N1207176 CVAMC - Upgrade Air Handling Units- Asbestos Report 031021.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--Upgrade Air Handler Units 539-21-104
- Solicitation number
- 36C25021B0059
About this file
This document describes an upcoming federal contract opportunity for upgrade work at the Veterans Administration Cincinnati VAMC facility. The solicitation will be for project number 539-21-104 to upgrade air handler units with a project magnitude between $5 million and $10 million under NAICS code 238220. The contract is set aside as a 100% small business opportunity with an SDVOSB preference. Interested offerors must ensure their VIP and SAM.gov registrations as an SDVOSB are accurate and valid. Safety and experience information will be required prior to award, including no more than three serious OSHA/EPA violations and an EMR less than 1.0. The performance period is 730 calendar days from NTP. Bonds will be required. The solicitation is expected to be released on September 29, 2021 via SAM.gov by Network Contracting Office 10 for the Department of Veterans Affairs VHA.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Survey VA Project: Upgrade Air Handling Units
VA Project Number: 539-21-104 Cincinnati VA Medical Center (CVAMC)
3200 Vine Street, Cincinnati, Ohio 45220
March 10, 2021 Terracon Project No. N1207176
Prepared for:
FFE, Inc.
Cincinnati, OH 45246
Prepared by:
Terracon Consultants, Inc.
Cincinnati, Ohio 45226
Terracon Consul tants, Inc., 611 Lunken Park Dr ive, Cincinnat i , OH 45226 P (513) 321-5816 terracon.com
March 10, 2021
FFE, Inc.
110 Boggs Lane, Suite 170 Cincinnati, OH 45246
Attn: Mr. Clint Weekley, PE, CBCP, LEED AP President P: 513-519-5999 (cell) E: clint.weekley@ffe-serv.com
Re: Asbestos Survey Report VA Project: Upgrade Air Handling Units VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220 Terracon Project No. N1207176
Dear Mr. Weekley:
Terracon Consultants, Inc. (Terracon) is pleased to submit the attached report for the above-referenced renovation project to FFE, Inc. (Client). The purpose of this report is to present the results of an asbestos survey which was performed at the Cincinnati VA Medical Center (CVAMC) during the month of February of 2021, and in general accordance with our proposal number PN1207176, dated April 13, 2020. We understand that this survey was requested for the purpose of a planned renovation project to upgrade various air handling units and associated mechanical systems at the CVAMC.
Asbestos-containing materials (ACM) were identified as a result of this project-specific survey at the CVAMC. Please refer to the attached report for further detail.
Terracon appreciates the opportunity to provide this service to FFE, Inc. If you have any questions regarding this report, please contact the undersigned at 513-321-5816.
Sincerely, Terracon Consultants, Inc.
Josh Vogel Joseph A. Tussey, CHMM Project Manager Sr. Associate / Group Manager
OH AHES #35291 OH AHES #32388
Project: Upgrade Air Handling Units ■ Cincinnati VAMC March 10, 2021 ■ Terracon Project No. N1207176
TABLE OF CONTENTS
1.0 INTRODUCTION
1.1 Project Objective
1.2 Reliance
2.0 Project DESCRIPTION
3.0 FIELD ACTIVITIES
3.1 Visual Assessment
3.2 Physical Assessment
3.3 Sample Collection
3.4 Sample Analysis
4.0 REGULATORY OVERVIEW
5.0 FINDINGS AND RECOMMENDATIONS
6.0 LIMITATIONS/GENERAL COMMENTS
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
APPENDIX C ASBESTOS ANALYTICAL LABORATORY REPORT
APPENDIX D LICENSES AND CERTIFICATIONS
APPENDIX E SAMPLE & ACM LOCATION DRAWINGS
APPENDIX F PHOTO LOG
Responsive ■ Resourceful ■ Reliable 1
ASBESTOS SURVEY
VA Project: Upgrade Air Handling Units
VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC)
3200 Vine Street, Cincinnati, Ohio 45220 Terracon Project No. N1207176
March 10, 2021
1.0 INTRODUCTION
Terracon Consultants, Inc. (Terracon) conducted an asbestos survey specifically limited to within the boundaries and intent of the planned renovation project entitled “Upgrade Air Handling Units” at the Cincinnati VA Medical Center (CVAMC). The survey was performed on various days during the month of February 2021 by United States Environmental Protection Agency (USEPA)-accredited asbestos inspectors who were also certified by the Ohio Environmental Protection Agency (OEPA) as Asbestos Hazard Evaluation Specialists (AHES). Based on Client-provided renovation drawings, accessible building components and areas intended to be impacted by the renovation project were surveyed. Homogeneous areas of suspect asbestos-containing materials (ACM) were visually identified and documented. Although reasonable effort was made to survey accessible suspect materials, additional suspect but un-sampled materials could be located in walls, in voids, or in other concealed areas. Suspect ACM samples were collected in general accordance with the sampling protocols outlined in USEPA 40 Code of Federal Regulations (CFR) Part 763, Subpart E, known as the Asbestos Hazard Emergency Response Act (AHERA).
Samples were delivered to an accredited laboratory for analysis by Polarized Light Microscopy
(PLM).
1.1 Project Objective
Terracon understood the renovation project pertains to various upgrades to air handlers and associated ductwork/mechanical components throughout the CVAMC. Please note that asbestos surveys are required prior to renovation and demolition projects to satisfy requirements of the USEPA 40 CFR Part 61, Subpart M, the National Emission Standards for Hazardous Air Pollutants (NESHAP) regulation (as well as the state NESHAP equivalent).
1.2 Reliance
This report is for the exclusive use of FFE, Inc. (Client) for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and the Client. Reliance on this report by the Client and all authorized parties will be subject to the terms, conditions, and limitations stated in the proposal and the agreement between Terracon and the Client
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable 2
2.0 PROJECT DESCRIPTION
Terracon understood the renovation project pertains to various upgrades to air handlers and associated ductwork/mechanical components throughout the VAMC. Client-provided renovation drawings were used as a “road-map” for this project-specific survey.
3.0 FIELD ACTIVITIES
The survey was conducted by Mr. Lemuel Weyer and Mr. Tyler Stenten, USEPA-accredited asbestos inspectors and OEPA-certified AHES. Copies of their Ohio AHES credentials are attached as Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763, Subpart E, Section 763.86, AHERA.
A summary of survey activities is provided below.
3.1 Visual Assessment
Based on a review of Client-provided drawings, survey activities were initiated with visual observation of project-specific accessible areas and accessible building components to be impacted by the renovation project to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application.
3.2 Physical Assessment
A physical assessment of each HA of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized, or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
3.3 Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Terracon collected a total of 141 bulk samples from 41 homogeneous areas of suspect ACM. A summary of suspect ACM samples collected during the survey is included as Appendix B.
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable 3
3.4 Sample Analysis
Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) of Indianapolis, Indiana for analysis PLM with dispersion staining techniques per USEPA methodology 600/R-93/116. The percentage of asbestos, where applicable, was determined by microscopic visual estimation. When applicable for friable material samples determined by PLM to have a low asbestos content (<10%), the additional point count (PC) method was utilized.
EMSL is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP), accreditation number 200188-0.
The laboratory analytical report is included in Appendix C.
4.0 REGULATORY OVERVIEW
The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM).
The asbestos NESHAP regulation classifies material subject to demolition or renovation as either RACM, Category I non-friable ACM, or Category II non-friable ACM. RACM includes all friable ACM (pre-disturbance), along with Category I non-friable ACM that becomes friable (during disturbance), and Category I non-friable ACM subject to sanding, grinding, cutting, or abrading, or Category II non-friable ACM with a high probability of becoming crumbled, pulverized, or reduced to powder by forces expected to act on the material during disturbance. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials (other than Category I non-friable ACM) that contain more than 1% asbestos. Category II non-friable ACM generally includes (but is not limited to) cementitious material such as: cement pipes, cement siding (Transite™), cement panels, glazing, mortar, and grouts.
The Ohio Environmental Protection Agency (OEPA) adopted Chapter 3745-20 of the Ohio Administrative Code and implements the Asbestos NESHAP. The owner or operator must provide the OEPA district office or local air agency with written notification at least 10 business days prior to the commencement demolition projects and prior to removal of friable ACMs in quantities greater than 50 linear or 50 square feet. The OEPA also regulates friable asbestos abatement activities, asbestos personnel training, and issuance of asbestos professional certifications under OAC 3745-22. OEPA audits asbestos abatement projects and responds to public health emergencies where friable ACMs has been released. Please note that per OEPA regulations, March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable 4 non-friable floor tile if broken into pieces four (4) square inches or smaller are considered friable, and thus as a RACM.
The United States Occupational Safety and Health Administration (USOSHA) asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The USOSHA standard requires that employee exposure to airborne asbestos must not exceed 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight-hour time weighted average (TWA) and not exceed
1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30-minute time period known as an excursion limit (EL). The TWA and EL are known as USOSHA’s asbestos permissible exposure limits (PELs). The USOSHA standard classifies construction and maintenance activities which could disturb ACM and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
5.0 FINDINGS AND RECOMMENDATIONS
Specific to the subject renovation project areas and components to be impacted based on Client-provided renovation drawings, asbestos was identified by laboratory analysis in samples collected from the following materials:
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity*
Tan Duct Mastic Basement - Associated with
AHU 20 and Adjacent Ductwork
2% Chrysotile Good/Non- Friable
~ 25 Square Feet (SF) of Duct
Mastic
Tan Duct Mastic
1st Floor Area A - Associated with Kitchen Vents and
Adjacent Duct Work; AHU 16 and Adjacent Ductwork
2% Chrysotile Good/Non- Friable
~ 100 SF of Duct Mastic
Gray-Brown Duct Mastic
2nd Floor Area C - Associated with Ductwork Under Fiberglass Insulation
3% Chrysotile Good/Non- Friable
~ 50 SF of Duct Mastic
Brown Duct Mastic
2nd Floor Area C - Associated with Ductwork and 2nd Floor Area A - South Area Hallway Under Fiberglass Insulation
3% Chrysotile Good/Non- Friable
~ 100 SF of Duct Mastic
Tan Duct Mastic 3rd Floor Area C - Associated with Air Handler Unit 22 Ductwork in Men’s Surgical
Area Locker Room
3% Chrysotile Good/Non- Friable
~ 20 SF of Duct Mastic
Tan Duct Mastic 4th Floor Mechanical Room - Associated with AHU 22 and
Adjacent Ductwork 2% Chrysotile Good/Non-
Friable ~ 100 SF of Duct
Mastic
Tan Duct Mastic 1st Floor- Associated with Duct Work in Former Café
Area 2% Chrysotile Good/Non-
Friable ~ 150 SF of Duct
Mastic
Tan Duct Mastic
Associated with Duct Work with East Elevator
Maintenance Room (Located on 10th Floor Roof)
2% Chrysotile Good/Non- Friable
~ 10 SF of Duct Mastic
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable 5
ACM Description Material Location % and Type Asbestos Condition Estimated
Quantity* Tar under Non-
Asbestos-Containing Cementitious Duct
Coating
Central Ductwork on North Roof of 1st Floor (Former
Dining Room Roof) 5% Chrysotile Fair/Non-
Friable ~ 500 SF of Duct
Coating
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions on quantities present. Please note that the quantities listed for duct mastic are Terracon’s opinion of asbestos-containing duct mastic present on ductwork to be impacted by the project, and the quantities listed are not meant to refer to actual square footage of duct surfaces or runs of duct work in linear feet. Additionally, please note that duct mastic is on hard metal ductwork, and in some instances, it may be located under non-asbestos-containing fiberglass insulation.
A sample and results summary table is included in Appendix B, the laboratory analytical report is included in Appendix C, drawings indicating sample and ACM locations are included in Appendix E, and example photos of the identified materials are included in Appendix F.
If the identified ACMs will be impacted by the renovation project, such materials will first need to be properly removed, handled, and disposed by a state-licensed abatement contractor in accordance with applicable federal and state EPA asbestos regulations, Occupational Safety and Health Administration (OSHA) asbestos regulations, and per VA abatement project specifications.
It should be noted that inaccessible/concealed suspect materials, other than those identified during this survey, may exist. This survey did not include disassembling equipment or electrical wiring/electrical components as the building was fully active/operational and inspecting/sampling such equipment/materials would representative a safety hazard to the inspector. Should additional suspect materials be uncovered prior to or during renovation activities, those materials must be assumed asbestos-containing until sampled by a state-licensed asbestos inspector and analysis refutes the positive assumption.
6.0 LIMITATIONS/GENERAL COMMENTS
The survey was project-specific and limited to the HVAC/building components indicated on Client-provided drawings to be impacted and within the boundaries of the areas to be renovated. This survey is not meant to be a comprehensive survey of the entire facilities. In addition, Terracon did not perform sampling which required demolition or destructive activities such as knocking large holes in walls, dismantling of equipment or removal of protective coverings. Reasonable efforts to access suspect materials within known areas of restricted access (e.g., crawl spaces) were made; however, confined spaces or areas/equipment which may pose a health or safety risk to Terracon personnel were not sampled (inspecting/opening energizing equipment, inspecting/sampling electrical wiring and similar components). Sampling did not include suspect materials which could not be safely reached with available ladders/man-lifts.
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable 6
This asbestos survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed during our survey of the building. The information contained in this report is relevant to the date on which this survey was performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by FFE, Inc. for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities, further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
Responsive ■ Resourceful ■ Reliable
APPENDIX A
VA Project: Upgrade Air Handling Units
VA Project No.: 539-21-104 Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220
IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
HA
No’s. ACM Description Material Location % and Type Asbestos
EPA NESHAP
Classification
Condition/ Friability
Estimated Quantity*
04 Tan Duct Mastic Basement - Associated with AHU 20 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non-
Friable ~ 25 Square Feet
(SF) of Duct Mastic 08 Tan Duct Mastic 1st Floor Area A - Associated with Kitchen Vents and
Adjacent Duct Work; AHU 16 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non- Friable
~ 100 SF of Duct Mastic
12 Gray-Brown Duct Mastic 2nd Floor Area C - Associated with Ductwork Under Fiberglass Insulation 3% Chrysotile Category II Non-Friable Good/Non-
Friable ~ 50 SF of Duct
Mastic
14 Brown Duct Mastic 2nd Floor Area C - Associated with Ductwork and 2nd
Floor Area A - South Area Hallway Under Fiberglass Insulation
3% Chrysotile Category II Non-Friable Good/Non- Friable
~ 100 SF of Duct Mastic
17 Tan Duct Mastic 3rd Floor Area C - Associated with Air Handler Unit 22 Ductwork in Men’s Surgical Area Locker Room 3% Chrysotile Category II Non-Friable Good/Non-
Friable ~ 20 SF of Duct
Mastic 21 Tan Duct Mastic 4th Floor Mechanical Room - Associated with AHU 22 and Adjacent Ductwork 2% Chrysotile Category II Non-Friable Good/Non- Friable
~ 100 SF of Duct Mastic
24 Tan Duct Mastic 1st Floor- Associated with Duct Work in Former Café Area 2% Chrysotile Category II Non-Friable Good/Non-
Friable ~ 150 SF of Duct
Mastic
27 Tan Duct Mastic Associated with Duct Work with East Elevator Maintenance Room (Located on 10th Floor Roof) 2% Chrysotile Category II Non-Friable Good/Non-
Friable ~ 10 SF of Duct
Mastic
Tar under Non-Asbestos- Containing Cementitious
Duct Coating
Central Duct Work on North Roof of 1st Floor (Former Dining Room Roof) 5% Chrysotile Category II Non-Friable Fair/Non-
Friable ~ 500 SF of Duct
Coating
*Estimated quantities listed above are based on a cursory field evaluation, and actual quantities may vary significantly, especially if ACMs are present outside of the planned renovation areas, and in hidden and/or inaccessible areas not evaluated as part of this survey. This is not a bidding document and contractors would be responsible for drawing their own conclusions regarding quantities present. Please note that the quantities listed for duct mastic are Terracon’s opinion of asbestos-containing duct mastic present on ductwork to be impacted by the project, and the quantities listed are not meant to refer to actual square footage of duct surfaces or runs of duct work in linear feet. Additionally, please note that duct mastic is on hard metal ductwork, and in some instances, it may be located under non-asbestos-containing fiberglass insulation.
See Appendix B for a summary of samples collected with respective analytical results, Appendix C for the laboratory analytical report, Appendix E for sample and ACM location drawings, and Appendix F for photo examples of the above identified materials.
It should be noted that inaccessible/concealed suspect materials, other than those identified during this survey, may exist. This survey did not include disassembling equipment or electrical wiring/electrical components as the building was fully active/operational and inspecting/sampling such equipment/materials would representative a safety hazard to the inspector. Should additional suspect materials be uncovered prior to or during renovation activities, those materials must be assumed asbestos-containing until sampled by a state-licensed asbestos inspector and analysis refutes the positive assumption.
If the identified ACMs will be impacted by the renovation, such materials would need to be properly removed, handled, and disposed in accordance with applicable federal and state EPA regulations, Occupational Safety and Health Administration (OSHA) regulations, and per VA project specifications.
APPENDIX B
VA Project: Upgrade Air Handling Units VA Project No.: 539-21-104
Cincinnati VA Medical Center (CVAMC) 3200 Vine Street, Cincinnati, OH 45220
ASBESTOS SURVEY SAMPLE & RESULTS SUMMARY
Sample # Sample Material
Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
White Pipe Encapsulant
North side of pump system
Northwest heater pump system in Sub- Basement
None Detected (ND)
02 East pump ND
03 West pump ND
Gray Duct Mastic
Northeast corner of Room A013
Throughout Basement
ND
05 Center of Room
A0127 ND
06 AHU 20 ND
White Cloth Duct Tape
Near Northwest Corner of Duct Ductwork within
Basement Dock Area
ND
08 ND
09 Near northeast corner of duct ND
Tan Duct Mastic
Northwest corner of AHU 20
Associated with AHU 20 and associated ductwork
<1% Chrysotile
11 North duct of AHU 20 2% Chrysotile
12 North duct of AHU 20 2% Chrysotile
05 13 Center of office Center Office in Dock Area ND
Project: Upgrade Air Handling Units ■ CVAMC March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
14 2’ x 2’ White Ceiling Tile with Small
Fissures
Center of office ND
15 Northeast Corner of Office ND
2’ x 2’ Ceiling Tile – No Pattern
Southeast corner
Kitchen Area
ND
17 Southwest corner ND
18 Northwest corner ND
Gray Duct Mastic
Near Southeast Corner of Kitchen
Associated with Kitchen
Ductwork
ND
20 At AHU 16 ND
21 At AHU 16 ND
Tan Duct Mastic
South Side of Duct Work in Kitchen
Associated with Vents and Adjacent Ducts in Kitchen and
AHU 16
2% Chrysotile
North Side of Ductwork in
Kitchen 2% Chrysotile
AHU 16 in Convenience Store North Mechanical
Closet
2% Chrysotile
Gray-Brown Duct Mastic
Near Middle North Wall
Associated with Duct Work in Food Service
Area
ND
26 Center of Room ND
AHU 16 in Convenience Store North Mechanical
Closet
ND
10 28 Northeast Corner of Store
Food Service Area and
ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
29 2’ x 2’ White Ceiling Tile with Texture
Pattern
Northeast Corner of Store
Convenience Store Area ND
30 Center of Food Service Area ND
2’ x 2’ White Ceiling Tile with Small
Fissures
Hallway at C249
Throughout second floor
ND
32 Hallway at C241 ND
33 Hallway at C220 ND
Gray-Brown Duct Mastic
Hallway at Room C249
Associated with Ductwork in Area C of the
2nd floor
3% Chrysotile
35 Hallway at Room C237 3% Chrysotile
36 Hallway at Room C213 3% Chrysotile
Gray Duct Mastic
EKG Waiting Room, east end
Associated with Ductwork in
Area C of the 2nd
Floor
ND
38 Hallway at Room
C241 ND
39 Hallway at Room
C241 ND
Brown Duct Mastic
Hallway at Room C231 Area C – 2nd floor hallway near C231 and in South Hallway of Area
A
3% Chrysotile
41 Hallway near C226 3% Chrysotile
42 Hallway at C205 3% Chrysotile
43 2’ x 2’ White Ceiling Tile with Small
Fissures
At North Entrance to PACU Throughout 3rd floor
ND
44 At Entrance to Surgical Area
ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
South Wall of Men’s
Locker Room Restroom
ND
White Pipe Encapsulant
PACU Northwest room
PACU
Northwest room
ND
47 PACU Northwest room ND
48 PACU Northwest room ND
Tan Duct Mastic
Center south wall of Men’s locker room restroom
3rd Floor Duct Work associated with AHU 22 in
Men’s Surgical Area Locker
Room
3% Chrysotile
Center south wall of Men’s locker room restroom
3% Chrysotile
Center south wall of Men’s locker room restroom
3% Chrysotile
White Pipe Encapsulant
Center of Room
SPS Area – 3rd floor
ND
53 Middle East Side ND
54 Middle East Side ND
Gray Caulking
Middle West side Middle east side of AHU 22 in 4th
Floor Mechanical
Space
ND
56 Middle West side ND
57 Middle West side ND
White Pipe Encapsulant
Middle West Side Associated with Fiberglass pipes around AHU 22 in 4th Floor Mechanical
Space
ND
59 South East Corner ND
60 South East Corner ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
Tan Duct Mastic
Top Center of AHU Seams of AHU 22 and associated duct work in 4th
Floor Mechanical
Space
2% Chrysotile
62 South end of AHU 2% Chrysotile
63 Southeast Corner Duct 2% Chrysotile
Gray Duct Mastic
South End at Top of Duct Work on Air
Handler Unit South Duct work of AHU 22 in 4th
Floor Mechanical
Space
ND
South End at Top of
Duct Work on Air Handler Unit
ND
South End at Top of
Duct Work on Air Handler Unit
ND
Black Tar Wrap
Near Middle West Wall of Former Café
Associated with Pipes on West Side of Former
Café Area
ND
68 Near Middle West Wall of Former Café ND
69 Near Middle West Wall of Former Cafe ND
Tan Duct Mastic
Middle West Side of Former Café
Associated with Ductwork in Former Café
Area
2% Chrysotile
71 Center of Former Café 2% Chrysotile
72 Near Middle East Side of Former Cafe 2% Chrysotile
White Pipe Encapsulant
Middle West Side of Former Café Associated with
Fiberglass Pipes throughout the Former Café
Area
ND
74 Center of Area ND
75 Center of Area ND
26 76 White Pipe Encapsulant Southwest Corner ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
77 Southwest Corner Associated with Fiberglass Pipe Insulation within
East Elevator Maintenance
Room
ND
78 Southeast Corner ND
Tan Duct Mastic
Middle East Wall Associated with Ductwork with East Elevator Maintenance
Room
2% Chrysotile
80 Middle East Wall 2% Chrysotile
81 Middle South Wall 2% Chrysotile
Tar and Tar Paper, Foam and White Block Insulation
Roofing Materials
West of AHU 10
3rd Floor Roof Area Around
AHU 10
Asphalt: ND, Tar: ND, Tar Paper:
ND, Foam: ND, Insulation: ND
83 West of AHU 10 Asphalt: ND, Tar: ND, Tar Paper:
ND, Foam: ND, Insulation: ND
84 East of AHU 10 Asphalt: ND, Tar: ND, Tar Paper:
ND, Foam: ND, Insulation: ND
Silver Coating on
Rubber, Foam and Mastic Roof Curb
Materials
Middles East Side of
AHU 10
Roof Curb Base Associated with
AHU 10
Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND
86 Northeast Corner of
AHU 10
Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND
87 Southwest Corner of
AHU 10
Coating: ND, Rubber: ND, Tar: ND, Tar Paper: ND, Roofing: ND
White Caulking
North of AHU 10 Associated with
Duct Work Stands and
Junctions into Walls
ND
89 Middle North Side of Roof Duct Work ND
90 Near Wall on Duct Work ND
91 Tar, Foam, Tar Paper and Perlite Insulation
Roofing Materials
Middle North Side of Roof
North 1st Floor Roof (Above
Former Dining Area)
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
92 Middle North Side of Roof
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
93 Near Northwest Corner of Roof
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
Rubber Roof Curb with Tar and Silver
Coating
East Side of AHU
Around Base of AHUs and Duct
Work
Rubber: ND, Tar: ND, Coating: ND
95 Center of Roof Rubber: ND, Tar: ND, Coating: ND
96 Middle South Side of Roof
Rubber: ND, Tar: ND, Coating: ND
Brown-Gray Duct Mastic
West Side
Associated with Duct Work inside AHU 15 Room
ND
98 West Side ND
99 East End ND
White Pipe Encapsulant
Middle South Side Associated with Fiberglass Pipes within AHU 15
Room
ND
101 Middle South Side ND
102 Middle North Side ND
Cementitious Coating with Tar over White
Block Insulation
Northwest End Central Duct
Work on North Roof of 1st Floor (Former Dining
Room Roof)
Coating: ND, Tar: 5% Chrysotile, Insulation: ND
104 Middle West Side Coating: ND, Tar: 5% Chrysotile, Insulation: ND
105 Southeast Corner Coating: ND, Tar: 5% Chrysotile, Insulation: ND
Tar, Foam, Tar Paper and Perlite Insulation
Roofing Materials
Central East Side of Roof
3rd Floor North Roof
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
107 Central East Side of Roof
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
108 Near Northwest Corner of Roof
Tar: ND, Foam: ND, Tar Paper: ND, Insulation: ND, Roofing: ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
Rubber Roof Curb with Tar and Silver
Coating
Center of Roof Around Base Roof Curb of
AHUs and Duct Work on 3rd
Floor North Roof
Rubber: ND, Tar: ND, Coating: ND
110 East of AHUs Rubber: ND, Tar: ND, Coating: ND
111 Northwest Corner of Roof Rubber: ND, Tar: ND, Coating: ND
Gray Duct Mastic
North Fan Associated with
Fan Vents in Southeast
Corner of North 3rd Floor Roof
ND
113 North Fan ND
114 South Fan ND
Plaster Walls: Base Coat and Finish Coat
Basement- At Entrance to Morgue
Area
Throughout Building
Base Coat: ND, Finish Coat: ND
1st Floor- Main
Hallway at Room Women’s Restroom
Base Coat: ND, Finish Coat: ND
03 2nd Floor- East Side Elevator Lobby
Base Coat: ND, Finish Coat: ND
04 3rd Floor- At Double Doors to Area B Base Coat: ND, Finish Coat: ND
05 4th Floor- East Side of Elevator Lobby Base Coat: ND, Finish Coat: ND
5th Floor- Near
Entrance to Pharmacy Area
Base Coat: ND, Finish Coat: ND
07 6th Floor- East Side of Elevator Lobby Base Coat: ND, Finish Coat: ND
08 7th Floor – Near Room A743 Base Coat: ND, Finish Coat: ND
9th Floor- Northwest Corner of Elevator
Lobby Base Coat: ND, Finish Coat: ND
02 10 Basement- East Elevator Lobby
Throughout Building Drywall: ND, Joint Compound: ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
Drywall System:
Drywall and Joint
Compound
1st Floor- Hallway at Room A123 Drywall: ND, Joint Compound: ND
12 2nd Floor- Northwest Corner of C201 Drywall: ND, Joint Compound: ND
3rd Floor- Near
Southeast Corner of Elevator Lobby
Drywall: ND, Joint Compound: ND
4th Floor- Area B- Doorway to North
Wing Drywall: ND, Joint Compound: ND
5th Floor- South Wall of East Elevator Lobby
Drywall: ND, Joint Compound: ND
6th Floor- South Wall of Main Elevator South
Drywall: ND, Joint Compound: ND
17 7th Floor – At Entrance to Area B Drywall: ND, Joint Compound: ND
8th Floor- Northeast Corner Service Elevator Lobby
Drywall: ND, Joint Compound: ND
Spray-On Fireproofing
Basement – East Elevator Lobby
Throughout Building
ND
20 1st Floor- Near Main Entrance Lobby ND
2nd Floor – Entrance to Dentistry Area ND
22 3rd Floor- Center of Elevator Lobby ND
23 4th Floor – Center of Elevator Lobby ND
5th Floor- Near
Entrance to Pharmacy Area
ND
25 6th Floor- East Elevator Lobby ND
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
Sample # Sample Material Description Sample Location HA Location(s) Results (% / Type of Asbestos)
HA # SEQ. #
7th Floor- West Side of Main Elevator Lobby
ND
9th Floor – East End of Hallway at Entrance to
Maintenance Area
ND
Inspector Signatures: ________________________ _____________________________ Lem Weyer, OH AHES #36337 Tyler Stenten, OH AHES #35931
March 10, 2021 ■ Terracon Project No. N1207176
Responsive ■ Resourceful ■ Reliable
APPENDIX C
ASBESTOS ANALYTICAL LABORATORY DATA
EMSL Analytical, Inc.
6340 CastlePlace Dr. Indianapolis, IN 46250
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Attention: Phone:Lem Weyer (513) 321-5816
Fax:Terracon Consultants, Inc. (513) 321-0294
Received Date:611 Lunken Park Drive 02/17/2021 9:45 AM
Analysis Date:Cincinnati, OH 45226 02/19/2021
Collected Date:
Project: CVAMC-AHU N1207176
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
01-01
162102984-0001
None DetectedNon-fibrous (Other)95%Cellulose5%White
Non-Fibrous
Homogeneous
Northwest Heater
Pump System - White
Pipe Encapsulant
01-02
162102984-0002
None DetectedNon-fibrous (Other)95%Cellulose5%White
Non-Fibrous
Homogeneous
Northwest Heater
Pump System - White
Pipe Encapsulant
01-03
162102984-0003
None DetectedNon-fibrous (Other)95%Cellulose5%White
Non-Fibrous
Homogeneous
Northwest Heater
Pump System - White
Pipe Encapsulant
02-04
162102984-0004
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Basement - Gray
Duct Mastic
02-05
162102984-0005
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Basement - Gray
Duct Mastic
02-06
162102984-0006
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Basement - Gray
Duct Mastic
03-07
162102984-0007
None DetectedNon-fibrous (Other)70%Cellulose30%White
Fibrous
Homogeneous
Duct in Dock Area -
White Cloth Duct
Tape
03-08
162102984-0008
None DetectedNon-fibrous (Other)70%Cellulose30%White
Fibrous
Homogeneous
Duct in Dock Area -
White Cloth Duct
Tape
03-09
162102984-0009
None DetectedNon-fibrous (Other)70%Cellulose30%White
Fibrous
Homogeneous
Duct in Dock Area -
White Cloth Duct
Tape
04-10
162102984-0010
<1% ChrysotileNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Associated with AHU
20 Associated Duct
Work - Tan Duct
Mastic
04-11
162102984-0011
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Associated with AHU
20 Associated Duct
Work - Tan Duct
Mastic
04-12
162102984-0012
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Associated with AHU
20 Associated Duct
Work - Tan Duct
Mastic
05-13
162102984-0013
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose80%Gray
Fibrous
Homogeneous
Center office in Dock
Area - 2x2 White
Ceiling Tile with small fissure
05-14
162102984-0014
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose80%Gray
Fibrous
Homogeneous
Center office in Dock
Area - 2x2 White
Ceiling Tile with small fissure
Initial report from: 02/19/2021 12:17:48
Page 1 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
05-15
162102984-0015
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
50%
30%
Tan
Fibrous
Homogeneous
Center office in Dock
Area - 2x2 White
Ceiling Tile with small fissure
06-16
162102984-0016
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Kitchen Area - 2x2
Ceiling Tile-No
Pattern
06-17
162102984-0017
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Kitchen Area - 2x2
Ceiling Tile-No
Pattern
06-18
162102984-0018
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
50%
30%
Tan
Fibrous
Homogeneous
Kitchen Area - 2x2
Ceiling Tile-No
Pattern
07-19
162102984-0019
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated With
Kitchen Duct Work -
Gray Duct Mastic
07-20
162102984-0020
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated With
Kitchen Duct Work -
Gray Duct Mastic
07-21
162102984-0021
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated With
Kitchen Duct Work -
Gray Duct Mastic
08-22
162102984-0022
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Associated with vents and adjacent ducts in
Kitchen - Tan Duct
Mastic
08-23
162102984-0023
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Associated with vents and adjacent ducts in
Kitchen - Tan Duct
Mastic
08-24
162102984-0024
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Associated with vents and adjacent ducts in
Kitchen - Tan Duct
Mastic
09-25
162102984-0025
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in food service area - Gray-Brown
Duct Mastic
09-26
162102984-0026
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in food service area - Gray-Brown
Duct Mastic
09-27
162102984-0027
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in food service area - Gray-Brown
Duct Mastic
10-28
162102984-0028
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Food Service area and convenience store area - 2x2 White
Ceiling Tile with
Texture
10-29
162102984-0029
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Food Service area and convenience store area - 2x2 White
Ceiling Tile with
Texture
Page 2 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
10-30
162102984-0030
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
50%
30%
Tan
Fibrous
Homogeneous
Food Service area and convenience store area - 2x2 White
Ceiling Tile with
Texture
11-31
162102984-0031
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray
Fibrous
Homogeneous
Throughout Second
Floor - 2x2 White
Ceiling Tile with Small
Fissure
11-32
162102984-0032
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
40%
40%
Gray/White
Fibrous
Homogeneous
Throughout Second
Floor - 2x2 White
Ceiling Tile with Small
Fissure
11-33
162102984-0033
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
50%
30%
Tan
Fibrous
Homogeneous
Throughout Second
Floor - 2x2 White
Ceiling Tile with Small
Fissure
12-34
162102984-0034
3% ChrysotileNon-fibrous (Other)97%Brown/Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor -
Gray-Brown Duct
Mastic
12-35
162102984-0035
3% ChrysotileNon-fibrous (Other)97%Brown/Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor -
Gray-Brown Duct
Mastic
12-36
162102984-0036
3% ChrysotileNon-fibrous (Other)97%Brown/Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor -
Gray-Brown Duct
Mastic
13-37
162102984-0037
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor - Gray
Duct Mastic
13-38
162102984-0038
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor - Gray
Duct Mastic
13-39
162102984-0039
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Associated with duct work in Area C
Second Floor - Gray
Duct Mastic
14-40
162102984-0040
3% ChrysotileNon-fibrous (Other)97%Brown
Non-Fibrous
Homogeneous
Area C-2nd Floor
Hallway Near C231 and South Hallway of
Area A - Brown Duct
Mastic
14-41
162102984-0041
3% ChrysotileNon-fibrous (Other)97%Brown
Non-Fibrous
Homogeneous
Area C-2nd Floor
Hallway Near C231 and South Hallway of
Area A - Brown Duct
Mastic
14-42
162102984-0042
3% ChrysotileNon-fibrous (Other)97%Brown
Non-Fibrous
Homogeneous
Area C-2nd Floor
Hallway Near C231 and South Hallway of
Area A - Brown Duct
Mastic
Page 3 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
15-43
162102984-0043
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
70%
10%
Gray/White
Fibrous
Homogeneous
Throughout 3rd Floor
- 2x2 White Ceiling
Tile with small fissures
15-44
162102984-0044
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
70%
10%
Gray/White
Fibrous
Homogeneous
Throughout 3rd Floor
- 2x2 White Ceiling
Tile with small fissures
15-45
162102984-0045
None DetectedPerlite
Non-fibrous (Other)
15%
5%
Cellulose
Min. Wool
70%
10%
Tan
Fibrous
Homogeneous
Throughout 3rd Floor
- 2x2 White Ceiling
Tile with small fissures
16-46
162102984-0046
None DetectedNon-fibrous (Other)40%Cellulose
Glass
50%
10%
White/Silver
Fibrous
Homogeneous
PACU Northwest
Room - White
Encapsulant
16-47
162102984-0047
None DetectedNon-fibrous (Other)40%Cellulose
Glass
50%
10%
White/Silver
Fibrous
Heterogeneous
PACU Northwest
Room - White
Encapsulant
16-48
162102984-0048
None DetectedNon-fibrous (Other)25%Cellulose
Glass
70%
5%
White
Fibrous
Homogeneous
PACU Northwest
Room - White
Encapsulant
17-49
162102984-0049
3% ChrysotileNon-fibrous (Other)97%Tan
Non-Fibrous
Homogeneous
3rd Floor Duct Work
Associated with AHU
22 in Men's locker room - Tan Duct
Mastic
17-50
162102984-0050
3% ChrysotileNon-fibrous (Other)97%Tan
Non-Fibrous
Homogeneous
3rd Floor Duct Work
Associated with AHU
22 in Men's locker room - Tan Duct
Mastic
17-51
162102984-0051
3% ChrysotileNon-fibrous (Other)97%Tan
Non-Fibrous
Homogeneous
3rd Floor Duct Work
Associated with AHU
22 in Men's locker room - Tan Duct
Mastic
18-52
162102984-0052
None DetectedNon-fibrous (Other)98%Cellulose2%White
Non-Fibrous
Homogeneous
SPS Area -3rd Floor -
White Encapsulant
18-53
162102984-0053
None DetectedNon-fibrous (Other)98%Cellulose2%White
Non-Fibrous
Homogeneous
SPS Area -3rd Floor -
White Encapsulant
18-54
162102984-0054
None DetectedNon-fibrous (Other)95%Cellulose5%White
Non-Fibrous
Homogeneous
SPS Area -3rd Floor -
White Encapsulant
19-55
162102984-0055
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle East Side of
AHU 22 in 4th Floor
Mechanical Space -
Gray Caulking
19-56
162102984-0056
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle East Side of
AHU 22 in 4th Floor
Mechanical Space -
Gray Caulking
19-57
162102984-0057
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Middle East Side of
AHU 22 in 4th Floor
Mechanical Space -
Gray Caulking
Page 4 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
20-58
162102984-0058
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Associated with
Fiberglass pipes around AHU 22 in 4th floor mechanical space - White
Encapsulant
20-59
162102984-0059
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Associated with
Fiberglass pipes around AHU 22 in 4th floor mechanical space - White
Encapsulant
20-60
162102984-0060
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Associated with
Fiberglass pipes around AHU 22 in 4th floor mechanical space - White
Encapsulant
21-61
162102984-0061
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Seams of AHU 22 and associated duct work in 4th floor mechanical space -
Tan Duct Mastic
21-62
162102984-0062
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Seams of AHU 22 and associated duct work in 4th floor mechanical space -
Tan Duct Mastic
21-63
162102984-0063
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
Seams of AHU 22 and associated duct work in 4th floor mechanical space -
Tan Duct Mastic
22-64
162102984-0064
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
South duct work of
AHU 22 in 4th floor mechanical space -
Gray Duct Mastic
22-65
162102984-0065
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
South duct work of
AHU 22 in 4th floor mechanical space -
Gray Duct Mastic
22-66
162102984-0066
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
South duct work of
AHU 22 in 4th floor mechanical space -
Gray Duct Mastic
Page 5 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162102984EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Analyst(s)
Craig Nixon (44)
Maggie Hayden (22)
Richard Harding, Laboratory Manager or Other Approved Signatory
EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received.
Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA 600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample. Estimation of uncertainty is available on request.
Samples analyzed by EMSL Analytical, Inc. Indianapolis, IN NVLAP Lab Code 200188-0, AZ0939, CA 2575, CO AL-15132, TX 300262
Page 6 of 6ASB_PLM_0008_0001 - 1.78 Printed: 2/19/2021 12:17 PM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162103243EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Attention: Phone:Lem Weyer (513) 321-5816
Fax:Terracon Consultants, Inc. (513) 321-0294
Received Date:611 Lunken Park Drive 02/22/2021 8:00 AM
Analysis Date:Cincinnati, OH 45226 02/26/2021
Collected Date: 02/19/2021
Project: CVAMC - AHU - N1207176
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
162103243-0001
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
ASSOCIATED WITH
PIPE ON WEST
SIDE OF FORMER
CAFÉ AREA NEAR
MIDDLE WEST
WALL OF FORMER
CAFÉ - BLACK TAR
WRAP
HA: 23
162103243-0002
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
ASSOCIATED WITH
PIPE ON WEST
SIDE OF FORMER
CAFÉ AREA NEAR
MIDDLE WEST
WALL OF FORMER
CAFÉ - BLACK TAR
WRAP
HA: 23
162103243-0003
None DetectedNon-fibrous (Other)40%Cellulose60%Black
Fibrous
Homogeneous
ASSOCIATED WITH
PIPE ON WEST
SIDE OF FORMER
CAFÉ AREA NEAR
MIDDLE WEST
WALL OF FORMER
CAFÉ - BLACK TAR
WRAP
HA: 23
162103243-0004
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
ASSOCIATED WITH
DUCT WORK IN
FORMER CAFÉ -
TAN DUCT MASTIC
HA: 24
162103243-0005
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
ASSOCIATED WITH
DUCT WORK IN
FORMER CAFÉ
AREA CENTER OF
FORMER CAFÉ -
TAN DUCT MASTIC
HA: 24
162103243-0006
2% ChrysotileNon-fibrous (Other)98%Tan
Non-Fibrous
Homogeneous
ASSOCIATED WITH
DUCT WORK IN
FORMER CAFÉ
AREA NEAR
MIDDLE EAST SIDE
OF FORMER CAFÉ -
TAN DUCT MASTIC
HA: 24
Report amended: 03/01/2021 08:31:38 Replaces initial report from: 02/26/2021 16:43:25 Reason Code: DataEntry-Other (see report comment)
Page 1 of 3ASB_PLM_0008_0001 - 1.78 Printed: 3/1/2021 8:32 AM
Tel/Fax: (317) 803-2997 / (317) 803-3047 http://www.EMSL.com / indianapolislab@emsl.com
162103243EMSL Order:
Customer ID: HCNU50
Customer PO: N1207176
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
162103243-0007
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
ASSOCIATED WITH
FIBERGLASS PIPES
THOUGHOUT THE
FORMER CAFÉ
AREA MIDDLE
WEST SIDE OF
FORMER CAFÉ -
WHITE PIPE
ENCAPSULANT
HA: 25
162103243-0008
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
ASSOCIATED WITH
FIBERGLASS PIPES
THOUGHOUT THE
FORMER CAFÉ
AREA CENTER OF
AREA - WHITE PIPE
ENCAPSULANT
HA: 25
162103243-0009
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
ASSOCIATED WITH
FIBERGLASS PIPES
THOUGHOUT THE
FORMER CAFÉ
AREA CENTER OF
AREA - WHITE PIPE
ENCAPSULANT
HA: 25
162103243-0010
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
ASSOCIATED WITH
FIBERGLASS PIPE
INSULATION WITHIN
EAST ELEVATOR
MAINTENANCE
ROOM SOUTHWEST
CORNER - WHITE
PIPE
ENCAPSULANT
HA: 26
162103243-0011
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
ASSOCIATED…