE CONSULTING WILLIAM XIA (919) 535-3965PE11900852

SCOPE TYPE:

ACTUAL BUILDING HEIGHT: FEET # STORIES

UNLIMITED PER:

N/A N/A

II (000)

V (000)

AMBULATORY HEALTH CARE

DAY CARE

ONE- AND TWO-FAMILY DWELLING

APARTMENT

LODGING OR ROOMING HOUSE

HOTELS AND DORMITORY

APOGEE CONSULTING KEVIN KUBLANK 33282 (919) 535-3949

MECHANICAL

G-004

3 71

T97

PROPOSED LOCATION OF

VA PROVIDED TEMPORARY

MOBILE FREEZER.

CONTRACTOR TO VERIFY

LOCATION WITH VA COR.

EXISTING FREEZER TO BE

DEMOLISHED

NEW CONDENSING UNITS

2 – CANTEEN / PRIMARY CARE / BLIND REHAB

3 – PHYSICAL THERAPY / PROSTHETICS

4 – DOMICILIARY

5 – PAIN CLINIC

6 – POLICE / COMP & PENSION / EYE CLINIC

7 – WOMEN’S CLINIC

8 – ADMINISTRATIVE

9 – AUDITORIUM

10, 11, 12, 13, 14, 15 – RESIDENTIAL BUILDINGS

16 – AMERICAN LEGION / DAV (VSA), UNION

17 – COMMUNITY HOUSING OUTREACH SERVICES (CHOS)

18 – FACILITIES MANAGEMENT SERVICES (FMS)

19 – RECORDS OFFICE / POLICE DISPATCH / MAIL ROOM

20 – MAINTENANCE SHOPS

21 – LAUNDRY SERVICES

23 – BOILER PLANT

53, 54, 55, 56, 57, 58 – RESIDENTIAL GARAGES

59 – STORAGE

60 – STORAGE

61 – MENTAL HEALTH, ADDICTION TREATMENT CENTER (ATC)

62 – EXERCISE HALL (GYM)

71 – LIBRARY

72 – LOCKSMITH

81 – MAIN HOSPITAL

85 – DENTAL, AUDIOLOGY, ADMIN, GRECC, SOCIAL WORK

94 – STORAGE

111 – CHAPEL

114 – GOLF COURSE CLUB HOUSE

131 – GENERATOR

143 – WAREHOUSE

148 – VA SUPPORTIVE HOUSING (WASH) / VOC. REHAB

199 – INFORMATION TECHNOLOGY (IT)

200 – COMMUNITY LIVING CENTER (CLC)

202 – CHILD CARE

AREA OF WORK

EXISTING 2 HOUR FIRE BARRIER

EXISTING 1 HOUR FIRE BARRIER

EXISTING 1 HOUR SMOKE BARRIER

WALL RATING LEGEND

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:1

P

M C

U s e rs \a p u lle n

\D o c u m e n ts

\A

-0

-V A

A m e r

L a k e

-R e p l

T o n

C o n d -W

A

R a p u lle n V

D X

T .r v t

G-002

GENERAL INFORMATION, NFPA 101

CODE SUMMARY, AND SITE PLAN

2 5ANP

REPLACE 40 TON

CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493 APRIL 30, 2025

BID DOCUMENTS

663A4-23-20124-050

DJR

SCALE: NO SCALE

SITE PLAN AND LOCATION OF TEMPORARY FREEZER DURING CONSTRUCTION

BUILDING LEGEND

SCOPE LEGEND

N O

R T H

THE POTENTIAL FOR HAZARDOUS MATERIALS EXISTS IN THE ROOF FOR ROOF PENETRATIONS. CONTRACTOR TO REFER TO SPECS SECTIONS 02 41 19, 02 82 13.13, 02 21 13. 41, 02 82 13.41, AND 02 85 00.

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF

PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

ILSM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

AMERICAN LAKE REPLACE 40 TON CONDENSER AT BLDG 200

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

DUST CONTROL PLAN NOTES

1. AT THE BEGINNING OF CONSTRUCTION, THE VAMC INFECTION CONTROL GROUP SHALL CONFIRM

THE DESIGNATION FOR THIS PROJECT FOR THE CLASS OF PRECAUTIONS AND LEVEL OF

INFECTION CONTROL ACTIVITIES. THE ICRA CHART HAS BEEN COMPLETED BASED ON THE DESIGN

PARAMETERS AND CONVERSATIONS WITH THE VA COR AND/OR VAMC INFECTION CONTROL

GROUP. HARD SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON THE

PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA FROM NON-WORK AREA

AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND ACTIVE.

2. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES (PROVIDE AND LOCATE A

STAGING AREA FOR HAZMAT SUITS NEAR THE PLASTIC BARRIER ENTRANCE SPACES -

CONSTRUCTION ANTEROOM. THEY SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND

LEAVING THE CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE

MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS. ANY DUST SHALL BE

IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE CONSTRUCTION BARRIER. UPON

COMPLETION OF THE CONSTRUCTION PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY

TO MINIMIZE SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY DUST

PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER. [AFTER EACH PHASE,

PERFORM TASKS STATED IN CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND

RELATED AREAS NOTE 2.

3. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER ENTRANCE SPACES

(CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR MORE OFTEN AS NEEDED TO PREVENT THE

SPREAD OF DUST AND DEBRIS INTO ADJACENT CLEAN SPACE.

INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL

1. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.

2. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES SHALL BE DEFINED. EGRESS

PATHS SHALL BE FREE OF DEBRIS; DESIGNATED ELEVATORS SHALL BE USED DURING

SCHEDULED TIMES; AND ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE

CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE

CONSTRUCTION AREA AND MATERIALS.

3. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION MATERIAL IN AND OUT OF

THE PROJECT - A CLEAN CART SHALL BE USED; THE NOT-SO-CLEAN CART SHALL BE USED

BETWEEN THE MAIN ENTRY AND THE CONSTRUCTION STAGING/PREP AREA.

4. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE USE OF

ELEVATORS WITH AN EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.

DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC. IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR

MACHINES SHALL BE USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.

FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT OF THE

CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE

AREAS WITHOUT PRIOR APPROVAL OF THE COR.

5. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE INFILTRATION FROM ANY

ADJACENT EXCAVATION DEBRIS.

6. ALL EQUIPMENT REMAINING IN THE RENOVATION AREA SHALL BE COVERED AND PROTECTED

PRIOR STARTING EACH CONSTRUCTION PHASE.

VENTILATION AND ENVIRONMENTAL CONTROLS

1. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE CONTRACTOR WHETHER THE

CONSTRUCTION AREA USES FRESH/OUTSIDE OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED

OR RETURN VENTS COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW

FROM CLEAN TO DIRTY AREAS.

2. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA SHALL BE NEGATIVE WITH

RESPECT TO SURROUNDING AREAS AND WITH NO DISRUPTION OF AIR SYSTEMS OF ADJACENT

AREAS. USE OF THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE

DUST SHALL PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER CAPABLE OF

FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR

SYSTEM, A PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO PREVENT

CONTAMINATION OF THE DUCTS.

3. FOR EXHAUST DUCT ROUTING THRU CORRIDOR: INSTALL HARD DUCT WITH NON-FLANGE HANGER

HUNG FROM CEILING ABOVE, BOTTOM OF DUCT SHALL BE A MINIMUM OF 7'-2" A.F.F.

4. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

5. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE

AIR IS NOT BEING RE-CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA

ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE PROJECT IN THE FREQUENCY

AS IDENTIFIED BY THE COR.

CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED AREAS

1. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND

DEBRIS BEFORE LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN

(E.G., COVERALLS, FOOTGEAR AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO

REMOVE DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE APPAREL IS

UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR ANTEROOM FOR CHANGING

CLOTHING AND STORING EQUIPMENT (DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM DUST

AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

2. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE, VA EMS STAFF HAS DONE A TERMINAL

CLEANING, AND VA INFECTIOUS DISEASE CONTROL HAS INSPECTED AND APPROVED THE

CLEANING.

ICRA NOTES

IIILOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

I

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 V

V

IV

V

IV

III

IV

II

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects Includes, but is not limited to:

• Removal or replacement of building system component(s).

• Removal/installation of drywall partitions.

• Invasive large-scale new building construction.

• Renovation work in two or more rooms.

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:

• Removal of preexisting floor covering, walls, casework or other building components.

• New drywall placement.

• Renovation work in a single room.

• Nonexisting cable pathway or invasive electrical work above ceilings.

• The removal of drywall where a moderate amount of dust and debris is created.

• Dry sanding where a moderate amount of dust and debris is created.

• Work creating significant vibration and/or noise.

• Any activity that cannot be completed in a single work shift.

Small scale, short duration activities which create minimal dust Includes, but is not limited to:

• Work conducted above the ceiling (e.g., prolonged inspection or repair of firewalls and barriers, installation of conduit and/or cabling, and access to mechanical and/or electrical chase spaces).

• Fan shutdown/startup.

• Installation of electrical devices or new flooring that produces minimal dust and debris.

• The removal of drywall where minimal dust and debris is created.

• Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

Inspection and Non-Invasive Activities Includes, but is not limited to:

• Removal of ceiling tile for visual inspection-limited to 1 tile per 50 square feet with limited exposure time.

• Limited building system maintenance (e.g., pneumatic tube station, HVAC system, fire suppression system, electrical and carpentry work to include painting without sanding) that does not create dust or debris.

• Clean plumbing activity limited in nature.

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

• Physical Therapy

• Radiology departments

• All patient waiting rooms

• All outpatient clinics

• Research Areas

• Respiratory Therapy

• Office areas (non-clinical)

• FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

• Emergency Room

• Clinical Laboratories (specimen)

• Same Day Surgery

• Pharmacy

• Nutrition and Food

Service/Canteen

• Procedural Areas (GI)

• Inpatient Mental Health

• Any area caring for immunocompromised patients

• Cardiac Cath Lab/IR

• Central Sterile Supply

• Sterile Processing Service

• Intensive Care Units

IIII

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

During Construction Project Upon Completion of Project

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

6. Containment units or environmental containment units (ECUs) approved for Class IV precautions in small areas totally contained by the unit and that has HEPA-filtered exhaust air.

7. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

8. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

9. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

10. Maintain negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

11. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

12. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is not acceptable.

13. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

14. Contain all trash and debris in the work area.

15. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

16. Worker clothing must be clean and free of visible dust before leaving the work area.

HEPA vacuuming of clothing or use of cover suites is acceptable.

17. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be immediately changed.

18. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

19. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

• Medical/Surgical Units

• Negative pressure isolation rooms

• Outpatient Chemotherapy

Areas

• Operating rooms

• Post Anesthesia Care Unit

• Dialysis

• Dental

C

LA

S S

V

1. Includes all activities required by Class IV

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities Management

Maintenance and Engineering department before construction begins.

3. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

4. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to ground and ceiling and secure from movement or damage. Apply tape that will not leave a residue to seal gaps between barriers, ceiling or floor.

5. Seal all penetrations in containment barriers, anteroom barriers, including floors and ceiling using approved materials (UL schedule firestop if applicable for barrier type).

6. Construct anteroom large enough for equipment staging, cart cleaning, workers. The anteroom must be constructed adjacent to entrance of construction work area.

7. Personnel will be required to wear coveralls at all times during Class V work activities.

Coveralls must be removed before leaving the anteroom.

8. Remove or isolate return air diffusers to avoid dust entering the HVAC system.

9. Remove or isolate the supply air diffusers to avoid positive pressurization of the space.

10. Negative airflow pattern must be maintained from the entry point to the anteroom and into the construction area. The airflow must cascade from outside to inside the construction area. The entire construction area must remain negatively pressurized.

11. Maintain negative pressurization of the entire workspace using HEPA exhaust air systems directed outdoors. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows does not require HEPA-filtered air.

12. If exhaust is directed indoors, then the system must be HEPA filtered. Prior to start of work, HEPA filtration must be verified by particulate measurement as no less than 99.97% efficiency and must not alter or change airflow/pressure relationships in other areas.

13. Exhaust into shared or recirculating HVAC systems, or other shared exhaust systems (bathroom exhaust) is not acceptable.

14. Install device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

15. Contain all trash and debris in the work area.

16. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

17. Worker clothing must be clean and free of visible dust before leaving the work area anteroom.

18. Workers must wear shoe covers prior to entry into the work area. Shoe covers must be changed prior to exiting the anteroom to the occupied space (non-work area).

Damaged shoe covers must be immediately changed.

19. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

20. Consider collection of particulate data during work to monitor and ensure that contaminates do not enter the occupied spaces. Routine collection of particulate samples may be used to verify HEPA filtration efficiencies.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

During Construction Project

C

LA

S S

I

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Upon Completion of Project

1. Execute work by methods to minimize raising dust from construction operations.

2. Perform noninvasive work activity as to not block or interrupt patient care.

3. Perform noninvasive work activities in areas that are not directly occupied with patients.

4. Perform noninvasive work activity in a manner that does not create dust.

5. Immediately replace any displaced ceiling tile before leaving the area and/or at end of noninvasive work activity.

C

LA

S S

II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

1. Includes all activities required by Class I

2. Perform only limited dust work and/or activities designed for basic facilities and engineering work.

3. Perform limited dust and invasive work following standing precautions procedures approved by the organization.

4. This Class of Precautions must never be used for construction or renovation activities.

5. Provide active means to prevent airborne dust from dispersing into atmosphere.

6. Water mist work surfaces to control dust while cutting.

7. Seal unused doors with duct tape.

8. Block off and seal air vents.

9. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

10. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

Construction areas must be inspected by an infection preventionist or designee and engineering representative for discontinuation or downgrading of ICRA precautions.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

1. Carefully remove screws and painter tape.

2. If dust will be generated during screw removal, use hand-held HEPA vacuum.

3. Drywall cutting is prohibited during removal process.

4. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

5. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminates from the work area.

2. Negative air devices must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify the HVAC systems meets original airflow and air exchange design specifications.

CONSTRUCTION ACTIVITIES SHALL BE CLASSIFIED AS FOLLOWS UNLESS NOTED OTHERWISE:

1. INSTALLATION OF CABLE TRAY IN CORRIDOR CEILINGS SHALL BE CONSIDERED CONSTRUCITON ACTIVITY TYPE B.

2. ALL CONDUIT SPECIFIED TO BE INSTALLED IN WALL SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

3. CONSTRUCTION OF NEW ROOMS SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE D.

4. INSTALLATION OF NEW DOORS TO OR FROM EXISTING SPACES SHALL BE CONSIDERED CONSTRUCTION ACTIVITY TYPE C.

C

LA

S S

II

I

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Provide active means to prevent airborne dust dispersion into the occupied areas.

4. Means for controlling minimal dust dispersion may include hand-held HEPA vacuum devices, polyethylene plastic containment, or isolation of work area by closing room door.

5. Remove or isolate return air diffusers to avoid dust from entering the HVAC system.

6. Remove or isolate the supply air diffusers to avoid positive pressurization of the space,

7. If work area is contained, then it must be neutrally to negatively pressurized at all times.

8. Seal all doors with tape that will not leave residue.

9. Contain all trash and debris in the work area.

10. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

11. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

12. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces.

13. Clean construction area at the end of each shift by damp mopping or HEPA Vacuum.

For Type C activities, follow procedures for Class IV.

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

A

.F .F

A P

P R

O X

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

PLASTIC

WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H

E

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING

WALL

EXISTING

CEILING

FLEX DUCT

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:2

P

M C

U s e rs \a p u lle n

\D o c u m e n ts

\A

-0

-V A

A m e r

L a k e

-R e p l

T o n

C o n d -W

A

R a p u lle n V

D X

T .r v t

G-003

ICRA INFORMATION AND DETAILS

3 5ANP

REPLACE 40 TON

CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493 APRIL 30, 2025

BID DOCUMENTS

663A4-23-20124-050

DJR

SCALE: NO SCALE

ILSM CONSTRUCTION EGRESS SIGNAGE

SCALE: NO SCALE

ICRA ROOM ELEVATION

SCALE: NO SCALE

ICRA MOBILE CONTAINMENT CART

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

A17

AL AN AO AP AQ AR AS AT AU

G-005

AGAE

A18

A19

A20

A21

EXISTING

FREEZER

FREEZER

FREEZER

REFRIG

REFRIG

REFRIG

REFRIG

REFRIG

REFRIG

EXISTING PATH OF

TRAVEL

A-104

PROPOSED LOCATION OF

VA PROVIDED TEMPORARY

MOBILE FREEZER.

CONTRACTOR TO VERIFY

LOCATION WITH VA COR.

EXISTING PATH OF

TRAVEL

AREA OF WORK

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:2

P

M C

U s e rs \a p u lle n

\D o c u m e n ts

\A

-0

-V A

A m e r

L a k e

-R e p l

T o n

C o n d -W

A

R a p u lle n V

D X

T .r v t

G-004

BUILDING 200 OVERALL PLAN

4 5ANP

REPLACE 40 TON

CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493 APRIL 30, 2025

BID DOCUMENTS

663A4-23-20124-050

DJR

SCALE: 1/16" = 1'-0"

BUILDING 200 OVERALL PLAN 0 8 16 32

N O

R T H

SCOPE LEGEND

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

A17

AP AQ AR AS AT

A18

A19

A20

A21

FREEZER

FREEZER

REFRIGERATOR

REFRIGERATOR

REFRIGERATOR

REFRIGERATOR

REFRIGERATOR

REFRIGERATOR

C1-22

CORRIDOR

F122

KITCHEN

C1-21

CORRIDOR

F134

RECEIVING

C1-22

CORRIDOR

F124

NON-FOOD

STORAGE

F125

WOMEN

F126

MEN

F127

OFFICE

F141

ROOF ACCESS

F137

INGREDIENT

CONTROL

F123

CART STORAGE

F140

FOOD STORAGE

F131

CORRIDOR

6'-0"

G101

ELECT

G100

BOILER ROOM

C1-10

CORRIDOR

G102

SOILED LINEN

HOLDING

F133

EMERGENCY

ELEC

F140

FOOD STORAGE

F132

OFFICE

F129

OFFICE

F128

OFFICE

LIFE SAFETY IS NOT ALTERED IN THIS PROJECT. EXIT SIGNS

ARE SHOW FOR CLARITY OF EMERGENCY EGRESS.

EXIT CORRIDOR

EXIT CORRIDOR

E X

IT

C

O R

R

ID

O R

E X

IT

C

O R

R

ID

O R

AREA NOT IN SCOPE

Engineers Architects

# NEW KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/2

/2

:5

:2

P

M C

U s e rs \a p u lle n

\D o c u m e n ts

\A

-0

-V A

A m e r

L a k e

-R e p l

T o n

C o n d -W

A

R a p u lle n V

D X

T .r v t

G-005

FIRST FLOOR COLD STORAGE ICRA

PLAN

5 5ANP

REPLACE 40 TON

CONDENSER AT B200

AMERICAN LAKE VA MEDICAL CENTER

9600 VETERANS DRIVE SW

TACOMA, WA 98493 APRIL 30, 2025

BID DOCUMENTS

663A4-23-20124-050

DJR

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

SCALE: 1/4" = 1'-0"

FIRST FLOOR COLD STORAGE ICRA PLAN 0 2 4 8

N O

R T H

A. ALL WORK IN FREEZERS AND REFRIGERATORS

TO BE CONDUCTED AFTER HOURS WHEN

KITCHEN IS CLOSED. CONTRACTOR TO

COORDINATE WITH VA COR.

B. SEE MECHANICAL NARRATIVE AND DRAWINGS

FOR LOCATION AND SEQUENCE OF WORK.

C. IF HEPA FILTERS ARE USED, CONTRACTOR TO

ROUTE DUCTING OUTSIDE.

1 DOOR TO REMAIN CLOSED DURING

CONSTRUCTION.

2 ZIPPER DOOR AND PLASTIC BARRIER FOR WORK

IN FREEZERS 1 AND 7. MAINTAIN 4’-0”

CLEARANCE IN CORRIDOR.

3 ZIPPER DOOR AND PLASTIC BARRIER FOR WORK

IN REFRIGERATORS 4, 5, AND 6. MAINTAIN 4’-0”

CLEARANCE IN CORRIDOR.

4 ZIPPER DOOR AND PLASTIC BARRIER FOR WORK

IN REFRIGERATORS 2, 3, AND 8. MAINTAIN 4’-0”

CLEARANCE IN CORRIDOR.

5 EXIT CORRIDOR, SEE SHEET G-004 FOR

EMERGENCY PATH OF EGRESS.

SCOPE LEGEND

5070L

IC

E N

S E D A RC H I T ECT

DA

V ID J . REICHARD

NOR T H CA RO L I NA

AFF ABOVE FINISHED FLOOR

ACP/APC ACOUSTIC CEILING PANEL/

ACOUSTIC PANEL CEILING

ACT ACOUSTIC(AL) TILE

ADJ ADJUSTABLE

ADT'L ADDITIONAL

AGG AGGREGATE

ALT ALTERNATE

AL ALUMINUM

APPROX APPROXIMATE(LY)

ASPH ASPHALT

AUTO AUTOMATIC

B/O BOTTOM OF

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRG BEARING

CENTERLINE

C/C CENTER TO CENTER

CJ CONTROL JOINT

CLL CONTRACT LIMIT LINE

CEM CEMENT(ITIOUS)

CMU CONCRETE MASONRY UNIT

CLG CEILING

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CPT CARPET

CT CERAMIC TILE

CTR CENTER(ED)

DF DRINKING FOUNTAIN

DS DOWNSPOUT

DBL DOUBLE

DEG DEGREE

DEMO DEMOLITION

DET/DTL DETAIL

DIA DIAMETER

DIM DIMENSION

DN DOWN

DWG(S) DRAWING(S)

E EAST

EC ELECTRICAL CONTRACTOR

EHO ELECTRICAL HOLD OPEN

EJ EXPANSION JOINT

EW EACH WAY

EA EACH

EIFS EXTERIOR INSULATION

FINISH SYSTEM

EL ELEVATION

ELEC ELECTRIC(AL)

ELEV ELEVATOR

EMER EMERGENCY

EQ EQUAL

EQUIP EQUIPMENT

EXIST EXISTING

EXT EXTERIOR

EWC ELECTRIC WATER COOLER

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FFE FINISH FLOOR ELEVATION

FV FIELD VERIFY

FEC FIRE EXTINGUISHER CABINET

FDN FOUNDATION

FIN FINISH

FLSHG FLASHING

FLR FLOOR

FRMG FRAMING

FT FOOT/FEET

FTG FOOTING

GC GENERAL CONTRACTOR

GA GAUGE

GALV GALVANIZED

GEN GENERAL

GYP GYPSUM

HM HOLLOW METAL

HDWR HARDWARE

HOL HOLLOW

HOR HORIZONTAL

HT HEIGHT

HVAC HEATING/VENTILATION/AIR

CONDITIONING

ID INSIDE DIAMETER

IN INCH

INCL INCLUDING

INSUL INSULATION

INT INTERIOR

JAN JANITOR

JT JOINT

LAV LAVATORY

LB(S) POUND(S)

L/S LANDSCAPE

LT LIGHT

MO MASONRY OPENING

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTD MOUNTED

MTL METAL

N NORTH

NIC NOT IN CONTRACT

NTS NOT TO SCALE

NOM NOMINAL

OC ON CENTER

OD OUTSIDE DIAMETER

O TO O OUT TO OUT

OPNG OPENING

OPP OPPOSITE

OVHD OVERHEAD

PEB PRE-ENGINEERED BUILDING

PJF PREFORMED JOINT FILLER

PT PRESSURE TREATED

PERIM PERIMETER

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PLYWD PLYWOOD

PNT PAINT

PR PAIR

PTD PAINTED

PWR POWER

RB RUBBER BASE

RD ROOF DRAIN

RO ROUGH OPENING

RAD RADIUS

REC RECESSED

REINF REINFORCED

REQ'D REQUIRED

REV REVISED (REVISION)

RM ROOM

S SOUTH

SB SPLASH BLOCK

SF SQUARE FEET

SS STAINLESS STEEL

SIM SIMILAR

SPEC SPECIFICATIONS

SQ SQUARE

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

T&G TONGUE AND GROOVE

T/O TOP OF

TELE TELEPHONE

TRTD TREATED

TS TUBE STEEL

TYP TYPICAL

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

VCT VINYL COMPOSITION TILE

VIF VERIFY IN FIELD

VERT VERTICAL

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WWF WELDED WIRE FABRIC

WD WOOD

WH WATER HEATER

WT WEIGHT

CL

DEMOLITION KEYNOTE WINDOW TYPE

ROOF PITCH SYMBOL

DOOR NUMBER

TYPICAL KEYNOTE CEILING/ SOFFIT

HEIGHT

MATL

1'-0"

1##

1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNERS AS TO THE LIMITATIONS OF THE WORK AREA.

ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR/VA AND THE

CONTRACTOR BEFORE THE START OF THE WORK.

2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM THE BASIS OF DESIGN PRODUCT. PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO WORK. PRODUCTS FROM OTHER MANUFACTURER'S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VERY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR

RECESSED OR SEMI-RECESSED PRODUCTS) AND IS RESPONSIBLE FOR ACCOMMODATING AND

COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE

DIFFERENCES.

3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO

BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.

4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATIONS FROM THE COR/VA PRIOR TO BIDDING.

WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR

GREATER QUANTITY OF WORK.

5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE

DRAWINGS AND SPECIFICATIONS.

6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS (BOTH EXPOSED AND

CONCEALED) AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD

DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS. NOTIFY THE COR/VA

PRIOR TO PROCEEDING WITH THE WORK.

7. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION. MECHANICAL DUCTWORK & EQUIPMENT SHALL HAVE PRIORITY OVER OTHER DISCIPLINES FOR INSTALLATIONS & ROUTING. COORDINATE

UTILITIES, SO THAT THEY ARE INSTALLED IN AND ORDERLY AND UNIFORM MANNER.

8. COMPLY WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL CODES.

9. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL CONSTRUCTION PERMITS.

10. CONTRACTOR SHALL PREPARE A PLAN SHOWING LAYDOWN AREA, SECURITY FENCE, DUMPSTER LOCATION, SCAFFOLDING, AND ACCESS FOR COR/VA REVIEW AND APPROVAL.

11. PROVIDE METAL BACKING AT WALLS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS, INCLUDING BUT NOT LIMITED TO WALL PROTECTION, SHELVING, CASEWORK, EQUIPMENT, PLUMBING, ETC. CUT AND PATCH GYP BD IN EXISTING WALLS FOR INSTALLATION OF NEW METAL BACKING WHERE REQUIRED. PROVIDE METAL BACKING IN WALLS AT WATER CLOSET LOCATIONS FOR GRAB BAR INSTALLATION WHETHER GRAB

BARS ARE INDICATED OR NOT.

12. PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE

STUDS, AS REQUIRED FOR COMPLETION OF THE WORK.

13. PROVIDE STRUCTURAL SUPPORTS ABOVE CEILING WHERE REQUIRED FOR CEILING HUNG EQUIPMENT.

14. FURR OUT AROUND COLUMNS, PIPES, UTILITIES, ETC., WITH THE MINIMUM DEPTH NECESSARY TO CONCEAL

PIPES.

15. CLEAN PAINT OFF ALL NEW AND EXISTING FIRE LABELS IN SCOPE OF WORK TO ALLOW READABILITY.

16. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.

17. ALL PRESSURE TREATED WOOD SHALL BE ISOLATED FROM METAL DECK AND / OR METAL STUDS TO PREVENT

CORROSION. ALL FASTENERS IN PRESSURE TREATED WOOD SHALL BE STAINLESS STEEL.

18. PROVIDE SEALANT AT ALL INTERSECTIONS / JOINTS BETWEEN DIFFERENT MATERIALS.

19. ALL ITEMS AND MATERIALS SHOWN, INDICATED, OR REQUIRED FOR A COMPLETE PROJECT SHALL BE

PROVIDED AND INSTALLED BY THE CONTRACTOR (UNO).

20. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL

GOVERN

21. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH OTHER TRADES REGARDING THE LOCATION AND SIZE OF PIPES, EQUIPMENT, FIXTURE, CONDUIT, DUCTS, OPENINGS, SWITCHES, OUTLETS, ETC., SO THAT INTERFERENCE BETWEEN THE INSTALLATION OR THE PROGRESS OF THE WORK OF ANY CONTRACTOR OR THE SUBCONTRACTOR ON THE PROJECT CAN BE MINIMIZED IN THE FIELD. SEE SPEC SECTION 01 33 23 SHOP

DRAWINGS.

22. IN SPACES WITH HIGH CONCENTRATION OF INTER-RELATED EQUIPMENT, PIPING, CONDUIT, AND DUCTWORK (SUCH AS CORRIDORS, MECHANICAL ROOMS, TELECOM ROOMS, ETC), PROVIDE COORDINATION DRAWINGS CLEARLY DEPICTING THE LAYOUT (BOTH PLAN AND ELEVATION, OR PERSPECTIVE) BASED ON FIELD CONDITION. CONTRACTOR TO CLEARLY DEFINE IN ADVANCE OF CONSTRUCTION THE RELATIONSHIP OF ALL PIPING CONDUIT, DUCTWORK, AND EQUIPMENT. DEMONSTRATE CLEARANCE SPACE SUFFICIENT TO SERVICE

THE EQUIPMENT. SEE SPEC SECTION 01 33 23 SHOP DRAWINGS.

23. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS

PROJECT.

24. PROVIDE BACKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS

REQUIRED FOR COMPLETION OF THE WORK.

RENOVATION

1. PROTECT EXISTING ITEMS, EQUIPMENT, FINISHES, ETC. TO REMAIN. REPAIR / REPLACE / RESTORE, CONDITIONS THAT ARE DAMAGED OR DISTURBED AS A RESULT OF DEMOLITION OR NEW WORK.

2. CONTRACTOR SHALL MINIMIZE DOWNTIME ASSOCIATED WITH SCHEDULED SHUTDOWNS. COORDINATE WITH

COR/VA.

GENERAL NOTES

GENERAL

1. KEYNOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT PORTRAY THE FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED

FOR COMPLETION OF THE PROJECT.

2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED AND CLEAR AREA OF DEBRIS PRIOR TO PROCEEDING

WITH NEW CONSTRUCTION.

3. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR/VA AND ARCHITECT OF ANY

CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.

4. COORDINATE WITH COR/VA FOR WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL.

5. COORDINATE WITH COR/VA FOR SCHEDULED USE OF CONSTRUCTION ACCESS ROUTES (INCLUDING USE OF FREIGHT ELEVATOR IF REQUIRED), TRANSPORTATION, AND LOCATIONS OF ITEMS SUCH AS DUMPSTERS.

6. COORDINATE WITH COR/VA FOR ANY DOWNTIME ON ALL BUILDING SYSTEMS. PROVIDE TEMPORARY

SERVICES DURING INTERRUPTIONS OF EXISTING UTILITIES.

7. CONDUCT DEMOLITION TO MINIMIZE INTERFERENCE WITH VA'S NORMAL OPERATION AND WITH ADJACENT

BUILDING AREAS.

8. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTIONS OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE (INCLUDING FIRE PROTECTION). DISCOVERY OF UTILITIES OR CONDITIONS DIFFERING FROM THOSE

INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR/VA.

9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF THE PROJECT

(UNO).

10. RECORD EXISTING CONDITIONS BY USE OF ANY COMBINATION OF MEASURED DRAWINGS AND

PRECONSTRUCTION PHOTOGRAPHS.

11. CONTRACTOR SHALL NOTIFY COR/VA OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORESEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS, ELECTRICAL, OR DATA). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH / REPAIR MATERIALS AND FINISHES TO MATCH EXISTING.

12. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. IF DAMAGED, PATCH / REPAIR. REPAIR OR REPLACE ITEMS DAMAGED DURING

CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.

13. AT AREAS INDICATED TO BE PATCHED AND REPAIRED FOR ADDITION AND RENOVATION PROJECTS, THE CONSTRUCTION AND ASSEMBLY OF THE PATCH / REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.

14. REFER TO STRUCTURAL, MECHANICAL, PLUMBING, ELECTRICAL, VENDOR DRAWINGS, AND SPECIFICATIONS

FOR ADDITIONAL DEMOLITION ITEMS AND INFORMATION.

15. COORDINATE WITH COR/VA ON WHAT ITEMS ARE TO BE REMOVED, DISPOSED OF, SALVAGED, AND/OR

REINSTALLED.

- REMOVED & DISPOSED OF ITEMS: SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS.

COORDINATE WITH COR/VA.

- REMOVED & SALVAGED ITEMS: SHALL BE CLEANED, PACKED OR CRATED AFTER CLEANING, AND LABELED TO IDENTIFY THE CONTENTS OF CONTAINERS. PROTECT AND TRANSPORT ITEMS TO VA STORAGE AREA.

- REMOVED & REINSTALLED ITEMS: SHALL BE CLEANED AND REPAIRED TO FUNCTIONAL CONDITION ADEQUATE FOR INTENDED USE, PACKED OR CRATED AFTER CLEANING AND LABELED TO IDENTIFY THE CONTENTS OF THE CONTAINERS. PROTECT AND TRANSPORT ITEMS TO TEMPORARY STORAGE, REINSTALL

ITEMS IN LOCATIONS INDICATED.

16. PATCH / REPAIR ALL MATERIALS AND SURFACES CUT OR DAMAGED DURING DEMOLITION WITH MEANS AND

METHODS SO AS TO NOT TO VOID EXISTING WARRANTIES.

17. AFTER REMOVAL OF EXISTING CONCRETE OR CMU WALLS. FILL FLOOR VOIDS UP TO FINISH CONCRETE LEVEL

AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.

18. WHERE EXISTING CONSTRUCTION IS TO BE CUT OR REMOVED, PROVIDE SMOOTH AND STRAIGHT CUT JOINTS THAT ARE STRUCTURALLY SOUND. PATCH / REPAIR ADJACENT SURFACES TO MATCH EXISTING AND PROVIDE

IMPERCEPTIBLE TRANSITION (UNO).

19. WHERE DEMOLITION WORK UNCOVERS OR LEAVES OPENINGS IN PARTITIONS / CEILINGS OR INCOMPLETE PARTITIONS / CEILINGS, EXTEND, RESTORE, AND/OR CLOSE OPENING IN PARTITIONS / CEILINGS AS INDICATED AND/OR AS REQUIRED TO MAINTAIN FIRE RATINGS. MATCH EXISTING CONSTRUCTION, (UNO), WITHIN THE LIMITS AND TOLERANCES FOR MATERIALS AS SPECIFIED OR RECOMMENDED BY THE MANUFACTURER.

REFINISH SURFACES TO ALIGN FLUSH WITH EXISTING.

20. WHEREVER EXISTING EQUIPMENT, PIPING, DUCTS, ETC., ARE REQUIRED TO BE REMOVED, SUCH REMOVAL SHALL INCLUDE ALL ANCHORS, HANGERS, BRACING, FOUNDATIONS, ETC. AFTER REMOVAL, AFFECTED CONSTRUCTION AND SURFACES, SUCH AS FLOORS, WALLS, BASES, AND CEILINGS, SHALL BE FINISHED TO

MATCH ADJACENT SURFACES (UNO).

21. CEASE OPERATIONS IMMEDIATELY IF THE STRUCTURE APPEARS TO BE IN DANGER AND NOTIFY THE COR/VA

AND ARCHITECT/ENGINEER. DO NOT RESUME OPERATIONS UNTIL DIRECTED.

22. CONTRACTOR IS RESPONSIBLE FOR SHORING AND TEMPORARY SUPPORT OF STRUCTURE NECESSARY DUE TO DEMOLITION IN ORDER TO MAINTAIN THE INTEGRITY OF RELEVANT STRUCTURE.

This is the start of the file's text. The full file is on GovTribe.