This document describes an upcoming federal contract opportunity for upgrade work at the Veterans Administration Cincinnati VAMC facility. The solicitation will be for project number 539-21-104 to upgrade air handler units with a project magnitude between $5 million and $10 million under NAICS code 238220. The contract is set aside as a 100% small business opportunity with an SDVOSB preference. Interested offerors must ensure their VIP and SAM.gov registrations as an SDVOSB are accurate and valid. Safety and experience information will be required prior to award, including no more than three serious OSHA/EPA violations and an EMR less than 1.0. The performance period is 730 calendar days from NTP. Bonds will be required. The solicitation is expected to be released on September 29, 2021 via SAM.gov by Network Contracting Office 10 for the Department of Veterans Affairs VHA.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Survey VA Project: Upgrade Air Handling Units

VA Project Number: 539-21-104 Cincinnati VA Medical Center (CVAMC)

3200 Vine Street, Cincinnati, Ohio 45220

March 10, 2021 Terracon Project No. N1207176

Prepared for:

FFE, Inc.

Cincinnati, OH 45246

Prepared by:

Terracon Consultants, Inc.

Cincinnati, Ohio 45226

Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com

March 10, 2021

FFE, Inc.

110 Boggs Lane, Suite 170 Cincinnati, OH 45246

Attn: Mr. Clint Weekley, PE, CBCP, LEED AP President P: 513-519-5999 (cell) E: clint.weekley@ffe-serv.com

Re: Asbestos Survey Report VA Project: Upgrade Air Handling Units VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220 Terracon Project No. N1207176

Dear Mr. Weekley:

Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to FFE, Inc. (Client). The purpose of this report is to present the results of an asbestos survey which was performed at the Cincinnati VA Medical Center (CVAMC) during the month of February of 2021, and in general accordance with our proposal number PN1207176, dated April 13, 2020. We understand that this survey was requested for the purpose of a planned renovation project to upgrade various air handling units and associated mechanical systems at the CVAMC.

Asbestos-containing materials (ACM) were identified as a result of this project-specific survey at the CVAMC. Please refer to the attached report for further detail.

Terracon appreciates the opportunity to provide this service to FFE, Inc. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.

Sincerely, Terracon Consultants, Inc.

Josh Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager

OH AHES #35291 OH AHES #32388

Project: Upgrade Air Handling Units ■ Cincinnati VAMC March 10, 2021 ■ Terracon Project No. N1207176

TABLE OF CONTENTS

1.0 INTRODUCTION

1.1 Project Objective

1.2 Reliance

2.0 Project DESCRIPTION

3.0 FIELD ACTIVITIES

3.1 Visual Assessment

3.2 Physical Assessment

3.3 Sample Collection

3.4 Sample Analysis

4.0 REGULATORY OVERVIEW

5.0 FINDINGS AND RECOMMENDATIONS

6.0 LIMITATIONS/GENERAL COMMENTS

APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY

APPENDIX C ASBESTOS ANALYTICAL LABORATORY REPORT

APPENDIX D LICENSES AND CERTIFICATIONS

APPENDIX E SAMPLE & ACM LOCATION DRAWINGS

APPENDIX F PHOTO LOG

Responsive ■ Resourceful ■ Reliable 1

ASBESTOS SURVEY

VA Project: Upgrade Air Handling Units

VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC)

3200 Vine Street, Cincinnati, Ohio 45220 Terracon Project No. N1207176

March 10, 2021

1.0 INTRODUCTION

Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Upgrade Air Handling Units” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on various days during the month of February 2021 by United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors who were also certified by the Ohio Environmental Protection Agency (OEPA) as Asbestos Hazard Evaluation Specialists (AHES). Based on Client-provided renovation drawings, accessible building components and areas intended to be impacted by the renovation project were surveyed. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).

Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy

(PLM).

1.1 Project Objective

Terracon understood the renovation project pertains to various upgrades to air handlers and associated ductwork/mechanical components throughout the CVAMC. Please note that asbestos surveys are required prior to renovation and demolition projects to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).

1.2 Reliance

This report is for the exclusive use of FFE, Inc. (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and the Client. Reliance on this report by the Client and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and the Client

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable 2

2.0 PROJECT DESCRIPTION

Terracon understood the renovation project pertains to various upgrades to air handlers and associated ductwork/mechanical components throughout the VAMC. Client-provided renovation drawings were used as a “road-map” for this project-specific survey.

3.0 FIELD ACTIVITIES

The survey was conducted by Mr. Lemuel Weyer and Mr. Tyler Stenten, USEPA-accredited asbestos inspectors and OEPA-certified AHES. Copies of their Ohio AHES credentials are attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA.

A summary of survey activities is provided below.

3.1 Visual Assessment

Based on a review of Client-provided drawings, survey activities were initiated with visual observation of project-specific accessible areas and accessible building components to be impacted by the renovation project to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.

3.2 Physical Assessment

A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.

3.3 Sample Collection

Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.

The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.

Terracon collected a total of 141 bulk samples from 41 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable 3

3.4 Sample Analysis

Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) of Indianapolis, Indiana for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for friable material samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized.

EMSL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 200188-0.

The laboratory analytical report is included in Appendix C.

4.0 REGULATORY OVERVIEW

The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).

The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.

The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health emergencies where friable ACMs has been released. Please note that per OEPA regulations, March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable 4 non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.

The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed

1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.

5.0 FINDINGS AND RECOMMENDATIONS

Specific to the subject renovation project areas and components to be impacted based on Client-provided renovation drawings, asbestos was identified by laboratory analysis in samples collected from the following materials:

ACM Description Material Location % and Type Asbestos Condition Estimated

Quantity*

Tan Duct Mastic Basement - Associated with

AHU 20 and Adjacent Ductwork

2% Chrysotile Good/Non- Friable

~ 25 Square Feet (SF) of Duct

Mastic

Tan Duct Mastic

1st Floor Area A - Associated with Kitchen Vents and

Adjacent Duct Work; AHU 16 and Adjacent Ductwork

2% Chrysotile Good/Non- Friable

~ 100 SF of Duct Mastic

Gray-Brown Duct Mastic

2nd Floor Area C - Associated with Ductwork Under Fiberglass Insulation

3% Chrysotile Good/Non- Friable

~ 50 SF of Duct Mastic

Brown Duct Mastic

2nd Floor Area C - Associated with Ductwork and 2nd Floor Area A - South Area Hallway Under Fiberglass Insulation

3% Chrysotile Good/Non- Friable

~ 100 SF of Duct Mastic

Tan Duct Mastic 3rd Floor Area C - Associated with Air Handler Unit 22 Ductwork in Men’s Surgical

Area Locker Room

3% Chrysotile Good/Non- Friable

~ 20 SF of Duct Mastic

Tan Duct Mastic 4th Floor Mechanical Room - Associated with AHU 22 and

Adjacent Ductwork 2% Chrysotile Good/Non-

Friable ~ 100 SF of Duct

Mastic

Tan Duct Mastic 1st Floor- Associated with Duct Work in Former Café

Area 2% Chrysotile Good/Non-

Friable ~ 150 SF of Duct

Mastic

Tan Duct Mastic

Associated with Duct Work with East Elevator

Maintenance Room (Located on 10th Floor Roof)

2% Chrysotile Good/Non- Friable

~ 10 SF of Duct Mastic

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable 5

ACM Description Material Location % and Type Asbestos Condition Estimated

Quantity* Tar under Non-

Asbestos-Containing Cementitious Duct

Coating

Central Ductwork on North Roof of 1st Floor (Former

Dining Room Roof) 5% Chrysotile Fair/Non-

Friable ~ 500 SF of Duct

Coating

*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present. Please note that the quantities listed for duct mastic are Terracon’s opinion of asbestos-containing duct mastic present on ductwork to be impacted by the project, and the quantities listed are not meant to refer to actual square footage of duct surfaces or runs of duct work in linear feet. Additionally, please note that duct mastic is on hard metal ductwork, and in some instances, it may be located under non-asbestos-containing fiberglass insulation.

A sample and results summary table is included in Appendix B, the laboratory analytical report is included in Appendix C, drawings indicating sample and ACM locations are included in Appendix E, and example photos of the identified materials are included in Appendix F.

If the identified ACMs will be impacted by the renovation project, such materials will first need to be properly removed, handled, and disposed by a state-licensed abatement contractor in accordance with applicable federal and state EPA asbestos regulations, Occupational Safety and Health Administration (OSHA) asbestos regulations, and per VA abatement project specifications.

It should be noted that inaccessible/concealed suspect materials, other than those identified during this survey, may exist. This survey did not include disassembling equipment or electrical wiring/electrical components as the building was fully active/operational and inspecting/sampling such equipment/materials would representative a safety hazard to the inspector. Should additional suspect materials be uncovered prior to or during renovation activities, those materials must be assumed asbestos-containing until sampled by a state-licensed asbestos inspector and analysis refutes the positive assumption.

6.0 LIMITATIONS/GENERAL COMMENTS

The survey was project-specific and limited to the HVAC/building components indicated on Client-provided drawings to be impacted and within the boundaries of the areas to be renovated. This survey is not meant to be a comprehensive survey of the entire facilities. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas/equipment which may pose a health or safety risk to Terracon personnel were not sampled (inspecting/opening energizing equipment, inspecting/sampling electrical wiring and similar components). Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable 6

This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by FFE, Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.

Responsive ■ Resourceful ■ Reliable

APPENDIX A

VA Project: Upgrade Air Handling Units

VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220

IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)

HA

No’s. ACM Description Material Location % and Type Asbestos

EPA NESHAP

Classification

Condition/ Friability

Estimated Quantity*

04 Tan Duct Mastic Basement - Associated with AHU 20 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non-

Friable ~ 25 Square Feet

(SF) of Duct Mastic 08 Tan Duct Mastic 1st Floor Area A - Associated with Kitchen Vents and

Adjacent Duct Work; AHU 16 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non- Friable

~ 100 SF of Duct Mastic

12 Gray-Brown Duct Mastic 2nd Floor Area C - Associated with Ductwork Under Fiberglass Insulation 3% Chrysotile Category II Non-Friable Good/Non-

Friable ~ 50 SF of Duct

Mastic

14 Brown Duct Mastic 2nd Floor Area C - Associated with Ductwork and 2nd

Floor Area A - South Area Hallway Under Fiberglass Insulation

3% Chrysotile Category II Non-Friable Good/Non- Friable

~ 100 SF of Duct Mastic

17 Tan Duct Mastic 3rd Floor Area C - Associated with Air Handler Unit 22 Ductwork in Men’s Surgical Area Locker Room 3% Chrysotile Category II Non-Friable Good/Non-

Friable ~ 20 SF of Duct

Mastic 21 Tan Duct Mastic 4th Floor Mechanical Room - Associated with AHU 22 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non- Friable

~ 100 SF of Duct Mastic

24 Tan Duct Mastic 1st Floor- Associated with Duct Work in Former Café Area 2% Chrysotile Category II Non-Friable Good/Non-

Friable ~ 150 SF of Duct

Mastic

27 Tan Duct Mastic Associated with Duct Work with East Elevator Maintenance Room (Located on 10th Floor Roof) 2% Chrysotile Category II Non-Friable Good/Non-

Friable ~ 10 SF of Duct

Mastic

Tar under Non-Asbestos- Containing Cementitious

Duct Coating

Central Duct Work on North Roof of 1st Floor (Former Dining Room Roof) 5% Chrysotile Category II Non-Friable Fair/Non-

Friable ~ 500 SF of Duct

Coating

*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the planned renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions regarding quantities present. Please note that the quantities listed for duct mastic are Terracon’s opinion of asbestos-containing duct mastic present on ductwork to be impacted by the project, and the quantities listed are not meant to refer to actual square footage of duct surfaces or runs of duct work in linear feet. Additionally, please note that duct mastic is on hard metal ductwork, and in some instances, it may be located under non-asbestos-containing fiberglass insulation.

See Appendix B for a summary of samples collected with respective analytical results, Appendix C for the laboratory analytical report, Appendix E for sample and ACM location drawings, and Appendix F for photo examples of the above identified materials.

It should be noted that inaccessible/concealed suspect materials, other than those identified during this survey, may exist. This survey did not include disassembling equipment or electrical wiring/electrical components as the building was fully active/operational and inspecting/sampling such equipment/materials would representative a safety hazard to the inspector. Should additional suspect materials be uncovered prior to or during renovation activities, those materials must be assumed asbestos-containing until sampled by a state-licensed asbestos inspector and analysis refutes the positive assumption.

If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.

APPENDIX B

VA Project: Upgrade Air Handling Units VA Project No.: 539-21-104

Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220

ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY

Sample # Sample Material

Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

White Pipe Encapsulant

North side of pump system

Northwest heater pump system in Sub- Basement

None Detected (ND)

02 East pump ND

03 West pump ND

Gray Duct Mastic

Northeast corner of Room A013

Throughout Basement

ND

05 Center of Room

A0127 ND

06 AHU 20 ND

White Cloth Duct Tape

Near Northwest Corner of Duct Ductwork within

Basement Dock Area

ND

08 ND

09 Near northeast corner of duct ND

Tan Duct Mastic

Northwest corner of AHU 20

Associated with AHU 20 and associated ductwork

<1% Chrysotile

11 North duct of AHU 20 2% Chrysotile

12 North duct of AHU 20 2% Chrysotile

05 13 Center of office Center Office in Dock Area ND

Project: Upgrade Air Handling Units ■ CVAMC March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

14 2’ x 2’ White Ceiling Tile with Small

Fissures

Center of office ND

15 Northeast Corner of Office ND

2’ x 2’ Ceiling Tile – No Pattern

Southeast corner

Kitchen Area

ND

17 Southwest corner ND

18 Northwest corner ND

Gray Duct Mastic

Near Southeast Corner of Kitchen

Associated with Kitchen

Ductwork

ND

20 At AHU 16 ND

21 At AHU 16 ND

Tan Duct Mastic

South Side of Duct Work in Kitchen

Associated with Vents and Adjacent Ducts in Kitchen and

AHU 16

2% Chrysotile

North Side of Ductwork in

Kitchen 2% Chrysotile

AHU 16 in Convenience Store North Mechanical

Closet

2% Chrysotile

Gray-Brown Duct Mastic

Near Middle North Wall

Associated with Duct Work in Food Service

Area

ND

26 Center of Room ND

AHU 16 in Convenience Store North Mechanical

Closet

ND

10 28 Northeast Corner of Store

Food Service Area and

ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

29 2’ x 2’ White Ceiling Tile with Texture

Pattern

Northeast Corner of Store

Convenience Store Area ND

30 Center of Food Service Area ND

2’ x 2’ White Ceiling Tile with Small

Fissures

Hallway at C249

Throughout second floor

ND

32 Hallway at C241 ND

33 Hallway at C220 ND

Gray-Brown Duct Mastic

Hallway at Room C249

Associated with Ductwork in Area C of the

2nd floor

3% Chrysotile

35 Hallway at Room C237 3% Chrysotile

36 Hallway at Room C213 3% Chrysotile

Gray Duct Mastic

EKG Waiting Room, east end

Associated with Ductwork in

Area C of the 2nd

Floor

ND

38 Hallway at Room

C241 ND

39 Hallway at Room

C241 ND

Brown Duct Mastic

Hallway at Room C231 Area C – 2nd floor hallway near C231 and in South Hallway of Area

A

3% Chrysotile

41 Hallway near C226 3% Chrysotile

42 Hallway at C205 3% Chrysotile

43 2’ x 2’ White Ceiling Tile with Small

Fissures

At North Entrance to PACU Throughout 3rd floor

ND

44 At Entrance to Surgical Area

ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

South Wall of Men’s

Locker Room Restroom

ND

White Pipe Encapsulant

PACU Northwest room

PACU

Northwest room

ND

47 PACU Northwest room ND

48 PACU Northwest room ND

Tan Duct Mastic

Center south wall of Men’s locker room restroom

3rd Floor Duct Work associated with AHU 22 in

Men’s Surgical Area Locker

Room

3% Chrysotile

Center south wall of Men’s locker room restroom

3% Chrysotile

Center south wall of Men’s locker room restroom

3% Chrysotile

White Pipe Encapsulant

Center of Room

SPS Area – 3rd floor

ND

53 Middle East Side ND

54 Middle East Side ND

Gray Caulking

Middle West side Middle east side of AHU 22 in 4th

Floor Mechanical

Space

ND

56 Middle West side ND

57 Middle West side ND

White Pipe Encapsulant

Middle West Side Associated with Fiberglass pipes around AHU 22 in 4th Floor Mechanical

Space

ND

59 South East Corner ND

60 South East Corner ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

Tan Duct Mastic

Top Center of AHU Seams of AHU 22 and associated duct work in 4th

Floor Mechanical

Space

2% Chrysotile

62 South end of AHU 2% Chrysotile

63 Southeast Corner Duct 2% Chrysotile

Gray Duct Mastic

South End at Top of Duct Work on Air

Handler Unit South Duct work of AHU 22 in 4th

Floor Mechanical

Space

ND

South End at Top of

Duct Work on Air Handler Unit

ND

South End at Top of

Duct Work on Air Handler Unit

ND

Black Tar Wrap

Near Middle West Wall of Former Café

Associated with Pipes on West Side of Former

Café Area

ND

68 Near Middle West Wall of Former Café ND

69 Near Middle West Wall of Former Cafe ND

Tan Duct Mastic

Middle West Side of Former Café

Associated with Ductwork in Former Café

Area

2% Chrysotile

71 Center of Former Café 2% Chrysotile

72 Near Middle East Side of Former Cafe 2% Chrysotile

White Pipe Encapsulant

Middle West Side of Former Café Associated with

Fiberglass Pipes throughout the Former Café

Area

ND

74 Center of Area ND

75 Center of Area ND

26 76 White Pipe Encapsulant Southwest Corner ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

77 Southwest Corner Associated with Fiberglass Pipe Insulation within

East Elevator Maintenance

Room

ND

78 Southeast Corner ND

Tan Duct Mastic

Middle East Wall Associated with Ductwork with East Elevator Maintenance

Room

2% Chrysotile

80 Middle East Wall 2% Chrysotile

81 Middle South Wall 2% Chrysotile

Tar and Tar Paper, Foam and White Block Insulation

Roofing Materials

West of AHU 10

3rd Floor Roof Area Around

AHU 10

Asphalt: ND, Tar: ND, Tar Paper:

ND, Foam: ND, Insulation: ND

83 West of AHU 10 Asphalt: ND, Tar: ND, Tar Paper:

ND, Foam: ND, Insulation: ND

84 East of AHU 10 Asphalt: ND, Tar: ND, Tar Paper:

ND, Foam: ND, Insulation: ND

Silver Coating on

Rubber, Foam and Mastic Roof Curb

Materials

Middles East Side of

AHU 10

Roof Curb Base Associated with

AHU 10

Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND

86 Northeast Corner of

AHU 10

Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND

87 Southwest Corner of

AHU 10

Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND

White Caulking

North of AHU 10 Associated with

Duct Work Stands and

Junctions into Walls

ND

89 Middle North Side of Roof Duct Work ND

90 Near Wall on Duct Work ND

91 Tar, Foam, Tar Paper and Perlite Insulation

Roofing Materials

Middle North Side of Roof

North 1st Floor Roof (Above

Former Dining Area)

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

92 Middle North Side of Roof

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

93 Near Northwest Corner of Roof

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

Rubber Roof Curb with Tar and Silver

Coating

East Side of AHU

Around Base of AHUs and Duct

Work

Rubber: ND, Tar: ND, Coating: ND

95 Center of Roof Rubber: ND, Tar: ND, Coating: ND

96 Middle South Side of Roof

Rubber: ND, Tar: ND, Coating: ND

Brown-Gray Duct Mastic

West Side

Associated with Duct Work inside AHU 15 Room

ND

98 West Side ND

99 East End ND

White Pipe Encapsulant

Middle South Side Associated with Fiberglass Pipes within AHU 15

Room

ND

101 Middle South Side ND

102 Middle North Side ND

Cementitious Coating with Tar over White

Block Insulation

Northwest End Central Duct

Work on North Roof of 1st Floor (Former Dining

Room Roof)

Coating: ND, Tar: 5% Chrysotile, Insulation: ND

104 Middle West Side Coating: ND, Tar: 5% Chrysotile, Insulation: ND

105 Southeast Corner Coating: ND, Tar: 5% Chrysotile, Insulation: ND

Tar, Foam, Tar Paper and Perlite Insulation

Roofing Materials

Central East Side of Roof

3rd Floor North Roof

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

107 Central East Side of Roof

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

108 Near Northwest Corner of Roof

Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

Rubber Roof Curb with Tar and Silver

Coating

Center of Roof Around Base Roof Curb of

AHUs and Duct Work on 3rd

Floor North Roof

Rubber: ND, Tar: ND, Coating: ND

110 East of AHUs Rubber: ND, Tar: ND, Coating: ND

111 Northwest Corner of Roof Rubber: ND, Tar: ND, Coating: ND

Gray Duct Mastic

North Fan Associated with

Fan Vents in Southeast

Corner of North 3rd Floor Roof

ND

113 North Fan ND

114 South Fan ND

Plaster Walls: Base Coat and Finish Coat

Basement- At Entrance to Morgue

Area

Throughout Building

Base Coat: ND, Finish Coat: ND

1st Floor- Main

Hallway at Room Women’s Restroom

Base Coat: ND, Finish Coat: ND

03 2nd Floor- East Side Elevator Lobby

Base Coat: ND, Finish Coat: ND

04 3rd Floor- At Double Doors to Area B Base Coat: ND, Finish Coat: ND

05 4th Floor- East Side of Elevator Lobby Base Coat: ND, Finish Coat: ND

5th Floor- Near

Entrance to Pharmacy Area

Base Coat: ND, Finish Coat: ND

07 6th Floor- East Side of Elevator Lobby Base Coat: ND, Finish Coat: ND

08 7th Floor – Near Room A743 Base Coat: ND, Finish Coat: ND

9th Floor- Northwest Corner of Elevator

Lobby Base Coat: ND, Finish Coat: ND

02 10 Basement- East Elevator Lobby

Throughout Building Drywall: ND, Joint Compound: ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

Drywall System:

Drywall and Joint

Compound

1st Floor- Hallway at Room A123 Drywall: ND, Joint Compound: ND

12 2nd Floor- Northwest Corner of C201 Drywall: ND, Joint Compound: ND

3rd Floor- Near

Southeast Corner of Elevator Lobby

Drywall: ND, Joint Compound: ND

4th Floor- Area B- Doorway to North

Wing Drywall: ND, Joint Compound: ND

5th Floor- South Wall of East Elevator Lobby

Drywall: ND, Joint Compound: ND

6th Floor- South Wall of Main Elevator South

Drywall: ND, Joint Compound: ND

17 7th Floor – At Entrance to Area B Drywall: ND, Joint Compound: ND

8th Floor- Northeast Corner Service Elevator Lobby

Drywall: ND, Joint Compound: ND

Spray-On Fireproofing

Basement – East Elevator Lobby

Throughout Building

ND

20 1st Floor- Near Main Entrance Lobby ND

2nd Floor – Entrance to Dentistry Area ND

22 3rd Floor- Center of Elevator Lobby ND

23 4th Floor – Center of Elevator Lobby ND

5th Floor- Near

Entrance to Pharmacy Area

ND

25 6th Floor- East Elevator Lobby ND

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)

HA # SEQ. #

7th Floor- West Side of Main Elevator Lobby

ND

9th Floor – East End of Hallway at Entrance to

Maintenance Area

ND

Inspector Signatures: ________________________ _____________________________ Lem Weyer, OH AHES #36337 Tyler Stenten, OH AHES #35931

March 10, 2021 ■ Terracon Project No. N1207176

Responsive ■ Resourceful ■ Reliable

APPENDIX C

ASBESTOS ANALYTICAL LABORATORY DATA

EMSL Analytical, Inc.

6340 CastlePlace Dr. Indianapolis, IN 46250

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Attention: Phone:Lem Weyer (513) 321-5816

Fax:Terracon Consultants, Inc. (513) 321-0294

Received Date:611 Lunken Park Drive 02/17/2021 9:45 AM

Analysis Date:Cincinnati, OH 45226 02/19/2021

Collected Date:

Project: CVAMC-AHU N1207176

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

01-01

162102984-0001

None DetectedNon-fibrous (Other)95%Cellulose5%White

Non-Fibrous

Homogeneous

Northwest Heater

Pump System - White

Pipe Encapsulant

01-02

162102984-0002

None DetectedNon-fibrous (Other)95%Cellulose5%White

Non-Fibrous

Homogeneous

Northwest Heater

Pump System - White

Pipe Encapsulant

01-03

162102984-0003

None DetectedNon-fibrous (Other)95%Cellulose5%White

Non-Fibrous

Homogeneous

Northwest Heater

Pump System - White

Pipe Encapsulant

02-04

162102984-0004

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Basement - Gray

Duct Mastic

02-05

162102984-0005

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Basement - Gray

Duct Mastic

02-06

162102984-0006

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Basement - Gray

Duct Mastic

03-07

162102984-0007

None DetectedNon-fibrous (Other)70%Cellulose30%White

Fibrous

Homogeneous

Duct in Dock Area -

White Cloth Duct

Tape

03-08

162102984-0008

None DetectedNon-fibrous (Other)70%Cellulose30%White

Fibrous

Homogeneous

Duct in Dock Area -

White Cloth Duct

Tape

03-09

162102984-0009

None DetectedNon-fibrous (Other)70%Cellulose30%White

Fibrous

Homogeneous

Duct in Dock Area -

White Cloth Duct

Tape

04-10

162102984-0010

<1% ChrysotileNon-fibrous (Other)100%Tan

Non-Fibrous

Homogeneous

Associated with AHU

20 Associated Duct

Work - Tan Duct

Mastic

04-11

162102984-0011

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Associated with AHU

20 Associated Duct

Work - Tan Duct

Mastic

04-12

162102984-0012

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Associated with AHU

20 Associated Duct

Work - Tan Duct

Mastic

05-13

162102984-0013

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose80%Gray

Fibrous

Homogeneous

Center office in Dock

Area - 2x2 White

Ceiling Tile with small fissure

05-14

162102984-0014

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose80%Gray

Fibrous

Homogeneous

Center office in Dock

Area - 2x2 White

Ceiling Tile with small fissure

Initial report from: 02/19/2021 12:17:48

Page 1 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

05-15

162102984-0015

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

50%

30%

Tan

Fibrous

Homogeneous

Center office in Dock

Area - 2x2 White

Ceiling Tile with small fissure

06-16

162102984-0016

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray

Fibrous

Homogeneous

Kitchen Area - 2x2

Ceiling Tile-No

Pattern

06-17

162102984-0017

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray

Fibrous

Homogeneous

Kitchen Area - 2x2

Ceiling Tile-No

Pattern

06-18

162102984-0018

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

50%

30%

Tan

Fibrous

Homogeneous

Kitchen Area - 2x2

Ceiling Tile-No

Pattern

07-19

162102984-0019

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated With

Kitchen Duct Work -

Gray Duct Mastic

07-20

162102984-0020

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated With

Kitchen Duct Work -

Gray Duct Mastic

07-21

162102984-0021

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated With

Kitchen Duct Work -

Gray Duct Mastic

08-22

162102984-0022

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Associated with vents and adjacent ducts in

Kitchen - Tan Duct

Mastic

08-23

162102984-0023

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Associated with vents and adjacent ducts in

Kitchen - Tan Duct

Mastic

08-24

162102984-0024

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Associated with vents and adjacent ducts in

Kitchen - Tan Duct

Mastic

09-25

162102984-0025

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in food service area - Gray-Brown

Duct Mastic

09-26

162102984-0026

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in food service area - Gray-Brown

Duct Mastic

09-27

162102984-0027

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in food service area - Gray-Brown

Duct Mastic

10-28

162102984-0028

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Food Service area and convenience store area - 2x2 White

Ceiling Tile with

Texture

10-29

162102984-0029

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray

Fibrous

Homogeneous

Food Service area and convenience store area - 2x2 White

Ceiling Tile with

Texture

Page 2 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

10-30

162102984-0030

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

50%

30%

Tan

Fibrous

Homogeneous

Food Service area and convenience store area - 2x2 White

Ceiling Tile with

Texture

11-31

162102984-0031

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray

Fibrous

Homogeneous

Throughout Second

Floor - 2x2 White

Ceiling Tile with Small

Fissure

11-32

162102984-0032

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

40%

40%

Gray/White

Fibrous

Homogeneous

Throughout Second

Floor - 2x2 White

Ceiling Tile with Small

Fissure

11-33

162102984-0033

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

50%

30%

Tan

Fibrous

Homogeneous

Throughout Second

Floor - 2x2 White

Ceiling Tile with Small

Fissure

12-34

162102984-0034

3% ChrysotileNon-fibrous (Other)97%Brown/Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor -

Gray-Brown Duct

Mastic

12-35

162102984-0035

3% ChrysotileNon-fibrous (Other)97%Brown/Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor -

Gray-Brown Duct

Mastic

12-36

162102984-0036

3% ChrysotileNon-fibrous (Other)97%Brown/Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor -

Gray-Brown Duct

Mastic

13-37

162102984-0037

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor - Gray

Duct Mastic

13-38

162102984-0038

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor - Gray

Duct Mastic

13-39

162102984-0039

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Associated with duct work in Area C

Second Floor - Gray

Duct Mastic

14-40

162102984-0040

3% ChrysotileNon-fibrous (Other)97%Brown

Non-Fibrous

Homogeneous

Area C-2nd Floor

Hallway Near C231 and South Hallway of

Area A - Brown Duct

Mastic

14-41

162102984-0041

3% ChrysotileNon-fibrous (Other)97%Brown

Non-Fibrous

Homogeneous

Area C-2nd Floor

Hallway Near C231 and South Hallway of

Area A - Brown Duct

Mastic

14-42

162102984-0042

3% ChrysotileNon-fibrous (Other)97%Brown

Non-Fibrous

Homogeneous

Area C-2nd Floor

Hallway Near C231 and South Hallway of

Area A - Brown Duct

Mastic

Page 3 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

15-43

162102984-0043

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

70%

10%

Gray/White

Fibrous

Homogeneous

Throughout 3rd Floor

- 2x2 White Ceiling

Tile with small fissures

15-44

162102984-0044

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

70%

10%

Gray/White

Fibrous

Homogeneous

Throughout 3rd Floor

- 2x2 White Ceiling

Tile with small fissures

15-45

162102984-0045

None DetectedPerlite

Non-fibrous (Other)

15%

5%

Cellulose

Min. Wool

70%

10%

Tan

Fibrous

Homogeneous

Throughout 3rd Floor

- 2x2 White Ceiling

Tile with small fissures

16-46

162102984-0046

None DetectedNon-fibrous (Other)40%Cellulose

Glass

50%

10%

White/Silver

Fibrous

Homogeneous

PACU Northwest

Room - White

Encapsulant

16-47

162102984-0047

None DetectedNon-fibrous (Other)40%Cellulose

Glass

50%

10%

White/Silver

Fibrous

Heterogeneous

PACU Northwest

Room - White

Encapsulant

16-48

162102984-0048

None DetectedNon-fibrous (Other)25%Cellulose

Glass

70%

5%

White

Fibrous

Homogeneous

PACU Northwest

Room - White

Encapsulant

17-49

162102984-0049

3% ChrysotileNon-fibrous (Other)97%Tan

Non-Fibrous

Homogeneous

3rd Floor Duct Work

Associated with AHU

22 in Men's locker room - Tan Duct

Mastic

17-50

162102984-0050

3% ChrysotileNon-fibrous (Other)97%Tan

Non-Fibrous

Homogeneous

3rd Floor Duct Work

Associated with AHU

22 in Men's locker room - Tan Duct

Mastic

17-51

162102984-0051

3% ChrysotileNon-fibrous (Other)97%Tan

Non-Fibrous

Homogeneous

3rd Floor Duct Work

Associated with AHU

22 in Men's locker room - Tan Duct

Mastic

18-52

162102984-0052

None DetectedNon-fibrous (Other)98%Cellulose2%White

Non-Fibrous

Homogeneous

SPS Area -3rd Floor -

White Encapsulant

18-53

162102984-0053

None DetectedNon-fibrous (Other)98%Cellulose2%White

Non-Fibrous

Homogeneous

SPS Area -3rd Floor -

White Encapsulant

18-54

162102984-0054

None DetectedNon-fibrous (Other)95%Cellulose5%White

Non-Fibrous

Homogeneous

SPS Area -3rd Floor -

White Encapsulant

19-55

162102984-0055

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Middle East Side of

AHU 22 in 4th Floor

Mechanical Space -

Gray Caulking

19-56

162102984-0056

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Middle East Side of

AHU 22 in 4th Floor

Mechanical Space -

Gray Caulking

19-57

162102984-0057

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

Middle East Side of

AHU 22 in 4th Floor

Mechanical Space -

Gray Caulking

Page 4 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

20-58

162102984-0058

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Associated with

Fiberglass pipes around AHU 22 in 4th floor mechanical space - White

Encapsulant

20-59

162102984-0059

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Associated with

Fiberglass pipes around AHU 22 in 4th floor mechanical space - White

Encapsulant

20-60

162102984-0060

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

Associated with

Fiberglass pipes around AHU 22 in 4th floor mechanical space - White

Encapsulant

21-61

162102984-0061

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Seams of AHU 22 and associated duct work in 4th floor mechanical space -

Tan Duct Mastic

21-62

162102984-0062

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Seams of AHU 22 and associated duct work in 4th floor mechanical space -

Tan Duct Mastic

21-63

162102984-0063

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

Seams of AHU 22 and associated duct work in 4th floor mechanical space -

Tan Duct Mastic

22-64

162102984-0064

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

South duct work of

AHU 22 in 4th floor mechanical space -

Gray Duct Mastic

22-65

162102984-0065

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

South duct work of

AHU 22 in 4th floor mechanical space -

Gray Duct Mastic

22-66

162102984-0066

None DetectedNon-fibrous (Other)100%Gray

Non-Fibrous

Homogeneous

South duct work of

AHU 22 in 4th floor mechanical space -

Gray Duct Mastic

Page 5 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162102984EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Analyst(s)

Craig Nixon (44)

Maggie Hayden (22)

Richard Harding, Laboratory Manager or Other Approved Signatory

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.

Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. Indianapolis, IN NVLAP Lab Code 200188-0, AZ0939, CA 2575, CO AL-15132, TX 300262

Page 6 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162103243EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Attention: Phone:Lem Weyer (513) 321-5816

Fax:Terracon Consultants, Inc. (513) 321-0294

Received Date:611 Lunken Park Drive 02/22/2021 8:00 AM

Analysis Date:Cincinnati, OH 45226 02/26/2021

Collected Date: 02/19/2021

Project: CVAMC - AHU - N1207176

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

162103243-0001

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

ASSOCIATED WITH

PIPE ON WEST

SIDE OF FORMER

CAFÉ AREA NEAR

MIDDLE WEST

WALL OF FORMER

CAFÉ - BLACK TAR

WRAP

HA: 23

162103243-0002

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

ASSOCIATED WITH

PIPE ON WEST

SIDE OF FORMER

CAFÉ AREA NEAR

MIDDLE WEST

WALL OF FORMER

CAFÉ - BLACK TAR

WRAP

HA: 23

162103243-0003

None DetectedNon-fibrous (Other)40%Cellulose60%Black

Fibrous

Homogeneous

ASSOCIATED WITH

PIPE ON WEST

SIDE OF FORMER

CAFÉ AREA NEAR

MIDDLE WEST

WALL OF FORMER

CAFÉ - BLACK TAR

WRAP

HA: 23

162103243-0004

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

ASSOCIATED WITH

DUCT WORK IN

FORMER CAFÉ -

TAN DUCT MASTIC

HA: 24

162103243-0005

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

ASSOCIATED WITH

DUCT WORK IN

FORMER CAFÉ

AREA CENTER OF

FORMER CAFÉ -

TAN DUCT MASTIC

HA: 24

162103243-0006

2% ChrysotileNon-fibrous (Other)98%Tan

Non-Fibrous

Homogeneous

ASSOCIATED WITH

DUCT WORK IN

FORMER CAFÉ

AREA NEAR

MIDDLE EAST SIDE

OF FORMER CAFÉ -

TAN DUCT MASTIC

HA: 24

Report amended: 03/01/2021 08:31:38 Replaces initial report from: 02/26/2021 16:43:25 Reason Code: DataEntry-Other (see report comment)

Page 1 of 3ASB_PLM_0008_0001 - 1.78 Printed: 3/1/2021 8:32 AM

Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com

162103243EMSL Order:

Customer ID: HCNU50

Customer PO: N1207176

Project ID:

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized

Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous

Non-Asbestos Asbestos

% Type

162103243-0007

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

ASSOCIATED WITH

FIBERGLASS PIPES

THOUGHOUT THE

FORMER CAFÉ

AREA MIDDLE

WEST SIDE OF

FORMER CAFÉ -

WHITE PIPE

ENCAPSULANT

HA: 25

162103243-0008

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

ASSOCIATED WITH

FIBERGLASS PIPES

THOUGHOUT THE

FORMER CAFÉ

AREA CENTER OF

AREA - WHITE PIPE

ENCAPSULANT

HA: 25

162103243-0009

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

ASSOCIATED WITH

FIBERGLASS PIPES

THOUGHOUT THE

FORMER CAFÉ

AREA CENTER OF

AREA - WHITE PIPE

ENCAPSULANT

HA: 25

162103243-0010

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

ASSOCIATED WITH

FIBERGLASS PIPE

INSULATION WITHIN

EAST ELEVATOR

MAINTENANCE

ROOM SOUTHWEST

CORNER - WHITE

PIPE

ENCAPSULANT

HA: 26

162103243-0011

None DetectedNon-fibrous (Other)100%White

Non-Fibrous

Homogeneous

ASSOCIATED…

This is the start of the file's text. The full file is on GovTribe.