Attachment THERMAL AND MOISTURE PROTECTION.pdf
PDF 148 KB Posted
- Solicitation number
- 36C77622B0005
About this file
This document contains specifications for firestopping and smoke stopping products and installation requirements for a construction project at the Durham VA Medical Center in Durham, North Carolina. The specifications require firestopping systems tested according to ASTM E814 to maintain fire barrier integrity for through-penetrations, allowing for cable changes without compromising the seal. Smoke stopping seals are to be installed in smoke partitions using a silicone sealant per the specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment IFB Microsoft Teams Meeting Information.docx | DOCX document | |
| 36C77622B0005 0004.docx | DOCX document | |
| Attachment 2 190378_VA Durham_Comprehensive Drawings Set Updated.pdf | ||
| 36C77622B0005 0003.docx | DOCX document | |
| Attachment Technical Questions.docx | DOCX document | |
| Attachment VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-14-2021.docx | DOCX document | |
| 36C77622B0005 0002.docx | DOCX document | |
| 36C77622B0005 0001.docx | DOCX document | |
| Attachment Site Visit Sign in Sheet.pdf | ||
| Attachment 1 190378_VA Durham_ComprehensiveSpecifications.pdf | ||
| Attachment 2 190378_VA Durham_Comprehensive Drawings Set.pdf | ||
| 36C77622B0005.docx | DOCX document | |
| Attachment 4 CONTRACTOR SAFETY AND ENVIRONMENTAL RECORD EVALUATION FORM.docx | DOCX document | |
| Attachment 3 Wage Determination DBA 11.1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Durham VAMC April 28, 2015
Construct New Specialty Care Building 42 Final Documents for Construction
Durham, NC 27705 Project No. 558-321
07 84 00 - 1
SECTION 07 84 00
FIRESTOPPING
PART 1 GENERAL
1.1 DESCRIPTION
A. Closures of openings in walls, floors, and roof decks against penetration of flame, heat, and smoke or gases in fire resistant rated construction.
B. Closure of openings in walls against penetration of gases or smoke in smoke partitions.
1.2 RELATED WORK
A. Expansion and seismic joint firestopping: Section 07 95 13, EXPANSION
JOINT COVER ASSEMBLIES.
B. Sealants and application: Section 07 92 00, JOINT SEALANTS.
C. Fire and smoke damper assemblies in ductwork: Section 23 31 00, HVAC
DUCTS AND CASINGS and Section 23 37 00, AIR OUTLETS AND INLETS.
1.3 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT
DATA, AND SAMPLES.
B. Manufacturer's literature, data, and installation instructions for types of firestopping and smoke stopping used.
C. List of FM, UL, or WH classification number of systems installed.
D. Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use.
1.4 DELIVERY AND STORAGE
A. Deliver materials in their original unopened containers with manufacturer’s name and product identification.
B. Store in a location providing protection from damage and exposure to the elements.
1.5 WARRANTY
A. Firestopping work subject to the terms of the Article “Warranty of
Construction”, FAR clause 52.246-21, except extend the warranty period to five years.
1.6 QUALITY ASSURANCE
A. FM, UL, or WH or other approved laboratory tested products shall be acceptable.
07 84 00 - 2
1.7 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in the text by the basic designation only.
B. American Society for Testing and Materials (ASTM):
E84-10..................Surface Burning Characteristics of Building
Materials
E814-11.................Fire Tests of Through-Penetration Fire Stops
C. Factory Mutual Engineering and Research Corporation (FM):
Annual Issue Approval Guide Building Materials
D. Underwriters Laboratories, Inc. (UL):
Annual Issue Building Materials Directory
Annual Issue Fire Resistance Directory
1479-10.................Fire Tests of Through-Penetration Firestops
E. Warnock Hersey (WH):
Annual Issue Certification Listings
PART 2 - PRODUCTS
2.1 FIRESTOP SYSTEMS
A. Use either factory built (Firestop Devices) or field erected (through-
Penetration Firestop Systems) to form a specific building system maintaining required integrity of the fire barrier and stop the passage of gases or smoke.
B. Through-penetration firestop systems and firestop devices tested in accordance with ASTM E814 or UL 1479 using the "F" or "T" rating to maintain the same rating and integrity as the fire barrier being sealed. "T" ratings are not required for penetrations smaller than or equal to 100 mm (4 in) nominal pipe or 0.01 m2 (16 sq. in.) in overall cross sectional area.
C. Products requiring heat activation to seal an opening by its intumescence shall exhibit a demonstrated ability to function as designed to maintain the fire barrier.
D. Firestop sealants used for firestopping or smoke sealing shall have following properties:
1. Contain no flammable or toxic solvents.
2. Have no dangerous or flammable out gassing during the drying or curing of products.
07 84 00 - 3
3. Water-resistant after drying or curing and unaffected by high humidity, condensation or transient water exposure.
4. When used in exposed areas, shall be capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
E. Firestopping system or devices used for penetrations by glass pipe, plastic pipe or conduits, unenclosed cables, or other non-metallic materials shall have following properties:
1. Classified for use with the particular type of penetrating material used.
2. Penetrations containing loose electrical cables, computer data cables, and communications cables protected using firestopping systems that allow unrestricted cable changes without damage to the seal.
3. Intumescent products which would expand to seal the opening and act as fire, smoke, toxic fumes, and, water sealant.
F. Maximum flame spread of 25 and smoke development of 50 when tested in accordance with ASTM E84.
G. FM, UL, or WH rated or tested by an approved laboratory in accordance with ASTM E814.
H. Materials shall be asbestos free.
2.2 SMOKE STOPPING IN SMOKE PARTITIONS
A. Use silicone sealant in smoke partitions as specified in Section 07 92
00, JOINT SEALANTS.
B. Use mineral fiber filler and bond breaker behind sealant.
C. Sealants shall have a maximum flame spread of 25 and smoke developed of
50 when tested in accordance with E84.
D. When used in exposed areas capable of being sanded and finished with similar surface treatments as used on the surrounding wall or floor surface.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Submit product data and installation instructions, as required by article, submittals, after an on site examination of areas to receive firestopping.
07 84 00 - 4
3.2 PREPARATION
A. Remove dirt, grease, oil, loose materials, or other substances that prevent adherence and bonding or application of the firestopping or smoke stopping materials.
B. Remove insulation on insulated pipe for a distance of 150 mm (six inches) on either side of the fire rated assembly prior to applying the firestopping materials unless the firestopping materials are tested and approved for use on insulated pipes.
3.3 INSTALLATION
A. Do not begin work until the specified material data and installation instructions of the proposed firestopping systems have been submitted and approved.
B. Install firestopping systems with smoke stopping in accordance with FM, UL, WH, or other approved system details and installation instructions.
C. Install smoke stopping seals in smoke partitions.
3.4 CLEAN-UP AND ACCEPTANCE OF WORK
A. As work on each floor is completed, remove materials, litter, and debris.
B. Do not move materials and equipment to the next-scheduled work area until completed work is inspected and accepted by the COR.
C. Clean up spills of liquid type materials.
- - - E N D - - -