This document contains a government file related to a federal contract solicitation and opportunity for the Department of Veterans Affairs. The solicitation is for a firm-fixed-price contract to design and build a data center recabling project at the Durham VA Medical Center in Durham, North Carolina. Key details include that the project involves re-cabling the existing data center to support new servers and network equipment, installing new cable trays, moving existing racks and cabinets, and providing fiber optic and category 6A cabling throughout. The solicitation is set aside on a competitive basis for Service-Disabled Veteran-Owned Small Businesses. The document also includes a tracking sheet of technical questions submitted by contractors relating to the project scope, specifications for equipment to be provided like racks and cable managers, and responses from the VA providing clarification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment IFB Microsoft Teams Meeting Information.docx | DOCX document | |
| Attachment THERMAL AND MOISTURE PROTECTION.pdf | ||
| 36C77622B0005 0004.docx | DOCX document | |
| Attachment 2 190378_VA Durham_Comprehensive Drawings Set Updated.pdf | ||
| 36C77622B0005 0003.docx | DOCX document | |
| Attachment VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx | DOCX document | |
| 36C77622B0005 0002.docx | DOCX document | |
| 36C77622B0005 0001.docx | DOCX document | |
| Attachment Site Visit Sign in Sheet.pdf | ||
| Attachment 1 190378_VA Durham_ComprehensiveSpecifications.pdf | ||
| Attachment 2 190378_VA Durham_Comprehensive Drawings Set.pdf | ||
| 36C77622B0005.docx | DOCX document | |
| Attachment 4 CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx | DOCX document | |
| Attachment 3 Wage Determination DBA 11.1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION # 36C77622B0005 PROJECT NAME: EHRM CORRECT DATA CENTER DURHAM - TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
ITEM
NO.
| DATE QUESTION RECEIVED |
| DATE QUESTION ANSWERED |
| QUESTION |
| GOVERNMENT RESPONSE |
| 1. |
| 12/20/2021 |
| 12/20/2021 |
| Is this procurement being procured using a MATOC or is this procurement being procured as a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside? There was conflicting information listed in the site visit agenda. |
| This procurement is being procured as a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside and not as a MATOC. The term MATOC listed in the site visit agenda was a typo. Please follow all guidance provide in solicitation 36C77622B0005 that is posted to contract opportunities. |
| 2. |
| 12/21/2021 |
| 1/11/22 |
| Phase 1 Horizontal Cabling Note 1 on DC100 |
Please can you provide a print which shows data outlets in the areas surrounding the data center that are served from the data center?
None is available at this time.
| 3. |
| 12/21/2021 |
| 1/11/22 |
| Phase 1 Horizontal Cabling Note 1 on DC100 |
Please can you confirm these cables are to be Category 6A?
All new ethernet cables must be Category 6A.
| 4. |
| 12/21/2021 |
| 1/11/22 |
| MDA Racks Keynotes 1 & 2 on DC200 |
These racks are to be provided and installed by the awarded contractor?
Please can you provide a specification on the racks required at these locations to include:
Desired manufacturer and part number if known?
Dimensions to include depth, width, and height.
Fully enclosed with side panels, front, and rear doors?
APC AR3340. NetShelter SX 42U 750mm Wide x 1200mm Deep Networking Enclosure with Sides Black
| 5. |
| 12/21/2021 |
| 1/11/22 |
| HAD. Network Rack Enclosure Keynote 4 on DC200 |
These racks are to be provided and installed by the awarded contractor?
Please can you provide a specification on the racks required at these locations to include:
Desired manufacturer and part number if known?
Dimensions to include depth, width, and height.
Fully enclosed with side panels, front, and rear doors?
Yes. APC AR3340. NetShelter SX 42U 750mm Wide x 1200mm Deep Networking Enclosure with Sides Black
| 6. |
| 12/21/2021 |
| 1/11/22 |
| Future Backbone Term Rack DC200 Detail 1 |
This rack is to be provided and installed by the awarded contractor?
Please can you provide a specification on the racks required at these locations to include:
Desired manufacturer and part number if known?
Dimensions to include depth, width, and height.
Fully enclosed with side panels, front, and rear doors?
Yes. APC AR3340. NetShelter SX 42U 750mm Wide x 1200mm Deep Networking Enclosure with Sides Black
| 7. |
| 12/21/2021 |
| 1/11/22 |
| APC Cabinets DC200 Detail 1 |
Please can you confirm the APC cabinets shown to be “new” will be furnished by the VA and installed by the awarded contractor?
Any APU labeled “APU New” cabinets to be furnished and installed by contractor. “APU” cabinets are existing on-site.
| 8. |
| 12/21/2021 |
| 1/11/22 |
| Rack and Cabinet installation |
Do you require the racks and cabinets to be installed to the concreate floor beneath the raised floor?
Typically not. The cabinets have wheels on the bottom for relocation, then adjustable stands to secure at location.
| 9. |
| 12/21/2021 |
| 1/11/22 |
| Rack Elevations |
Please can you provide rack elevation drawings for the following to show termination hardware, wire management and any other equipment to be furnished and installed by the awarded contractor?
Please refer to sheet DC602 for rack and tray elevations.
| 10. |
| 12/21/2021 |
| 1/11/22 |
| Category 6A Patch Cords |
Please can you confirm the quantity and lengths of Category 6A patch cords to be installed at the following locations?
Each MDA cabinet Each HAD. Cabinet Each 5U Rack mounted above the cabinets
DC200 Wiring Legend:
MDA: (48) 6 CAT6a to each HDA HDA: 24 to patch panels
Total distance of each run will need to be calculated. Max distance from each HDA won’t be more than 15m
| 11. |
| 12/21/2021 |
| 1/11/22 |
| Fiber Optic Patch Cords |
Please can you confirm the quantity and lengths of the fiber optic patch cords to be installed at the following locations?
Each MDA cabinet Each HAD. Cabinet Each 5U Rack mounted above the cabinets
DC200 Wiring Legend:
MDA: (8) 48 strand fiber to HDA HDA: (1) 24 strand to patch panels
Total distance of each run will need to be calculated. Max distance from each HDA won’t be more than 15m
| 12. |
| 12/21/2021 |
| 1/11/22 |
| Basket Tray |
Please can you provide a plan view to show the final basket tray layout in the Data Center?
Drawings DC600, DC601, and DC602 will show this information and be provided to bidders.
| 13. |
| 12/21/2021 |
| 1/11/22 |
| This is clearly a secured area. Will the VA or Engineering provide a “watch” of sorts at the site to allow contractors in and out of the site throughout the day? |
The intention if the Prime contractor to have a person(s) vetted to provide watch while inside the Data Center. The intention is for the VA to conduct spot checks on the contractor and not provide constant monitoring.
| 14. |
| 12/21/2021 |
| 1/11/22 |
| If the answer to previous Question (13) is “no” or that we will simply be provided a POC that we have to call each time we want in, then I would suggest that the Prime contractor’s on site Superintendent be thoroughly vetted such they can be given a code or card to access the site during construction to aid in this effort. |
The idea obviously being that it becomes cumbersome to both the contractor and its subs AS WELL AS whomever is responsible for attending the door each time we need in and out. We would not want to see a situation where its “once you are in there your in there” situation which becomes problematic with running tools and materials back and forth or bathroom breaks, etc. I’m sure you get the idea.
See #13 above.
| 15. |
| 12/21/2021 |
| 1/11/22 |
| Has a laydown areas for a dumpster been established yet? |
No. Once the project has been awarded space will have to be found for a dumpster. As space close to the loading dock is at a premium, it might not be located close to the back of the building.
| 16. |
| 12/21/2021 |
| 1/11/22 |
| Parking for contractors? |
The prime contractor will get one parking pass. Other on-site parking is for patients or employees only. Other contractor Vehicles will have to be parked off-site.
| 17. |
| 12/21/2021 |
| 1/11/22 |
| Will contractors/subs be allowed to use facilities inside the building such as restrooms and commissary? |
Yes, to bathrooms and yes, to commissary/canteen. But it is expected that the areas are treated respectfully as other patrons of the hospital will have to use the bathrooms/canteen.
| 18. |
| 12/21/2021 |
| 1/11/22 |
| Has testing been completed for hazardous materials in the work area. If so have reports been provided. If not, is it a requirement of this contract for the contractor to provide such testing prior to construction activities? |
Nothing was done for investigating hazardous materials, if hazardous material are discovered a change order will have to be done.
| 19. |
| 12/21/2021 |
| 1/11/22 |
| It would seem that there is currently work being performed under another contract in this area (Plastic barricades throughout the room). Will this work be completed and demobilization occur prior to the award of this contract? |
No current contracts. Local OI&T is currently cleaning and removing non-standard equipment.
| 20. |
| 12/27/2021 |
| 1/11/22 |
| Note Item 9 & 10 on drawing AD-102 indicates “In data room and telecom room F-104A replace floor tiles damaged and damaged pedestals”. Please clarify what is the estimated quantity for damaged tile not under the server? |
Approximately 240 tiles
| 21. |
| 12/27/2021 |
| 1/11/22 |
| The work requires a large amount of damaged existing plywood to be repaired. Please clarify what is the estimated square footage for damaged existing plywood. |
All existing plywood shall be removed. See AD-102 and Dwg. AE-102, Note M, General notes.;
“The existing plywood panels that are for the support of the Equipment and Electrical panels shall ALL be removed “in the area of new work and over the rated walls”, and replaced with fire resistive plywood, only where new equipment or electrical panels are shown. “
There are a number of ply wood panels in the existing Telecom and Lab areas, where the tel/data racks were scheduled to be removed by VA, ahead of the construction.
Those walls should be patched and matched by the contractor with new 5/8” FC GWB. No new ply wood panels are needed where there is no equipment being replaced.
| 22. |
| 12/27/2021 |
| 1/11/22 |
| AD-102 Item 11 states “Verify if walls surrounding data room have 5/8 fire rated gypsum on both sides of the partition. Carry an allowance patching walls and holes. Partition should run from floor to ceiling.” |
It is unclear if the gypsum board is 5/8-inch fire rated gypsum that surrounds the outside walls of the data center is existing. Also, if it is damaged or has openings in it that will need to be repaired. Please clarify if the walls surrounding the Data Center will have to removed and replaced with 5/8 inch Fire Rated Gypsum?
See Note #28
| 23. |
| 12/27/2021 |
| 1/11/22 |
| The plywood is being added to the walls in part of the data room. Please clarify what the height of the plywood is needed. |
There is a note for full height FR plywood support panel on the drawings. Keep the panels 18” min. above the finished floors or raised tiles.
| 24. |
| 12/27/2021 |
| 1/11/22 |
| All the utilities are coming through the basement. What are the conditions like ceiling height that the workers will have to do the work? Some of the utilities are in a crawl space. What are the dimensions that they will have to be installed? |
This portion of the basement below the Data Center is considered a crawlspace, height 3’-4’.
| 25. |
| 12/27/2021 |
| 1/11/22 |
| In order to disconnect and install new work in the server areas, can the servers be shut down for limited periods on the weekends or at night to make the disconnects and new connections? |
Servers will be brought down and migrated from area to another depending on the phase being completed. Planning will need to be coordinated with Engineering, BioMed and IT.
| 26. |
| 12/27/2021 |
| 1/11/22 |
| How are the servers being connected currently? Are they feed under the floor on from cable trays? The new system is being feed from new bus ducts. |
Servers and racks are currently connected by fiber and Ethernet via the overhead cable trays.
| 27. |
| 12/27/2021 |
| 1/11/22 |
| To protect the servers, bus duct and cable trays during construction, please clarify what is the required materials to be used for cover/dust protection. |
To minimize dust and debris a 3 mil plastic sheet can be used to cover the equipment, but installed in a way as to not block the air flow to the front of the server racks.
| 28. |
| 12/27/2021 |
| 1/11/22 |
| Please confirm that the exterior walls of the data center FG104 have 5/8 fire rated gypsum wallboard are existing, except for missing areas where gypsum board has been removed previously. |
Per our records, the walls around FG104 are not 1hr rated. The contractor is to provide a fire rated walls that are identified by Note #11, the contractor can propose a means and method to meet that requirement post-award..
| 29. |
| 12/28/2021 |
| 1/11/22 |
| Phase 1 Horizontal Cabling Note 1 on DC100 working hours |
Can the overhead rough in for phase 1 be completed during normal working hours 7.00AM to 5.00PM?
Yes.
| 30. |
| 12/28/2021 |
| 1/11/22 |
| DC 200 Note 6 Modify Rack Placement |
Can these racks be moved to their new location during normal working hours 7.00AM to 5.00PM?
Not during normal operating hours. 0700-1700
| 31. |
| 12/28/2021 |
| 1/11/22 |
| Cabinets/Rack installation |
Do you require the cabinets and racks to be secured to the floor slab beneath the raised floor?
See answer #8 above
| 32. |
| 12/28/2021 |
| 1/11/22 |
| Fiber Optic Cable to FG158A |
How many strands are required?
This fiber will be OM4 rated?
The fiber will be terminated on LC connectors or MTP.
Fiber link to FG158A must be 24-strand OM4 terminated on MPO connectors and then with MPO to duplex LC cassettes on each end.
| 33. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC100 |
Notes- Sequence 1. Is there a list and quantity of network equipment to be relocated?
No. Network equipment will be relocated with local OI&T and Enterprise Service Line assistance as it will require downtime planning.
| 34. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC100 |
Notes- Sequence 1. 1.B. Is there a drawing showing existing work area outlets and associated devices?
No.
| 35. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC100 |
Notes- Sequence 1. 1.E. & 1.F. Owner to remove all abandoned cabling. Contractor to remove existing cabling . Please clarify.
Local OI&T is in the process of removing decommissioned equipment and cabling. Vendor will remove cabling of existing equipment after new connections to overhead panels have been completed.
| 36. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC100 |
Notes- Sequence 1. 1.H. Why will the existing cable tray be removed? Is there a drawing showing the existing cable tray and the new cable tray?
DC600, item 1 Existing cable tray not adequate for fiber cables and not properly installed. Previous contract failed and abandoned demolition.
DC601 & DC602 – New Tray Plan
See DC600, DC601, DC602 to be issued as an addendum.
| 37. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC100 |
Keyed Notes. 4. Will the racks be removed (TBD) by contractor and after Owner will relocate them?
THE OWNER IS RELOCATING THE EQUIPMENT IN THE RACK. CONTRACTOR MUST REMOVE THE CABINET/RACK.
| 38. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Keyed Notes. 3. Are there specs for the 12” Vertical Cable Managers?
THE VERTICAL CABLE MANAGERS MUST BE A MINIMUM OF 12”W X 10”D. See Spec 27 11 00, 2.1.13.H for other details
Panduit PR2V Vertical Dual Sided Manager, 45RU, 12 in. Wide, Black
PR2VD12
| 39. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Keyed Notes. 7 & 8. Will the cooling units be relocated by owner?
No. This work is within the contractor’s scope of work.
| 40. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Keyed Notes. 9. Will the new cooling unit be installed by owner?
No. This work is within the contractor’s scope of work.
| 41. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 1. Please clarify “ Follow diverse routes” ?
Fiber runs will need to follow along the cable trays to their respective HDA cabinets. As well as to the server cabinets. Flow of data will have redundant connections.
THE CABLES MUST NOT SHARE THE SAME CABLE TRAY OR CROSS EACH OTHER TO THE FURTHEST EXTENT POSSIBLE.
| 42. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 1. Please clarify “ Through to Server Cabinets with equal feeds from each side” ?
MDA-A & MDA-B are mirrors providing redundant connections. Each HDA will replicate those redundant connections to each server cabinet patch panel.
THE ROUTE FROM MDA CABINETS WILL GO THROUGH THE HDA CABINETS TO SERVER CABINETS AS SHOWN IN THE 1-LINE DIAGRAM ON DC200
| 43. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 1. Please clarify “ To the overhead racks above each cabinet” ? Are the “ cabinets” in note, the HDA cabinets since the backbone (A and B) is from MDA cabinets to HDA cabinets ? Now, Do the HDA cabinets have an overhead 5U Rack?
The network feed reaching to the Server Cabinets. Each HDA cabinet will feed fiber and CAT6a to the overhead panels.
No, see DC600 & DC601
THE HDA CABINETS DO NOT HAVE AN OVERHEAD 5U RACK. THE OVERHEAD RACKS ARE ABOVE EACH SERVER CABINET.
| 44. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 3. Only one of the three cabinets (MDA-A or MDA-B), will be dedicated for patching; meaning that the “Backbone à (1) 48 Strand OM4 Fiber cable & (6) UITP Cat6A cables “to the associated HDA cabinets will be from only one of the three MDA cabinets?
Yes.
Of the 3 cabinets for each MDA, 1 cabinet will provide the patching/backbone connections. 1 backbone connection from MDA-A and 1 from MDA-B to HDA-B-4 creating the redundant/mirrored connections.
SEE THE 1-LINE DIAGRAM ON DC200. THE LINKS MUST BE FROM BOTH MDA-A AND MDA-B.
| 45. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 6. Will all other cabinets (no the MDA cabinets, no the HDA cabinets) have an overhead 5U rack, including the Backbone termination racks?
No. ALL OTHER CABINETS WILL HAVE OVERHEAD 5U RACK EXCEPT FOR MDA, HDA, AND BACKBONE TERMINATION RACKS.
| 46. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 6. Are there specs for the overhead 5U rack?
OVERHEAD RACK SHALL BE ORTRONICS OR-60401015 OR APPROVED ALTERNATE.
| 47. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 6. Will the overhead 5U rack be attached to the upper level of the Copper of the Fiber tray?
THE OVERHEAD RACH ATTACHES TO BOTH THE UPPER AND LOWER LEVELS OF CABLE TRAY.
| 48. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 7. Per Detail 2. Only from HDA-B-2, HDA-A-2, HDA-B-1, and HDA-A-1 cabinets (located on the right of Detail 2. ) will it be (1) 24 Strand OM4 fiber cable & (24)UTP Cat6A cables to all racks/cabinets in all Rows inside Data Center? No connections from left cabinets (see cabinets inside green mark below)?
THE CABINETS ON THE LEFT SIDE OF THE 1-LINE DIAGRAM CONNECT TO RACKS EXACTLY THE SAME AS THOSE ON THE RIGHT SIDE OF THE DIAGRAM FOR ALL ROWS INSIDE THE DATA CENTER.
| 49. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Fiber Distribution Narrative. 7. “From each HDA Cabinet to each Overhead patch panel shall be (1) 24 Strand OM4 fiber cable & (24)UTP Cat6A cables.” Per this note, from each of these HDA cabinets (HDA-B-2, HDA-A-2, HDA-B-1, and HDA-A-1) , it shall be (1) 24 Strand OM4 fiber cable & (24)UTP Cat6A cables to each of the Non-HDA Cabinets ( quantity = 48 ) (see drawing below) ?
Correct.
Remove counts from Future Backbone and NTWK Rack 1, 2, 3
THE HDA CABINETS CONNECT TO EACH OF THE CABINETS IN THEIR ROW, NOT ALL CABINETS IN THE DATA CENTER. FOR EXAMPLE, HDA-A-1 AND HDA-B-1 WILL EACH CONNECT TO ALL OF THE CABINETS BETWEEN THEM IN THE ROW BUT NOT TO OTHER SERVER CABINETS IN THE DATA CENTER.
| 50. |
| 12/28/2021 |
| 1/11/22 |
| Drawing DC200 |
Should all cables (fiber & copper) in Data Center and to work areas be plenum rated?
All cables running external to the Data Center will require plenum. Internal does not.
ALL CABLES MUST MEET THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS BOTH FOR THE LOCAL AHJ AND THE VA.
| 51. |
| 12/28/2021 |
| 1/11/22 |
| Reference Fiber Distribution Narrative - Note #3 Drawing DC200 |
Is the Low Voltage Contractor (LVC) responsible for providing the six (6) MDA A&B core cabinets?
YES.
| 52. |
| 12/28/2021 |
| 1/11/22 |
| If yes to the above question, please provide the size (dimensions) and required components such as type of doors, casters if any, vertical cable management, etc. |
| Yes. APC AR3340. NetShelter SX 42U 750mm Wide x 1200mm Deep Networking Enclosure with Sides Black |
| 53. |
| 12/28/2021 |
| 1/11/22 |
| Reference Fiber Distribution Narrative - Note #6 Drawing DC200 |
Please identify all Non-HDA racks receiving 24 Strand OM4 and Category 6A cables.
ALL RACKS NOT LABELED HDA, MDA, OR FUTURE BACBONE TERMINATION RACK MUST HAVE AN OVERHEAD RACK AND OM4/CAT6A CABLING.
Please reference DC600, DC601 & DC602
| 54. |
| 12/28/2021 |
| 1/11/22 |
| Reference Keyed Notes - Note #3 Drawing DC200 |
Is there a preferred manufacturer and type of vertical cable manager?
THE VERTICAL CABLE MANAGERS MUST BE A MINIMUM OF 12”W X 10”D.
| 55. |
| 12/28/2021 |
| 1/11/22 |
| Reference Keyed Notes - Note #4 Drawing DC200 |
Is this supposed to be a cabinet or a rack?
Networking Cabinet to patch panels above Server Cabinets
| 56. |
| 12/28/2021 |
| 1/11/22 |
| Is this a tax-exempt project? |
| Far Clause 52.229-3 Federal, State and Local Taxes is included in the solicitation. Offerors shall bid with Federal, State and Local taxes included in their bid. |
| 57. |
| 12/28/2021 |
| 1/11/22 |
| If tax-exempt, will the government be providing a tax-exempt certificate to the Prime Contractor for use by subcontractors and vendors? |
| N/A |
| 58. |
| 12/28/2021 |
| 1/11/22 |
| Can the Superintendent be shared across multiple projects, or should they be dedicated full-time to this project and this project only? |
| Dedicated full-time to this project only. |
| 59. |
| 12/28/2021 |
| 1/11/22 |
| Can the Superintendent fulfil multiple roles? |
| The Superintendent cannot have other roles |
| 60. |
| 12/28/2021 |
| 1/11/22 |
| Will the VA provide a spot for the Prime Contractor employee(s) to set up an office or should contractors include monies for a temp office, utilities, etc.? We ask this because we know the VA has very little spare real estate. |
| There is no space on the medical campus for a temporary trailer. The Prime may use the existing space only to set up tables/printers/etc as they wish. |
| 61. |
| 12/28/2021 |
| 1/11/22 |
| If so, can they also fulfil the Quality Control role? |
| The Superintendent cannot have other roles. The QC Manager can be the SSHO (01 45 00, 3.2.B.1.3.E) |
| 62. |
| 12/28/2021 |
| 1/11/22 |
| What about the SSHO role? |
| The Superintendent cannot have other roles. The QC Manager can be the SSHO (01 45 00, 3.2.B.1.3.E) |
| 63. |
| 12/28/2021 |
| 1/11/22 |
| Does the VA anticipate this project will require off hours work? |
| Yes, Engineering is still determining the impact of the required outage for the electrical work. It will be at least after hours or weekend or both to do the required work on panel FGEE1. |
The plumbing work shall need to be done when the servers are at their lowest load (overnight work or weekend work, possibly even overnight weekend), unless the contractor can show their means and methods can handle the Data Center’s heat load at other times via temporary cooling.
| 64. |
| 12/28/2021 |
| 1/11/22 |
| If so, what trades or scopes will be required to perform off hours work? |
| See Answer #63 above. |
| 65. |
| 12/28/2021 |
| 1/11/22 |
| One of the first things we must do is install a shunt Trip main in panels FGEE1 & FGEE2. We need to know the Manufacture and Type for these two panels please. |
| Eaton, photos attached at end of document. |
| 66. |
| 12/28/2021 |
| 1/11/22 |
| How many data drops are being removed? |
| THIS IS THE RESPONSIBILITY OF THE BIDDING CONTRACTOR TO DETERMINE. |
| 67. |
| 12/28/2021 |
| 1/11/22 |
| How many fiber cables are being removed? |
| THIS IS THE RESPONSIBILITY OF THE BIDDING CONTRACTOR TO DETERMINE. |
| 68. |
| 12/28/2021 |
| 1/11/22 |
| How many fiber cables to be installed? |
| THIS IS THE RESPONSIBILITY OF THE BIDDING CONTRACTOR TO DETERMINE. |
| 69. |
| 12/28/2021 |
| 1/11/22 |
| Do we provide CAT6 and Fiber cables? |
| YES |
| 70. |
| 12/28/21 |
| 1/11/22 |
| There is no Fire Stopping specification. Please provide. |
| Answer to be posted soon. |
| 71. |
| 1/03/22 |
| 1/11/22 |
| What will be the vaccine mandate requirements for this project? Would the Contractors be required to meet the Federal Contractor mandate, ETS OSHA mandate, and/or the CMS Medical Mandate? |
Please see Solicitation 36C77622B0005 amendment 0002 VHA Supplemental Contract Requirements for Combatting COVID-19.
RFI 65
Appendix
| One of the first things we must do is install a shunt Trip main in panels FGEE1 & FGEE2. We need to know the Manufacture and Type for these two panels please. |
| Eaton, photos attached below. |
Panel FGEE1 plate and tag
Panel FGEE2 image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image1.png image2.jpeg