Attachment 2 190378_VA Durham_Comprehensive Drawings Set.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77622B0005
About this file
This document provides details for a federal contract opportunity to design and build a data center recabling project at the Durham VA Medical Center in Durham, North Carolina. The Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central is soliciting proposals for a firm-fixed-price contract to complete the VISN 6 EHRM Re-Cabling the Data Center. Interested offerors should respond by the solicitation response date of June 10, 2022 specified in solicitation number 36C77622B0005. The selected contractor will be responsible for designing and constructing the recabling of the data center located at 508 Fulton Street in Durham, North Carolina to support the Electronic Health Record Modernization initiative.
The key details provided include the solicitation number, brief description of services required, issuing agency, location of work to be performed, and pricing structure. No further information is given on response requirements, award date, or other contractual terms. An attachment with comprehensive drawings of the current data center configuration is also referenced but contents not summarized.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment IFB Microsoft Teams Meeting Information.docx | DOCX document | |
| Attachment THERMAL AND MOISTURE PROTECTION.pdf | ||
| 36C77622B0005 0004.docx | DOCX document | |
| Attachment 2 190378_VA Durham_Comprehensive Drawings Set Updated.pdf | ||
| 36C77622B0005 0003.docx | DOCX document | |
| Attachment Technical Questions.docx | DOCX document | |
| Attachment VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx | DOCX document | |
| 36C77622B0005 0002.docx | DOCX document | |
| 36C77622B0005 0001.docx | DOCX document | |
| Attachment Site Visit Sign in Sheet.pdf | ||
| Attachment 1 190378_VA Durham_ComprehensiveSpecifications.pdf | ||
| 36C77622B0005.docx | DOCX document | |
| Attachment 4 CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx | DOCX document | |
| Attachment 3 Wage Determination DBA 11.1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER
PHASE-2
PHASE-2
PHASE-1
PHASE-1
CORRIDOR
C O
R R
I D
O R
PHASE-2
PHASE 2
FG158 A
FG104
PHASE 2
CORRIDOR
PHASE 2
PHASE 2
GROUND FLOOR - RM FG104 DATA CENTER - DEMOLITION PHASING PLAN
SCALE: 1/4" = 1'-0"
AD-101
GROUND FLOOR DEMOLITION PLAN
PHASING
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN,19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
New Stamp
UPSB
UPSC
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER
PHASE-2
PHASE-2
PHASE-1
PHASE-1
CORRIDOR
C O
R R
I D
O R
UPSA
UPS
PHASE 2
FG158 A
FG104
PHASE 2
CORRIDOR
PHASE 2
PHASE 2
DATA CENTERTELECOME RM.
DATA CENTER CORRIDOR
CORRIDOR
TELECOME
CLOSET
GROUND FLOOR - DATA CENTER -DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SECTION AT DATA CENTER
SCALE: 3/16" = 1'-0"
SECTION AT TELECOM AND DATA CENTER
SCALE: 3/16" = 1'-0"
AD-102
DEMOLITION FLOOR PLAN &
SECTIONS
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
PHASE-1
PHASE-2
PHASE-1
PHASE-2
E E E
E E E E
E E E E
E
E E E
E E E E
E E
E
E
E E E
E EE
S
S
S
E
S
FG140
FG158
TELECOM
TELECOM
PC LAB
FG104A
DATA
CENTER
FG158 A
FG104
PHASE 2
CORRIDOR
C O
R R
I D
O R
CORRIDOR
PHASE-2
FG140
FG139
FG138
FG108
PC LAB
OFFICE
OFFICE
STORAGE
GROUND FLOOR - RM FG104 DATA CENTER -DEMOLITION CEILING PLAN
SCALE: 1/4" = 1'-0"
VS MA
AD-103
GROUND FLOOR DEMOLITION-
REFLECTED CEILING PLAN
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
X F
M
PANEL FGEE2
BATT.
CAB
PANEL LM1
(EXISTING)
DISC. DS1
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE-2
FE
FE
FE
FE
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
PC LAB
OFFICE
OFFICE
STORAGE
FG104A
DATA
CENTER FG-104
CORRIDOR
C O
R R
I D
MDA-A-1
MDA-A-2
MDA-A-3
MDA-B-1
MDA-B-2
MDA-B-3
FE
BATT.
CAB
BATT.
CAB
CORRIDOR
PHASE-2
SB
S B
UPS
UPD1
UPD2
HVAC-1
HVAC-2
MISC-1
MISC-2
UPS
EXTINGUISHER
RELOCATE
GROUND FLOOR - RM FG104 DATA CENTER PHASING PLAN
SCALE: 1/4" = 1'-0"
AE-101
GROUND FLOOR PLAN
PHASING
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
X F
M
PANEL FGEE2
BATT.
CAB
PANEL LM1
(EXISTING)
DISC. DS1
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE-2
PHASE
-1
PHASE-2
PHASE-1
PHASE-1
PHASE-2
PHASE-2
DN
FE
FE
FE
FE
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER FG-104
CORRIDOR
C O
R R
I D
MDA-A-1
MDA-A-2
MDA-A-3
MDA-B-1
MDA-B-2
MDA-B-3
FE
BATT.
CAB
BATT.
CAB
CORRIDOR
PHASE-2
SB
S B
UPS
UPD1
UPD2
HVAC-1
HVAC-2
MISC-1
MISC-2
UPS
EXTINGUISHER
RELOCATE
SSCG
SSCG
A4.2
A
AE.10.2
ROOM
A4.2
FE
1 2
DATA CENTERTELECOME RM.
DATA CENTER CORRIDOR
CORRIDOR
NEW
TELECOME
CLOSET
AE-106
AE-106
GROUND FLOOR - RM FG104 DATA CENTER FLOOR PLAN
SCALE: 1/4" = 1'-0"
SECTION AT DATA CENTER
SCALE: 3/16" = 1'-0"
SECTION AT TELECOM AND DATA CENTER
SCALE: 3/16" = 1'-0"
AE-102
FLOOR PLAN & SECTIONS
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
AE-103
SECTIONS & DETAILS
VS SS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN .19 .2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
KEY PLAN
(HSA PROJECT DURHAM 20.02)
TELECOM
FG104A
DATA CENTER FG104
PHASE-2
PHASE-2
PHASE-2
PHASE
-1
PHASE-1
PHASE-1
PHASE-2
PHASE-2
PHASE-2
18"x2"
18"x2"
OS OS
OS
OS
OSOS
OSOS
OS
OS
S B
E
E E
E
E
E
E
E
E E E E
E E E
E
E
E
OS
J
S
S
S
S
S
S
C D
75CD
75CD
75CD
75CD
75CD
75CD
C D
75CD
S
C D
15CD
C D
C D
S
CM
MM
FSD
F S
D F
S D
F S
D F
S D
F S
D F
S D
FSD
FSD
FSD
CM
S D
S D
S D
S D
S D
S D
S D
CM
CM
CM
CM
CM
CM
S D
S D
S D
CM
CM
CM
R T
S R
T S
R T
S
RTS RTS RTS
R T
S R
T S
RTS
R T
S
FSD
S D
CM
R T
S
S
S
S
S
S
S
S
S
S
S
S
S
S S
S
S
S
S
S
NAC
C D
S
TYP
S
E
GROUND FLOOR - RM FG104 DATA CENTER- REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
AC-101
GROUND FLOOR REFLECTED
CEILING PLAN
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:
KEY PLAN
(HSA PROJECT DURHAM 20.02)
AF-101
DOOR & FINISH SCHEDULES &
DETAILS
VS MA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENT
FULLY SPRINKLERED
Office of Construction and Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseENGINEER A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
VA - DURHAM NC -
DATA CENTER 1
JAN, 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5
Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
KEY PLAN
(HSA PROJECT DURHAM 20.02)
New Stamp
HSA
FG140
FG139
FG138
FG158
TELECOM
TELECOMFG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
ROW B
ROW C
ROW B ROW A
UPSA
UPS
XF
M
R
PANEL FGEE2
BATT.
CAB
UPSB
UPSC
UPD2
WLAN SW_1/2
UPS2 UPD1
BATT.
CAB
PANEL LM1
(EXISTING)
DISC. DS1
NET
RACK-3
NET
RACK-2
NET
RACK-1
FG108
DATA CENTER
ABCDEFGHIJKLM
APC
CLIN 1
HP
APC
HP
APC
APC
APC COOL
APC
APC
DELL
APC
APC
A-NET
SWITCH
HP
PANDUIT
APC
HP
APC
APC
DELL
HP
APC COOL
APC
TAPE LIB
TAPE LIB
HP
PDU
PDU
DELL
APC COOL
HP
HP
IBM
IBM
IBM
APC
APC
APC
APC COOL
HP
HP
IBM
APC COOL
SW 5
APC
APC
SW 2
PDU
PDU
APC
APC
APC COOL
HP
HP
HP
HP
APC
APC
APC
HP
HP
APC
APC
APC COOL
APC
APC
APC
APC COOL
HP
APC
APC
PDU
PDU
APC
APC COOL
APC
APC
APC
APC
APC
APC
AP
C
APC COOL
APC COOL
RACK AVAILABILITY LEGEND
(PHYSICAL U-SPACE)
RACK FULL
RACK 1/2 FULL
RACK 1/4 FULL
RACK EMPTY
FG140
FG139
FG138
FG158
TELECOM
TELECOMFG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
NET
RACK-3
NET
RACK-2
NET
RACK-1
ROW B
ROW C
ROW B ROW A
UPSA
UPS
XF
M
R
PANEL FGEE2
BATT.
CAB
UPSB
UPSC
UPD2
UPS2 UPD1
BATT.
CAB
PANEL LM1
(EXISTING)
DISC. DS1
WLAN SW_1/2
DATA CENTER
APC
HP
APC
HP
APC
HP
HP
IBM
IBM
IBM
HP
HP
HP
HP
APC
APC
APC
FG108
ABCDEFGHIJKLM
ETR
TBD
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
TBD
TBD
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
ETR
ETR
ETR
TBR
ETR
ETR
ETR
ETR
ETR
ETR
ETR
TBD
ETR
ETR
ETR
TBD
ETR
TBD
TBD
ETR
ETR
ETR
ETR
ETR
ETR
TBD
TBD
ETR
TBR
TBR
TB
R
HP
HP
TBD
PANDUIT
TBD
APC
PDU
PDU
HP
APC
TBD
APC
PDU
PDU
APC
TBD
APC
TBD
APC
TBD
PDU
PDU
4 TYP. WHERE SHOWN
ROW C
ETR
CLIN 1
APC
APC
APC
APC
DELL
APC
APC
A-NET
SWITCH
HP
APC
DELL
HP
APC
TAPE LIB
TAPE LIB
HP
DELL
APC
APC
APC
HP
IBM
SW 5
SW 2
APC
HP
APC
APC
APC
APC
HP
APC
APC
APC
APC
APC
APC
APC
AP
C
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
"ETR "- EXISTING TO REMAIN
"TBD" - TO BE DEMOLISHED
"TBR" - TO BE RELOCATED
DATA CENTER FG104 - EXISTING CONDITIONS PLAN
SCALE: 1/4" = 1'-0"1 SCALE: 1/4" = 1'-0"2 DATA CENTER - DEMOLITION & PHASE 1 PLAN
1 EXISTING BACKBONE TERMINATION RACKS
EXISTING HORIZONTAL TERMINATION RACKS
TELCOM ROOM FG158 - NEW QTY (2) - STANDARD 19", 45U 2-POST RACKS WITH 12"
VERTICAL CABLE MANAGERS.
EXISTING RACK, OWNER TO RELOCATE ALL EXISTING RACK EQUIPMENT. RACK TO BE
REMOVED BY CONTRACTOR.
EXISTING "EMPTY" RACK, RE-PURPOSED AS INDICATED
EXISTING TELEPHONE PLYWOOD BACKBOARD AND PUNCH DOWN BLOCKS
TO BE RELOCATED NEXT SEQUENCE. SEE SHEET DC200, KEYED NOTES 7 & 8
KEYED NOTES
NOTES - SEQUENCE 1
1. SEQUENCE 1 REQUIRES THAT ALL NETWORK TERMINATIONS AND ASSOCIATED EQUIPMENT
SERVING HORIZONTAL CABLING TO THE SURROUNDING WORK AREAS THAT IS CURRENTLY
LOCATED IN THE DATA CENTER BE MOVED TO A NEW TELECOMMUNICATIONS ROOM (TR) IN
EXISTING ADJACENT ROOM FG158. TO SUPPORT THIS MOVE, NEW HORIZONTAL CABLING
WILL BE INSTALLED TO SUPPORT THE RELOCATION OF TERMINATIONS, AND EQUIPMENT.
UPON COMPLETION OF THIS SEQUENCE, ALL REQUIRED NETWORK EQUIPMENT AND
TERMINATIONS SHOULD BE RELOCATED AND OPERATIONAL IN THE NEW TR. THE
SEQUENCE 1 SEQUENCE OF OPERATIONS SHALL BE AS FOLLOWS:
1.A. RE-LOCATE/BUILD NEW TELECOMMUNICATIONS ROOM (TR) IN ADJACENT ROOM FG158
1.B. INSTALL NEW HORIZONTAL CABLING FROM NEW TR TO EXISTING WORK AREA
OUTLETS AND ASSOCIATED DEVICES THAT ARE CURRENTLY SERVED FROM DATA
CENTER.
1.C. COORDINATE WITH OWNER TO TERMINATE NEW CABLING AT DEVICE END
1.D. OWNER SHALL CUT OVER ALL REQUIRED NETWORK CONNECTIONS TO NEW TR
1.E. OWNER TO REMOVE ALL ABANDONED CABLING IN DATA CENTER AS REQUIRED BY
CODE
1.F. REMOVE EXISTING CABLING AND RACKS DESIGNATED AS "WLAN_SW1/2"
1.G. REMOVE EXISTING NETWORK RACKS AND EQUIPMENT AS INDICATED ON DETAIL 3 THIS
SHEET, COORDINATE REMOVAL WITH OWNER
1.H. TEMPORARILY SUPPORT REMAINING ACTIVE NETWORK CABLES IN DATA CENTER WITH
INDEPENDENT SUPPORT SYSTEM SUCH THAT EXISTING CABLE TRAY CAN BE
REMOVED. REMOVE ALL EXISTING LADDER TRAY IN DATA CENTER
1.I. OWNER TO REMOVE EMPTY RACKS AS PART OF SEQUENCE 1
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED:
VA FORM 08-6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEENGINEER STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
T: 781.481.0210 www.f-t.com/
FITZEMEYER & TOCCI
1 Glenwood Avenue Floor 5 Raliegh, NC 27603
OFFICE OF
CONSTRUCTION
AND
FACILITIES
MANAGEMENT
FULLY SPRINKLERED
86 CHOSEN VALE LANE SUITE 201
ENFIELD, NH 03748
P: (603).632.4507 www.LEDesigngroup.com
BID DOCUMENTS
DC100
EXISTING CONDITIONS & PHASE 1 PLAN 19130TECHNOLOGY DESIGN
DURHAM, NC
1/19/21 TABTMBNo. Description Date
1 CONCEPT PLAN 11/04/19
2 SCHEMATIC DESIGN 12/13/19
3 60% DD 01/17/20
4 60% DD_REVISED 04/24/20
5 90% CD 07/24/20
6 100% DESIGN SUBMITTAL 11/13/20
SHEET SYMBOL LEGEND
SHEET ABBREVIATIONS
MDA-A
D
TO RACKS (TYP. FOR ALL ROWS)
MDA-B
A
C
B
C
A
C
B
C
TO RACKS (TYP. FOR ALL ROWS)
D
HDA-A-2
HDA-A-3
HDA-B-2
HDA-B-3 HDA-B-1
HDA-A-1
HDA-A-4
HDA-B-4
DN
FE
FE
FE
FE
ROW B
ROW C
ROW B ROW A
UPSA
UPS
XF
M
R
PANEL FGEE2
BATT.
CAB
UPSB
UPSC
UPD2
GROUND BUS
UPS2 UPD1
BATT.
CAB
PANEL LM1
(EXISTING)
DISC. DS1
DATA CENTER
NTWK
RACK 1
NTWK
RACK 2
NTWK
RACK 3
FG108
TELECOM
FG158A
ABCDEFGHIJKLM
SBB
ROW A
4 TYP. WHERE SHOWN
ROW C
5'
3'-8"
TELECOM
FG104A
FG158
3 3
HDA-B-1
MDA-B-1
MDA-B-2
MDA-B-3
HDA-B-2
HDA-A-2
HDA-B-3
CERNER
APC
MDA-A-1
MDA-A-2
MDA-A-3
HDA-B-4
APC
APC
FUTURE
BACKBONE
TERM. RACK
CERNER
CERNER
CERNER
HDA-A-3
HDA-A-4 HDA-A-1
NEW
NEW
NEW
ETR
NEW
NEW
NEW
APC
CLIN 1
APC
APC
APC
APC
APC
A-NET
SWITCH
HP
APC
HP
APC
TAPE LIB
TAPE LIB
HP
DELL
IBM
SW 5
SW 2
APC
HP
APC
APC
APC
APC
APC
APC
APC
DELL
HP
APC
DELL
APC
APC
APC
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
APC COOL
NEW
NEW
NEW
NEW
NEW
NEW
APC COOL
NEW
APC COOL
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
NEW
APC
APC
APC
NOTES
1. CONTRACTOR TO VERIFY WITH OWNER FINAL LOCATION OF ALL NEW RACKS PRIOR TO
INSTALLATION.
2. ALL EXISTING RACK EQUIPMENT TO BE PROTECTED FROM DUST AND DEBRIS DURING
CONSTRUCTION. REFERENCE ARCHITECTURAL DRAWINGS FOR PHASING
REQUIREMENTS AND PROTECTION DETAILS.
3. ALL RACKS AND CABINETS SHALL HAVE A 1U RACK BONDING BUSBAR (RBB) INSTALLED
AND BONDED PER ANSI/TIA-607-C.
4. COPPER DISTRIBUTION WILL BE FROM HDA RACKS TO ADJACENT RACKS. SEE DETAIL 2
THIS SHEET.
5. FIBER OPTIC CABLES WILL TERMINATE IN MPO TO LC CASSETTES.
6. MODIFY RACK PLACEMENT TO ELIMINATE GAPS BETWEEN RACKS AS REQUIRED.
7. FIBER OPTIC BACKBONE AND HORIZONTAL MPO CABLES AND CASSETTES MUST USE
METHOD-A-POLARITY
1-LINE DIAGRAM - CORE "MDA" FIBER DISTRIBUTION
SCALE: N.T.S.SCALE: 1/4" = 1'-0"
DATA CENTER - PHASE 2 PROPOSED FLOOR PLAN
1 NEW MDA-A CORE LOCATION, QTY (3) RACKS.
NEW MDA-B CORE LOCATION, QTY (3) RACKS.
TELCOM ROOM FG158 - NEW QTY (2) - STANDARD 19", 45U 2-POST RACKS WITH 12" VERTICAL
CABLE MANAGERS.
NEW 30" WIDE NETWORK RACK ENCLOSURE
EXISTING "EMPTY" RACK, RE-PURPOSED AS INDICATED
NEW 45U CERNER EQUIPMENT RACK, PROVIDED AND INSTALLED BY OWNER
EXISTING 300mm COOLING UNIT RELOCATED TO ROW B FROM ROW C
EXISTING 600mm COOLING UNIT RELOCATED TO ROW C FROM ROW B
NEW 300mm COOLING UNIT
MAINTAIN INDEPENDENT SUPPORT FOR EXISTING BACKBONE CABLING THROUGHOUT
CONSTRUCTION
KEYED NOTES
HDA-A FIBER: QTY 24-STRAND OM4 TERMINATED ON MPO12
HDA-B FIBER: QTY 24-STRAND OM4 TERMINATED ON MPO12
COPPER: QTY 24 CAT6A COPPER CABLE
BACKBONE
1. FIBER: QTY 48-STRAND OM4 TERMINATED ON MPO12
2. COPPER: QTY (6) - CAT6A
WIRING LEGEND
A
B
C
D
FIBER DISTRIBUTION NARRATIVE
1. EACH BACKBONE (A AND B) WILL BE MIRROR IMAGES OF EACH OTHER. TO THE
GREATEST EXTENT POSSIBLE CABLING SHALL FOLLOW DIVERSE ROUTES FROM THE
CORE MDA CABINETS THROUGH TO THE SERVER CABINETS WITH EQUAL FEEDS FROM
EACH SIDE ULTIMATELY CONNECTING TO THE OVERHEAD RACKS ABOVE EACH CABINET.
2. ALL MPO TERMINATED CABLES SHALL BE CONNECTED ON BOTH ENDS WITH MPO TO LC
CASSETTES WITH THE QUANTITY OF LC CONNECTORS EQUAL TO THE NUMBER OF
STRANDS TERMINATING AT THAT POINT.
3. EACH OF THE (2) NETWORK CORES (MDA-A AND MDA-B) SHALL CONSIST OF QTY (3)
CABINETS WITH ONE DEDICATED FOR PATCHING.
4. EACH NETWORK SIDE (A AND B) SHALL HAVE DEDICATED HDA CABINETS DESIGNATED
BY ROW (I.E. HDA-"A1") LOCATED AT THE OPPOSITE ENDS OF EACH ROW.
5. FROM THE MDA PATCHING CABINET TO THE ASSOCIATED HDA SHALL BE A 48-STRAND
OM4 CABLE TERMINATED ON MPO BASE 12.
6. EACH NON-HDA CABINET SHALL HAVE OVERHEAD PATCH PANELS MOUNTED ON A 5U
RACK ATTACHED TO THE UPPER LEVEL OF CABLE TRAY. COPPER PATCH PANELS SHALL
BE 48-PORT 1U CAT6A. FIBER PANELS SHALL BE 2U.
7. FROM EACH HDA CABINET TO EACH OVERHEAD PATCH PANEL SHALL BE 24-STRAND OM4
CABLE TERMINATED ON MPO BASE12, AND 24-CAT6A.
PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBER
PROJECT TITLE
LOCATION
ISSUE DATE CHECKED DRAWN
DRAWING TITLE
APPROVED:
VA FORM 08-6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PHASEENGINEER STAMPCONSULTANT
321 4 5 6 7 8 9 10
ARCHITECT
T: 781.481.0210 www.f-t.com/
FITZEMEYER & TOCCI
1 Glenwood Avenue Floor 5 Raliegh, NC 27603
OFFICE OF
CONSTRUCTION
AND
FACILITIES
MANAGEMENT
FULLY SPRINKLERED
86 CHOSEN VALE LANE SUITE 201
ENFIELD, NH 03748
P: (603).632.4507 www.LEDesigngroup.com DC200
PHASE 2
PROPOSED FLOOR PLAN & NETWORK 1-LINE DIAGRAM
19130TECHNOLOGY DESIGN
DURHAM, NC
TABTMBNo. Description Date
1 CONCEPT PLAN 11/04/19
2 SCHEMATIC DESIGN 12/13/19
3 60% DD 01/17/20
4 60% DD_REVISED 04/24/20
.\Repository\19130-vadurham_5-10-20_rvt21-190378-01-VADurhamNCDataCenterUpdate_MEP2019_FTlogo-9661126-1444060.tif
5 90% CD 07/24/20
BID DOCUMENTS
1/19/2021
6 100% DESIGN SUBMITTAL 11/13/20
ABBREVIATIONSDRAWING NOTES
DUCTWORK LEGEND
AIR DEVICE LEGEND
VALVE LEGENDPIPING LEGEND GENERAL NOTES
TD TRANSFER AIR DUCT
FINS PER INCHFPI
FA
EXH
EX. EXISTING
EXHAUST
FREE AREA
GALLONS PER MINUTE
GENERAL EXHAUST
GENERAL CONTRACTORGC
GE
GPM
KILOWATTSKW
ID
KE
IN
HVAC HEATING, VENTILATION AND AIR CONDITIONING
INCHES
INSIDE DIAMETER
KITCHEN EXHAUST
MECHANICAL CONTRACTORMEC
LD
MBH
LAT LEAVING AIR TEMPERATURE
LOUVERED DOOR
THOUSANDS OF BRITISH THERMAL UNITS PER HOUR
FEET
FEET PER MINUTEFPM
FT
GAL GALLONS
NC NORMALLY CLOSED
OUTSIDE AIR TEMPERATUREOAT
NTS
OA
NO
NIC NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
OUTSIDE AIR
STATIC PRESSURESP
SUPPLY AIRSA
SAT SUPPLY AIR TEMPERATURE
EACHEA
DRAWINGDWG
FACILITY MANAGEMENT SYSTEMFMS
ENTERING AIR TEMPERATURE
EXHAUST AIRE.A.
EAT
DIA.
DN
DDC
DB DRY BULB TEMPERATURE (°F)
DIRECT DIGITAL CONTROL
DIAMETER
DOWN
CONTROL VALVECV
CONNECT
CLEAN OUT
CUBIC FEET PER MINUTECFM
CONN.
CO
CAP CAPACITY
BRITISH THERMAL UNIT PER HOUR
BRITISH THERMAL UNIT
BOTTOM OF DUCTBOD
BTUH
BTU
C CLOSED
AUTOMATIC TEMPERATURE CONTROLATC
AP
ARCH.
AFF
AD ACCESS DOOR
ABOVE FINISHED FLOOR
ACCESS PANEL
ARCHITECT
EH EXHAUST HOOD
CRAC COMPUTER ROOM AC UNIT
CP CONDENSATE PUMP
AIR COOLED REFRIGERANT CONDENSERARC
CH CHILLER
AIR COOLED CONDENSING UNITACCU
1 REVISION NOTE
DEMOLITION WORK NOTE
NEW WORK NOTE
NEW WORK NOTE
EQUIPMENT TAG
FIN TUBE RADIATION DESIGNATION
HEATING CAPACITY (MBH)
ELEMENT LENGTH
QUANTITY
NECK SIZE OR LENGTH IF LINEAR DIFFUSER
AIR VOLUME (CFM)
SUPPLY/RETURN/EXHAUST REGISTER OR GRILLE TAG
U UNDERCUT DOORWAY (BY G.C.)
SUPPLY AIR
RETURN OR EXHAUST AIR
SUPPLY DIFFUSER
ARROWS INDICATE BLOW PATTER
SUPPLY DIFFUSER OR REGISTER BELOW DUCT
RETURN GRILLE
RETURN REGISTER OR GRILLE BELOW DUCT
RECTANGULAR TO ROUND DUCTWORK TRANSITION
MITERED ELBOW WITH TURNING VANES
RECTANGULAR TRANSITION
FLEXIBLE CONNECTION
12"Ø
12"x8"
RETURN DUCTWORK DOWN
EXHAUST DUCTWORK UP
EXHAUST DUCTWORK DOWN
CAPPED DUCTWORK
RETURN DUCTWORK UP
SUPPLY DUCTWORK DOWN
SUPPLY DUCTWORK UP
ROUND DUCTWORK - DIMENSION IS DUCT DIAMETER (IN.)
RECTANGULAR DUCTWORK - FIRST DIMENSION IS SIDE SHOWN (IN.)
BFV BUTTERFLY VALVE
DV DRAIN VALVE
SCV SWING CHECK VALVE
LCV LIFT CHECK VALVE
BALANCE COCKBC
BV BALANCE VALVE
SC CONTROL VALVE
FLG FLANGE
BASKET STRAINERBKS
CONCENTRIC REDUCER (ENLARGER)CRD
ECCENTRIC REDUCER (ENLARGER)ERD
PIPE GUIDEGD
DRAINDR
FRESH AIR INTAKEFAI
DOOR LOUVER (BY G.C.)DL
PIPE DOWN
PIPE UP
RUN-OUT OFF BOTTOM
RUN-OUT OFF TOP
PIPE OFF TOP
PIPE OFF BOTTOM
DIRECTION OF FLOW
PIPE BREAK
PC PUMPED CONDENSATE
CD CD A.C. CONDENSATE DRAIN
RHG RHG REFRIGERANT HOT GAS
RL RL REFRIGERANT LIQUID
RG
RG
SD/R
SD
AIR SEPARATORAS
ELECTRICAL CONTRACTOREC
ENTERING WATER TEMPERATUREEWT
SQUARE FEETSF
TE TOILET EXHAUST
EL EXPANSION LOOP
SATURATED SUCTION TEMPERATURE
TRANSFER AIRTA
SST
DRAIN PIPE PITCH AND FLOW
1/2" WIRE MESH SCREEN (ON OPEN END DUCT)
IS ISOLATION VALVE REFER TO DETAILS AND SPEC.
EXHAUST REGISTER OR GRILLEEG
EXHAUST REGISTER OR GRILLE BELOW DUCTEG
QUANTITY
NECK SIZE OR LENGTH IF LINEAR DIFFUSER
AIR VOLUME (CFM)
SUPPLY DIFFUSER TAG
EB ELECTRIC BASEBOARD
EG EXHAUST GRILLE
EC EVAPORATIVE COOLER
SIDEWALL SUPPLY REGISTERSG
EG/RG SIDEWALL EXHAUST/RETURN REGISTER
SD-A-#
10"Ø, 12"x12"
TYP 3
SG-A, RG-A or EG-A 10"Ø, 12"x12"
TYP 3
ACCU-1
FTR-A
10'-0" 11.8
ELECTRICAL AREA - THE AREA INDICATED IS AN
ELECTRICAL ZONE. DUCTWORK, PIPING, AND SYSTEMS
SHALL NOT RUN THROUGH THIS ZONE. EXCEPTION:PIPES,
DUCTS, AND EQUIPMENT DEDICATED TO SERVE THE
ZONE ARE ALLOWED. COORDINATE WITH ELECTRICAL
CONTRACTOR AND COMPLY WITH ALL CODE CLEARANCE
REQUIREMENTS.
PRESSURE GAUGEPG
FLOW SWITCHFS
AUTOMATIC AIR VENTAAV
MANUAL AIR VENTMAV
FLOAT & THERMOSTATIC STEAM TRAPF&TT
THERMOSTATIC STEAM TRAPTT
BUCKET STEAM TRAPBT
PRESSURE/TEMPERATURE PLUGPT
PIPE CAP
STRAINER WITH DRAIN VALVE AND CAP
RS RS REFRIGERANT SUCTION
HCR HCR HOT/CHILLED WATER RETURN
HCS HCS HOT/CHILLED WATER SUPPLY
HWR HWR HOT WATER RETURN
HWS HWS HOT WATER SUPPLY
CHR CHR CHILLED WATER RETURN
CHS CHS CHILLED WATER SUPPLY
CWR CWR CONDENSER WATER RETURN
CWS CWS CONDENSER WATER SUPPLY
MUW MAKE UP WATER
PC
PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
BRANCH CONNECTION (DIRECTION TO BE FIELD DETERMINED)
BEAM PENETRATION BY DUCTWORK
ACOUSTICALLY LINED DUCTWORK
(E) 12"x8" EXISTING DUCTWORK TO REMAIN
LIMIT OF DEMOLITION
CAP EXISTING
CONNECT TO EXISTING
AIR FLOW STATION
EXHAUST REGISTER
COMPUTER ROOM AIR CONDITIONING UNIT
ER
AC
AFS
HUMIDIFIERH
FP
FTR
FCU
F FAN (GENERIC)
FAN COIL UNIT
FAN POWERED AIR TERMINAL
FIN TUBE RADIATION
HX
HP WATER SOURCE HEAT PUMP
HEAT EXCHANGER
SD SUPPLY DIFFUSER
SOUND ATTENUATORSA
RH/IH
RTU
RR
RG RETURN GRILLE
RETURN REGISTER
RELIEF HOOD/ INTAKE HOOD
ROOFTOP UNIT
VARIABLE AIR VOLUME BOXV
SUPPLY REGISTER
SUPPLY GRILLE
SR
SG
UH UNIT HEATER
FILTER BOXFB
UNIT VENTILATORUV
VI VIBRATION INSOLATION
AUTOMATIC AIR VENTAAV
COMBUSTION AIR SUPPLYCAS
CA COMBUSTION AIR
COOLING COILCC
CT
CP CONTROL PANEL
CURRENT TRANSFORMER
CONTRACTORCONTR
EXISTING TO REMAINETR
EXISTING TO BE REMOVED
EXTERNAL STATIC PRESSUREESP
ETBR
ET EXPANSION TANK
FULL LOAD AMPSFLA
FLOOR DRAINFLD
HP
HE
GUH GAS FIRED UNIT HEATER
HOOD EXHAUST
HORSE POWER
HEATING COILHC
LWT LEAVING WATER TEMPERATURE
OUTSIDE DIAMETEROD
OBD OPPOSED BLADE DAMPER
PC PLUMBING CONTRACTOR
RA
PSI
PD PRESSURE DROP
POUNDS PER SQUARE INCH
RETURN AIR
RM ROOM
SPEEDSPD
STAINLESS STEELSS
TSTAT THERMOSTAT
TYP TYPICAL
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VFD VARIABLE FREQUENCY DRIVE
WB WET BULB TEMPERATURE (°F)
WMS WIRE MESH SCREEN
X
E
(X) 12"x8" EXISTING DUCTWORK TO BE DEMOLISHED
MECHANICAL DEMOLITION / RELOCATION LEGEND
"X" EXISTING MECHANICAL EQUIPMENT, DEVICE AND/OR SYSTEM TO
BE SELECTIVELY DEMOLISHED
"XR" EXISTING MECHANICAL EQUIPMENT TO BE REMOVED, STORED
AND RE-LOCATED.
"XT" EXISTING MECHANICAL DEVICE OR EQUIPMENT TO BE REMOVED
AND TURNED OVER TO OWNER FOR RE-USE
"XL" RE-LOCATED EXISTING MECHANICAL EQUIPMENT OR DEVICE.
"E" EXISTING MECHANICAL EQUIPMENT OR DEVICE TO REMAIN
FIRE PROTECTION CONTRACTORFPC
EXLXTXRX
EXAMPLE
OPEN ENDED DUCTOED
DEMOLITION GENERAL NOTES
PILOT OPERATED PRESSURE REDUCING VALVE
C.O. CLEAN OUT
PCHR PCHR PRIMARY CHILLED WATER RETURN
PCHS PCHS PRIMARY CHILLED WATER SUPPLY
SCHR SCHR SECONDARY CHILLED WATER RETURN
SCHS SCHS SECONDARY CHILLED WATER SUPPLY
TCHR TCHR TERTIARY CHILLED WATER RETURN
TCHS TCHS TERTIARY CHILLED WATER SUPPLY
MUW
UC UNDERCUT DOOR
EQUIPMENT TAGS
B BOILER
GAS FIRED MAKE-UP AIR UNITMUA
P PUMP
WATER FLOW STATIONWFS
CONTROL LEGEND
TEMPERATURE SENSOR
HUMIDITY SENSOR
TIME CLOCK CONTROLLER
SWITCH CONTROLLER
HEAT/COOL THERMOSTAT
CONTROL LINE
TS
Hs
C
S
REVERSE ACTING THERMOSTAT
FACILITY MANAGEMENT PANELFMS
R
CO2 SENSOR
CO SENSORCO
CO2
STATIC PRESSURE SENSORSP1
DIFFERENTIAL PRESSURE SENSORDPS
AFS- AIR FLOW MEASURING STATION
VFD VARIABLE FREQUENCY DRIVE
DSD DUCT SMOKE DETECTOR
FLOW METERFM
DPSOR
HUMIDISTATH
ENVIRONMETAL CONTROL PANELECP
T
T
D D DRAIN
GMU GLYCOL MAKE-UPGMU
RG RG REFRIGERANT GAS
RD RD REFRIGERANT DISCHARGE
GV GATE VALVE
GLV GLOBE VALVE
BV BALL VALVE
PRV PRESSURE REDUCING VALVE
RV RELIEF VALVE
UNION
PLS PIPE LINE STRAINER
TRM THERMOMETER
PIPE ANCHORAN
EXPANSION COMPENSATOREC
PIPE FLEXIBLE CONNECTIONPFC
GR GR GLYCOL RETURN
GS GS GLYCOL SUPPLY
1. MECHANICAL WORK IS INDICATED DIAGRAMMATIC. EXACT LOCATIONS OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD (SPACING SUBJECT TO ARCHITECT'S REVIEW AND APPROVAL) TO AVOID CONFLICT
WITH OTHER TRADES AND EXISTING SITE CONDITIONS.
2. THE CONTRACTOR SHALL VISIT AND CAREFULLY EXAMINE THE SITE TO IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE WORK OF THIS SECTION. REPORT IN WRITING TO THE ARCHITECT CONDITIONS WHICH MIGHT ADVERSELY AFFECT WORK. NO EXTRA PAYMENT WILL BE PROVIDED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY
CONSTRUED BY AN EXPERIENCED OBSERVER.
3. WORK REQUIRING INTERRUPTION OF BUILDING SERVICES SHALL BE CAREFULLY REVIEWED AND COORDINATED WITH THE OWNER TO MINIMIZE FREQUENCY AND DURATION OF SERVICE INTERRUPTIONS.
4. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION OF CEILING GRID, DIFFUSERS, AND GRILLES.
5. ALL INSTALLATIONS SHALL PERMIT AND PROVIDE ACCESSIBILITY FOR SERVICE AND REPLACEMENT OF ALL NEW
EQUIPMENT AND EXISTING EQUIPMENT IMPACTED BY THIS WORK.
6. COORDINATE ALL OPENINGS IN FLOORS WITH STRUCTURAL DRAWINGS AND GENERAL CONTRACTOR.
7. COORDINATE ALL ROOF OPENINGS WITH ARCHITECT AND STRUCTURAL ENGINEER.
8. REFER TO STRUCTURAL FRAMING PLANS FOR EXACT LOCATION OF ALL ROOF MOUNTED EQUIPMENT.
9. ALL MECHANICAL EQUIPMENT, PIPING, AND DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING LOCAL, STATE, AND FEDERAL SEISMIC CODES. PARTICULAR ATTENTION SHALL
BE MADE TO VIBRATION ISOLATION, ANCHORING, AND BALANCING REQUIREMENTS.
10. PROVIDE SMOKE DETECTORS AND SMOKE DAMPERS WHERE SHOWN ON THE MECHANICAL DRAWINGS.
COORDINATE THE QUANTITY AND EXACT LOCATION WITH ACTUAL SHEET METAL SHOP DRAWINGS, TO BE PRODUCED BY MECHANICAL CONTRACTOR, AND APPROVED BY ENGINEER. PROVIDE SMOKE DETECTORS AND SMOKE DAMPERS IN BOTH SUPPLY AND RETURN DUCTS ON ALL AIR HANDLERS AS SHOWN IN MECHANICAL
DRAWINGS.
11. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH CODES AND STANDARDS SET FORTH IN NFPA, SMACNA, AND ASHRAE FOR LOW PRESSURE DUCTWORK SYSTEMS.
12. ALL EXPOSED DUCTWORK SHALL BE PAINTED TO MATCH CEILING. REFER TO ARCHITECTURAL DRAWINGS.
13. PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTS FOR AIR BALANCING.
14. ALL SHEET METAL PLENUMS AT OUTSIDE AIR LOUVERS SHALL BE INSULATED WITH RIGID INSULATION, AS PER
SPECIFICATIONS.
15. RUN-OUTS TO RETURN AND EXHAUST REGISTERS, OR GRILLES ABOVE GYP BOARD CEILINGS, SHALL BE RIGID
DUCTED. NO FLEXIBLE DUCT WORK SHALL BE ALLOWED ON RETURN OR EXHAUST REGISTERS.
16. ALL DUCTS, PIPES, AND EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM THE BUILDING STRUCTURE
WITH PROPER ALLOWANCES FOR CONTRACTION, EXPANSION, AND VIBRATION ELIMINATION.
17. PROVIDE 12"x10" ACCESS PANELS AT ALL BASEBOARD CONTROL VALVES. COORDINATE EXACT LOCATIONS
WITH GENERAL CONTRACTOR.
18. PROVIDE COPPER 3/4" RUN-OUTS TO HOT WATER REHEAT COILS, CABINET HEATERS AND UNIT HEATERS
UNLESS NOTED OTHERWISE.
19. PROVIDE SWING JOINTS AT ALL BRANCH CONNECTIONS TO HYDRONIC EQUIPMENT.
20. ROOM THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR UNLESS OTHERWISE SHOWN OR
DIRECTED. COORDINATE LOCATIONS WITH ARCHITECTURAL WALL PROTECTIONS.
21. COORDINATE EXACT LOCATION OF UNIT HEATERS WITHIN ELECTRIC ROOMS WITH ELECTRICAL CONTRACTOR.
22. REFER TO SPECIFICATIONS FOR TYPE OF VALVE TO BE USED. VALVES ARE SHOWN ON PLANS FOR PLACEMENT
ONLY.
23. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR FREE AREA REQUIRED.
24. ALL DIFFUSER, REGISTER, AND GRILLE SIZES INDICATED ON FLOOR PLANS ARE NECK SIZE REQUIRED.
25. ALL PIPING IS TO BE SLOPED A MINIMUM OF 1/4" PER HUNDRED FEET IN THE DIRECTION OF DRAINAGE.
26. NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED ON THIS PROJECT.
27. COORDINATE ENTIRE INSTALLATION WITH THE WORK OF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR
INSTALLATIONS.
28. PERFORM DUCT LEAK TESTING IN ACCORDANCE WITH THE SPECIFICATIONS AND SMACNA GUIDELINES OF ALL DUCTWORK EXCEPT CLASS 2 THROUGHOUT THE PROJECT SCOPE. REFER TO INSTALLATION OF DUCTWORK
SECTION OF THE DIVISION 23 00 00 SPECIFICATIONS.
1. CONTRACTOR SHALL VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED
OBSERVERS.
2. PRIOR TO COMMENCING WORK OF THIS SECTION, EXAMINE SITE AND CONDITIONS UNDER WHICH WORK WILL BE PERFORMED. DETERMINE EXACT LOCATIONS OF EXISTING EQUIPMENT, PIPING AND CONTROLS. REPORT TO OWNER ANY CONDITIONS THAT MIGHT ADVERSELY AFFECT WORK. COMMENCEMENT OF WORK SHALL BE
CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS AND PREPARATORY WORK.
3. ABANDONING OF DUCTWORK, PIPING OR EQUIPMENT IN PLACE SHALL NOT BE ALLOWED. COMPLETE REMOVAL
REQUIRED UNLESS NOTED OTHERWISE.
4. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP REMAINING PIPING
WITH SAME OR COMPATIBLE PIPING MATERIAL.
5. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND CAP REMAINING DUCTS
WITH SAME OR COMPATIBLE DUCTWORK MATERIAL.
6. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT.
7. EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT AND
DELIVER TO OWNER.
8. COMPLY WITH ALL STATE AND LOCAL CODES AS TO REMOVAL AND DISPOSAL OF EQUIPMENT REMOVED FROM
THE SITE.
9. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE DEMOLITION.
10. REMOVE PREVIOUSLY ABANDONED WORK IN THE WAY OF EXISTING CONSTRUCTION, OR AS NOTED.
11. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
12. COMPLY WITH ANSI A10.6 (SAFETY REQUIREMENTS FOR DEMOLITION OPERATIONS) AND NFPA 241 (STANDARD
FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS).
13. PERMITS: GIVE ALL REQUIRED NOTICES, FILE ALL REQUIRED PLANS AND SPECIFICATIONS RELATING TO THE WORK OF THIS SECTION WITH THE PROPER AUTHORITIES AND PAY FOR ANY REQUIRED PERMITS.
14. ALL AIR-CONDITIONING EQUIPMENT AND SYSTEMS SHALL BE REMOVED WITHOUT RELEASING REFRIGERANTS.
REFRIGERANT RECOVERY IS TO BE PERFORMED BY A REFRIGERANT RECOVERY TECHNICIAN CERTIFIED BY AN
EPA-APPROVED CERTIFICATION PROGRAM.
15. ALL EQUIPMENT AND SYSTEMS TO BE DEMOLISHED UNDER THIS SECTION AND NOT DESIRED BY OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE ALL SUCH EQUIPMENT FROM
THE SITE PROMPTLY AFTER DETACHMENT FROM BUILDING STRUCTURE.
16. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.
17. IT IS UNKNOWN WHETHER HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY
NOTIFY ARCHITECT AND OWNER.
18. EXISTING PIPING SHOWN ON DRAWINGS DOES NOT INDICATE FULL EXTENT OF PIPING DEMOLITION. FIELD
VERIFICATIONS REQUIRED.
RECTANGULAR ROUND
DAMPERS
FD FIRE DAMPER
M
SMOKE DAMPER
MOTORIZED OR AUTOMATIC CONTROL DAMPER
BACK DRAFT DAMPER
VOLUME DAMPER
ACD
SD
BD
VD
FD
BD
FS FIRE & SMOKE DAMPERFS
SD
MECHANICAL DRAWING LIST
CO IN-ROW COOLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT
VA - DURHAM NC - DATA CENTER
UPDATE
558-18-273
JANUARY 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5 Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
C U s e rs
\a v a le n ti n e .F
-T \D o c u m e n ts
\R e v it
\1
.0
V
A D u rh a m
N C
D a ta C e n te r
U p d a te
M
E P
A V a le n ti n e f-t.
c o m
.r v t
/1
/2
:5
:2
A
M
MH001
MECHANICAL LEGEND
AMVTRB
Sheet Number Sheet Name
MH001 MECHANICAL LEGEND
MD101-MD1 MECHANICAL BASEMENT PIPING DEMOLITION PLAN
MD102-MD1 MECHANICAL GROUND FLOOR DEMOLITION PLAN
MH102-MH1 MECHANICAL GROUND FLOOR PLAN
MP101-MP1 MECHANICAL BASEMENT PIPING PLAN
MH601 HVAC SCHEDULES AND DETAILS
MH602 HVAC PIPING SCHEMATICS
MH700 MECHANICAL SEQUENCE OF OPERATIONS
Number: Revisions: Date: 01/19/2021
CRAWL SPACE
AB1000
ELEVATOR MACH RM
STAIR−8
144'-6"
23'-10"25'21'-6"21'-6"
AB1000
S
D
E
F
G
B65
(X)ACCU (X)ACCU
(X)RS/RL
(TYP. 2)
(X)RS/RL
(TYP. 2)
(X)RS/RL
(TYP. 2)
(X)RS UP
(X)RL UP
(X) 1-1/2" CHS/R UP
(TYP. ALL)
(X) 1-1/2" CHS/R UP
(TYP. ALL)
(E)CH (E)CH (E)CH
(E) 5" CHR
(E) 5" CHS
(X)5" CHR
(X)5" CHS
(X)5" CHR
(X)5" CHS
(X)2-1/2" CHS
(X)2-1/2" CHR
N.I.C.
DEMOLITION GENERAL NOTES
1. DESIGN INTENT IS TO RETAIN THE EXISTNG CHILLED WATER
COOLING SYSTEM UNTIL THE NEW SYSTEM IS FULLY OPERATIONAL.
DEMOLITION SCOPE SHOWN HERE SHALL OCCUR AFTER THE THE
NEW SYSTEM IS INSTALLED. REFRIGERANT COOLING SYSTEM
SERVING WALL MOUNTED CRAC UNITS ON FLOOR ABOVE SHALL BE
DEMOLISHED ALONG WITH THE CRAC UNITS TO MAKE ROOM FOR
NEW CHILLED WATER COOLING UNITS ON FLOOR ABOVE.
PROJECT SEQUENCING NOTES
1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.
PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN
THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL
SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS
IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER
AND MAKEUP WATER FLOW SWITCH.
2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA
CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH
AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED
ON DRAWINGS. COORDINATE WITH OTHER TRADES.
3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER
PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-
ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE
TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS
WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.
4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED
WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE
MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT
VA - DURHAM NC - DATA CENTER
UPDATE
558-18-273
KEY PLAN
JANUARY 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5 Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
C U s e rs
\a v a le n ti n e .F
-T \D o c u m e n ts
\R e v it
\1
.0
V
A D u rh a m
N C
D a ta C e n te r
U p d a te
M
E P
A V a le n ti n e f-t.
c o m
.r v t
/1
/2
:5
:1
A
M
MD101-MD1
MECHANICAL BASEMENT PIPING
DEMOLITION PLAN
AMVTRB
8' 16'4'0
1/8" = 1'-0"MD101-MD1
1 HVAC HYDRONIC PIPING BASEMENT FLOOR DEMOLITION PLAN
KEYNOTES
Keynote Number Keynote Description
1 DEMOLISH AND REMOVE EXISTING BRANCH PIPING SERVING
IN-ROW COOLERS ABOVE. COORDINATE SHUTDOWN WITH OWNER.
COORDINATE PATCHING OF FLOOR WITH ARCHITECT.
DN
RAMP
DNDN
FG140
FG139
FG138
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER
CORRIDOR
CORRIDOR
FG158 A
FG104
CORRIDOR
DN
RAMP
DNDN
FG140
FG139
FG138
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER
CORRIDOR
CORRIDOR
FG158 A
FG104
CORRIDOR
D
E
F
G
(X)CRAC
(X)CRAC
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)VAV
(X) 10"x10"
(X
"x
(X) 8"x8"
(X
"x
(X
"x
(X) 10"x10"
(X) 14"x14"
(X) 18"x12"
(X
"x
(X) 10"x10"(X) 8"x8"
(X)SD (X)SD
(X)SD
(X)SD
(X)SD
(X)SD
(X)SD
(X)RG
(X) 32"x14"
(X) 24"x12"
(E)VAV
D
E
F
G
(X)CRAC
(X)CRAC
(X)RS DN
(X)RL DN
(X)RS DN
(X)RL DN
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(E)VAV
(XR)VAV
(XR)CO
(X) 1" CHS/R DN
(X) 1-1/2" CHS/R DN
(X) 1" CHS/R DN
(X) 1" CHS/R DN
(X)1" CHS/R DN
(X)1" CHS/R DN
(X)1-1/2" CHS/R DN
(X)1-1/2" CHS/R DN
(X)1-1/2" CHS/R DN
(X)1-1/2" CHS/R DN
(E) 1 1/2" CD
PROJECT SEQUENCING NOTES
1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.
PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN
THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL
SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS
IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER
AND MAKEUP WATER FLOW SWITCH.
2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA
CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH
AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED
ON DRAWINGS. COORDINATE WITH OTHER TRADES.
3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER
PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-
ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE
TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS
WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.
4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED
WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE
MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT
VA - DURHAM NC - DATA CENTER
UPDATE
558-18-273
KEY PLAN
JANUARY 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5 Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
C U s e rs
\a v a le n ti n e .F
-T \D o c u m e n ts
\R e v it
\1
.0
V
A D u rh a m
N C
D a ta C e n te r
U p d a te
M
E P
A V a le n ti n e f-t.
c o m
.r v t
/1
/2
:5
:1
A
M
MD102-MD1
MECHANICAL GROUND FLOOR
DEMOLITION PLAN
AMVTP
8' 16'4'0
1/4" = 1'-0"MD102-MD1
1 HVAC DUCT GROUND FLOOR DEMOLITION PLAN
KEYNOTES
Keynote Number Keynote Description
1 PROVIDE TEMPORARY COOLING FOR TELCOM SPACE WHILE NEW
WORK IS BEING COMPLETED. COOLING CAPACITY SHALL MATCH
EXISTING INSTALLED CAPACITY, AND IS ANTICIPATED TO BE 3 TONS.
2 DEMOLISH AND REMOVE EXISTING SUPPLY AIR DUCTWORK AND
ASSOCIATED DIFFUSERS AND ACCESSORIES SERVING PHASE 2
AREA. INTENT IS TO RELOCATE DUCTWORK TO SUPPORT NEW
LAYOUT.
3 CUT BACK DUCTWORK TO FLOOR ABOVE. RETAIN DUCT
PENETRATIONS FOR EXTENSION DURING NEW WORK PHASE.
4 DEMOLISH AND REMOVE EXISTING FLEXIBLE HOSE CONNECTION
DOWNSTREAM OF ISOLATION VALVE TO IN ROW COOLER. RETAIN
PIPING UPSTREAM OF ISOLATION VALVE FOR RECONNECTION
DURING NEW WORK PHASE.
5 REMOVE EXISTING IN-ROW COOLER AND DISCONNECT FROM
EXISTING GRAVITY CONDENSATE DRAINAGE SYSTEM LOCATED
BENEATH RAISED FLOOR. RETAIN EXISTING CONDENSATE
DRAINAGE PIPING FOR RECONFIGURATION DURING NEW WORK
PHASE. IN-ROW COOLER SHALL BE RETAINED FOR
RE-INSTALLATION DURING NEW WORK PHASE.
8' 16'4'0
1/4" = 1'-0"MD102-MD1
2 HVAC HYDRONIC PIPING 1ST FLOOR DEMOLITION PLAN
DNDN
FE
FE
FE
FE
FE
NEW
TELECOM
FG158A
DN
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER FG-104
CORRIDOR
CORRIDOR
TMGB
RAMP
DNDN
FE
FE
FE
FE
FE
NEW
TELECOM
FG158A
DN
FG140
FG139
FG138
FG108
FG158
TELECOM
TELECOM
FG141
PC LAB
OFFICE
STORAGE
STORAGE
FG104A
DATA
CENTER FG-104
CORRIDOR
CORRIDOR
TMGB
D
E
F
G
CRAC-2
CRAC-1
10"x10"
12"x6"
SG-A
150 CFM
(TYP. 2)
CO-1
(XL)CO
CO-2
(XL)CO
(XL)CO
(XL)CO
(XL)CO
(XL)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
32"x14"
32"x14"
(XR)CO
24"x12"
"x
10"x10"
8"x6"
8"x6"
6"Ø
(E)VAV
FD
FD
FSD
FD
FSD
FD
FD
FDFD
FSD
FSD
FSD
12"x6"
SG-A
200 CFM
(TYP. 2)
18"x14"
RG-A
700 CFM
16"x18"
24"x12"
10"x10"
(XL)VAV
6"Ø
18"x12"
10"x10"
24"x12"
(E) 18"x12"
18"x14"
"x
D
E
F
G
CRAC-1
CRAC-2
1" CHS DN
1" CHR DN
(TYP. 2)
(XL)CO
CO-1
(XL)CO
(XL)CO
(XL)CO
(XL)CO
(XL)CO
CO-2
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XR)CO
(XL)VAV
TTs
T
Ts
1" CD DP
1-1/4" CHS DN
1-1/4" CHR DN
1" CD DP
1-1/4" CHS DN
1-1/4" CHR DN
C.O.
C.O. C.O.
C.O.
(E) 1 1/2" CD
(E) 1 1/2" CD
1 1/2" CD
PROJECT SEQUENCING NOTES
1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.
PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN
THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL
SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS
IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER
AND MAKEUP WATER FLOW SWITCH.
2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA
CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH
AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED
ON DRAWINGS. COORDINATE WITH OTHER TRADES.
3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER
PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-
ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE
TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS
WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.
4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED
WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE
MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT
VA - DURHAM NC - DATA CENTER
UPDATE
558-18-273
KEY PLAN
JANUARY 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5 Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
C U s e rs
\a v a le n ti n e .F
-T \D o c u m e n ts
\R e v it
\1
.0
V
A D u rh a m
N C
D a ta C e n te r
U p d a te
M
E P
A V a le n ti n e f-t.
c o m
.r v t
/1
/2
:5
:2
A
M
MH102-MH1
MECHANICAL GROUND FLOOR PLAN
AMVTP
8' 16'4'0
1/4" = 1'-0"MH102-MH1
1 HVAC DUCT & HYDRONIC GROUND FLOOR PLAN
KEYNOTES
Keynote Number Keynote Description
1 EXTEND PUMPED CONDENSATE TO EXISTING SECONDARY DRAIN IN
CEILING.
2 RELOCATE EXISTING VAV OUT FROM ABOVE NEW RETURN DUCT
MAIN. EXTEND EXISTING HEATING WATER PIPING TO NEW VAV.
PROVIDE DRIP PANS ABOVE DATA CENTER CABINETS.
3 PROVIDE NEW FIRE DAMPER AT WALL PENETRATION.
4 PROVIDE NEW FIRE/SMOKE DAMPER AT CEILING PENETRATION.
5 EXTEND NEW 1-1/2" CHS/R BRANCH PIPING FROM CHILLED WATER
MAIN IN CRAWL SPACE BELOW TO NEW IN ROW COOLER. INSTALL
HORIZONTAL PIPING RUNS WITHIN RAISED FLOOR. PROVIDE NEW
FLOOR PENETRATION AT LOCATION WHERE CHILLED WATER
ENTERS THE SPACE.
6 EXTEND NEW CONDENSATE FROM IN-ROW COOLER AND
RECONNECT TO EXISTING 1-1/2" GRAVITY CONDENSATE DRAIN
LOCATED BELOW RAISED FLOOR.
7 PROVIDE NEW CHILLED WATER PIPING WITH CUSTOM LENGTH
FLEXIBLE HOSE CONNECTORS TO MINIMIZE KINKING AND LOOPING
BENEATH THE RAISED FLOOR.
8 RUN NEW DUCTWORK TIGHT TO STRUCTURE. OFFSET DOWN TO
PASS BENEATH EXISTING BEAMS.
8' 16'4'0
1/4" = 1'-0"MH102-MH1
2 HVAC HYDRONIC PIPING 1ST FLOOR PLAN
E
F
G
H
J
AB1000
ELEVATOR MACH RM
STAIR−8
144'-6"
23'-10"25'21'-6"21'-6"
15 _
13 _
" E
F
G
H
J
AB1000
E
F
G
B65
1 1/4" CHR
1 1/4" CHS
1-1/4" CHS UP
1-1/4" CHR UP
(TYP. 2)
(E)CH (E)CH (E)CH
4" CHR
4" CHS
4" CHS
4" CHR
GF-1
4" CHS
4" CHR
1 1/2" CHS
1 1/2" CHR
1-1/2" CHS/R UP
(TYP. ALL)
PROJECT SEQUENCING NOTES
1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.
PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN
THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL
SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS
IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER
AND MAKEUP WATER FLOW SWITCH.
2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA
CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH
AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED
ON DRAWINGS. COORDINATE WITH OTHER TRADES.
3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER
PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-
ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE
TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS
WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.
4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED
WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE
MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CONSULTANT
VA - DURHAM NC - DATA CENTER
UPDATE
558-18-273
KEY PLAN
JANUARY 19, 2021
508 FULTON ST, DURHAM, NC
FITZEMEYER & TOCCI
1 Glenwood Avenue, Floor 5 Raliegh, NC 27603
T: 781.481.0210 www.f-t.com/
IT:
LEADING EDGE DESIGN GROUP
86 Chosen Vale Lane Enfield, NH 03748
T: 603.828.6465 www.ledesigngroup.com
C U s e rs
\a v a le n ti n e .F
-T \D o c u m e n ts
\R e v it
\1
.0
V
A D u rh a m
N C
D a ta C e n te r
U p d a te
M
E P
A V a le n ti n e f-t.
c o m
.r v t
/1
/2
:5
:3
A
M
MP101-MP1
MECHANICAL BASEMENT PIPING PLAN
AMVTP
KEYNOTES
Keynote Number Keynote Description
1 PROVIDE GLYCOL FEEDER AT LOCATION INDICATED. REFER TO
PIPING SCHEMATIC FOR MORE INFORMATION.
2 INSTALL NEW STEEL PIPING NEXT TO EXISTING PVC PIPING.
3 PROVIDE ISOLATION VALVES ON EACH BRANCH PIPE.
4 PROVIDE FLOW SWITCH ON MAKEUP WATER CONNECTION TO
CHILLED WATER SYSTEM. FLOW SWITCH SHALL BE TIED TO BMS
AND SHALL INDICATE ALARM UPON MAKEUP WATER FLOW.
5 EXTEND NEW 1-1/2" CHS/R RISER UP TO NEW IN-ROW COOLERS ON
FLOOR ABOVE.
8' 16'4'0
1/8" = 1'-0"MP101-MP1
1 HVAC HYDRONIC PIPING BASEMENT FLOOR PLAN
TYPICAL PIPE RISER SUPPORT
UNINSULATED PIPE, HOT PIPE & COLD PIPE LESS THAN 2"
INSULATED COLD PIPE 2" and LARGER
232113-03
NO SCALE
FIREPROOF MINERAL WOOL OR
OTHER LISTED MATERIAL
SCH 80 SLEEVE ONE
NOMINAL SIZE
LARGER THAN
RISER
RISER CLAMP
FIREPROOF CAULK
3" MIN
REST CLAMP
ON
SLEEVE
PIPE
STRUCTURAL
FLOOR SLAB
OR
DECK
FOR EXISTING SLABS, PROVIDE STEEL GUSSETT WELDED TO SLEEVE RESTING ON SLAB. FOR NEW SLABS, PROVIDE ANCHOR RING WELDED TO SLEEVE AND SET IN SLAB DURING CONCRETE POURING.
1. COLD PIPE SHALL BE DEFINED AS ANY PIPE CONVEYING FLUIDS 65 DEGREES OR LESS.
SCH 80 SLEEVE
DIAMETER
LARGER
THAN CLAMP
DIAMETER
RISER CLAMP WITH
THRUST
RESTRAINTS AND
INSULATION
INSERT,
REFER TO SPEC
FILL VOIDS WITH
LISTED
FIREPROOFING
3" MIN
REST CLAMP
ON
SLEEVE
PIPE
STRUCTURAL
FLOOR SLAB
OR
DECK
TOP THRUST PLATES
WELDED TO PIPE
INSULATION BUTT
AGAINST
TOP & BOTTOM THRUST
PLATES
STRUCTURAL
INSULATION INSERT,
THICKNESS TO
MATCH
SPECIFIED PIPE
INSULATION
ATTACH PIPE TO
CLAMP WITH
CONTINUOUS
WELD
INSULATION WHERE
SPECIFIED BUTT UP
AGAINST
FIREPROOFING & CLAMP
THERMOSTAT H/C
2-WAY
VALVE (TYP)
COMBINATION
SHUT-OFF
VALVE & DRAIN
VALVE W/CAP
& CHAIN (TYP)
NO SCALE
SLEEVES FOR UPFEED UNITS.
FLOOR
FANS
AIR FILTER
CHILLED WATER COIL
ELECTRICAL
CONNECTION BOX
2. LEFT HAND UNIT SHOWN. RIGHT HAND UNIT OPPOSITE FEED. REFER TO PLANS.
NOTES
1. FASTEN TO WALL AT MOUNTING LUGS.
UNION
(TYPICAL)
238223-05
DRAIN PAN
REFER TO TERMINAL PIPING SCHEMATIC
FOR PIPING AND DRAIN REQUIREMENTS.
VERTICAL CRAC UNIT DETAIL
T
NO SCALE
233713-02
2. MAXIMUM LENGTH OF INSULATED FLEX DUCT "L" = 3'-0"
1. FASTEN INSULATED FLEX DUCT TO METAL DUCT WITH 22 GAUGE BAND CLAMPS & 4 SHEETMETAL
NOTES:
& SCHEDULE FOR TYPES
REFER TO SPECIFICATIONS
CEILING DIFFUSERS.
INSULATION
BELLMOUTH
FITTING WITH
QUAD. DAMPER
SCREWS AND SEAL. DO NOT USE PLASTIC ZIP-TIES.
BRANCH (TYPICAL)
TO DUCT MAIN OR
SECURE SHEETMETAL
CEILING
SUPPLY BRANCH
OR TRUNK
INSULATED FLEX
DUCT. REFER TO
SPECIFICATIONS
CEILING SUPPLY DIFFUSERS INSTALLATION DETAIL
"L"
3. NO BOTTOM SUPPLY CONNECTIONS TO MAIN OR BRANCH ALLOWED
232113-08
NO SCALE
PIPE HANGER DETAIL
CONT. VAPOR BARRIER
1/2 SECTION x 10"L
LOAD BEARING INSUL.
PER SPEC.
INSUL. PER SPEC.
120°, 14 GA, 8"L
SHTML. SADDLE
CONT. VAPOR
BARRIER
3/8" ROD
CONT. VAPOR
BARRIER
INSUL. PER SPEC.
180°, 14 GA,6"L
SHTMTL. SADDLE
5/8" ROD
120°, 14 GA, 8"L
SHTML. SADDLE
INSUL. PER SPEC.
1/2 SECTIONx10"L LOAD
BEARING INSUL. PER
SPEC.
1/2" SECTIONx8"L
LOAD BEARING
INSUL. PER. SPEC.
INSUL. PER SPEC.
FILL VOID W/
INSUL. CEMENT
PIPE SADDLE
7/8" RODS
6" & 8" COLD PIPING 6" & 8" HOT PIPING
7/8" RODS
CONT. VAPOR BARRIER
INSUL. PER SPEC.
1/2" SECTION x 8"L
LOAD BEARING INSUL.
PER SPEC.
180°, 14 GA,6"L
SHTMTL. SADDLE
5/8" ROD
INSUL. PER SPEC.
FILL VOID W/
INSUL. CEMENT
PIPE SADDLE
1/2 " ROD
2" & LESS
ALL PIPING
4" & 5" COLD PIPING
ALL PIPING
4" & 5" HOT PIPING
2-1/2" & 3"
AIR CONTROL TERMINAL W / H.W. REHEAT COIL DETAIL
1. IF STRAIGHT RUN CAN NOT BE MADE,
PROVIDE FLOW STRAIGHTENER AT BOX
INLET.
2. PROVIDE BELLMOUTH BRANCH DUCT
TAKE-OFF FITTING TO MATCH BOX INLET
SIZE FOR BOXES LOCATED WITHIN 10 FEET
FROM BRANCH TAKE-OFF, PROVIDE DUCT
TRANSITION AS SHOWN FOR BOXES
LOCATED GREATER THAN 10 FEET FROM
BRANCH TAKE-OFF.
NOTES:
1.5D R=1.5D
D
3D
D
1.5D
SUPPLY TO
SUPPLY FROM
CENTRAL SYSTEM
SPACE
SOUND ATTENUATOR
HOT WATER REHEAT COIL
AIR
CONTROL
TERMINAL
DOUBLE WALL
INSULATED
METAL FLEX
CONTROL PANEL
OFFSET CONNECTION (ALTERNATE)
STRAIGHT CONNECTION (PREFERRED)
BAND HANGER IN
BOX INLET (TYP.)
NO SCALE
233600-05
-3°F -2°F -1°F SP +1°F +2°F +3°F
CLOSED
HEAT
MAX
MIN
OPEN
ROOM TEMPERATURE
T E
R M
IN
A
L B
O X
D A
M P
E R
S E
T P
O
IN
T S
DAMPER FIXED,
REHEAT VALVE
MODULATES
DAMPER
FIXED,
REHEAT
CLOSED
DAMPER
OPENING,
REHEAT
CLOSED
DAMPER STEPS
TO HEAT CFM
3°F COOLING RANGE
2°F DEAD BAND
FLOATING POINT REHEAT
3. PROVIDE WORKING SPACE AT ALL
ELECTRICAL COMPONENT ACCESS, PER
LATEST NEC. COORDINATE EXACT
REQUIREMENTS WITH ELEC. CONTRACTOR
REQUIREMENTS.
4. ANY SINGLE WALL DUCTWORK, SUCH AS
THE COIL OR ANY TRANSITION PIECE,
SHALL BE INSULATED THE SAME AS
CONNECTED SUPPLY DUCTWORK. REFER
TO DUCTWORK INSULATION SPEC FOR
REQUIREMENTS.
HWR
HWS
238219-02
NO SCALE
TERMINAL HOT WATER COIL PIPING SCHEMATIC
REFER TO
DRAWINGS
NOTE:
1. POSITION PIPE HANGERS TO BEAR FULL WEIGHT OF PIPING. NO LOAD ON COIL BODY.
2. LOCATE UNIONS AND ARRANGE PIPING TO FACILITATE COIL REMOVAL AND TO
AVOID BLOCKING ACCESS DOORS, CONTROL PANELS, FILTERS, VALVES, MOTORS, ETC.
3. CONTROL VALVE TO FAIL OPEN.
STRAINER
MANUAL AIR VENT
AT ALL HIGH POINTS
(TYPICAL)
UNION OR SOLDERED
CONNECTION (TYP.)
BALL VALVE
BALANCING VALVE
2-WAY CONTROL VALVEPRESSURE/TEMPERATURE PLUG
(TYPICAL)
DRAIN VALVE
W/ CAP & CHAIN
CHR
CHS
238219-03
NO SCALE
IN-ROW COOLER CHILLED WATER COIL PIPING SCHEMATIC
REFER TO
DRAWINGS
NOTE:
1. POSITION PIPE HANGERS TO BEAR FULL WEIGHT OF PIPING. NO LOAD ON COIL BODY.
2. LOCATE UNIONS AND ARRANGE PIPING TO FACILITATE COIL REMOVAL AND TO
AVOID BLOCKING ACCESS DOORS, CONTROL PANELS, FILTERS, VALVES, MOTORS, ETC.
3. CONTROL VALVE TO FAIL OPEN.
STRAINER
MANUAL AIR VENT
AT ALL HIGH POINTS
(TYPICAL)
UNION OR SOLDERED
CONNECTION (TYPICAL)
BALL VALVE
BALANCING VALVE
2-WAY CONTROL
VALVE
PRESSURE/TEMPERATURE PLUG
(TYPICAL)
DRAIN VALVE
W/ CAP & CHAIN
P-TRAPDRAIN PAN
AUXILIARY
DRAIN PAN
FLEXIBLE HOSE
CONNECTION (TYP.)
NO SCALE
233300-06
COMBINATION FIRE/SMOKE DAMPER DETAIL
FIRE/SMOKE
DAMPER
DUCT
NOTE:
DUCT
WALL SLEEVE GAUGE SHALL CONFORM
TO SMACNA STANDARDS FOR FIRE
DAMPER INSTALLATION. MINIMUM
GAUGE NOT LESS THAN CONNECTING
DUCT.
HINGED ACCESS
DOOR. DOOR SHALL
BE INSULATED WHEN
INSTALLED ON
INSULATED DUCTS.
ALTERNATE
LOCATION ON
BOTTOM OF DUCT
LOCATE TO ALLOW
ACCESS LINK
SWITCH
INSULATION
WHERE SPECIFIED
ANGLES ON ALL SIDES OF SLEEVE AND
BOTH SIDES OF WALL. ANGLES SHALL BE
MINIMUM OF 1-1/2" x 1-1/2" x 14 GAUGE WITH
A MINIMUM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .