Attachment 2 190378_VA Durham_Comprehensive Drawings Set.pdf

PDF 12 MB Posted

Attached to
C1DA--EHRM CORRECT DATA CENTER DURHAM- Z (CERNER) (VA-21-00061043)
Solicitation number
36C77622B0005
Issued by

About this file

This document provides details for a federal contract opportunity to design and build a data center recabling project at the Durham VA Medical Center in Durham, North Carolina. The Department of Veterans Affairs, Veterans Health Administration, Program Contracting Activity Central is soliciting proposals for a firm-fixed-price contract to complete the VISN 6 EHRM Re-Cabling the Data Center. Interested offerors should respond by the solicitation response date of June 10, 2022 specified in solicitation number 36C77622B0005. The selected contractor will be responsible for designing and constructing the recabling of the data center located at 508 Fulton Street in Durham, North Carolina to support the Electronic Health Record Modernization initiative.

The key details provided include the solicitation number, brief description of services required, issuing agency, location of work to be performed, and pricing structure. No further information is given on response requirements, award date, or other contractual terms. An attachment with comprehensive drawings of the current data center configuration is also referenced but contents not summarized.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER

PHASE-2

PHASE-2

PHASE-1

PHASE-1

CORRIDOR

C O

R R

I D

O R

PHASE-2

PHASE 2

FG158 A

FG104

PHASE 2

CORRIDOR

PHASE 2

PHASE 2

GROUND FLOOR - RM FG104 DATA CENTER - DEMOLITION PHASING PLAN

SCALE: 1/4" = 1'-0"

AD-101

GROUND FLOOR DEMOLITION PLAN

PHASING

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN,19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

New Stamp

UPSB

UPSC

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER

PHASE-2

PHASE-2

PHASE-1

PHASE-1

CORRIDOR

C O

R R

I D

O R

UPSA

UPS

PHASE 2

FG158 A

FG104

PHASE 2

CORRIDOR

PHASE 2

PHASE 2

DATA CENTERTELECOME RM.

DATA CENTER CORRIDOR

CORRIDOR

TELECOME

CLOSET

GROUND FLOOR - DATA CENTER -DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SECTION AT DATA CENTER

SCALE: 3/16" = 1'-0"

SECTION AT TELECOM AND DATA CENTER

SCALE: 3/16" = 1'-0"

AD-102

DEMOLITION FLOOR PLAN &

SECTIONS

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

PHASE-1

PHASE-2

PHASE-1

PHASE-2

E E E

E E E E

E E E E

E

E E E

E E E E

E E

E

E

E E E

E EE

S

S

S

E

S

FG140

FG158

TELECOM

TELECOM

PC LAB

FG104A

DATA

CENTER

FG158 A

FG104

PHASE 2

CORRIDOR

C O

R R

I D

O R

CORRIDOR

PHASE-2

FG140

FG139

FG138

FG108

PC LAB

OFFICE

OFFICE

STORAGE

GROUND FLOOR - RM FG104 DATA CENTER -DEMOLITION CEILING PLAN

SCALE: 1/4" = 1'-0"

VS MA

AD-103

GROUND FLOOR DEMOLITION-

REFLECTED CEILING PLAN

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

X F

M

PANEL FGEE2

BATT.

CAB

PANEL LM1

(EXISTING)

DISC. DS1

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE-2

FE

FE

FE

FE

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

PC LAB

OFFICE

OFFICE

STORAGE

FG104A

DATA

CENTER FG-104

CORRIDOR

C O

R R

I D

MDA-A-1

MDA-A-2

MDA-A-3

MDA-B-1

MDA-B-2

MDA-B-3

FE

BATT.

CAB

BATT.

CAB

CORRIDOR

PHASE-2

SB

S B

UPS

UPD1

UPD2

HVAC-1

HVAC-2

MISC-1

MISC-2

UPS

EXTINGUISHER

RELOCATE

GROUND FLOOR - RM FG104 DATA CENTER PHASING PLAN

SCALE: 1/4" = 1'-0"

AE-101

GROUND FLOOR PLAN

PHASING

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

X F

M

PANEL FGEE2

BATT.

CAB

PANEL LM1

(EXISTING)

DISC. DS1

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE-2

PHASE

-1

PHASE-2

PHASE-1

PHASE-1

PHASE-2

PHASE-2

DN

FE

FE

FE

FE

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER FG-104

CORRIDOR

C O

R R

I D

MDA-A-1

MDA-A-2

MDA-A-3

MDA-B-1

MDA-B-2

MDA-B-3

FE

BATT.

CAB

BATT.

CAB

CORRIDOR

PHASE-2

SB

S B

UPS

UPD1

UPD2

HVAC-1

HVAC-2

MISC-1

MISC-2

UPS

EXTINGUISHER

RELOCATE

SSCG

SSCG

A4.2

A

AE.10.2

ROOM

A4.2

FE

1 2

DATA CENTERTELECOME RM.

DATA CENTER CORRIDOR

CORRIDOR

NEW

TELECOME

CLOSET

AE-106

AE-106

GROUND FLOOR - RM FG104 DATA CENTER FLOOR PLAN

SCALE: 1/4" = 1'-0"

SECTION AT DATA CENTER

SCALE: 3/16" = 1'-0"

SECTION AT TELECOM AND DATA CENTER

SCALE: 3/16" = 1'-0"

AE-102

FLOOR PLAN & SECTIONS

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

AE-103

SECTIONS & DETAILS

VS SS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN .19 .2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

KEY PLAN

(HSA PROJECT DURHAM 20.02)

TELECOM

FG104A

DATA CENTER FG104

PHASE-2

PHASE-2

PHASE-2

PHASE

-1

PHASE-1

PHASE-1

PHASE-2

PHASE-2

PHASE-2

18"x2"

18"x2"

OS OS

OS

OS

OSOS

OSOS

OS

OS

S B

E

E E

E

E

E

E

E

E E E E

E E E

E

E

E

OS

J

S

S

S

S

S

S

C D

75CD

75CD

75CD

75CD

75CD

75CD

C D

75CD

S

C D

15CD

C D

C D

S

CM

MM

FSD

F S

D F

S D

F S

D F

S D

F S

D F

S D

FSD

FSD

FSD

CM

S D

S D

S D

S D

S D

S D

S D

CM

CM

CM

CM

CM

CM

S D

S D

S D

CM

CM

CM

R T

S R

T S

R T

S

RTS RTS RTS

R T

S R

T S

RTS

R T

S

FSD

S D

CM

R T

S

S

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

NAC

C D

S

TYP

S

E

GROUND FLOOR - RM FG104 DATA CENTER- REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

AC-101

GROUND FLOOR REFLECTED

CEILING PLAN

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.comNumber: Revisions: Date:

KEY PLAN

(HSA PROJECT DURHAM 20.02)

AF-101

DOOR & FINISH SCHEDULES &

DETAILS

VS MA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

BID DOCUMENT

FULLY SPRINKLERED

Office of Construction and Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseENGINEER A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

VA - DURHAM NC -

DATA CENTER 1

JAN, 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5

Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

KEY PLAN

(HSA PROJECT DURHAM 20.02)

New Stamp

HSA

FG140

FG139

FG138

FG158

TELECOM

TELECOMFG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

ROW B

ROW C

ROW B ROW A

UPSA

UPS

XF

M

R

PANEL FGEE2

BATT.

CAB

UPSB

UPSC

UPD2

WLAN SW_1/2

UPS2 UPD1

BATT.

CAB

PANEL LM1

(EXISTING)

DISC. DS1

NET

RACK-3

NET

RACK-2

NET

RACK-1

FG108

DATA CENTER

ABCDEFGHIJKLM

APC

CLIN 1

HP

APC

HP

APC

APC

APC COOL

APC

APC

DELL

APC

APC

A-NET

SWITCH

HP

PANDUIT

APC

HP

APC

APC

DELL

HP

APC COOL

APC

TAPE LIB

TAPE LIB

HP

PDU

PDU

DELL

APC COOL

HP

HP

IBM

IBM

IBM

APC

APC

APC

APC COOL

HP

HP

IBM

APC COOL

SW 5

APC

APC

SW 2

PDU

PDU

APC

APC

APC COOL

HP

HP

HP

HP

APC

APC

APC

HP

HP

APC

APC

APC COOL

APC

APC

APC

APC COOL

HP

APC

APC

PDU

PDU

APC

APC COOL

APC

APC

APC

APC

APC

APC

AP

C

APC COOL

APC COOL

RACK AVAILABILITY LEGEND

(PHYSICAL U-SPACE)

RACK FULL

RACK 1/2 FULL

RACK 1/4 FULL

RACK EMPTY

FG140

FG139

FG138

FG158

TELECOM

TELECOMFG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

NET

RACK-3

NET

RACK-2

NET

RACK-1

ROW B

ROW C

ROW B ROW A

UPSA

UPS

XF

M

R

PANEL FGEE2

BATT.

CAB

UPSB

UPSC

UPD2

UPS2 UPD1

BATT.

CAB

PANEL LM1

(EXISTING)

DISC. DS1

WLAN SW_1/2

DATA CENTER

APC

HP

APC

HP

APC

HP

HP

IBM

IBM

IBM

HP

HP

HP

HP

APC

APC

APC

FG108

ABCDEFGHIJKLM

ETR

TBD

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

TBD

TBD

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

TBD

ETR

ETR

ETR

TBR

ETR

ETR

ETR

ETR

ETR

ETR

ETR

TBD

ETR

ETR

ETR

TBD

ETR

TBD

TBD

ETR

ETR

ETR

ETR

ETR

ETR

TBD

TBD

ETR

TBR

TBR

TB

R

HP

HP

TBD

PANDUIT

TBD

APC

PDU

PDU

HP

APC

TBD

APC

PDU

PDU

APC

TBD

APC

TBD

APC

TBD

PDU

PDU

4 TYP. WHERE SHOWN

ROW C

ETR

CLIN 1

APC

APC

APC

APC

DELL

APC

APC

A-NET

SWITCH

HP

APC

DELL

HP

APC

TAPE LIB

TAPE LIB

HP

DELL

APC

APC

APC

HP

IBM

SW 5

SW 2

APC

HP

APC

APC

APC

APC

HP

APC

APC

APC

APC

APC

APC

APC

AP

C

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

"ETR "- EXISTING TO REMAIN

"TBD" - TO BE DEMOLISHED

"TBR" - TO BE RELOCATED

DATA CENTER FG104 - EXISTING CONDITIONS PLAN

SCALE: 1/4" = 1'-0"1 SCALE: 1/4" = 1'-0"2 DATA CENTER - DEMOLITION & PHASE 1 PLAN

1 EXISTING BACKBONE TERMINATION RACKS

EXISTING HORIZONTAL TERMINATION RACKS

TELCOM ROOM FG158 - NEW QTY (2) - STANDARD 19", 45U 2-POST RACKS WITH 12"

VERTICAL CABLE MANAGERS.

EXISTING RACK, OWNER TO RELOCATE ALL EXISTING RACK EQUIPMENT. RACK TO BE

REMOVED BY CONTRACTOR.

EXISTING "EMPTY" RACK, RE-PURPOSED AS INDICATED

EXISTING TELEPHONE PLYWOOD BACKBOARD AND PUNCH DOWN BLOCKS

TO BE RELOCATED NEXT SEQUENCE. SEE SHEET DC200, KEYED NOTES 7 & 8

KEYED NOTES

NOTES - SEQUENCE 1

1. SEQUENCE 1 REQUIRES THAT ALL NETWORK TERMINATIONS AND ASSOCIATED EQUIPMENT

SERVING HORIZONTAL CABLING TO THE SURROUNDING WORK AREAS THAT IS CURRENTLY

LOCATED IN THE DATA CENTER BE MOVED TO A NEW TELECOMMUNICATIONS ROOM (TR) IN

EXISTING ADJACENT ROOM FG158. TO SUPPORT THIS MOVE, NEW HORIZONTAL CABLING

WILL BE INSTALLED TO SUPPORT THE RELOCATION OF TERMINATIONS, AND EQUIPMENT.

UPON COMPLETION OF THIS SEQUENCE, ALL REQUIRED NETWORK EQUIPMENT AND

TERMINATIONS SHOULD BE RELOCATED AND OPERATIONAL IN THE NEW TR. THE

SEQUENCE 1 SEQUENCE OF OPERATIONS SHALL BE AS FOLLOWS:

1.A. RE-LOCATE/BUILD NEW TELECOMMUNICATIONS ROOM (TR) IN ADJACENT ROOM FG158

1.B. INSTALL NEW HORIZONTAL CABLING FROM NEW TR TO EXISTING WORK AREA

OUTLETS AND ASSOCIATED DEVICES THAT ARE CURRENTLY SERVED FROM DATA

CENTER.

1.C. COORDINATE WITH OWNER TO TERMINATE NEW CABLING AT DEVICE END

1.D. OWNER SHALL CUT OVER ALL REQUIRED NETWORK CONNECTIONS TO NEW TR

1.E. OWNER TO REMOVE ALL ABANDONED CABLING IN DATA CENTER AS REQUIRED BY

CODE

1.F. REMOVE EXISTING CABLING AND RACKS DESIGNATED AS "WLAN_SW1/2"

1.G. REMOVE EXISTING NETWORK RACKS AND EQUIPMENT AS INDICATED ON DETAIL 3 THIS

SHEET, COORDINATE REMOVAL WITH OWNER

1.H. TEMPORARILY SUPPORT REMAINING ACTIVE NETWORK CABLES IN DATA CENTER WITH

INDEPENDENT SUPPORT SYSTEM SUCH THAT EXISTING CABLE TRAY CAN BE

REMOVED. REMOVE ALL EXISTING LADDER TRAY IN DATA CENTER

1.I. OWNER TO REMOVE EMPTY RACKS AS PART OF SEQUENCE 1

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED:

VA FORM 08-6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEENGINEER STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

T: 781.481.0210 www.f-t.com/

FITZEMEYER & TOCCI

1 Glenwood Avenue Floor 5 Raliegh, NC 27603

OFFICE OF

CONSTRUCTION

AND

FACILITIES

MANAGEMENT

FULLY SPRINKLERED

86 CHOSEN VALE LANE SUITE 201

ENFIELD, NH 03748

P: (603).632.4507 www.LEDesigngroup.com

BID DOCUMENTS

DC100

EXISTING CONDITIONS & PHASE 1 PLAN 19130TECHNOLOGY DESIGN

DURHAM, NC

1/19/21 TABTMBNo. Description Date

1 CONCEPT PLAN 11/04/19

2 SCHEMATIC DESIGN 12/13/19

3 60% DD 01/17/20

4 60% DD_REVISED 04/24/20

5 90% CD 07/24/20

6 100% DESIGN SUBMITTAL 11/13/20

SHEET SYMBOL LEGEND

SHEET ABBREVIATIONS

MDA-A

D

TO RACKS (TYP. FOR ALL ROWS)

MDA-B

A

C

B

C

A

C

B

C

TO RACKS (TYP. FOR ALL ROWS)

D

HDA-A-2

HDA-A-3

HDA-B-2

HDA-B-3 HDA-B-1

HDA-A-1

HDA-A-4

HDA-B-4

DN

FE

FE

FE

FE

ROW B

ROW C

ROW B ROW A

UPSA

UPS

XF

M

R

PANEL FGEE2

BATT.

CAB

UPSB

UPSC

UPD2

GROUND BUS

UPS2 UPD1

BATT.

CAB

PANEL LM1

(EXISTING)

DISC. DS1

DATA CENTER

NTWK

RACK 1

NTWK

RACK 2

NTWK

RACK 3

FG108

TELECOM

FG158A

ABCDEFGHIJKLM

SBB

ROW A

4 TYP. WHERE SHOWN

ROW C

5'

3'-8"

TELECOM

FG104A

FG158

3 3

HDA-B-1

MDA-B-1

MDA-B-2

MDA-B-3

HDA-B-2

HDA-A-2

HDA-B-3

CERNER

APC

MDA-A-1

MDA-A-2

MDA-A-3

HDA-B-4

APC

APC

FUTURE

BACKBONE

TERM. RACK

CERNER

CERNER

CERNER

HDA-A-3

HDA-A-4 HDA-A-1

NEW

NEW

NEW

ETR

NEW

NEW

NEW

APC

CLIN 1

APC

APC

APC

APC

APC

A-NET

SWITCH

HP

APC

HP

APC

TAPE LIB

TAPE LIB

HP

DELL

IBM

SW 5

SW 2

APC

HP

APC

APC

APC

APC

APC

APC

APC

DELL

HP

APC

DELL

APC

APC

APC

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

APC COOL

NEW

NEW

NEW

NEW

NEW

NEW

APC COOL

NEW

APC COOL

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

NEW

APC

APC

APC

NOTES

1. CONTRACTOR TO VERIFY WITH OWNER FINAL LOCATION OF ALL NEW RACKS PRIOR TO

INSTALLATION.

2. ALL EXISTING RACK EQUIPMENT TO BE PROTECTED FROM DUST AND DEBRIS DURING

CONSTRUCTION. REFERENCE ARCHITECTURAL DRAWINGS FOR PHASING

REQUIREMENTS AND PROTECTION DETAILS.

3. ALL RACKS AND CABINETS SHALL HAVE A 1U RACK BONDING BUSBAR (RBB) INSTALLED

AND BONDED PER ANSI/TIA-607-C.

4. COPPER DISTRIBUTION WILL BE FROM HDA RACKS TO ADJACENT RACKS. SEE DETAIL 2

THIS SHEET.

5. FIBER OPTIC CABLES WILL TERMINATE IN MPO TO LC CASSETTES.

6. MODIFY RACK PLACEMENT TO ELIMINATE GAPS BETWEEN RACKS AS REQUIRED.

7. FIBER OPTIC BACKBONE AND HORIZONTAL MPO CABLES AND CASSETTES MUST USE

METHOD-A-POLARITY

1-LINE DIAGRAM - CORE "MDA" FIBER DISTRIBUTION

SCALE: N.T.S.SCALE: 1/4" = 1'-0"

DATA CENTER - PHASE 2 PROPOSED FLOOR PLAN

1 NEW MDA-A CORE LOCATION, QTY (3) RACKS.

NEW MDA-B CORE LOCATION, QTY (3) RACKS.

TELCOM ROOM FG158 - NEW QTY (2) - STANDARD 19", 45U 2-POST RACKS WITH 12" VERTICAL

CABLE MANAGERS.

NEW 30" WIDE NETWORK RACK ENCLOSURE

EXISTING "EMPTY" RACK, RE-PURPOSED AS INDICATED

NEW 45U CERNER EQUIPMENT RACK, PROVIDED AND INSTALLED BY OWNER

EXISTING 300mm COOLING UNIT RELOCATED TO ROW B FROM ROW C

EXISTING 600mm COOLING UNIT RELOCATED TO ROW C FROM ROW B

NEW 300mm COOLING UNIT

MAINTAIN INDEPENDENT SUPPORT FOR EXISTING BACKBONE CABLING THROUGHOUT

CONSTRUCTION

KEYED NOTES

HDA-A FIBER: QTY 24-STRAND OM4 TERMINATED ON MPO12

HDA-B FIBER: QTY 24-STRAND OM4 TERMINATED ON MPO12

COPPER: QTY 24 CAT6A COPPER CABLE

BACKBONE

1. FIBER: QTY 48-STRAND OM4 TERMINATED ON MPO12

2. COPPER: QTY (6) - CAT6A

WIRING LEGEND

A

B

C

D

FIBER DISTRIBUTION NARRATIVE

1. EACH BACKBONE (A AND B) WILL BE MIRROR IMAGES OF EACH OTHER. TO THE

GREATEST EXTENT POSSIBLE CABLING SHALL FOLLOW DIVERSE ROUTES FROM THE

CORE MDA CABINETS THROUGH TO THE SERVER CABINETS WITH EQUAL FEEDS FROM

EACH SIDE ULTIMATELY CONNECTING TO THE OVERHEAD RACKS ABOVE EACH CABINET.

2. ALL MPO TERMINATED CABLES SHALL BE CONNECTED ON BOTH ENDS WITH MPO TO LC

CASSETTES WITH THE QUANTITY OF LC CONNECTORS EQUAL TO THE NUMBER OF

STRANDS TERMINATING AT THAT POINT.

3. EACH OF THE (2) NETWORK CORES (MDA-A AND MDA-B) SHALL CONSIST OF QTY (3)

CABINETS WITH ONE DEDICATED FOR PATCHING.

4. EACH NETWORK SIDE (A AND B) SHALL HAVE DEDICATED HDA CABINETS DESIGNATED

BY ROW (I.E. HDA-"A1") LOCATED AT THE OPPOSITE ENDS OF EACH ROW.

5. FROM THE MDA PATCHING CABINET TO THE ASSOCIATED HDA SHALL BE A 48-STRAND

OM4 CABLE TERMINATED ON MPO BASE 12.

6. EACH NON-HDA CABINET SHALL HAVE OVERHEAD PATCH PANELS MOUNTED ON A 5U

RACK ATTACHED TO THE UPPER LEVEL OF CABLE TRAY. COPPER PATCH PANELS SHALL

BE 48-PORT 1U CAT6A. FIBER PANELS SHALL BE 2U.

7. FROM EACH HDA CABINET TO EACH OVERHEAD PATCH PANEL SHALL BE 24-STRAND OM4

CABLE TERMINATED ON MPO BASE12, AND 24-CAT6A.

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

APPROVED:

VA FORM 08-6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASEENGINEER STAMPCONSULTANT

321 4 5 6 7 8 9 10

ARCHITECT

T: 781.481.0210 www.f-t.com/

FITZEMEYER & TOCCI

1 Glenwood Avenue Floor 5 Raliegh, NC 27603

OFFICE OF

CONSTRUCTION

AND

FACILITIES

MANAGEMENT

FULLY SPRINKLERED

86 CHOSEN VALE LANE SUITE 201

ENFIELD, NH 03748

P: (603).632.4507 www.LEDesigngroup.com DC200

PHASE 2

PROPOSED FLOOR PLAN & NETWORK 1-LINE DIAGRAM

19130TECHNOLOGY DESIGN

DURHAM, NC

TABTMBNo. Description Date

1 CONCEPT PLAN 11/04/19

2 SCHEMATIC DESIGN 12/13/19

3 60% DD 01/17/20

4 60% DD_REVISED 04/24/20

.\Repository\19130-vadurham_5-10-20_rvt21-190378-01-VADurhamNCDataCenterUpdate_MEP2019_FTlogo-9661126-1444060.tif

5 90% CD 07/24/20

BID DOCUMENTS

1/19/2021

6 100% DESIGN SUBMITTAL 11/13/20

ABBREVIATIONSDRAWING NOTES

DUCTWORK LEGEND

AIR DEVICE LEGEND

VALVE LEGENDPIPING LEGEND GENERAL NOTES

TD TRANSFER AIR DUCT

FINS PER INCHFPI

FA

EXH

EX. EXISTING

EXHAUST

FREE AREA

GALLONS PER MINUTE

GENERAL EXHAUST

GENERAL CONTRACTORGC

GE

GPM

KILOWATTSKW

ID

KE

IN

HVAC HEATING, VENTILATION AND AIR CONDITIONING

INCHES

INSIDE DIAMETER

KITCHEN EXHAUST

MECHANICAL CONTRACTORMEC

LD

MBH

LAT LEAVING AIR TEMPERATURE

LOUVERED DOOR

THOUSANDS OF BRITISH THERMAL UNITS PER HOUR

FEET

FEET PER MINUTEFPM

FT

GAL GALLONS

NC NORMALLY CLOSED

OUTSIDE AIR TEMPERATUREOAT

NTS

OA

NO

NIC NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

OUTSIDE AIR

STATIC PRESSURESP

SUPPLY AIRSA

SAT SUPPLY AIR TEMPERATURE

EACHEA

DRAWINGDWG

FACILITY MANAGEMENT SYSTEMFMS

ENTERING AIR TEMPERATURE

EXHAUST AIRE.A.

EAT

DIA.

DN

DDC

DB DRY BULB TEMPERATURE (°F)

DIRECT DIGITAL CONTROL

DIAMETER

DOWN

CONTROL VALVECV

CONNECT

CLEAN OUT

CUBIC FEET PER MINUTECFM

CONN.

CO

CAP CAPACITY

BRITISH THERMAL UNIT PER HOUR

BRITISH THERMAL UNIT

BOTTOM OF DUCTBOD

BTUH

BTU

C CLOSED

AUTOMATIC TEMPERATURE CONTROLATC

AP

ARCH.

AFF

AD ACCESS DOOR

ABOVE FINISHED FLOOR

ACCESS PANEL

ARCHITECT

EH EXHAUST HOOD

CRAC COMPUTER ROOM AC UNIT

CP CONDENSATE PUMP

AIR COOLED REFRIGERANT CONDENSERARC

CH CHILLER

AIR COOLED CONDENSING UNITACCU

1 REVISION NOTE

DEMOLITION WORK NOTE

NEW WORK NOTE

NEW WORK NOTE

EQUIPMENT TAG

FIN TUBE RADIATION DESIGNATION

HEATING CAPACITY (MBH)

ELEMENT LENGTH

QUANTITY

NECK SIZE OR LENGTH IF LINEAR DIFFUSER

AIR VOLUME (CFM)

SUPPLY/RETURN/EXHAUST REGISTER OR GRILLE TAG

U UNDERCUT DOORWAY (BY G.C.)

SUPPLY AIR

RETURN OR EXHAUST AIR

SUPPLY DIFFUSER

ARROWS INDICATE BLOW PATTER

SUPPLY DIFFUSER OR REGISTER BELOW DUCT

RETURN GRILLE

RETURN REGISTER OR GRILLE BELOW DUCT

RECTANGULAR TO ROUND DUCTWORK TRANSITION

MITERED ELBOW WITH TURNING VANES

RECTANGULAR TRANSITION

FLEXIBLE CONNECTION

12"Ø

12"x8"

RETURN DUCTWORK DOWN

EXHAUST DUCTWORK UP

EXHAUST DUCTWORK DOWN

CAPPED DUCTWORK

RETURN DUCTWORK UP

SUPPLY DUCTWORK DOWN

SUPPLY DUCTWORK UP

ROUND DUCTWORK - DIMENSION IS DUCT DIAMETER (IN.)

RECTANGULAR DUCTWORK - FIRST DIMENSION IS SIDE SHOWN (IN.)

BFV BUTTERFLY VALVE

DV DRAIN VALVE

SCV SWING CHECK VALVE

LCV LIFT CHECK VALVE

BALANCE COCKBC

BV BALANCE VALVE

SC CONTROL VALVE

FLG FLANGE

BASKET STRAINERBKS

CONCENTRIC REDUCER (ENLARGER)CRD

ECCENTRIC REDUCER (ENLARGER)ERD

PIPE GUIDEGD

DRAINDR

FRESH AIR INTAKEFAI

DOOR LOUVER (BY G.C.)DL

PIPE DOWN

PIPE UP

RUN-OUT OFF BOTTOM

RUN-OUT OFF TOP

PIPE OFF TOP

PIPE OFF BOTTOM

DIRECTION OF FLOW

PIPE BREAK

PC PUMPED CONDENSATE

CD CD A.C. CONDENSATE DRAIN

RHG RHG REFRIGERANT HOT GAS

RL RL REFRIGERANT LIQUID

RG

RG

SD/R

SD

AIR SEPARATORAS

ELECTRICAL CONTRACTOREC

ENTERING WATER TEMPERATUREEWT

SQUARE FEETSF

TE TOILET EXHAUST

EL EXPANSION LOOP

SATURATED SUCTION TEMPERATURE

TRANSFER AIRTA

SST

DRAIN PIPE PITCH AND FLOW

1/2" WIRE MESH SCREEN (ON OPEN END DUCT)

IS ISOLATION VALVE REFER TO DETAILS AND SPEC.

EXHAUST REGISTER OR GRILLEEG

EXHAUST REGISTER OR GRILLE BELOW DUCTEG

QUANTITY

NECK SIZE OR LENGTH IF LINEAR DIFFUSER

AIR VOLUME (CFM)

SUPPLY DIFFUSER TAG

EB ELECTRIC BASEBOARD

EG EXHAUST GRILLE

EC EVAPORATIVE COOLER

SIDEWALL SUPPLY REGISTERSG

EG/RG SIDEWALL EXHAUST/RETURN REGISTER

SD-A-#

10"Ø, 12"x12"

TYP 3

SG-A, RG-A or EG-A 10"Ø, 12"x12"

TYP 3

ACCU-1

FTR-A

10'-0" 11.8

ELECTRICAL AREA - THE AREA INDICATED IS AN

ELECTRICAL ZONE. DUCTWORK, PIPING, AND SYSTEMS

SHALL NOT RUN THROUGH THIS ZONE. EXCEPTION:PIPES,

DUCTS, AND EQUIPMENT DEDICATED TO SERVE THE

ZONE ARE ALLOWED. COORDINATE WITH ELECTRICAL

CONTRACTOR AND COMPLY WITH ALL CODE CLEARANCE

REQUIREMENTS.

PRESSURE GAUGEPG

FLOW SWITCHFS

AUTOMATIC AIR VENTAAV

MANUAL AIR VENTMAV

FLOAT & THERMOSTATIC STEAM TRAPF&TT

THERMOSTATIC STEAM TRAPTT

BUCKET STEAM TRAPBT

PRESSURE/TEMPERATURE PLUGPT

PIPE CAP

STRAINER WITH DRAIN VALVE AND CAP

RS RS REFRIGERANT SUCTION

HCR HCR HOT/CHILLED WATER RETURN

HCS HCS HOT/CHILLED WATER SUPPLY

HWR HWR HOT WATER RETURN

HWS HWS HOT WATER SUPPLY

CHR CHR CHILLED WATER RETURN

CHS CHS CHILLED WATER SUPPLY

CWR CWR CONDENSER WATER RETURN

CWS CWS CONDENSER WATER SUPPLY

MUW MAKE UP WATER

PC

PIPING TO BE REMOVED

EXISTING PIPING TO REMAIN

BRANCH CONNECTION (DIRECTION TO BE FIELD DETERMINED)

BEAM PENETRATION BY DUCTWORK

ACOUSTICALLY LINED DUCTWORK

(E) 12"x8" EXISTING DUCTWORK TO REMAIN

LIMIT OF DEMOLITION

CAP EXISTING

CONNECT TO EXISTING

AIR FLOW STATION

EXHAUST REGISTER

COMPUTER ROOM AIR CONDITIONING UNIT

ER

AC

AFS

HUMIDIFIERH

FP

FTR

FCU

F FAN (GENERIC)

FAN COIL UNIT

FAN POWERED AIR TERMINAL

FIN TUBE RADIATION

HX

HP WATER SOURCE HEAT PUMP

HEAT EXCHANGER

SD SUPPLY DIFFUSER

SOUND ATTENUATORSA

RH/IH

RTU

RR

RG RETURN GRILLE

RETURN REGISTER

RELIEF HOOD/ INTAKE HOOD

ROOFTOP UNIT

VARIABLE AIR VOLUME BOXV

SUPPLY REGISTER

SUPPLY GRILLE

SR

SG

UH UNIT HEATER

FILTER BOXFB

UNIT VENTILATORUV

VI VIBRATION INSOLATION

AUTOMATIC AIR VENTAAV

COMBUSTION AIR SUPPLYCAS

CA COMBUSTION AIR

COOLING COILCC

CT

CP CONTROL PANEL

CURRENT TRANSFORMER

CONTRACTORCONTR

EXISTING TO REMAINETR

EXISTING TO BE REMOVED

EXTERNAL STATIC PRESSUREESP

ETBR

ET EXPANSION TANK

FULL LOAD AMPSFLA

FLOOR DRAINFLD

HP

HE

GUH GAS FIRED UNIT HEATER

HOOD EXHAUST

HORSE POWER

HEATING COILHC

LWT LEAVING WATER TEMPERATURE

OUTSIDE DIAMETEROD

OBD OPPOSED BLADE DAMPER

PC PLUMBING CONTRACTOR

RA

PSI

PD PRESSURE DROP

POUNDS PER SQUARE INCH

RETURN AIR

RM ROOM

SPEEDSPD

STAINLESS STEELSS

TSTAT THERMOSTAT

TYP TYPICAL

VAV VARIABLE AIR VOLUME

VB VACUUM BREAKER

VFD VARIABLE FREQUENCY DRIVE

WB WET BULB TEMPERATURE (°F)

WMS WIRE MESH SCREEN

X

E

(X) 12"x8" EXISTING DUCTWORK TO BE DEMOLISHED

MECHANICAL DEMOLITION / RELOCATION LEGEND

"X" EXISTING MECHANICAL EQUIPMENT, DEVICE AND/OR SYSTEM TO

BE SELECTIVELY DEMOLISHED

"XR" EXISTING MECHANICAL EQUIPMENT TO BE REMOVED, STORED

AND RE-LOCATED.

"XT" EXISTING MECHANICAL DEVICE OR EQUIPMENT TO BE REMOVED

AND TURNED OVER TO OWNER FOR RE-USE

"XL" RE-LOCATED EXISTING MECHANICAL EQUIPMENT OR DEVICE.

"E" EXISTING MECHANICAL EQUIPMENT OR DEVICE TO REMAIN

FIRE PROTECTION CONTRACTORFPC

EXLXTXRX

EXAMPLE

OPEN ENDED DUCTOED

DEMOLITION GENERAL NOTES

PILOT OPERATED PRESSURE REDUCING VALVE

C.O. CLEAN OUT

PCHR PCHR PRIMARY CHILLED WATER RETURN

PCHS PCHS PRIMARY CHILLED WATER SUPPLY

SCHR SCHR SECONDARY CHILLED WATER RETURN

SCHS SCHS SECONDARY CHILLED WATER SUPPLY

TCHR TCHR TERTIARY CHILLED WATER RETURN

TCHS TCHS TERTIARY CHILLED WATER SUPPLY

MUW

UC UNDERCUT DOOR

EQUIPMENT TAGS

B BOILER

GAS FIRED MAKE-UP AIR UNITMUA

P PUMP

WATER FLOW STATIONWFS

CONTROL LEGEND

TEMPERATURE SENSOR

HUMIDITY SENSOR

TIME CLOCK CONTROLLER

SWITCH CONTROLLER

HEAT/COOL THERMOSTAT

CONTROL LINE

TS

Hs

C

S

REVERSE ACTING THERMOSTAT

FACILITY MANAGEMENT PANELFMS

R

CO2 SENSOR

CO SENSORCO

CO2

STATIC PRESSURE SENSORSP1

DIFFERENTIAL PRESSURE SENSORDPS

AFS- AIR FLOW MEASURING STATION

VFD VARIABLE FREQUENCY DRIVE

DSD DUCT SMOKE DETECTOR

FLOW METERFM

DPSOR

HUMIDISTATH

ENVIRONMETAL CONTROL PANELECP

T

T

D D DRAIN

GMU GLYCOL MAKE-UPGMU

RG RG REFRIGERANT GAS

RD RD REFRIGERANT DISCHARGE

GV GATE VALVE

GLV GLOBE VALVE

BV BALL VALVE

PRV PRESSURE REDUCING VALVE

RV RELIEF VALVE

UNION

PLS PIPE LINE STRAINER

TRM THERMOMETER

PIPE ANCHORAN

EXPANSION COMPENSATOREC

PIPE FLEXIBLE CONNECTIONPFC

GR GR GLYCOL RETURN

GS GS GLYCOL SUPPLY

1. MECHANICAL WORK IS INDICATED DIAGRAMMATIC. EXACT LOCATIONS OF ALL COMPONENTS ARE TO BE DETERMINED IN THE FIELD (SPACING SUBJECT TO ARCHITECT'S REVIEW AND APPROVAL) TO AVOID CONFLICT

WITH OTHER TRADES AND EXISTING SITE CONDITIONS.

2. THE CONTRACTOR SHALL VISIT AND CAREFULLY EXAMINE THE SITE TO IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT THE WORK OF THIS SECTION. REPORT IN WRITING TO THE ARCHITECT CONDITIONS WHICH MIGHT ADVERSELY AFFECT WORK. NO EXTRA PAYMENT WILL BE PROVIDED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY

CONSTRUED BY AN EXPERIENCED OBSERVER.

3. WORK REQUIRING INTERRUPTION OF BUILDING SERVICES SHALL BE CAREFULLY REVIEWED AND COORDINATED WITH THE OWNER TO MINIMIZE FREQUENCY AND DURATION OF SERVICE INTERRUPTIONS.

4. REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATION OF CEILING GRID, DIFFUSERS, AND GRILLES.

5. ALL INSTALLATIONS SHALL PERMIT AND PROVIDE ACCESSIBILITY FOR SERVICE AND REPLACEMENT OF ALL NEW

EQUIPMENT AND EXISTING EQUIPMENT IMPACTED BY THIS WORK.

6. COORDINATE ALL OPENINGS IN FLOORS WITH STRUCTURAL DRAWINGS AND GENERAL CONTRACTOR.

7. COORDINATE ALL ROOF OPENINGS WITH ARCHITECT AND STRUCTURAL ENGINEER.

8. REFER TO STRUCTURAL FRAMING PLANS FOR EXACT LOCATION OF ALL ROOF MOUNTED EQUIPMENT.

9. ALL MECHANICAL EQUIPMENT, PIPING, AND DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING LOCAL, STATE, AND FEDERAL SEISMIC CODES. PARTICULAR ATTENTION SHALL

BE MADE TO VIBRATION ISOLATION, ANCHORING, AND BALANCING REQUIREMENTS.

10. PROVIDE SMOKE DETECTORS AND SMOKE DAMPERS WHERE SHOWN ON THE MECHANICAL DRAWINGS.

COORDINATE THE QUANTITY AND EXACT LOCATION WITH ACTUAL SHEET METAL SHOP DRAWINGS, TO BE PRODUCED BY MECHANICAL CONTRACTOR, AND APPROVED BY ENGINEER. PROVIDE SMOKE DETECTORS AND SMOKE DAMPERS IN BOTH SUPPLY AND RETURN DUCTS ON ALL AIR HANDLERS AS SHOWN IN MECHANICAL

DRAWINGS.

11. ALL DUCTWORK SHALL BE INSTALLED IN ACCORDANCE WITH CODES AND STANDARDS SET FORTH IN NFPA, SMACNA, AND ASHRAE FOR LOW PRESSURE DUCTWORK SYSTEMS.

12. ALL EXPOSED DUCTWORK SHALL BE PAINTED TO MATCH CEILING. REFER TO ARCHITECTURAL DRAWINGS.

13. PROVIDE MANUAL VOLUME DAMPERS AT ALL BRANCH DUCTS FOR AIR BALANCING.

14. ALL SHEET METAL PLENUMS AT OUTSIDE AIR LOUVERS SHALL BE INSULATED WITH RIGID INSULATION, AS PER

SPECIFICATIONS.

15. RUN-OUTS TO RETURN AND EXHAUST REGISTERS, OR GRILLES ABOVE GYP BOARD CEILINGS, SHALL BE RIGID

DUCTED. NO FLEXIBLE DUCT WORK SHALL BE ALLOWED ON RETURN OR EXHAUST REGISTERS.

16. ALL DUCTS, PIPES, AND EQUIPMENT SHALL BE INDEPENDENTLY SUPPORTED FROM THE BUILDING STRUCTURE

WITH PROPER ALLOWANCES FOR CONTRACTION, EXPANSION, AND VIBRATION ELIMINATION.

17. PROVIDE 12"x10" ACCESS PANELS AT ALL BASEBOARD CONTROL VALVES. COORDINATE EXACT LOCATIONS

WITH GENERAL CONTRACTOR.

18. PROVIDE COPPER 3/4" RUN-OUTS TO HOT WATER REHEAT COILS, CABINET HEATERS AND UNIT HEATERS

UNLESS NOTED OTHERWISE.

19. PROVIDE SWING JOINTS AT ALL BRANCH CONNECTIONS TO HYDRONIC EQUIPMENT.

20. ROOM THERMOSTATS SHALL BE MOUNTED 4'-0" ABOVE FINISHED FLOOR UNLESS OTHERWISE SHOWN OR

DIRECTED. COORDINATE LOCATIONS WITH ARCHITECTURAL WALL PROTECTIONS.

21. COORDINATE EXACT LOCATION OF UNIT HEATERS WITHIN ELECTRIC ROOMS WITH ELECTRICAL CONTRACTOR.

22. REFER TO SPECIFICATIONS FOR TYPE OF VALVE TO BE USED. VALVES ARE SHOWN ON PLANS FOR PLACEMENT

ONLY.

23. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR FREE AREA REQUIRED.

24. ALL DIFFUSER, REGISTER, AND GRILLE SIZES INDICATED ON FLOOR PLANS ARE NECK SIZE REQUIRED.

25. ALL PIPING IS TO BE SLOPED A MINIMUM OF 1/4" PER HUNDRED FEET IN THE DIRECTION OF DRAINAGE.

26. NOT ALL SYMBOLS OR ABBREVIATIONS ARE USED ON THIS PROJECT.

27. COORDINATE ENTIRE INSTALLATION WITH THE WORK OF ALL OTHER TRADES PRIOR TO ANY FABRICATION OR

INSTALLATIONS.

28. PERFORM DUCT LEAK TESTING IN ACCORDANCE WITH THE SPECIFICATIONS AND SMACNA GUIDELINES OF ALL DUCTWORK EXCEPT CLASS 2 THROUGHOUT THE PROJECT SCOPE. REFER TO INSTALLATION OF DUCTWORK

SECTION OF THE DIVISION 23 00 00 SPECIFICATIONS.

1. CONTRACTOR SHALL VISIT SITE AND IDENTIFY EXISTING CONDITIONS AND DIFFICULTIES THAT WILL AFFECT WORK OF THIS SECTION. NO COMPENSATION WILL BE GRANTED FOR ADDITIONAL WORK CAUSED BY UNFAMILIARITY WITH SITE CONDITIONS THAT ARE VISIBLE OR READILY CONSTRUED BY EXPERIENCED

OBSERVERS.

2. PRIOR TO COMMENCING WORK OF THIS SECTION, EXAMINE SITE AND CONDITIONS UNDER WHICH WORK WILL BE PERFORMED. DETERMINE EXACT LOCATIONS OF EXISTING EQUIPMENT, PIPING AND CONTROLS. REPORT TO OWNER ANY CONDITIONS THAT MIGHT ADVERSELY AFFECT WORK. COMMENCEMENT OF WORK SHALL BE

CONSTRUED AS COMPLETE ACCEPTANCE OF EXISTING CONDITIONS AND PREPARATORY WORK.

3. ABANDONING OF DUCTWORK, PIPING OR EQUIPMENT IN PLACE SHALL NOT BE ALLOWED. COMPLETE REMOVAL

REQUIRED UNLESS NOTED OTHERWISE.

4. PIPING TO BE REMOVED: REMOVE PORTION OF PIPING INDICATED TO BE REMOVED AND CAP REMAINING PIPING

WITH SAME OR COMPATIBLE PIPING MATERIAL.

5. DUCTS TO BE REMOVED: REMOVE PORTION OF DUCTS INDICATED TO BE REMOVED AND CAP REMAINING DUCTS

WITH SAME OR COMPATIBLE DUCTWORK MATERIAL.

6. EQUIPMENT TO BE REMOVED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT.

7. EQUIPMENT TO BE REMOVED AND SALVAGED: DISCONNECT AND CAP SERVICES AND REMOVE EQUIPMENT AND

DELIVER TO OWNER.

8. COMPLY WITH ALL STATE AND LOCAL CODES AS TO REMOVAL AND DISPOSAL OF EQUIPMENT REMOVED FROM

THE SITE.

9. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE BEGINNING SELECTIVE DEMOLITION.

10. REMOVE PREVIOUSLY ABANDONED WORK IN THE WAY OF EXISTING CONSTRUCTION, OR AS NOTED.

11. COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.

12. COMPLY WITH ANSI A10.6 (SAFETY REQUIREMENTS FOR DEMOLITION OPERATIONS) AND NFPA 241 (STANDARD

FOR SAFEGUARDING CONSTRUCTION, ALTERATION AND DEMOLITION OPERATIONS).

13. PERMITS: GIVE ALL REQUIRED NOTICES, FILE ALL REQUIRED PLANS AND SPECIFICATIONS RELATING TO THE WORK OF THIS SECTION WITH THE PROPER AUTHORITIES AND PAY FOR ANY REQUIRED PERMITS.

14. ALL AIR-CONDITIONING EQUIPMENT AND SYSTEMS SHALL BE REMOVED WITHOUT RELEASING REFRIGERANTS.

REFRIGERANT RECOVERY IS TO BE PERFORMED BY A REFRIGERANT RECOVERY TECHNICIAN CERTIFIED BY AN

EPA-APPROVED CERTIFICATION PROGRAM.

15. ALL EQUIPMENT AND SYSTEMS TO BE DEMOLISHED UNDER THIS SECTION AND NOT DESIRED BY OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR. THE CONTRACTOR SHALL REMOVE ALL SUCH EQUIPMENT FROM

THE SITE PROMPTLY AFTER DETACHMENT FROM BUILDING STRUCTURE.

16. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.

17. IT IS UNKNOWN WHETHER HAZARDOUS MATERIALS WILL BE ENCOUNTERED IN THE WORK. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY

NOTIFY ARCHITECT AND OWNER.

18. EXISTING PIPING SHOWN ON DRAWINGS DOES NOT INDICATE FULL EXTENT OF PIPING DEMOLITION. FIELD

VERIFICATIONS REQUIRED.

RECTANGULAR ROUND

DAMPERS

FD FIRE DAMPER

M

SMOKE DAMPER

MOTORIZED OR AUTOMATIC CONTROL DAMPER

BACK DRAFT DAMPER

VOLUME DAMPER

ACD

SD

BD

VD

FD

BD

FS FIRE & SMOKE DAMPERFS

SD

MECHANICAL DRAWING LIST

CO IN-ROW COOLER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSULTANT

VA - DURHAM NC - DATA CENTER

UPDATE

558-18-273

JANUARY 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5 Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

C U s e rs

\a v a le n ti n e .F

-T \D o c u m e n ts

\R e v it

\1

.0

V

A D u rh a m

N C

D a ta C e n te r

U p d a te

M

E P

A V a le n ti n e f-t.

c o m

.r v t

/1

/2

:5

:2

A

M

MH001

MECHANICAL LEGEND

AMVTRB

Sheet Number Sheet Name

MH001 MECHANICAL LEGEND

MD101-MD1 MECHANICAL BASEMENT PIPING DEMOLITION PLAN

MD102-MD1 MECHANICAL GROUND FLOOR DEMOLITION PLAN

MH102-MH1 MECHANICAL GROUND FLOOR PLAN

MP101-MP1 MECHANICAL BASEMENT PIPING PLAN

MH601 HVAC SCHEDULES AND DETAILS

MH602 HVAC PIPING SCHEMATICS

MH700 MECHANICAL SEQUENCE OF OPERATIONS

Number: Revisions: Date: 01/19/2021

CRAWL SPACE

AB1000

ELEVATOR MACH RM

STAIR−8

144'-6"

23'-10"25'21'-6"21'-6"

AB1000

S

D

E

F

G

B65

(X)ACCU (X)ACCU

(X)RS/RL

(TYP. 2)

(X)RS/RL

(TYP. 2)

(X)RS/RL

(TYP. 2)

(X)RS UP

(X)RL UP

(X) 1-1/2" CHS/R UP

(TYP. ALL)

(X) 1-1/2" CHS/R UP

(TYP. ALL)

(E)CH (E)CH (E)CH

(E) 5" CHR

(E) 5" CHS

(X)5" CHR

(X)5" CHS

(X)5" CHR

(X)5" CHS

(X)2-1/2" CHS

(X)2-1/2" CHR

N.I.C.

DEMOLITION GENERAL NOTES

1. DESIGN INTENT IS TO RETAIN THE EXISTNG CHILLED WATER

COOLING SYSTEM UNTIL THE NEW SYSTEM IS FULLY OPERATIONAL.

DEMOLITION SCOPE SHOWN HERE SHALL OCCUR AFTER THE THE

NEW SYSTEM IS INSTALLED. REFRIGERANT COOLING SYSTEM

SERVING WALL MOUNTED CRAC UNITS ON FLOOR ABOVE SHALL BE

DEMOLISHED ALONG WITH THE CRAC UNITS TO MAKE ROOM FOR

NEW CHILLED WATER COOLING UNITS ON FLOOR ABOVE.

PROJECT SEQUENCING NOTES

1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.

PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN

THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL

SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS

IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER

AND MAKEUP WATER FLOW SWITCH.

2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA

CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH

AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED

ON DRAWINGS. COORDINATE WITH OTHER TRADES.

3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER

PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-

ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE

TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS

WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.

4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED

WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE

MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSULTANT

VA - DURHAM NC - DATA CENTER

UPDATE

558-18-273

KEY PLAN

JANUARY 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5 Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

C U s e rs

\a v a le n ti n e .F

-T \D o c u m e n ts

\R e v it

\1

.0

V

A D u rh a m

N C

D a ta C e n te r

U p d a te

M

E P

A V a le n ti n e f-t.

c o m

.r v t

/1

/2

:5

:1

A

M

MD101-MD1

MECHANICAL BASEMENT PIPING

DEMOLITION PLAN

AMVTRB

8' 16'4'0

1/8" = 1'-0"MD101-MD1

1 HVAC HYDRONIC PIPING BASEMENT FLOOR DEMOLITION PLAN

KEYNOTES

Keynote Number Keynote Description

1 DEMOLISH AND REMOVE EXISTING BRANCH PIPING SERVING

IN-ROW COOLERS ABOVE. COORDINATE SHUTDOWN WITH OWNER.

COORDINATE PATCHING OF FLOOR WITH ARCHITECT.

DN

RAMP

DNDN

FG140

FG139

FG138

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER

CORRIDOR

CORRIDOR

FG158 A

FG104

CORRIDOR

DN

RAMP

DNDN

FG140

FG139

FG138

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER

CORRIDOR

CORRIDOR

FG158 A

FG104

CORRIDOR

D

E

F

G

(X)CRAC

(X)CRAC

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)VAV

(X) 10"x10"

(X

"x

(X) 8"x8"

(X

"x

(X

"x

(X) 10"x10"

(X) 14"x14"

(X) 18"x12"

(X

"x

(X) 10"x10"(X) 8"x8"

(X)SD (X)SD

(X)SD

(X)SD

(X)SD

(X)SD

(X)SD

(X)RG

(X) 32"x14"

(X) 24"x12"

(E)VAV

D

E

F

G

(X)CRAC

(X)CRAC

(X)RS DN

(X)RL DN

(X)RS DN

(X)RL DN

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(E)VAV

(XR)VAV

(XR)CO

(X) 1" CHS/R DN

(X) 1-1/2" CHS/R DN

(X) 1" CHS/R DN

(X) 1" CHS/R DN

(X)1" CHS/R DN

(X)1" CHS/R DN

(X)1-1/2" CHS/R DN

(X)1-1/2" CHS/R DN

(X)1-1/2" CHS/R DN

(X)1-1/2" CHS/R DN

(E) 1 1/2" CD

PROJECT SEQUENCING NOTES

1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.

PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN

THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL

SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS

IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER

AND MAKEUP WATER FLOW SWITCH.

2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA

CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH

AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED

ON DRAWINGS. COORDINATE WITH OTHER TRADES.

3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER

PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-

ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE

TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS

WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.

4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED

WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE

MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSULTANT

VA - DURHAM NC - DATA CENTER

UPDATE

558-18-273

KEY PLAN

JANUARY 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5 Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

C U s e rs

\a v a le n ti n e .F

-T \D o c u m e n ts

\R e v it

\1

.0

V

A D u rh a m

N C

D a ta C e n te r

U p d a te

M

E P

A V a le n ti n e f-t.

c o m

.r v t

/1

/2

:5

:1

A

M

MD102-MD1

MECHANICAL GROUND FLOOR

DEMOLITION PLAN

AMVTP

8' 16'4'0

1/4" = 1'-0"MD102-MD1

1 HVAC DUCT GROUND FLOOR DEMOLITION PLAN

KEYNOTES

Keynote Number Keynote Description

1 PROVIDE TEMPORARY COOLING FOR TELCOM SPACE WHILE NEW

WORK IS BEING COMPLETED. COOLING CAPACITY SHALL MATCH

EXISTING INSTALLED CAPACITY, AND IS ANTICIPATED TO BE 3 TONS.

2 DEMOLISH AND REMOVE EXISTING SUPPLY AIR DUCTWORK AND

ASSOCIATED DIFFUSERS AND ACCESSORIES SERVING PHASE 2

AREA. INTENT IS TO RELOCATE DUCTWORK TO SUPPORT NEW

LAYOUT.

3 CUT BACK DUCTWORK TO FLOOR ABOVE. RETAIN DUCT

PENETRATIONS FOR EXTENSION DURING NEW WORK PHASE.

4 DEMOLISH AND REMOVE EXISTING FLEXIBLE HOSE CONNECTION

DOWNSTREAM OF ISOLATION VALVE TO IN ROW COOLER. RETAIN

PIPING UPSTREAM OF ISOLATION VALVE FOR RECONNECTION

DURING NEW WORK PHASE.

5 REMOVE EXISTING IN-ROW COOLER AND DISCONNECT FROM

EXISTING GRAVITY CONDENSATE DRAINAGE SYSTEM LOCATED

BENEATH RAISED FLOOR. RETAIN EXISTING CONDENSATE

DRAINAGE PIPING FOR RECONFIGURATION DURING NEW WORK

PHASE. IN-ROW COOLER SHALL BE RETAINED FOR

RE-INSTALLATION DURING NEW WORK PHASE.

8' 16'4'0

1/4" = 1'-0"MD102-MD1

2 HVAC HYDRONIC PIPING 1ST FLOOR DEMOLITION PLAN

DNDN

FE

FE

FE

FE

FE

NEW

TELECOM

FG158A

DN

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER FG-104

CORRIDOR

CORRIDOR

TMGB

RAMP

DNDN

FE

FE

FE

FE

FE

NEW

TELECOM

FG158A

DN

FG140

FG139

FG138

FG108

FG158

TELECOM

TELECOM

FG141

PC LAB

OFFICE

STORAGE

STORAGE

FG104A

DATA

CENTER FG-104

CORRIDOR

CORRIDOR

TMGB

D

E

F

G

CRAC-2

CRAC-1

10"x10"

12"x6"

SG-A

150 CFM

(TYP. 2)

CO-1

(XL)CO

CO-2

(XL)CO

(XL)CO

(XL)CO

(XL)CO

(XL)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

32"x14"

32"x14"

(XR)CO

24"x12"

"x

10"x10"

8"x6"

8"x6"

6"Ø

(E)VAV

FD

FD

FSD

FD

FSD

FD

FD

FDFD

FSD

FSD

FSD

12"x6"

SG-A

200 CFM

(TYP. 2)

18"x14"

RG-A

700 CFM

16"x18"

24"x12"

10"x10"

(XL)VAV

6"Ø

18"x12"

10"x10"

24"x12"

(E) 18"x12"

18"x14"

"x

D

E

F

G

CRAC-1

CRAC-2

1" CHS DN

1" CHR DN

(TYP. 2)

(XL)CO

CO-1

(XL)CO

(XL)CO

(XL)CO

(XL)CO

(XL)CO

CO-2

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XR)CO

(XL)VAV

TTs

T

Ts

1" CD DP

1-1/4" CHS DN

1-1/4" CHR DN

1" CD DP

1-1/4" CHS DN

1-1/4" CHR DN

C.O.

C.O. C.O.

C.O.

(E) 1 1/2" CD

(E) 1 1/2" CD

1 1/2" CD

PROJECT SEQUENCING NOTES

1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.

PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN

THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL

SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS

IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER

AND MAKEUP WATER FLOW SWITCH.

2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA

CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH

AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED

ON DRAWINGS. COORDINATE WITH OTHER TRADES.

3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER

PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-

ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE

TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS

WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.

4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED

WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE

MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSULTANT

VA - DURHAM NC - DATA CENTER

UPDATE

558-18-273

KEY PLAN

JANUARY 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5 Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

C U s e rs

\a v a le n ti n e .F

-T \D o c u m e n ts

\R e v it

\1

.0

V

A D u rh a m

N C

D a ta C e n te r

U p d a te

M

E P

A V a le n ti n e f-t.

c o m

.r v t

/1

/2

:5

:2

A

M

MH102-MH1

MECHANICAL GROUND FLOOR PLAN

AMVTP

8' 16'4'0

1/4" = 1'-0"MH102-MH1

1 HVAC DUCT & HYDRONIC GROUND FLOOR PLAN

KEYNOTES

Keynote Number Keynote Description

1 EXTEND PUMPED CONDENSATE TO EXISTING SECONDARY DRAIN IN

CEILING.

2 RELOCATE EXISTING VAV OUT FROM ABOVE NEW RETURN DUCT

MAIN. EXTEND EXISTING HEATING WATER PIPING TO NEW VAV.

PROVIDE DRIP PANS ABOVE DATA CENTER CABINETS.

3 PROVIDE NEW FIRE DAMPER AT WALL PENETRATION.

4 PROVIDE NEW FIRE/SMOKE DAMPER AT CEILING PENETRATION.

5 EXTEND NEW 1-1/2" CHS/R BRANCH PIPING FROM CHILLED WATER

MAIN IN CRAWL SPACE BELOW TO NEW IN ROW COOLER. INSTALL

HORIZONTAL PIPING RUNS WITHIN RAISED FLOOR. PROVIDE NEW

FLOOR PENETRATION AT LOCATION WHERE CHILLED WATER

ENTERS THE SPACE.

6 EXTEND NEW CONDENSATE FROM IN-ROW COOLER AND

RECONNECT TO EXISTING 1-1/2" GRAVITY CONDENSATE DRAIN

LOCATED BELOW RAISED FLOOR.

7 PROVIDE NEW CHILLED WATER PIPING WITH CUSTOM LENGTH

FLEXIBLE HOSE CONNECTORS TO MINIMIZE KINKING AND LOOPING

BENEATH THE RAISED FLOOR.

8 RUN NEW DUCTWORK TIGHT TO STRUCTURE. OFFSET DOWN TO

PASS BENEATH EXISTING BEAMS.

8' 16'4'0

1/4" = 1'-0"MH102-MH1

2 HVAC HYDRONIC PIPING 1ST FLOOR PLAN

E

F

G

H

J

AB1000

ELEVATOR MACH RM

STAIR−8

144'-6"

23'-10"25'21'-6"21'-6"

15 _

13 _

" E

F

G

H

J

AB1000

E

F

G

B65

1 1/4" CHR

1 1/4" CHS

1-1/4" CHS UP

1-1/4" CHR UP

(TYP. 2)

(E)CH (E)CH (E)CH

4" CHR

4" CHS

4" CHS

4" CHR

GF-1

4" CHS

4" CHR

1 1/2" CHS

1 1/2" CHR

1-1/2" CHS/R UP

(TYP. ALL)

PROJECT SEQUENCING NOTES

1. DEMOLISH AND REMOVE EXISTING TR ROOM DX COOLING CRAC UNITS.

PROVIDE TEMPORARY COOLING FOR THE DURATION OF THE DOWNTIME IN

THE TR ROOM. INSTALL NEW CHILLED WATER PIPING MAINS IN CRAWL

SPACE AND EXTEND NEW PIPING RISERS TO WALL MOUNTED CRAC UNITS

IN SUPPORT OF TR ROOM RECONFIGURATION. INSTALL GLYCOL FEEDER

AND MAKEUP WATER FLOW SWITCH.

2. AFTER EMPTY DATA RACKS HAVE BEEN REMOVED FROM THE DATA

CENTER, BEGIN ABOVE-CEILING WORK WITHIN DATA CENTER. DEMOLISH

AND REPLACE EXISTING DUCTWORK MAINS AND BRANCHES AS INDICATED

ON DRAWINGS. COORDINATE WITH OTHER TRADES.

3. AFTER ABOVE CEILING WORK IS COMPLETE. EXTEND CHILLED WATER

PIPING RISERS TO NEW LOCATIONS OF IN-ROW COOLER. COORDINATE IN-

ROW COOLER CHANGEOVERS WITH IT CONTRACTOR. PROVIDE

TEMPORARY COOLING AS NEEDED TO MAINTAIN SPACE CONDITIONS

WHILE THE EXISTING IN-ROW COOLERS ARE BEING RECONFIGURED.

4. AFTER ALL IN-ROW COOLERS HAVE BEEN MOVED TO THE NEW CHILLED

WATER MAIN, THE EXISTING PIPE RISERS AND ASSOCIATED PVC PIPE

MAINS IN THE CRAWL SPACE SHALL BE DEMOLISHED.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

BID DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

CONSULTANT

VA - DURHAM NC - DATA CENTER

UPDATE

558-18-273

KEY PLAN

JANUARY 19, 2021

508 FULTON ST, DURHAM, NC

FITZEMEYER & TOCCI

1 Glenwood Avenue, Floor 5 Raliegh, NC 27603

T: 781.481.0210 www.f-t.com/

IT:

LEADING EDGE DESIGN GROUP

86 Chosen Vale Lane Enfield, NH 03748

T: 603.828.6465 www.ledesigngroup.com

C U s e rs

\a v a le n ti n e .F

-T \D o c u m e n ts

\R e v it

\1

.0

V

A D u rh a m

N C

D a ta C e n te r

U p d a te

M

E P

A V a le n ti n e f-t.

c o m

.r v t

/1

/2

:5

:3

A

M

MP101-MP1

MECHANICAL BASEMENT PIPING PLAN

AMVTP

KEYNOTES

Keynote Number Keynote Description

1 PROVIDE GLYCOL FEEDER AT LOCATION INDICATED. REFER TO

PIPING SCHEMATIC FOR MORE INFORMATION.

2 INSTALL NEW STEEL PIPING NEXT TO EXISTING PVC PIPING.

3 PROVIDE ISOLATION VALVES ON EACH BRANCH PIPE.

4 PROVIDE FLOW SWITCH ON MAKEUP WATER CONNECTION TO

CHILLED WATER SYSTEM. FLOW SWITCH SHALL BE TIED TO BMS

AND SHALL INDICATE ALARM UPON MAKEUP WATER FLOW.

5 EXTEND NEW 1-1/2" CHS/R RISER UP TO NEW IN-ROW COOLERS ON

FLOOR ABOVE.

8' 16'4'0

1/8" = 1'-0"MP101-MP1

1 HVAC HYDRONIC PIPING BASEMENT FLOOR PLAN

TYPICAL PIPE RISER SUPPORT

UNINSULATED PIPE, HOT PIPE & COLD PIPE LESS THAN 2"

INSULATED COLD PIPE 2" and LARGER

232113-03

NO SCALE

FIREPROOF MINERAL WOOL OR

OTHER LISTED MATERIAL

SCH 80 SLEEVE ONE

NOMINAL SIZE

LARGER THAN

RISER

RISER CLAMP

FIREPROOF CAULK

3" MIN

REST CLAMP

ON

SLEEVE

PIPE

STRUCTURAL

FLOOR SLAB

OR

DECK

FOR EXISTING SLABS, PROVIDE STEEL GUSSETT WELDED TO SLEEVE RESTING ON SLAB. FOR NEW SLABS, PROVIDE ANCHOR RING WELDED TO SLEEVE AND SET IN SLAB DURING CONCRETE POURING.

1. COLD PIPE SHALL BE DEFINED AS ANY PIPE CONVEYING FLUIDS 65 DEGREES OR LESS.

SCH 80 SLEEVE

DIAMETER

LARGER

THAN CLAMP

DIAMETER

RISER CLAMP WITH

THRUST

RESTRAINTS AND

INSULATION

INSERT,

REFER TO SPEC

FILL VOIDS WITH

LISTED

FIREPROOFING

3" MIN

REST CLAMP

ON

SLEEVE

PIPE

STRUCTURAL

FLOOR SLAB

OR

DECK

TOP THRUST PLATES

WELDED TO PIPE

INSULATION BUTT

AGAINST

TOP & BOTTOM THRUST

PLATES

STRUCTURAL

INSULATION INSERT,

THICKNESS TO

MATCH

SPECIFIED PIPE

INSULATION

ATTACH PIPE TO

CLAMP WITH

CONTINUOUS

WELD

INSULATION WHERE

SPECIFIED BUTT UP

AGAINST

FIREPROOFING & CLAMP

THERMOSTAT H/C

2-WAY

VALVE (TYP)

COMBINATION

SHUT-OFF

VALVE & DRAIN

VALVE W/CAP

& CHAIN (TYP)

NO SCALE

SLEEVES FOR UPFEED UNITS.

FLOOR

FANS

AIR FILTER

CHILLED WATER COIL

ELECTRICAL

CONNECTION BOX

2. LEFT HAND UNIT SHOWN. RIGHT HAND UNIT OPPOSITE FEED. REFER TO PLANS.

NOTES

1. FASTEN TO WALL AT MOUNTING LUGS.

UNION

(TYPICAL)

238223-05

DRAIN PAN

REFER TO TERMINAL PIPING SCHEMATIC

FOR PIPING AND DRAIN REQUIREMENTS.

VERTICAL CRAC UNIT DETAIL

T

NO SCALE

233713-02

2. MAXIMUM LENGTH OF INSULATED FLEX DUCT "L" = 3'-0"

1. FASTEN INSULATED FLEX DUCT TO METAL DUCT WITH 22 GAUGE BAND CLAMPS & 4 SHEETMETAL

NOTES:

& SCHEDULE FOR TYPES

REFER TO SPECIFICATIONS

CEILING DIFFUSERS.

INSULATION

BELLMOUTH

FITTING WITH

QUAD. DAMPER

SCREWS AND SEAL. DO NOT USE PLASTIC ZIP-TIES.

BRANCH (TYPICAL)

TO DUCT MAIN OR

SECURE SHEETMETAL

CEILING

SUPPLY BRANCH

OR TRUNK

INSULATED FLEX

DUCT. REFER TO

SPECIFICATIONS

CEILING SUPPLY DIFFUSERS INSTALLATION DETAIL

"L"

3. NO BOTTOM SUPPLY CONNECTIONS TO MAIN OR BRANCH ALLOWED

232113-08

NO SCALE

PIPE HANGER DETAIL

CONT. VAPOR BARRIER

1/2 SECTION x 10"L

LOAD BEARING INSUL.

PER SPEC.

INSUL. PER SPEC.

120°, 14 GA, 8"L

SHTML. SADDLE

CONT. VAPOR

BARRIER

3/8" ROD

CONT. VAPOR

BARRIER

INSUL. PER SPEC.

180°, 14 GA,6"L

SHTMTL. SADDLE

5/8" ROD

120°, 14 GA, 8"L

SHTML. SADDLE

INSUL. PER SPEC.

1/2 SECTIONx10"L LOAD

BEARING INSUL. PER

SPEC.

1/2" SECTIONx8"L

LOAD BEARING

INSUL. PER. SPEC.

INSUL. PER SPEC.

FILL VOID W/

INSUL. CEMENT

PIPE SADDLE

7/8" RODS

6" & 8" COLD PIPING 6" & 8" HOT PIPING

7/8" RODS

CONT. VAPOR BARRIER

INSUL. PER SPEC.

1/2" SECTION x 8"L

LOAD BEARING INSUL.

PER SPEC.

180°, 14 GA,6"L

SHTMTL. SADDLE

5/8" ROD

INSUL. PER SPEC.

FILL VOID W/

INSUL. CEMENT

PIPE SADDLE

1/2 " ROD

2" & LESS

ALL PIPING

4" & 5" COLD PIPING

ALL PIPING

4" & 5" HOT PIPING

2-1/2" & 3"

AIR CONTROL TERMINAL W / H.W. REHEAT COIL DETAIL

1. IF STRAIGHT RUN CAN NOT BE MADE,

PROVIDE FLOW STRAIGHTENER AT BOX

INLET.

2. PROVIDE BELLMOUTH BRANCH DUCT

TAKE-OFF FITTING TO MATCH BOX INLET

SIZE FOR BOXES LOCATED WITHIN 10 FEET

FROM BRANCH TAKE-OFF, PROVIDE DUCT

TRANSITION AS SHOWN FOR BOXES

LOCATED GREATER THAN 10 FEET FROM

BRANCH TAKE-OFF.

NOTES:

1.5D R=1.5D

D

3D

D

1.5D

SUPPLY TO

SUPPLY FROM

CENTRAL SYSTEM

SPACE

SOUND ATTENUATOR

HOT WATER REHEAT COIL

AIR

CONTROL

TERMINAL

DOUBLE WALL

INSULATED

METAL FLEX

CONTROL PANEL

OFFSET CONNECTION (ALTERNATE)

STRAIGHT CONNECTION (PREFERRED)

BAND HANGER IN

BOX INLET (TYP.)

NO SCALE

233600-05

-3°F -2°F -1°F SP +1°F +2°F +3°F

CLOSED

HEAT

MAX

MIN

OPEN

ROOM TEMPERATURE

T E

R M

IN

A

L B

O X

D A

M P

E R

S E

T P

O

IN

T S

DAMPER FIXED,

REHEAT VALVE

MODULATES

DAMPER

FIXED,

REHEAT

CLOSED

DAMPER

OPENING,

REHEAT

CLOSED

DAMPER STEPS

TO HEAT CFM

3°F COOLING RANGE

2°F DEAD BAND

FLOATING POINT REHEAT

3. PROVIDE WORKING SPACE AT ALL

ELECTRICAL COMPONENT ACCESS, PER

LATEST NEC. COORDINATE EXACT

REQUIREMENTS WITH ELEC. CONTRACTOR

REQUIREMENTS.

4. ANY SINGLE WALL DUCTWORK, SUCH AS

THE COIL OR ANY TRANSITION PIECE,

SHALL BE INSULATED THE SAME AS

CONNECTED SUPPLY DUCTWORK. REFER

TO DUCTWORK INSULATION SPEC FOR

REQUIREMENTS.

HWR

HWS

238219-02

NO SCALE

TERMINAL HOT WATER COIL PIPING SCHEMATIC

REFER TO

DRAWINGS

NOTE:

1. POSITION PIPE HANGERS TO BEAR FULL WEIGHT OF PIPING. NO LOAD ON COIL BODY.

2. LOCATE UNIONS AND ARRANGE PIPING TO FACILITATE COIL REMOVAL AND TO

AVOID BLOCKING ACCESS DOORS, CONTROL PANELS, FILTERS, VALVES, MOTORS, ETC.

3. CONTROL VALVE TO FAIL OPEN.

STRAINER

MANUAL AIR VENT

AT ALL HIGH POINTS

(TYPICAL)

UNION OR SOLDERED

CONNECTION (TYP.)

BALL VALVE

BALANCING VALVE

2-WAY CONTROL VALVEPRESSURE/TEMPERATURE PLUG

(TYPICAL)

DRAIN VALVE

W/ CAP & CHAIN

CHR

CHS

238219-03

NO SCALE

IN-ROW COOLER CHILLED WATER COIL PIPING SCHEMATIC

REFER TO

DRAWINGS

NOTE:

1. POSITION PIPE HANGERS TO BEAR FULL WEIGHT OF PIPING. NO LOAD ON COIL BODY.

2. LOCATE UNIONS AND ARRANGE PIPING TO FACILITATE COIL REMOVAL AND TO

AVOID BLOCKING ACCESS DOORS, CONTROL PANELS, FILTERS, VALVES, MOTORS, ETC.

3. CONTROL VALVE TO FAIL OPEN.

STRAINER

MANUAL AIR VENT

AT ALL HIGH POINTS

(TYPICAL)

UNION OR SOLDERED

CONNECTION (TYPICAL)

BALL VALVE

BALANCING VALVE

2-WAY CONTROL

VALVE

PRESSURE/TEMPERATURE PLUG

(TYPICAL)

DRAIN VALVE

W/ CAP & CHAIN

P-TRAPDRAIN PAN

AUXILIARY

DRAIN PAN

FLEXIBLE HOSE

CONNECTION (TYP.)

NO SCALE

233300-06

COMBINATION FIRE/SMOKE DAMPER DETAIL

FIRE/SMOKE

DAMPER

DUCT

NOTE:

DUCT

WALL SLEEVE GAUGE SHALL CONFORM

TO SMACNA STANDARDS FOR FIRE

DAMPER INSTALLATION. MINIMUM

GAUGE NOT LESS THAN CONNECTING

DUCT.

HINGED ACCESS

DOOR. DOOR SHALL

BE INSULATED WHEN

INSTALLED ON

INSULATED DUCTS.

ALTERNATE

LOCATION ON

BOTTOM OF DUCT

LOCATE TO ALLOW

ACCESS LINK

SWITCH

INSULATION

WHERE SPECIFIED

ANGLES ON ALL SIDES OF SLEEVE AND

BOTH SIDES OF WALL. ANGLES SHALL BE

MINIMUM OF 1-1/2" x 1-1/2" x 14 GAUGE WITH

A MINIMUM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .