Attachment 2 - 539-21-104 CD Drawings 8-19-2021.pdf
PDF 27 MB Posted
- Attached to
- Z1DA--Upgrade Air Handler Units 539-21-104 Federal contract opportunity
- Solicitation number
- 36C25021B0059
About this file
This solicitation is for project #539-21-104 to upgrade air handler units at the Veterans Administration Cincinnati VAMC. The project magnitude is between $5,000,000.00 and $10,000,000.00, with a NAICS code of 238220 and business size standard of $16.5 million. The solicitation will be issued as a 100% set-aside for small business with a preference for service-disabled veteran-owned small businesses. Interested offerors must be registered and verified in VIP and SAM databases. Offerors must demonstrate no more than three serious or one repeat or willful OSHA or EPA violations in the past three years, and an experience modification rate of 1.0 or less. The duration of the project shall not exceed 730 calendar days from receipt of the notice to proceed. Bonds in the form of offer, payment, and performance will be required. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the agency issuing this solicitation.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P A
R K
IN
G
G A
R A
G E
V
IN
E S
T
GOODMAN ST
SHIELD ST
N
PRIMARY CONTRACTOR
STAGING / CRANE STAGING
PRIMARY CONTRACTOR
STAGING / CRANE STAGING
SECONDARY CONTRACTOR
STAGING / CRANE STAGING
SITE NOTE: CRANE SHALL NOT BE ON
SITE DURING WEEKDAYS
V in e S t
Department of Veteran Affairs Medical Campus
Goodman St
Interstate 71
Martin Luther King Dr E
R ea di ng
R d
Je ffe rs on
A ve
E d e n A v e
Albert Sabin Way
B u rn e t
A v e
Shield St N
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:4
A
M
GI001
COVER SHEET/SHEET INDEX
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
VICINITY MAP
CINCINNATI VAMC
UPGRADE AIR HANDLER UNITS
DEPARTMENT OF VETERANS AFFAIRS
3200 Vine St, Cincinnati, OH 45220
REGIONAL VICINITY MAP
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR
SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT.
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO THEIR
ORIGINAL CONDITION AT THE END OF THE PROJECT.
6. MAINTAIN THE BUILDING IN A WEATHER TIGHT CONDITION AT ALL TIMES.
7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.
8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT
THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK
AREAS ADJACENT TO OCCUPIED SPACES.
9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR
DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE
SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS
WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT
PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS
RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND
FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE
AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT
REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL
CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT. THE CONTRACTOR SHALL NOT PROCEED WITH
WORK UNTIL WRITTEN CLARIFICATION FROM THE ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS OF THESE DOCUMENTS AND
THE MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY
STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO
OBTAIN A MINIMUM STANDARD OF QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS
LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS. COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR
AROUND THE CONSTRUCTION SITE..
11. COORDINATE ALL WORK WITH ALL OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING & SITE DRAWINGS.
EXACT SIZE AND LOCATION OF ALL ROOF AND FLOOR OPENINGS SHOWN ON ARCHITECTURAL DRAWINGS SHALL BE VERIFIED WITH THE ASSOCIATED
SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
12. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF CONSTRUCTION.
13. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES AND DIMENSIONS. NOTIFY ARCHITECT OF ANY
DISCREPANCIES.
14. WITHIN ALL METAL STUD PARTITIONS, THE GENERAL CONTRACTOR IS TO PROVIDE BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND
ACCESSORIES INCLUDING BUT NOT LIMITED TO: MECHANICAL, ELECTRICAL AND PLUMBING DEVICES, FURNITURE, CASEWORK, MILLWORK AND ALL
OTHER WALL MOUNTED ACCESSORIES AND ITEMS. THE LOCATIONS, MOUNTING HEIGHTS AND BLOCKING REQUIREMENTS SHOWN HEREON ARE GIVEN
FOR INFORMATIONAL PURPOSES ONLY AND IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO VERIFY THIS INFORMATION WITH THE
ASSOCIATED SUB-CONTRACTORS, MANUFACTURERS, OR EQUIPMENT SUPPLIERS. SEE TYPICAL BLOCKING DETAILS IN METAL STUD WALLS INCLUDED
IN THESE DOCUMENTS FOR BLOCKING AND ANCHORING REQUIREMENTS.
15. ALL CONCEALED WOOD SHALL BE FIRE RETARDANT TREATED.
16. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND
PLUMBING, TO DETERMINE THE SIZE AND LOCATION OF ALL PENETRATIONS IN NEW CONSTRUCTION. COORDINATE AND PROVIDE ALL OPENINGS. SEAL
CONSTRUCTION TIGHT TO ALL PENETRATIONS AND CAULK.
17. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH THE SPECIFICATIONS.
18. PROVIDE CONTROL JOINTS IN GYPSUM WALLBOARD INTERIOR PARTITIONS AT 30 FEET ON CENTER MAXIMUM. WHERE POSSIBLE, LOCATE AT CORNERS
ABOVE OPENINGS. VERIFY LOCATIONS WITH ARCHITECT. SEE THE ASSOCIATED TYPICAL DETAILS INCLUDED IN THESE DOCUMENTS.
19. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, OWNER AND ARCHITECT PRIOR TO CONSTRUCTION.
20. CONTRACTOR TO PROVIDE A PROJECT SCHEDULE STATING DAY, MONTH AND YEAR FOR EACH AIR HANDLER’S REPLACEMENT, REMOVAL OR
MODIFICATIONS. VA COR MAY DIRECT THE CONTRACTOR TO MODIFY THE SCHEDULE FOR WHEN UNITS ARE REPLACED AND/OR INSTALLED TO MEET
THE SEASONAL OPERATIONAL NEEDS OF THE MEDICAL CENTER. CONTRACTOR TO SUBMIT AHU REPLACEMENT, REMOVAL OR MODIFICATIONS
SCHEDULE TO THE VA COR FOR APPROVAL PER “THE COMPLETE PROJECT SCHEDULE SUBMITTAL” PARAGRAPH REQUIREMENT IN SECTION 01 32 16.15
PROJECT SCHEDULES.
15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE
CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK.
16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER
DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.
17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL
INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.
18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED IN THE FINAL
CONSTRUCTION.
19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW
MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE
PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING
MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW
CONDITION TO MATCH THE EXISTING FINISH.
21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE
OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING
UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.
23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE END OF
CONSTRUCTION OPERATIONS FOR EACH DAY.
24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT CRITICAL STRUCTURAL
MEMBERS ARE NOT DAMAGED.
25. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.
G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S
G E N E R A L N O T E S - N E W W O R K :
SITE MAP
539-21-104
D R A W I N G I N D E X
Sheet Number Sheet Name
GENERAL
GI001 COVER SHEET/SHEET INDEX
GI100 GENERAL NOTES AND DETAILS
STRUCTURAL
1-SF501 STRUCTURAL DETAILS
ARCHITECTURAL
1-AD150 DEMOLITION ROOF PLAN
1-A102 LOGISTICS SUITE EXISTING
1-A102a LOGISTICS PHASE 1
1-A102b LOGISTICS PHASE 2
1-A102c LOGISTICS PHASE 3
1-A141 REFLECTED CEILING PLANS - FIRST FLOOR
1-A142 REFLECTED CEILING PLANS - SECOND FLOOR
1-A142a LOGISTICS SUITE REFLECTED CEILING PLAN - PHASE 1
1-A142b LOGISTICS SUITE REFLECTED CEILING PLAN - PHASE 2
1-A142c LOGISTICS SUITE REFLECTED CEILING PLAN - PHASE 3
1-A143 REFLECTED CEILING PLANS - THIRD FLOOR
1-A145 REFLECTED CEILING PLAN - FIFTH FLOOR
1-A150 OVERALL ROOF PLAN
1-A151 ENLARGED ROOF PLANS
1-A152 ENLARGED ROOF PLANS
1-A153 ROOF DETAILS
MECHANICAL
M001 MECHANICAL LEGEND
1-M1SB MECHANICAL SUB-BASEMENT DEMOLITION & NEW WORK PLANS
1-MD100A MECHANICAL BASEMENT DEMOLITION PLANS
1-MD101 MECHANICAL FIRST FLOOR DEMOLITION PLAN
1-MD102A MECHANICAL SECOND FLOOR DEMOLITION PLAN
1-MDH102B MECHANICAL SECOND FLOOR DUCTWORK DEMOLITION PLAN
1-MDP102B MECHANICAL SECOND FLOOR PIPING DEMOLITION PLAN
1-MD104A MECHANICAL THIRD AND FOURTH FLOOR DEMOLITION PLAN
15-MDT102 BUILDING 15 SECOND FLOOR PLAN - REMOVALS & TEMPORARY UTILITIES
1-MT102A MECHANICAL SECOND FLOOR PHASING PLAN
1-MT102B MECHANICAL SECOND FLOOR PHASING PLAN
1-MT104C MECHANICAL FOURTH FLOOR TEMPORARY UTILITIES PLAN
1-MT105 MECHANICAL FIFTH FLOOR NEW WORK PLAN
1-M100A MECHANICAL BASEMENT NEW WORK PLAN
1-M100B MECHANICAL BASEMENT DEMOLITION AND NEW WORK PLANS
1-M101 MECHANICAL FIRST FLOOR NEW WORK PLAN
1-M102A MECHANICAL SECOND FLOOR NEW WORK PLAN
1-MH102B MECHANICAL SECOND FLOOR DUCTWORK NEW WORK PLANS
1-M103 MECHANICAL THIRD FLOOR DEMOLITION & NEW WORK PLANS
1-M104A MECHANICAL THIRD AND FOURTH FLOOR NEW WORK PLAN
1-M104B MECH FOURTH AND FIFTH FLOOR DEMOLITION AND NEW WORK PLANS
1-M104C MECHANICAL FOURTH FLOOR DEMOLITION & NEW WORK PLANS
1-M108 MECHANICAL ROOF PLAN - AHU-1,2,3
1-M109 MECH NINTH & ELEVENTH FLOOR DEMOLITION & NEW WORK PLANS
1-MP102B MECHANICAL SECOND FLOOR PIPING NEW WORK PLAN
15-MH102 MECHANICAL SECOND FLOOR NEW WORK PLANS
M501 MECHANICAL DETAILS
M502 MECHANICAL DETAILS
M503 MECHANICAL DETAILS
M504 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M602 MECHANICAL SCHEDULES
M603 MECHANICAL SCHEDULES
M604 MECHANICAL SCHEDULES
M701 MECHANICAL CONTROLS DIAGRAMS
M702 MECHANICAL CONTROLS DIAGRAMS
M703 MECHANICAL CONTROLS DIAGRAMS
M704 MECHANICAL CONTROLS DIAGRAMS
M705 MECHANICAL CONTROLS DIAGRAMS
ELECTRICAL
E001 ELECTRICAL LEGEND, NOTES
1-EP1SB ELECTRICAL SUB-BASEMENT DEMOLITION & NEW WORK PLANS
1-EP100A ELECTRICAL BASEMENT DEMOLITION & NEW WORK PLANS
1-EP100B ELECTRICAL BASEMENT DEMOLITION & NEW WORK PLANS
1-EP101 FIRST FLOOR ELECTRICAL PLAN
1-EP102A ELEC SECOND & THIRD FLOOR DEMOLITION & NEW WORK PLANS
1-EP102B SECOND FLOOR ELECTRICAL PLAN
1-EP103 THIRD FLOOR ELECTRICAL PLAN
1-EP104A ELEC FOURTH & FIFTH FLOOR DEMOLITION & NEW WORK PLANS
1-EP104B ELECTRICAL FOURTH FLOOR DEMOLITION & NEW WORK PLANS
1-EP104C FOURTH FLOOR ELECTRICAL PLAN
1-EP105 FIFTH FLOOR ELECTRICAL PLAN
1-EP109 ELEC NINTH & 10TH-11TH FLOOR DEMOLITION & NEW WORK PLANS
15-ED102 15-ED102 - ELECTRICAL SECOND FLOOR DEMOLITION PLAN
15-EP102 15-EP102 - ELECTRICAL SECOND FLOOR NEW WORK PLAN
E500 PANEL SCHEDULES
E501 PANEL SCHEDULES
E502 EQUIPMENT AND LIGHTING SCHEDULES
E600 RISER DIAGRAMS
E601 RISER DIAGRAMS
Revisions: Date: 1616637 EXPIRES 12/31/21
PATRICK R. QUINN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:0
:4
A
M
GI100
GENERAL NOTES AND DETAILS
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
Revisions: Date:
DUE TO THE LOCATION OF RENOVATION WORK INDICATED (VAMC SPS DEPARTMENT) CONSTRUCTION IS WITHIN THE HIGHEST INFECTION RISK CATEGORY. THE INFECTION AND DUST CONTROL PLANS SHALL BE
DISTRIBUTED AND APPLIED BY ALL CONTRACTORS PERFORMING WORK ON THIS PROJECT.
A. REFER TO PHASING PLANS AND SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS FOR
ADDITIONAL INFECTION CONTROL INFORMATION.
B. COORDINATE ALL WORK ASSOCIATED WITH PROJECT FOLLOWING THE SITE-SPECIFIC INFECTION
CONTROL RISK ASSESSMENT PUBLISHED BY THE VAMC.
C. AREAS ADJACENT TO IMMEDIATE (PHASED) WORK AREAS WILL BE FULLY OCCUPIED AND
FUNCTIONING NORMALLY THROUGHOUT THE CONSTRUCTION PERIOD.
D. THERE WILL BE ZERO TOLERANCE FOR ANY DUST MIGRATION OUTSIDE OF THE IMMEDIATE WORK
SITE AREAS IDENTIFIED BY PHASING PLANS.
E. ALL WORK OCCURRING WITHIN THE SURGERY DEPARTMENT MUST BE PERFORMED OUTSIDE OF
NORMAL VAMC WORKING HOURS.
F. CONTRACTOR SHALL PROVIDE FOR PROFESSIONAL TERMINAL CLEANING OF PHASED WORK AREAS
PRIOR TO TURNING OVER TO THE VAMC FOR OCCUPANCY.
G. EXTERIOR DEMOLITION ACTIVITIES (INCLUDES CUTTING AND PATCHING):
a. EVALUATE EXISTING SITE CONDITIONS TO DETERMINE THE PRESENCE OF ANY OUTSIDE AIR
INTAKES WITHIN 20' OF THE PROPOSED EXTERIOR WORK.
b. IF PRESENT - DETERMINE IF THE IMPACTED EXTERIOR AREAS OF THE FACILITY CAN OPERATE
TEMPORARILY ON RECIRCULATED AIR VS. OUTSIDE AIR.
• IF FEASIBLE - SEAL OFF AIR INTAKES WITHIN 20' OF DUST GENERATING WORK.
• IF NOT FEASIBLE - ROUTINELY CHECK THE LOW-EFFICIENCY FILTER BANKS LOCATED IN LINE
WITH ADJACENT AIR INTAKE(S) AND REPLACE AS NEEDED TO REDUCE PARTICULATE BUILD-UP.
c. SEAL WINDOWS AND REDUCE OTHER SOURCES OF OUTSIDE AIR INTRUSION (OPEN DOORS IN
STAIRWELLS AND CORRIDORS) THAT MAY BE IMPACTED BY CONSTRUCTION. PAY SPECIAL
ATTENTION TO PROTECTIVE ENVIRONMENT (PE) AREAS.
H. INTERIOR DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS CONTROL:
a. BARRIER SYSTEMS: PHASED AREAS OF WORK SHALL BE ISOLATED FROM ADJACENT AREAS WITH
1 -HR. RATED DUST PARTITIONS.
b. DUST PARTITIONS TO BE METAL FRAMED WITH GYPSUM WALL BOARD ON EACH SIDE. PARTITION
TO BE CONSTRUCTED EQUAL TO UL DESIGN U465.
• IN LIEU OF SITE BUILT DUST PARTITIONS, CONTRACTOR MAY UTILIZE PRE-ENGINEERED
(MODULAR) TEMPORARY CONSTRUCTION PARTITIONS LIKE THOSE MANUFACTURED BY EDGE
GUARD PRODUCTS, 216 N. PLATT ST., BEMENT, IL 61813, TELE 217-552-5418, WEBSITE:
WWW.EDGE-GUARD.COM OR APPROVED EQUAL.
c. DUST PARTITIONS SHALL BE INSTALLED WITH A TIGHT SEAL AT FLOOR AND CEILING OR
STRUCTURE ABOVE CEILING. WHERE OPERATING ROOM DEMISING WALLS ARE SHOWN TO BE
EXTENDED UP TO STRUCTURE ABOVE - PROVIDE AIR TIGHT SEAL AT BOTH TOP OF EXISTING
DEMISING WALL (TO BE EXTENDED) AND AT STRUCTURE ABOVE.
• WHERE O.R. DEMISING WALL EXTENSIONS IMPACT EXISTING FIRE PROOFED STEEL
STRUCTURE - CONTRACTOR SHALL CAREFULLY REMOVE THE FIREPROOFING (ONLY) IN AREA
WHERE TOP WALL PLATE MEETS EXISTING STEEL. PATCH ANY FIREPROOFING DISTURBED BY
CONSTRUCTION ACTIVITIES WITH NEW FIRE PROOFING MATCHING EXISTING SYSTEM.
• AN INTERIM PLASTIC DUST BARRIER (MINIMUM 6-MIL THICKNESS) SHALL BE INSTALLED TO PROTECT ADJACENT AREAS WHILE THE IMPERVIOUS (1-HR. RATED) DUST PARTITION IS BEING
CONSTRUCTED.
d. ANY DUST GENERATED FROM DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE IMMEDIATELY
CLEANED IF TRACKED OR FOUND OUTSIDE OF THE CONSTRUCTION PHASE PERIMETER.
e. CONTRACTOR PERSONNEL SHALL MONITOR DUST PARTITION CONDITION AND PERFORM
MAINTENANCE - DURING PHASED DEMOLITION AND CONSTRUCTION ACTIVITIES.
f. UPON COMPLETION OF CONSTRUCTION ACTIVITIES, DUST PARTITIONS SHALL BE CAREFULLY
REMOVED TO MINIMIZE THE SPREAD OF DUST.
• CONTRACTOR SHALL INSTALL INTERIM PLASTIC DUST BARRIERS (MINIMUM 6-MIL THICKNESS)
PRIOR TO THE REMOVAL OF DUST PARTITIONS.
I. TRAFFIC CONTROL:
a. PHASED SITE ACCESS SHALL HAVE DEFINED ENTRY AND EXIT PROCEDURES. EGRESS PATHS AND
BE FREE OF DEBRIS, TOOLS, EQUIPMENT, OR CONTAINERS.
b. DESIGNATED ELEVATORS SHALL ONLY BE USED DURING SCHEDULED TIME PERIODS AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE CONSTRUCTION ZONE.
COORDINATE ELEVATOR ACCESS WITH THE VAMC THROUGH THE COR.
c. INSTALL SIGNAGE TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM THE CONSTRUCTION AREAS.
J. DEMOLITION DEBRIS:
a. ALL DEBRIS GENERATED BY PROJECT SHALL BE REMOVED IN CARTS WITH TIGHTLY FITTING COVERS, USING DESIGNATED TRAFFIC ROUTES. EFFORTS SHALL BE MADE TO MINIMIZE THE USE
OF ELEVATORS SHARED BY PATIENTS OR STAFF. PERFORM TRANSPORT OF DEBRIS AT TIMES
DIRECTED BY THE VAMC THROUGH THE COR. IF EXTERIOR TRASH CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE USED AND THE CHUTE OPENING SEALED WHEN NOT IN USE. USED FILTERS SHALL BE
BAGGED AND SEALED BEFORE TRANSPORTING OUT OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR
APPROVAL OF THE VAMC.
K. VENTILATION AND ENVIRONMENTAL CONTROLS:
a. AIR SYSTEM FLOW: DETERMINE IF CONSTRUCTION AREA USES FRESH/OUTSIDE OR
RECIRCULATED AIR. ADD FILTERS AND/OR COVER RETURN GRILLS WITH FILTER MATERIAL OR
PLASTIC. AIR MUST (ONLY) FLOW IN THE DIRECTION OF CLEAN AREAS TO DIRTY AREAS.
b. NEGATIVE AIR PRESSURE: AIR WITHIN THE CONSTRUCTION AREAS (PHASES) MUST BE
MAINTAINED AT NEGATIVE PRESSURE WITH RESPECT TO SURROUNDING AREAS. NO DISRUPTION
OF AIR SYSTEMS OF ADJACENT AREAS IS ALLOWED DURING PERIODS OF VAMC OCCUPANCY OF
ADJACENT AREAS. THE NEGATIVE AIR PRESSURE SYSTEM WITHIN THE ENCLOSED PHASES SHALL
EXHAUST DIRECTLY OUTSIDE.
• DUST PARTITIONS SHALL BE OUTFITTED WITH CONTINUOUS AIR PRESSURE MONITORING
DEVICES WITH 24/7 READ OUT AND LOGGING. BASIS OF DESIGN FOR AIR PRESSURE
MONITORING DEVICE IS PHOENIX CONTROLS APM II, OR EQUAL.
L. WORKSITE CLOTHING AND CLEANING:
a. CONTRACTOR PERSONNEL CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS BEFORE
ENTERING OR LEAVING THE CONSTRUCTION AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G.
COVERALLS, FOOTGEAR, AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO
REMOVE DUST FROM CLOTHING BEFORE LEAVING THE PHASED CONSTRUCTION AREA. IF
PROTECTIVE APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE AS AN
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT.
b. ALL EQUIPMENT, TOOLS, CARS, MATERIALS, ETC. TRANSPORTED THROUGH NORMALLY OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WET MOPPING
BEFORE THEIR REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
c. THE CONSTRUCTION ZONE MUST BE MAINTAINED IN A CLEAN MANNER BY CONTRACTORS. SWEEP OR HEPA-VACUUM CONSTRUCTION AREA DAILY - OR MORE FREQUENTLY AS NEEDED TO MINIMIZE
DUST. ADJACENT AREAS IMPACTED BY CONSTRUCTION SHOULD BE DAMP MOPPED DAILY OR
MORE FREQUENTLY AS NEEDED. WALK-OFF MATS WITH TACKY OR ADHESIVE SURFACES SHOULD
BE UTILIZED TO MINIMIZE TRACKING OF DIRT AND DUST FROM CONSTRUCTION AREAS.
GENERAL ICRA NOTES
A. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION
SYSTEM.CONTRACTOR TO ASSUME UP TO 10% OF THE SPRINKLER HEADS ON EACH FLOOR IN THE SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE REMOVED AND REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE SPRINKLER PIPING SHALL BE PROVIDED AS
NECESSARY FOR SERVICE TO NEW SPRINKLER HEADS.
B. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.
C. REFER TO SPECIFICATION 21 13 13 FOR SPRINKLER HEAD AND PIPING REQUIREMENTS.
D. FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER ACCESSORIES AS REQUIRED TO PROVIDE A
COMPLETE INSTALLATION AND TO ELIMINATEINTERFERENCE WITH OTHER CONSTRUCTION.
E. REFER TO ARCHITECTURAL DRAWINGS FOR REFLECTED CEILING PLANS, SMOKE PARTITIONS, AND CONSTRUCTION. COORDINATE SPRINKLER LOCATIONS WITH ALL CEILING DEVICES. ADHERE TO ALL
HAZARD CLASSIFICATIONS SHOWN.
F. SPRINKLERS SHALL BE QUICK RESPONSE CHROME PLATED RECESSED PENDANT TYPE EXCEPT
AREAS NOTED ON PLANS TO HAVE ANTI-LIGATURE SPRINKLERS.
G. PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC CALCULATION.
H. EXISTING SPRINKLER SYSTEM AND ALL ASSOCIATED EQUIPMENT SHALL BE MAINTAINED FULLY
OPERATIONAL UNTIL THE NEW EQUIPMENT HAS BEEN TESTED AND ACCEPTED BY THE VA. THE
EXISTING SPRINKLER SYSTEM AND EQUIPMENT CAN BE TAKEN OUT OF SERVICE ONLY DURING
CONSTRUCTION PERIODS IN WHICH THE SPRINKLER SYSTEM IS BEING MODIFIED AND THE
CONTRACTOR IS AT THE WORK SITE. PRIOR TO LEAVING THE WORK SITE EACH DAY, THE
CONTRACTOR SHALL RESTORE THE SPRINKLER SYSTEM TO SERVICE. ALL AREAS OUTSIDE OF THE PROJECT CONSTRUCTION AREA SHALL HAVE THEIR EXISTING FIRE PROTECTION SPRINKLER SYSTEM
IN FULL SERVICE PRIOR TO LEAVING THE WORK SITE EACH DAY OR A FIRE WATCH SHALL BE
ESTABLISHED AT THE CONTRACTOR’S EXPENSE UNTIL THE SYSTEM IS RETURNED TO FULL
COVERAGE AND OPERATION. COORDINATE ALL NECESSARY SYSTEM SHUTDOWNS WITH VA COR
MINIMUM TWO WEEKS IN ADVANCE OF SHUTDOWN.
I. CONTRACTOR TO DETERMINE ASSOCIATED SPRINKLER ZONE BOUNDARIES IN AREAS OF WORK.
GENERAL FIRE PROTECTION NOTES
6X6-W1.4XW1.4 WWF
W/ 4" CONCRETE
.6C, CSV CONFORM
NON-COMPOSITE DECK
(ASTM A653)
/2
EXISTING SLAB & DECK
1/2" EPOXY ANCHOR
W/ 2-3/4" EMBED. @ 12" O.C.
(MIN. 2 ANCHORS EACH SIDE)
MAX. 16"
SEE PLAN
L4X3 (LLV)
/2
EX. 18X18" DUCT
PENETRATION TO REMAIN
E X
W
X
NEW DUCT PENETRATION
L4X4X1/4
L X
X
/4
L X
X
/4
L4X4X1/4
INFILL EXISTING OPENING
REFER TO SLAB INFILL DETAIL
3' - 1 1/2" 1' - 10"
E X
W
X
10"
1-SF501
1-SF501
/8
FG
INFILL EXISTING EXHAUST FAN PENETRATIONS
SEE SLAB INFILL DETAIL
REFER TO MECHANICAL FOR LOCATION
ROOF
3/16
EA. END
OPENING
1' - 10"
TIE BEAM TO DECK W/ 3/8" ANCHORS
(HILTI KH-EZ C OR EQUAL) W/ 2-1/2"
EMBED. @ 12" O.C.
EX. SLAB TIE BEAM TO DECK W/ 3/8" ANCHORS
(HILTI KH-EZ C OR EQUAL) W/ 2-1/2"
EMBED. @ 12" O.C.
(MIN. 3 PER SIDE)
OPENING
2' - 2"
EX. SLAB
(TYP.)
2 1/2"
1-SF501
Sim
1-SF501
Sim
EX. W12X19
EX. W12X19
NOTE:
1. PENETRATION LOCATION IS IN THE MENS LOCKER ROOM C324B. SEE
MECHANICAL DRAWINGS.
E X
W
X
L X
X
/4
L X
X
/4
L4X4X1/4
NEW DUCT PENETRATION
1' - 6" 6' - 5 11/16"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:0
:4
A
M
1-SF501
STRUCTURAL DETAILS
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
3/4" = 1'-0"
SLAB INFILL DETAIL
1/2" = 1'-0"
FOURTH FLOOR PENETRATIONS - PENTHOUSE
1/4" = 1'-0"
ROOF PENETRATIONS - 4TH FLOOR LEVEL
1/2" = 1'-0"
SECTION
1/2" = 1'-0"
SECTION
A. ALL READY MIXED CONCRETE SHALL CONFORM TO ASTM C94.
B. ALL CONCRETE SHALL DEVELOP THE COMPRESSIVE
STRENGTHS AT 28 DAYS (F`c) = 3000 psi UNLESS NOTED
OTHERWISE.
C. PROCEDURES FOR PLACEMENT OF CONCRETE SHALL BE IN
STRICT CONFORMANCE WITH ACI 304 "RECOMMENDED
PRACTICE FOR MEASURING, MIXING, TRANSPORTING, AND
PLACING CONCRETE".
D. ALL STRUCTURAL STEEL TO BE ASTM A36. ALL WIRE MESH
SHALL BE ASTM A1064.
G E N E R A L N O T E S
EMBED. EMBEDMENT
EX. EXISTING
SIM SIMILAR
V.I.F. VERIFY IN FIELD
ABBREVIATIONS
1/2" = 1'-0"
THIRD FLOOR PENETRATION - CORRIDOR
Revisions: Date:
CD SUBMITTAL 04/23/2021
DN
LMNOPQ
8a
Ma
NbPbQb
La
Mb Lb
1 1 2
TYP.
TYP
TYP
TYPTYP
TYP
MB-2-SECOND
FLOOR
739' - 11"
MB-3-THIRD
FLOOR
750' - 11"
P Q
MNOPQR
8a
Ma
NbPbQb
Mb
1/1-AD150
A/C Shaft
Stair 2
S*2*2
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
LKRS.
A227A Shower
A227
TB/ MYC Lab
B210B Dir. Off.
B205 Off.
B207A Corridor
C*2*17
Off.
B207BOff.
B207C
Micro Reading
B208
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:0
:3
A
M
1-AD150
DEMOLITION ROOF PLAN
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
THIRD FLOOR ROOF DEMOLITION PLAN
D R A W I N G N O T E S
1 REMOVE EXISTING ROOF CURB SHOWN AS HATCHED. COORDINATE REMOVAL WITH NEW WORK.
2 REMOVE EXISTING MECHANICAL EQUIPMENT SHOWN AS DASHED.
3 EXISTING MECHANICAL EQUIPMENT TO REMAIN.
4 REMOVE EXISTING CANT, FLASHING, AND COPING.
5 REMOVE EXISTING BUILT-UP BALLASTED ROOFING, FULL EXTENT OF ROOF SURFACE - REMOVE ALL ASSOCIATED
FLASHING, COPINGS, AND FASCIAS U.O.N.
6 REMOVE EXISTING GUARDRAIL SHOWN AS DASHED.
7 DEMOLISH AND PATCH SHEET METAL DOGHOUSE ADDITION
G E N E R A L N O T E S
1/4" = 1'-0"
AC SHAFT DEMOLITION ELEVATION
1/8" = 1'-0" A
SECOND FLOOR ROOF DEMOLITION PLAN
A. SEE MECHANICAL DEMOLITION PLANS FOR THE EXTENT OF EQUIPMENT BEING REMOVED.
B. MINIMUM ROOF SLOPE SHALL BE 1/8” = 1’-0” - MAINTAIN MINIMUM 3" OF INSULATION. MATCH
ELEVATION WHERE TYING INTO EXISTING.
C. THE ROOFING SYSTEM SHALL BE COMPLETELY WATERTIGHT AT THE END OF EACH DAY’S
CONSTRUCTION ACTIVITY. IF TEMPORARY ROOFING STRATEGIES ARE USED, MATERIALS INSTALLED
SHALL SERVE THE SAME FUNCTION AS EXISTING MATERIALS AND WILL BE COMPATIBLE WITH
EXISTING ROOF SYSTEM.
D. CONTRACTOR SHALL RELOCATE EXISTING SURFACE-MOUNTED LIGHTNING PROTECTION SYSTEM.
REINSTALL SYSTEM AT COMPLETION OF ROOF WORK IN EACH ROOF AREA. CONTRACTOR SHALL
RECERTIFY ENTIRE LIGHTNING PROTECTION SYSTEM AT CONCLUSION OF PROJECT.
E. SEE ASBESTOS ABATEMENT REPORT AND SPECIFICATIONS FOR ABATEMENT WORK.
F. EXISTING PLUMBING VENTS ARE NOT SHOWN ON ROOF PLAN BUT SHALL BE INCLUDED IN THE PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING SYSTEM REQUIREMENTS.
G. MISCELLANEOUS CONDUITS THRU ROOF SLABS AT MECHANICAL UNITS ARE NOT SHOWN BUT SHALL
BE INCLUDED IN THE PROJECT BID AND COMPLETED ACCORDING TO DETAILS AND/OR ROOFING
SYSTEM REQUIREMENTS.
H. CONTRACTOR SHALL VERIFY EXTENT OF UNUSED CURBS IN PROJECT AT AREAS OF ROOF
REPLACEMENT. ALL UNUSED CURBS SHALL BE REMOVED. INFILL AT OPENING WITH NON-COMPOSITE
METAL DECKING OVER STEEL FRAMING. SEE STRUCTURAL DRAWINGS FOR DETAIL.
I. EXISTING FLASHING SHALL REMAIN UNLESS NOTED OTHERWISE. SEE DETAILS.
T
D
80" MH
LMNO
8a
16a
K
KbMaNb
LaMb Lb
10a
43 29
45 33
3546 34
14 9
56 55
12363738
T
78 90
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202AF. Lkrs.
B203
Dir. Off.
B205 Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207BOff.
B207C
Pathology Off.
B209
Micro Reading
B208
HAC
B204
Corridor
C*2*25
LMNO
8a
16a
K J
Kb
Kb
Ma
La
Mb Lb
16b
10a
1-A153
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
Slide Stor.
B202A
F. Lkrs.
B203
Elec.
B206Pathology
Off.
B209
HAC
B204
Corridor
C*2*25
G E N E R A L N O T E S
A. ROOM TAGS AND SHELVING UNITS IN FULL TONE CONSTITUTE THE ROUGH AREA OF
SCOPE PER EACH PHASE.
B. REFER TO A141, A142, AND A143 FOR CEILING SCOPE ASSOCIATED WITH EACH PHASE.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK
PER PHASE.
D. EXISTING STRUCTURE TO REMAIN UNLESS NOTED OTHERWISE.
E. SEE GENERAL ICRA NOTES ON SHEET GI001 FOR ICRA AND PHASING REQUIREMENTS.
F. SEE GENERAL FIRE PROTECTION NOTES ON SHEET GI001.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:0
A
M
1-A102
LOGISTICS SUITE EXISTING
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
SECOND FLOOR PLAN - LOGISTICS PLAN - EXISTING
1/8" = 1'-0"
A
SECOND FLOOR REFLECTED CEILING PLAN - LOGISTICS - EXISTING
N
KEYPLAN
LMNO
8a
16a
K
Kb
Ma
Nb
LaMb Lb
10a
T
66 68
62 61
95 101
929293
78 -- 91 90
86 87
44 35
45 33
46 31
47 29
48 27
49 25
38 37 36
14 9
16 8
19 6
23 5
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202AF. Lkrs.
B203
Dir. Off.
B205 Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207BOff.
B207C
Pathology Off.
B209
Micro Reading
B208
HAC
B204
Corridor
C*2*25
LMNO
8a
16a
K
KbMaNb
LaMb Lb
10a
43 29
45 33
3546 34
14 9
56 55
12363738
T
78 90
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205 Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207BOff.
B207C
Pathology Off.
B209
Micro Reading
B208
HAC
B204
Corridor
C*2*25
Storage
A228B
G E N E R A L N O T E S
A. ROOM TAGS AND SHELVING UNITS IN FULL TONE CONSTITUTE THE ROUGH AREA OF
SCOPE PER EACH PHASE.
B. REFER TO A141, A142, AND A143 FOR CEILING SCOPE ASSOCIATED WITH EACH PHASE.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK
PER PHASE.
D. EXISTING STRUCTURE TO REMAIN UNLESS NOTED OTHERWISE.
E. SEE GENERAL ICRA NOTES ON SHEET GI001 FOR ICRA AND PHASING REQUIREMENTS.
F. SEE GENERAL FIRE PROTECTION NOTES ON SHEET GI001.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:1
A
M
1-A102a
LOGISTICS PHASE 1
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
SECOND FLOOR PLAN - LOGISTICS - PHASE 1 NEW WORK
1/8" = 1'-0"
A
SECOND FLOOR PLAN - LOGISTICS - EXISTING & DEMOLITION
D R A W I N G N O T E S
1 PHASE 1: RELOCATE SHELVING FROM WITHIN ROOM TO ADJACENT SPACES AS NOTED FOR DURATION OF WORK IN
ROOM.
2 PHASE 1: TEMPORARY CONSTRUCTION WALL - WALL CONSISTS OF 3 5/8" NON-STRUCTURAL METAL FRAMING TO
UNDERSIDE OF EXISTING BULKHEAD - FINISH WITH ONE LAYER OF 5/8" TYPE X GYPSUM BOARD, EACH SIDE - SEAL AT
ALL ADJACENT CONSTRUCTION.
3 PROVIDE ICRA BARRIER ACCORDING TO SAFETY SPECIFICATION FOR ICRA LEVEL 4 - PROTECT SURROUNDING SHELVING
AS NECESSARY FOR COMPLETION OF WORK. COORDINATE INSTALLATION WITH NEW WORK.
4 REMOVE PORTION OF CMU WALL SHOWN AS DASHED FOR INSTALLATION OF NEW WALL GRILLE - REFER TO MECHANICAL
AND STRUCTURAL DRAWINGS FOR LOCATIONS AND SIZE OF OPENING.
5 EXISTING MECHANICAL - SEE MECHANICAL DRAWINGS.
6 REMOVE EXISTING DOOR AND FRAME SHOWN AS DASHED.
7 REMOVE EXISTING PARTITION SHOWN AS DASHED, FULL HEIGHT.
N
LMNO
8a
16a
K
Kb
Ma
Nb
La
Mb Lb
10a
T53
104 106 dne dne
91--
52 51
40 38 37 36
44 35
45 33
46 31
47 29
48 27
49 25
14 9
18 7
19 6
23 5
Storage
A228B
Clean Supplies
B201
Dispatch Area
A236A
Off.
B207B
Off.
B207C
Corridor
C*2*17
Mech
A228C
Equipment Storage and
Testing
A228A
Office
A230
Office
A232
Office
A231
Shower
A227
LKRS.
A227A
Storage
A228B
Micro Reading
B208
Pathology Off.
B209
Off.
B207A
Dir. Off.
B205
Elec.
B206 F. Lkrs.
B203
Slide Stor.
B202A
M. Lkrs.
B202F. Tlt.
B203A
Ante Room
A223
Compressor Room
A222D
Equip Wash
A222B
G E N E R A L N O T E S
A. ROOM TAGS AND SHELVING UNITS IN FULL TONE CONSTITUTE THE ROUGH AREA OF
SCOPE PER EACH PHASE.
B. REFER TO A141, A142, AND A143 FOR CEILING SCOPE ASSOCIATED WITH EACH PHASE.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK
PER PHASE.
D. EXISTING STRUCTURE TO REMAIN UNLESS NOTED OTHERWISE.
E. SEE GENERAL ICRA NOTES ON SHEET GI001 FOR ICRA AND PHASING REQUIREMENTS.
F. SEE GENERAL FIRE PROTECTION NOTES ON SHEET GI001.
LMNO
8a
16a
K
Kb
Ma
Nb
LaMb Lb
10a
T
66 68
62 61
95 101
929293
78 -- 91 90
86 87
44 35
45 33
46 31
47 29
48 27
49 25
38 37 36
14 9
16 8
19 6
23 5
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202AF. Lkrs.
B203
Dir. Off.
B205 Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207BOff.
B207C
Pathology Off.
B209
Micro Reading
B208
HAC
B204
Corridor
C*2*25
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:3
A
M
1-A102b
LOGISTICS PHASE 2
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
SECOND FLOOR PLAN - LOGISTICS PLAN - PHASE 2 NEW WORK
D R A W I N G N O T E S
1 PHASE 2: SHELVING TO BE RELOCATED BY VA PRIOR TO BEGINNING OF NEW WORK.
2 PHASE 2: TEMPORARY WALL TO REMAIN THROUGH ENTIRE PHASE.
N
KEYPLAN
1/8" = 1'-0" A
SECOND FLOOR PLAN - LOGISTICS PLAN - BEFORE PHASE 2
T
LMNO
8a
16a
K
Kb
Ma
Nb
LaMb Lb
10a
45 33
46 31
47 29
48 27
363738
T53
104 105
DNE
94 96
92929376
78 # 91 90
86 87
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A
Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
M. Lkrs.
B202
Slide Stor.
B202A
F. Lkrs.
B203
Dir. Off.
B205 Off.
B207A
Elec.
B206
Corridor
C*2*17
Off.
B207BOff.
B207C
Pathology Off.
B209
Micro Reading
B208
HAC
B204
Corridor
C*2*25
Storage
A228B
G E N E R A L N O T E S
A. ROOM TAGS AND SHELVING UNITS IN FULL TONE CONSTITUTE THE ROUGH AREA OF
SCOPE PER EACH PHASE.
B. REFER TO A141, A142, AND A143 FOR CEILING SCOPE ASSOCIATED WITH EACH PHASE.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK
PER PHASE.
D. EXISTING STRUCTURE TO REMAIN UNLESS NOTED OTHERWISE.
E. SEE GENERAL ICRA NOTES ON SHEET GI001 FOR ICRA AND PHASING REQUIREMENTS.
F. SEE GENERAL FIRE PROTECTION NOTES ON SHEET GI001.
LMNO
8a
16a
K
Kb
Ma
Nb
La
Mb Lb
10a
T53
104 106 dne dne
91--
52 51
40 38 37 36
44 35
45 33
46 31
47 29
48 27
49 25
14 9
18 7
19 6
23 5
Storage
A228B
Clean Supplies
B201
Dispatch Area
A236A
Off.
B207B
Off.
B207C
Corridor
C*2*17
Mech
A228C
Equipment Storage and
Testing
A228A
Office
A230
Office
A232
Office
A231
Shower
A227
LKRS.
A227A
Storage
A228B
Micro Reading
B208
Pathology Off.
B209
Off.
B207A
Dir. Off.
B205
Elec.
B206 F. Lkrs.
B203
Slide Stor.
B202A
M. Lkrs.
B202F. Tlt.
B203A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:4
A
M
1-A102c
LOGISTICS PHASE 3
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
SECOND FLOOR PLAN - LOGISTICS PLAN - PHASE 3 NEW WORK
N
KEYPLAN
1/8" = 1'-0" A
SECOND FLOOR PLAN - LOGISTICS PLAN - BEFORE PHASE 3
D R A W I N G N O T E S
1 PHASE 3: SHELVING TO BE RELOCATED BY VA PRIOR TO BEGINNING OF NEW WORK.
2 PHASE 3: TEMPORARY WALL TO BE DEMOLISHED BEFORE ADJACENT SHELVING IS REPLACED AND BEFORE
BEGINNING OF PHASE 3 WORK.
T
T
T
T
T
T
LMNOPQ
8a
16a
K
KbMaNbPbQb
LaMb Lb
10a
Canteen Dining
A130
7' - 4"
8' - 8"
8' - 1"
Food Service
A128
7' - 4"
CLR
1' - 8"
C L R
Stockroom
B101A
G E N E R A L C E I L I N G N O T E S
A. ROOM TAGS AND CEILING HATCHES IN FULL TONE CONSTITUTE THE ROUGH AREA OF SCOPE
PER EACH PHASE.
B. REFER TO 1-A102, 1-A102a, 1-A102b, AND 1-A102c FOR ASSOCIATED NEW WORK.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK PER
PHASE.
D. REFER TO GI001 FOR FIRE PROTETION GENERAL NOTES.
E. CONTRACTOR SHALL SUPPORT EXISTING CEILING-MOUNTED FIXURES AND DEVICES DURING
DEMOLITION AND REINSTALL AFTER INSTALLATION OF THE NEW CEILING. PROTECT DURING ALL
PHASES OF CONSTRUCTION.
F. ALL DIMENSIONS ARE PLUS-OR-MINUS (+/-). HEIGHTS SHOWN ON REFLECTED CEILING PLANS
ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO REMOVAL
OF CEILINGS. NEW CEILING GRIDS SHALL BE INSTALLED AT EXISTING LOCATION AND HEIGHTS.
G. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM.
CONTRACTOR SHALL PRESUME UP TO 5% OF THE SPRINKLER HEADS ON EACH FLOOR IN THE
SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE REMOVED AND
REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE SPRINKLER PIPING SHALL BE PROVIDED AS NECESSARY FOR SERVICE TO NEW SPRINKLER HEADS. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE
PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:5
A
M
1-A141
REFLECTED CEILING PLANS -
FIRST FLOOR
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
D R A W I N G N O T E S
1 REMOVE EXISTING ACOUSTICAL CEILING GRID AND TILES. INSTALL NEW 24" X 24" ACOUSTICAL TILE CEILING AT
HEIGHT OF PREVIOUS LOCATION.
2 NEW CHASE - 5/8" TYPE X GYPSUM BOARD ON 3-5/8" COLD FORM STEEL WITH FRAMING TO MINIMUM 6" ABOVE FINISHED CEILING. PAINT NEW WALLS AND EXISTING ADJACENT TO MATCH EXISTING ADJACENT WALLS IN FINISH AND COLOR. INSTALL VA-STOCK RUBBER BASE TO MATCH EXISTING ADJACENT BASE (VC) . ADJUST CEILING GRID TO
ACCOMMODATE NEW CHASE.
3 REMOVE EXISTING GYPSUM BOARD CEILING AND REPLACE WITH NEW GYPSUM BOARD CEILING - MATCH EXISTING
CEILING HEIGHT.
N
KEYPLAN
1/8" = 1'-0" A
REFLECTED CEILING PLAN - FIRST FLOOR
ABCDEFGH
Hb Fb Eb
Da 9.2-S 10.8-S11-S 12-S12.2-S9-S
Q.2-S
Q -S
P.2-S
11.9-S 13-S 15.9-S 17-S 17.3-S 23-S22.2 22.422.5
22.6
22.322.1222.13
22.14 10.6
22.15
22.16
22.17
22.18
22.19
22.20
22.21
22.22
Off.
C237
8' - 0"
Prep Mon
C216K
Cardiac Cath Lab
C216
Storage
C235
HAC
C234
Reading
C202
Work Rm.
C203
CAT Scan Room
C204
Gamma Camera
C205
Uptake Prep Bay
C204A
Uptake Area
C204B
Uptake Prep Room
C204C
PET/CT
Scanner
C204D
Echo Rm
C250
Cath Lab
C216O
Stor.
C216P
I.V. Prep Rm.
C207
Elec.
C209
Control Room
C204E
Tlt.
C204F Tele.
C208
Reading Rm.
C250A
Gamma Camera
C210 Hot Lab
C212
Stor.
C213 Grieve/
Consult.
A293
Corridor
C*2*24
Off.
B234D
Cancer Registry
B234E
Chief
B234F
Off.
B234G
Prep Rm.
C214
Control
C215
Tlt.
C217
Waiting
C218 Stair 6
S*2*6
Tele.
C220
Stor.
C221
Elec.
C222
Lockers
C223
Lab Lounge
C224
Hemo Stor.
C225
Mech.
C226
Storage
C232
HAC
C239
Off.
C241
Off.
C242
Off.
C243
Off.
C244
Stor.
C245
Exam
C246
EKG Rm.
C247 Tlt.
C248
Scope Wash
C216A
Soil Ut.
C216B
Clean Linen
C216C
Observ.
C216D
Transfer
C216E
Radiology Spec Rm.
C216F
Scrub Area
C216G
Cath Lab
C216H
Equip
C216J Sterile Supply
C216L
Vestibule
C216M
Bone Density Lab
C211
Tlt.
C216Q
Tlt.
C214A
CT Scanner
C214B
Office
B235B
Closet
C216R
Mechanical
C232A
Break Rm.
C238
Off.
C240
22222
2 2
28' - 0"
8' - 0"
8' - 0"8' - 0"8' - 0"8' - 0"
8' - 0"
8' - 0"8' - 0"
9' - 0" 9' - 0"
8' - 0"
8' - 0"
28' - 0"
G E N E R A L C E I L I N G N O T E S
A. ROOM TAGS AND CEILING HATCHES IN FULL TONE CONSTITUTE THE ROUGH AREA OF SCOPE
PER EACH PHASE.
B. REFER TO 1-A102, 1-A102a, 1-A102b, AND 1-A102c FOR ASSOCIATED NEW WORK.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK PER
PHASE.
D. REFER TO GI001 FOR FIRE PROTETION GENERAL NOTES.
E. CONTRACTOR SHALL SUPPORT EXISTING CEILING-MOUNTED FIXURES AND DEVICES DURING
DEMOLITION AND REINSTALL AFTER INSTALLATION OF THE NEW CEILING. PROTECT DURING ALL
PHASES OF CONSTRUCTION.
F. ALL DIMENSIONS ARE PLUS-OR-MINUS (+/-). HEIGHTS SHOWN ON REFLECTED CEILING PLANS
ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO REMOVAL
OF CEILINGS. NEW CEILING GRIDS SHALL BE INSTALLED AT EXISTING LOCATION AND HEIGHTS.
G. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM.
CONTRACTOR SHALL PRESUME UP TO 5% OF THE SPRINKLER HEADS ON EACH FLOOR IN THE
SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE REMOVED AND
REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE SPRINKLER PIPING SHALL BE PROVIDED AS NECESSARY FOR SERVICE TO NEW SPRINKLER HEADS. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE
PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:0
A
M
1-A142
REFLECTED CEILING PLANS -
SECOND FLOOR
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" A
REFLECTED CEILING PLAN - SECOND FLOOR
D R A W I N G N O T E S
1 REMOVE GYPSUM BOARD/PLASTER CEILING AND REPLACE WITH NEW ACOUSTICAL CEILING GRID AND TILES - MATCH
EXISTING CEILING HEIGHT.
2 REMOVE EXISTING ACOUSTICAL CEILING GRID AND TILES. INSTALL NEW 24" X 24" ACOUSTICAL TILE CEILING AT HEIGHT
OF PREVIOUS LOCATION.
N
D
80" MH
LMNO
8a
16a
K J
KbMa
LaMb Lb
10a
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
Slide Stor.
B202AF. Lkrs.
B203
HAC
B204
Corridor
C*2*25
7' - 8"
LMNO
8a
16a
K J
KbMa
LaMb Lb
10a
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B203A
Slide Stor.
B202AF. Lkrs.
B203
HAC
B204
Corridor
C*2*25
7' - 8"
G E N E R A L C E I L I N G N O T E S
A. ROOM TAGS AND CEILING HATCHES IN FULL TONE CONSTITUTE THE ROUGH AREA OF SCOPE
PER EACH PHASE.
B. REFER TO 1-A102, 1-A102a, 1-A102b, AND 1-A102c FOR ASSOCIATED NEW WORK.
C. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL SCOPE OF WORK PER
PHASE.
D. REFER TO GI001 FOR FIRE PROTETION GENERAL NOTES.
E. CONTRACTOR SHALL SUPPORT EXISTING CEILING-MOUNTED FIXURES AND DEVICES DURING
DEMOLITION AND REINSTALL AFTER INSTALLATION OF THE NEW CEILING. PROTECT DURING ALL
PHASES OF CONSTRUCTION.
F. ALL DIMENSIONS ARE PLUS-OR-MINUS (+/-). HEIGHTS SHOWN ON REFLECTED CEILING PLANS
ARE FOR REFERENCE ONLY. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO REMOVAL
OF CEILINGS. NEW CEILING GRIDS SHALL BE INSTALLED AT EXISTING LOCATION AND HEIGHTS.
G. BUILDING 1 IS FULLY SPRINKLERED WITH AN AUTOMATIC WET PIPE FIRE PROTECTION SYSTEM.
CONTRACTOR SHALL PRESUME UP TO 5% OF THE SPRINKLER HEADS ON EACH FLOOR IN THE
SCOPE OF THIS PROJECT WITHIN THE AREA(S) OF WORK SHOWN WILL BE REMOVED AND
REPLACED TO AVOID CONFLICT WITH NEW CEILING GRID. NEW FIRE SPRINKLER PIPING SHALL BE PROVIDED AS NECESSARY FOR SERVICE TO NEW SPRINKLER HEADS. DESIGN, INSTALLATION, AND TESTING SHALL MEET THE REQUIREMENTS OF NFPA 13 LATEST EDITION, VA FIRE
PROTECTION MANUAL, AND ALL STATE AND LOCAL CODES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
FULLY SPRINKLERED
C U s e rs
\c a rt e \D o c u m e n ts
\0
L o c a l R e v it F ile s \2
\F F
E C in c in n a ti
U p g ra d e
A H
U s
B c a rt e r.
d a n ie l0
.r v t
/4
/2
:5
:1
A
M
1-A142a
LOGISTICS SUITE REFLECTED
CEILING PLAN - PHASE 1
08/05/2021 PQ CD
CINCINNATI, OH
539-21-104CONSTRUCTION
DOCUMENTS
UPGRADE AIR HANDLER
UNITS
1/8" = 1'-0" B
SECOND FLOOR REFLECTED CEILING PLAN - LOGISTICS - PHASE 1
1/8" = 1'-0"
A
SECOND FLOOR REFLECTED CEILING PLAN - LOGISTICS - PHASE 1 DEMO
D R A W I N G N O T E S
1 REMOVE EXISTING GYP CEILING INCLUDING ASSOCIATED SUPPORT UP TO STRUCTURE. PATCH AND REPAIR
ADJACENT WALLS AS NECESSARY FOR INSTALLATION OF NEW CEILING.
2 REMOVE EXISTING BULKHEAD BACK TO STRUCTURE. PATCH AND REPAIR ADJACENT WALLS AS NECESSARY FOR
INSTALLATION OF NEW CEILING.
3 REMOVE EXISTING ACOUSTICAL CEILING GRID AND TILES.
4 PHASE 1: TEMPORARY CONSTRUCTION WALL - WALL CONSISTS OF 3 5/8" NON-STRUCTURAL METAL FRAMING TO
UNDERSIDE OF EXISTING BULKHEAD - FINISH WITH ONE LAYER OF 5/8" TYPE X GYPSUM BOARD, EACH SIDE - SEAL AT
ALL ADJACENT CONSTRUCTION.
5 NEW 24" X 24" ACCOUSTIC CEILING TILE AND GRID AT HEIGHT OF PREVIOUS CEILING.
6 PROVIDE ICRA BARRIER ACCORDING TO SAFETY SPECIFICATION FOR ICRA LEVEL 4 - PROTECT SURROUNDING
SHELVING AS NECESSARY FOR COMPLETION OF WORK. COORDINATE INSTALLATION WITH NEW WORK.
7 REMOVE PORTION OF CMU WALL SHOWN AS DASHED FOR INSTALLATION OF NEW WALL GRILLE - REFER TO
MECHANICAL AND STRUCTURAL DRAWINGS FOR LOCATIONS AND SIZE OF OPENING.
8 PATCH AND REPAIR GYPSUM BOARD SOFFIT BULKHEAD IN COORDINATION WITH MECHANICAL VENT REMOVAL -
FINISH AND PAINT WALL TO MATCH ADJACENT WALL.
N
LMNO
8a
16a
K J
Kb
Kb
Ma
La
Mb Lb
10a
Ante Room
A223
Equip Wash
A222B
Compressor Room
A222D
Equipment Storage and
Testing
A228A
Storage
A228B
Mech
A228C
Office
A230
Dressing Rm.
A227B
Office
A231
LKRS.
A227A Shower
A227
Elec.
A225B
Service Lobby
A225
Trash Chute
A225A
Lounge
A226
Training Room
A224
HAC
A225C
Office
A232
Corridor
C*2*1
Ante
A235A
Dispatch Area
A236A
Clean Supplies
B201
F. Tlt.
B20…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .