Attachment 2 - 561A4-26-501 Replace Roof Building 143 Drawings.pdf

PDF 1 MB Posted

Attached to
Y1DA--NRM-CONST- 561A4-26-501 Replace Roof Building 143 - Design-Build
Solicitation number
36C24226R0071
Issued by

About this file

This document contains architectural construction drawings for a roof replacement project at Building 143 of the VA Lyons Campus (V.A.M.C.) in New Jersey, prepared as a 35% submittal by the Architect/Engineer of Record. The project, identified as 561A4-22-106, is overseen by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management.

The scope of work includes removal of existing roofing shingle materials and underlayment across the entire roof expanse, followed by visual inspection of roof deck sheathing for defects or moisture intrusion. New roofing installation requirements include 30-year architectural roof shingles over 15-pound roofing felt underlayment for pitched roof areas, replacement of low-slope roof areas with EPDM roof membrane over six inches minimum rigid insulation substrate with tapered and crickett details for proper drainage, installation of continuous ridge ventilation providing 14.8 square inches minimum of net free-air ventilation per linear foot, and installation of new eight-inch main roof drain and six-inch raised backup roof drain with associated drainage piping. Additional work includes replacement of existing metal gutters, installation of new prefinished aluminum downspouts and leader boxes, inspection and replacement of metal gutter segments as needed, installation of preformed metal thru-wall scuppers with overflow conductor heads, installation of prefinished metal dual rail roof-mounted snow guards, inspection of existing glass roof structures for damage and weather intrusion, and temporary relocation of operational mechanical, plumbing, and electrical equipment during construction. General contractor responsibilities include shutting off all operational equipment and supply lines prior to work commencement, coordinating with associated trades and building management, and preparing clean, dry roof surfaces free of loose substrate materials, membranes, and adhesives before new assembly installation.

View the file

Other files

File Type Posted
36C24226R0071 0002.docx DOCX document
36C24226R0071 0001.docx DOCX document
36C24226R0071_1.docx DOCX document
Attachment 1 - Wage Determination No. NJ20260042.docx DOCX document
Attachment 3 - 001121 Specification - Design-Build 561A4-26-501 Replace Roof B143.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROOF PLAN GENERAL NOTES

1. CONTRACTOR TO SHUT-OFF ALL OPERTATIONAL MECHANICAL OR

PLUMBING EQUIPMENT AND SUPPLY LINES PRIOR TO COMMENCEMENT OF

STRIPPING OF ROOFING MATERIALS. COORDINATE WITH ALL ASSOCIATED

TRADES AS WELL AS BUILDING MANAGEMENT.

2. CONTRACTOR TO TEMPORARILY RELOCATE ALL CONTINUING OPEATION

ROOF MOUNTED MECHANICAL, PLUMBING, AND ELECTRICAL EQUIPMENT WHICH

WILL BE AFFECTED AT ROOF OPERATIONAL LEVELS. ALL CONNECTION LINES

NOT INTENDED TO REMAIN SHALL BE SAFELY TERIMINATED OR TEMPORARILY

CAPPED DURING ROOFING WORK.

3. CONTRACTOR TO STRIP ALL ROOF ASSEMBLY MATERIALS DOWN TO

CONCRETE ROOF DECK SLAB AND/OR TO ROOF WALL FINISHED SURFACES.

SEE LAYOUT FOR DETAILS.

4. ENSURE NO LOOSE OLD SUBSTRATE MATERIAL, MEMBRANES, OR ROOFING

ADHESIVES REMAINS ON ROOF DECK CONCRETE SLAB OR ROOF WALLS, FOR

FLAT, SMOOTH SURFACES THROUGHOUT.

5. REPAIR ALL ROOF DECK AND ROOF WALL PENETRATIONS AS NEEDED IN

ORDER TO INSTALL NEW WORK.

6. PREPARE A CLEAN, DRY ROOF DECK AND ROOF WALL SURFACES FOR

INSTALLATION OF NEW ROOFING ASSEMBLIES.

AE162

R2

R3

E4

E5

1/4 12 1/4±

(f.v.)

12 1/4±

(f.v.)

1/4

1/6± (f.v.)

1/6± (f.v.)

1/6± (f.v.)

1/4

1/4

1/4 12

1/4

1/6± (f.v.)

1/6± (f.v.)

121/4± (f.v.)

12 1/4± (f.v.)

121/4± (f.v.)

1/6± (f.v.)

1/6± (f.v.)

1/6± (f.v.)

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

1/4

AE162

D S

D S

D S

D S

D S

D S

D S

DS DS

DS DS DS DS

D S

E2

E1

R1

R1

R1

R1

E2

E1

E2

E1

R1

R1

R1 D

S

E2

E1R6

R11

D S

D S

DS DS

DS DS

D S

D S

D S

D S

D S

D S

D S

DSDS

D S

D S

D S

DSDS

R6

R5

R6

R11R4

AE162

BLDG 143

ROOF SCOPE KEYNOTES

REMOVE EXISTING ROOFING SHINGLE MATERIALS OVER ENTIRETY OF ROOF EXPANSE.

E1

REMOVE ANY ROOFING UNDERLAYMENT PAPER AND MEMBRANES OVER ENTIRETY OF ROOF EXPANSE.

VISUALLY INSPECT ROOF DECK SHEATHING FOR DEFECTS OR MOISTURE INTRUSION.E2

30 YEAR ARCHITECTURAL ROOF SHINGLES OVER 15# ROOFING FELT UNDERLAYMENT THROUGHOUT.

R1

REPLACE EXISTING ROOFING MATERIALS AT LOW-SLOPE ROOF AREAS WITH NEW EPDM ROOF MEMBRANE OVER 6" MIN RIGID INSULATION SUBSTRATE TAPERED AND CRICKETED TO EXISTING DRAINING LOCATIONS.

EXISTING METAL GUTTERS RECESSED AT ROOF PLANE BEHIND EDGE FASCIA. VISUALLY INSPECT GUTTER MATERIALS FOR DAMAGERS, EXCESSIVE WEAR AND REPLACE AND RE-SEAM SEGMENTS AS NEEDED.

REPLACE EXISTING METAL DOWNSPOUTS AND DECORATIVE LEADER BOX WITH NEW PREFINISHED ALUMINUM

DOWNSPOUTS AND LEADER BOXES. SEE ELEVATIONS.

CONTINUOUS RIDGE VENT, INSTALL PER MANUFACTURER INSTRUCTIONS.

TO PROVIDE 14.8 SQ IN MIN OF NET FREE-AIR VENTILATION PER LINEAR FT.

RIGID INSULATION BOARD AHDERED TO EXISTING ROOF CONCRETE SLAB OR SUBSTRATE. BOARDS TAPERED

AND CUT AS INDICATED TO SHED RAINWATER TO ROOF DRAINAGE.

PREFORMED METAL THRU-WALL SCUPPER WITH OVERFLOW CONDUCTOR HEAD. SEE ELEVATIONS.

E3

E4

E5

R2

R3

R4

R5

R6

R7

R8

TEMPORARILY RELOCATE EXISTING OPERATIONAL MECHANICAL OR PLUMBING EQUIPMENT AS NEEDED

EXISTING ROOFING REMOVAL AND INSPECTION

NEW ROOFING ASSEMBLY INSTALLATIONS

EXISTING GLASS ROOF STRUCTURE. VISUALLY INSPECT FOR DAMAGES, WEAR, AND WEATHER INTRUSION.R9

NEW 8" MAIN ROOF DRAIN AND LEADER CONNECTS TO EXISTING DRAINAGE PIPE IN ROOF CAVITY.

NEW 6" RAISED BACKUP ROOF DRAIN AND NEW DRAIN PIPE IN ROOF CAVITY TERMINATES AT WALL FASCIA.

REMOVE EXISTING EPDM ROOFING OVER ENTIRETY OF ROOF EXPANSE.

CLEAN STRUCTURAL ROOF DECK OF ALL DEMOLITION DEBRIS AND PREPARE FOR NEW SUBSTRATE.

VISUALLY INSPECT GUTTER MATERIALS FOR DAMAGERS, EXCESSIVE WEAR AND REPLACE AND RE-SEAM

SEGMENTS AS NEEDED.

R10

PREFINISHED METAL DUAL RAIL ROOF-MOUNTED SNOW GUARDR11

TRUE

NORTH

PLAN

NORTH

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date Checked

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

35% SUBMITTAL

SS DA

REPLACE ROOFS AT VA LYONS CAMPUS 561A4-22-106

V.A.M.C., NEW JERSEY

01-22-2024

BUILDING 143 ROOF PLAN - EXISTING CONDITIONS AND NEW

SCOPE PLANS

AE161

1/16" = 1'-0"AE161

1 ROOF VIEW PLAN - BLDG 143

SCALE:

0' 8' 16' 32' 48'

1/16" = 1' - 0"

1st Floor Level (Bldg 143) - 291.0'

2nd Floor Level (Bldg 143) - 305.17''

9'

0"

3rd Floor Level (Bldg 143) - 319.17''

Roof Bearing Level (Bldg 143) - 328.17''

2 5 2 4

3 3

44 5

NOTE: BUILDING FACADE ELEMENTS NOT NOTED

INTENDED FOR CONCEPTUAL REPRESENTATION

OF EXISTING CONDITIONS ONLY.

1st Floor Level (Bldg 143) - 291.0'

2nd Floor Level (Bldg 143) - 305.17''

3rd Floor Level (Bldg 143) - 319.17''

Roof Bearing Level (Bldg 143) - 328.17''

9'

0"

5 4

22 4

6 56

BLDG 143

ELEVATION KEYNOTES

(NOT USED)

NEW 30 YEAR ARCHITECTURAL ROOF SHINGLES

REPLACE EXISTING METAL DOWNSPOUTS AND DECORATIVE LEADER BOX WITH NEW PREFINISHED ALUMINUM DOWNSPOUTS AND LEADER BOXES. FIELD VERIFY EXISTING LOCATIONS. MATCH PREVIOUS METAL COLOR FINISH.

REPLACE EXISTING METAL GUTTER AS NEEDED DEPENDING ON CURRENT MATERIAL SURFACE QUALITY.

CONTINUOUS RIDGE VENT, INSTALL PER MANUFACTURER INSTRUCTIONS.

TO PROVIDE 14.8 SQ IN MIN OF NET FREE-AIR VENTILATION PER LINEAR FT.

PREFINISHED METAL DUAL RAIL ROOF-MOUNTED SNOW GUARD

REPLACE EXISTING WALL MOUNTED METAL ROOF DRAIN LEADER DOWNSPOUTS WITH NEW PREFINISHED ALUMINUM

ROOF DRAIN LEADER AND INTEGRATED OVERFLOW CONDUCTOR HEADAND AND DOWNSPOUTS.

FIELD VERIFY EXISTING LOCATIONS. MATCH PREVIOUS METAL COLOR FINISH.

7 REPLACE EXISTING METAL DOWNSPOUTS WITH NEW PREFINISHED ALUMINUM DOWNSPOUTS, 3"X4" TYPICAL.

FIELD VERIFY EXISTING LOCATIONS. MATCH PREVIOUS METAL COLOR FINISH.

1st Floor Level (Bldg 143) - 291.0'

2nd Floor Level (Bldg 143) - 305.17''

3rd Floor Level (Bldg 143) - 319.17''

Roof Bearing Level (Bldg 143) - 328.17''

9'

0"

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

Date:

Drawing Title:

Approved Project Director

Project Title:

1 2 3 4 5 6 7 8 9

590 MEANS ST NW

Phase Project Number

Building Number

Drawing NumberLocation

Issue Date Checked

STAMP

STE. 200

ATLANTA, GA 30318

ARCHITECT/ENGINEER OF RECORDCONSULTANT

A

B

C

D

E

F

U.S. Department of Veterans Affairs

Office of Construction and

Facilities Management

Drawn

35% SUBMITTAL

SS DA

REPLACE ROOFS AT VA LYONS CAMPUS 561A4-22-106

V.A.M.C., NEW JERSEY

01-22-2024

BUILDING 143 ROOF PLAN AND EXTERIOR ELEVATIONS -

EXISTING CONDITIONS AND NEW SCOPE PLANS

AE162

1/16" = 1'-0"AE162

1 BLDG 143 - FRONT ELEVATION (SOUTH)

1/16" = 1'-0"AE162

2 BLDG 143 - SIDE ELEVATION (WEST), EAST SIDE ELEVATION MIRRORED

SITE KEY PLAN

1/16" = 1'-0"AE162

4 BLDG 143 - REAR ELEVATION (NORTH)

SCALE:

0' 8' 16' 32' 48'

1/16" = 1' - 0"

Sheets
AE101 - BUILDING 19, 25, AND 26 ROOF PLAN. EXISTING CONDITIONS AND NEW SCOPE PLANS
AE111 - BUILDING 19 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE121 - BUILDING 25 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE131 - BUILDING 26 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE141 - BUILDING 53 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE PLANS
AE142 - BUILDING 53 - EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE151 - BUILDING 54 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE PLANS
AE152 - BUILDING 54 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE161 - BUILDING 143 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE PLANS
AE162 - BUILDING 143 ROOF PLAN AND EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE PLANS
AE171 - BUILDING 14 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE
AE172 - BUILDING 14 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE181 - BUILDING 141 ROOF AND ELEVATION VIEWS - EXISTING CONDITIONS AND NEW SCOPE
AE191 - BUILDING 13 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE PLAN
AE192 - BUILDING 13 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE201 - BUILDING 135 ROOF PLAN - EXISTING CONDITIONS AND NEW SCOPE PLANS
AE202 - BUILDING 135 EXTERIOR ELEVATIONS - EXISTING CONDITIONS AND NEW SCOPE
AE501 - WALL SECTIONS AND ENLARGED DETAILS
AS101 - PROJECT SITE PLAN
GI000 - COVER SHEET
GI002 - NOTES, ABBREVIATIONS AND LEGENDS