About this file

This is a Price Proposal Breakdown template for Task Order submissions under an Indefinite Delivery Indefinite Quantity (IDIQ) contract (47PC5326R0015). The template provides contractors with standardized formatting instructions for pricing construction services at the task order level, organized by CSI MasterFormat divisions.

Contractors must complete the pricing sheet by providing labor costs, material costs, and line item subtotals for each division of work. The template covers divisions 1 through 9 (General Requirements, Existing Conditions, Concrete, Masonry, Metals, Woods/Plastics/Composites, Thermal & Moisture Protection, Openings, and Finishes) plus divisions 21, 22, 23, 26, and 27 (Fire Suppression, Plumbing, HVAC, Electrical, and Communications). Contractors are required to utilize unit pricing previously accepted at the IDIQ level when preparing proposals, and any requirements not covered by existing unit prices—including Division 01 and 02 costs—will be negotiated at the Task Order Request for Proposal level. The proposal format includes separate columns for General Contractor organic costs and subcontractor costs, with automatic calculations for overhead, profit, bonds, and insurance percentages to arrive at a total proposal price. All pricing must follow RS Means abbreviations for units of measurement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS: HOW TO COMPLETE PRICING SHEETS
1For each line item, provide labor, material, and line item subtotal costs.
2For units of measurement, refer to RS Means abbreviations.
3The Contractor shall be required to utilize the unit pricing accepted at the IDIQ level, when preparing Task Order price proposals. Task Order requirements which are not covered by unit price line items listed here, including Division 01 and 02 requirements, will be negotiated by the Task Order Contracting Officer at the Task Order RFP level.

TO Price Breakdown

Exhibit 13
Task Order Price Sheet

PRICE PROPOSAL CONTRACTOR NAME DATE SUBMITTED PROJECT NO. CONTRACT NO.

PROJECT AND CITYPURPOSE
Project NamePROPOSAL XXXX
Building Name & AddressITEM
City, State & Zip Code
DATE:SHEET NO.OF
XX
CSI MASTERFORMAT NUMBERDESCRIPTION OF WORKQUANTITYMATERIALLABORGC ORGANIC SUBTOTALSSUBCONTRACTOR SUBTOTALS
NO. UNITSUNIT MEAS.PER UNITSUBTOTALSPER UNITSUBTOTALS
1General Requirements
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 1 SUBTOTAL =$ - 0$ - 0
2Existing Conditions
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 2 SUBTOTAL =$ - 0$ - 0
3Concrete
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 3 SUBTOTAL =$ - 0$ - 0
4Masonry
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 4 SUBTOTAL =$ - 0$ - 0
5Metals
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 5 SUBTOTAL =$ - 0$ - 0
6Woods, Plastics, Composites
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 6 SUBTOTAL =$ - 0$ - 0
7Thermal & Moisture Protection
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 7 SUBTOTAL =$ - 0$ - 0
8Openings
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 8 SUBTOTAL =$ - 0$ - 0
9Finishes
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 9 SUBTOTAL =$ - 0$ - 0
21Fire Supression
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 21 SUBTOTAL =$ - 0$ - 0
22Plumbing
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 22 SUBTOTAL =$ - 0$ - 0
23Heating, Ventilating, and Air Conditioning
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 23 SUBTOTAL =$ - 0$ - 0
26Electrical
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 26 SUBTOTAL =$ - 0$ - 0
27Communications
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
DIVISON 27 SUBTOTAL =$ - 0$ - 0
TOTAL DIVISION SUBTOTAL =$ - 0$ - 0
GC Overhead (In House)XX%PCTTOTAL OH =#VALUE!
GC Profit (In House)XX%PCTTOTAL Profit =#VALUE!
SUBTOTAL WITH OH&P =#VALUE!
Bonds/InsuranceXX%PCTTOTAL B&I =#VALUE!
TOTAL PROPOSAL=#VALUE!