This document is a Draft Performance Work Statement (PWS) for Rapid Development and Integration Facility (RDIF) Support, a contract opportunity with the Air Force Life Cycle Management Center (AFLCMC). The PWS outlines comprehensive manufacturing, engineering, and technical support services for aircraft development and prototyping, primarily to be performed at Wright-Patterson Air Force Base, Ohio. Key capabilities required include CAD/CAM drawing, precision machining, welding, sheet metal work, mechanical and electrical system assembly, aircraft component maintenance, reverse engineering, research and development, quality assurance, and program management.
The contract will be a single-award Indefinite-Delivery, Indefinite-Quantity (IDIQ) competitive 8(a) set-aside, with an anticipated Request for Proposal release no earlier than August 19, 2025. The RDIF aims to provide rapid adaptive engineering solutions for urgent warfighter needs, focusing on aircraft modification and prototyping without replacing existing test centers. Performance will primarily occur at Building 148 on Wright-Patterson AFB, with potential occasional modifications at other CONUS and OCONUS Air Force locations. Contractors must maintain SECRET security clearance and be prepared to support fluctuating program requirements across various technical labor categories.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Draft
PERFORMANCE WORK STATEMENT (PWS)
1. PROJECT TITLE: Rapid Development and Integration Facility (RDIF) Support
2. BACKGROUND: The RDIF was created as an organic development capability within Air Force Life Cycle Management Center (AFLCMC) for Air Force (AF) Irregular Warfare (IW), and command, control, communications, computers, intelligence, surveillance, and reconnaissance (C4ISR) and expanded to additional agencies acquisition needs. This initiative established an AF aircraft development and prototype center of excellence, which will not supplant current test centers or processes. This initiative supports current reform initiatives and the current and future acquisition environment. It leverages existing Wright-Patterson Air Force Base (WPAFB), Ohio infrastructure initially, then develops the capability over time.
3. SCOPE: The RDIF's primary function and scope consists of the following:
aircraft/equipment related part development, integration, prototyping, production and kitting as awarded. While it is the Government's goal to perform as much of the requirement as possible, Contractor resources augment Government resources to accomplish the RDIF's mission. The support requirements fluctuate as programs and funding are acquired. While touch labor is the common element of support, various programs require the following: work at offsite locations, short-term specialties, materials, manufacturing, research and development, prototyping, quality assurance, engineering, aircraft modification, and test support.
4. APPLICABLE DOCUMENTS: All work shall be in accordance with current International Organization for Standardization (ISO) industry standards and military specifications unless otherwise specified in the task order.
5. PERFORMANCE REQUIREMENTS: This PWS establishes the basic task elements that constitute the general scope of this contract. Specific tasks, using one or more of these task elements present in this PWS paragraph, will be specified in each applicable task order. The following constitute the RDIF performance requirements and capabilities the Contractor must have or be capable of obtaining:
5.1 Production Facilities: The Contractor shall use the Government-provided production facility unless otherwise specified per individual task order.
5.2 Manufacturing Capabilities: The Contractor shall provide the following manufacturing capabilities to support the RDIF:
5.2.1 Computer Aided Design/Computer Aided Manufacturing (CAD/CAM) Drawing: The Contractor shall design, read, manipulate, and print using SolidWorks CAD software. They shall be able to receive SolidWorks data and load and translate to Computer Numerical Control (CNC) machines.
5.2.2 CNC, Manual Mills, Lathes, and Grinding associated with Precision Machining: The Contractor shall perform precision machining in accordance with current ISO industry standards.
5.2.3 Welding, Heat Treating, Painting, and Plating: The Contractor shall perform welding, heat treating, painting, and plating in accordance with current ISO and/or American Welding Society (AWS) industry standards.
5.2.4 Sheet Metal Components and Assembly: The Contractor shall manufacture sheet metal components and have the ability to assemble components in accordance with current ISO industry standards.
5.2.5 Maintenance and Overhaul of Aircraft Components: The Contractor shall perform maintenance and overhaul of aircraft components in accordance with current ISO industry standards.
5.2.6 Mechanical Assembly: The Contractor shall design, fabricate, test, and document mechanical assemblies (CDRLs A002, A003, A004, & A005).
5.2.7 Hydraulic Testing and Repair: The Contractor shall troubleshoot, repair, test, and document work performed on hydraulic systems (CDRLs A002, A003, & A004).
5.3 Electrical Manufacturing: The Contractor shall provide the following electrical manufacturing capabilities to support the RDIF:
5.3.1 Electro-Mechanical Device Repair and Overhaul: The Contractor shall troubleshoot, repair, test, and document work on electro-mechanical systems (CDRLs A002, A003, & A004).
5.3.2 Circuit Board Layout Repair and Assembly: The Contractor shall troubleshoot, repair, test, and document work on circuit boards (CDRLs A002, A003, & A004).
5.3.3 Cables and Wiring Harnesses (Design and Assembly): The Contractor shall design, fabricate, test, and document cable and wiring harnesses (CDRLs A002, A003, & A004).
5.4 Other Capabilities
5.4.1 Material Procurement: The Contractor shall have the ability to provide material, including raw materials, fabricated piece parts, mechanical and electrical components, integrated subsystems, and other hardware. The Contractor shall place priority on meeting Government task schedules when planning each task order, taking material ordering lead times into consideration. The Contractor shall have the ability to receive, track, document (to include certificate of conformance), stage, and distribute materials, as required, to workstations and worksites. The Contractor shall place materials/parts on order within 10 workdays after each task order award.
5.4.2 Integration (Mechanical and Electrical Subsystems): The Contractor shall perform electrical and mechanical subsystem integration.
5.4.3 Research, Studies, Development, and Prototyping, to include Reverse Engineering: The Contractor shall perform product research and studies as specified by task order. The Contractor shall develop new solutions/systems and prototype the idea. The Contractor shall perform reverse engineering when specified in the individual task orders (CDRLs A002 & A003).
5.4.4 Test and evaluation: The Contractor shall perform and document 100% testing of new designs (CDRLs A003 & A004).
5.4.5 Quality assurance, In-process Inspection, and Federal Aviation Administration (FAA) Certification: The Contractor shall provide Quality Assurance support to include in-process inspection, final inspection, Precision Measurement Equipment Laboratory (PMEL) base coordination, and FAA certification. The Contractor shall provide required documentation designated within individual task orders. The Contractor shall enforce quality assurance consistent with its Quality Control Plan in accordance with DAFI 63-101 (CDRLs A005, A006, A007, & A008).
5.4.6 Engineering and Technical Support: The Contractor shall provide engineering and technical support. The capability shall include providing drawings, data, and technical expertise as required by task order (CDRL A002).
5.4.7 Aircraft Modification: The Contractor shall perform aircraft modification when required. The Contractor shall plan and execute the aircraft modifications on cost and on schedule (CDRLs A002, A003, & A004).
5.4.8 Aircraft Ground Operations and Maintenance: The Contractor shall perform aircraft ground operations and maintenance support when required.
5.4.9 Training and Training Materials: The Contractor shall provide training and training materials (Government or Commercial) to their personnel as required. The training shall be relevant to the product being produced and written in accordance with the individual task order (CDRL A002).
5.4.10 Graphics: The Contractor shall provide graphics using Gerber stencil machines or laser etchers as required per individual task orders that conform to prescribed ISO standards.
5.4.11 Data and Drawings: The Contractor shall provide data and drawings. The Contractor, as part of this quality assurance program, shall prescribe procedures and processes to prevent re-work of both data and drawings (CDRLs A002, A003 & A004).
5.4.12 Program Management: The Contractor shall provide Program Management support to meet the Government's published project schedule on each individual task order.
5.4.13 Shipping: The Contractor shall provide shipping when requested per task order requirements.
6. PERFORMANCE STANDARDS: Quality, Quantity, and Timeliness standards will be defined for each task order issued under the IDIQ contract per specifications called out on supplied drawing packages.
6.1 Quality Standards: Condition, Error Rates, Accuracy, Form/Function, Reliability, and Maintainability
6.2 Quantity Standards: Capacity, Output, Volume, and Amount
6.3 Timeliness Standards: Response Times, Delivery, Completion Times, and Milestones
6.4 Labor Categories: Past labor categories that have been used most often include the following based on experience required to perform task orders:
• Administrative Support IV
• Administrative Support III
• Administrative Support II
• Electrician IV
• Electrician III
• Electrician II
• Sheet Metal Worker IV
• Sheet Metal Worker III
• Sheet Metal Worker II
• Welder IV
• Welder III
• Welder II
• Technician IV
• Technician III
• Technician II
• Mechanical Engineering Manager
• CNC Operator/Machinist Manager IV
• CNC Operator/Machinist Manager III
• CNC Operator/Machinist Manager II
• Quality Assurance Technical IV
• Quality Assurance Technical III
• Professional Services IV
• Professional Services III
• Professional Services II
• Program Manager
7. INCENTIVES: N/A
8. TRAVEL: Travel may be required in support of this contract. The Government will reimburse the Contractor for travel and per diem costs when this travel is directed by the Government and in excess of a 75-mile radius of the assigned duty location of the Contractor's employee, at rates specified in the United States (US) Joint Travel Regulation (JTR). The Contractor shall use per diem allowances rather than actual subsistence expenses for all persons in travel status both within and outside the continental United States. Per diem shall be limited to rates in effect at time of travel, not to exceed established rates in the JTR. Travel will be reimbursed subject to the limitations contained in FAR 31.205-46. All travel must be pre-approved seven days prior to travel, if possible, by the Contracting Officer (CO). All travel shall be on a cost reimbursable basis with no fee.
9. DELIVERABLES AND DELIVERY SCHEDULE: Deliverables and delivery schedule will be determined with each individual project task order. Note that CDRL A00l has been reserved. Contractor will be required to submit semi-annual reports showing the labor categories addressed in CDRL A009.
10. GOVERNMENT-FURNISHED EQUIPMENT, PROPERTY AND INFORMATION
(GFE/GFP/GFI): Government-furnished equipment, property and information will be provided to the Contractor when required to meet the performance of the individual task order.
11. PLACE OF PERFORMANCE AND HOURS OF OPERATION: The place of performance will be determined with each individual project and indicated on the task order.
Most task orders will be completed at the RDIF facility (Building 148) on Wright- Patterson Air Force Base, Ohio. Normal workdays are Monday through Friday, except United States federal holidays. Workers will normally be required to work eight hours per day, 40 hours per week, unless otherwise specified per task order. During an eight hour workday, core hours of 9am to 3pm daily must be covered unless otherwise authorized.
12. SECURITY: CLASSIFIED. Contractor personnel will be required to have access to classified material up to the SECRET Level. The Contractor shall obtain and maintain a final Secret security clearance for all employees handling classified material. Overarching delivery order security requirements and Contractor access to classified information will be specified in the DD Form 254. All Contractor personnel with access to unclassified automated information systems (AIS), including e-mail, shall comply with Government Security regulations including DoDM 5200.02, Procedures for the Personnel Security Program. The organization's Security Manager and the Computer Security M anager must coordinate on all requests before access may be granted. The level of security required will be specified in each individual task order, with Special Access Program (SAP) being the highest required.
12.1. Operations Security (OPSEC): The purpose of OPSEC is to reduce the vulnerability of AF missions to adversary collection and exploitation of Critical Information. Critical Information is defined as information about missions or activities the adversary needs to achieve its goals. The Contractor shall ensure compliance with DoDD 5205.02E, DoDM 5205.02-M, and/or other applicable Government security regulations including procedures to protect classified and/or Controlled Unclassified I nformation (CUI) and Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at geographically separated locations, or another Government facility comply with the OPSEC procedures of the facility.
12.2. Communications Security (COMSEC) User Accounts: If required by the local unit, the Contractor shall establish and manage a COMSEC user account and perform required COMSEC duties according to DAFMAN 17-1302 and as directed by the supporting COMSEC Account Manager/Alternate.
12.3. Controlled Unclassified Information (CUI)
12.3.1 Protection of CUI and unclassified DoD information not approved for public release on non-DoD Information Systems will be protected in accordance with DoDI
8582.01, Security of Unclassified DoD Information on non-DoD Information Systems, Enclosure 3. Unless specific categories of CUI require more stringent controls, non- DoD Information Systems must be protected using the guidelines set forth in NIST Special Publication 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations.
12.3.2 Covered Defense Information required for all solicitations and contracts, including solicitations and contracts using FAR part 12 procedures for the acquisition of commercial items must be followed.
The Contractor shall comply with DoDM 5200.01, Volume 4, DoD Information Security Program: Controlled Unclassified Information (CUI), Enclosures 3 & 4, for identification, protection, and training requirements of CUI. The Contractor shall be responsible for training its personnel and accomplishment of the out-processing procedures identified in DoDM 5200.01, Volume 4, Enclosure 4.
The Contractor shall comply with DoDM 5400.07 /Air Force Manual 33-302, DoD Freedom of Information Act (FOIA) Program, and AFI 16-1404, Air Force Information Security Program, for requirements. Protection of unclassified DoD information not approved for public release on non-DoD Information Systems will be protected in accordance with DoDI 8582.01, Security of Unclassified DoD Information on non-DoD Information Systems, Enclosure 3.
12.4. Access to Government Facility: The Contractor shall ensure Contractor personnel who require access to Government facilities comply with the security procedures and security education requirements of the facility. If Contractor personnel require repeated access to a Government facility over the life of the contract/order, the Contractor shall ensure they complete, as applicable, a DD Form 1172-2 to obtain a Contractor identification card. The DD Form 1172-2 shall be submitted as directed to the AFLCMC/WIE Security Office. Upon completion/termination of the contract/order or transfer/termination of the Contractor personnel, the CAC or Contractor identification card shall be returned as directed to the AFLCMC/WIE Security Office.
13. QUALITY CONTROL PLAN: The Contractor shall establish a Quality Control Plan as the basis for quality services surveillance and enforcement and deliver the plan to the Government within 10 days following contract award (CDRL A007).
14. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES: DoD Components working with contractors performing essential services shall develop and implement plans and procedures that are intended to provide reasonable assurance of the continuation of essential services during crisis or emergency situations using Contractor employees or other resources as necessary. Another words, the Contractor shall ensure the uninterrupted continuation of essential services as defined by the Department of Defense (DoD), regardless of government shutdowns, budgetary constraints, or other unforeseen circumstances. Essential services are those directly related to national security, defense readiness, and operational continuity, including, but not limited to, the maintenance of military systems.
15. INSURANCE: The Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at a minimum, the insurance listed in this section. The Contractor shall notify the CO in writing that the required insurance has been obtained.
15.1 Workers' compensation and employer's liability: The Contractor shall comply with applicable Federal and State workers' compensation and occupational disease statutes. The Contractor shall have employer's liability coverage of at least $100,000, except in states with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers.
15.2 General liability: The Contractor shall maintain bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
15.3 Automobile liability: The Contractor shall maintain automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
16. ORDERING PROCEDURES:
16.1 Authorized ordering activity: Only COs from AFLCMC/WISK are authorized to issue and administer task orders under this contract. Orders will be issued by a CO in accordance with the Ordering clause, FAR 52.216-18, of this contract. Additionally, the following procedures shall be used for negotiation of orders.
16.1.1 The CO will provide the Contractor with a copy of the notification of each proposed order, which will include a description of work to be performed, description of expertise required, desired completion date, and any other instructions or information pertinent to the specific order.
16.1.2 The Contractor shall then:
16.1.2.1 Submit to the CO a brief technical discussion describing how the work will be performed.
16.1.2.2 Submit a proposal identifying labor categories and number of hours within each category required for performance of the proposed work.
16.1.2.3 Identify and provide rationale for all material and subcontracted labor required for performance, including price, subcontractor name and business type specifying whether the subcontractor is a large or small business and, if a small business, its socioeconomic category for each subcontract and/or material.
16.1.2.4 Identify any GFP or Government-owned property at the RDIF required for performance.
16.1.2.5 Include the price proposed for the order.
16.1.2.6 Include Certificate of Current Cost or Pricing Data above the Truth in Negotiations Act (TINA) in accordance with FAR 15.406-2.
16.2 Authorized labor rates and Material Markup: Authorized labor rates and Material Markup proposed by the Contractor shall come from the RDIF Price Matrix incorporated into the IDIQ. The Contractor shall not propose any other labor rates or Material Markup unless authorized to do so in writing by the CO.
16.3 Actions after receipt of proposal: Upon receipt of the proposal, the CO will analyze the proposal and, if acceptable, issue an order directing the Contractor to commence performance; if the proposal is not fully acceptable as offered, negotiations may be conducted prior to issuance of any order. In the event issues pertaining to proposed work cannot be resolved to the satisfaction of the CO, the CO reserves the right to withdraw and cancel the proposed work. In such event, the Contractor shall be notified, via letter, of the CO’s decision. This decision shall be final and conclusive and shall not be subject to the Disputes clause or the Contract Disputes Act. The Contractor is not authorized to commence performance prior to issuance of the Order by the CO.
17. BASE SUPPORT: Base support will be provided by the Government to the Contractor in accordance with this PWS. The Contractor will require use of base support on a rent-free basis to include Government-controlled working space, material, or equipment that the Government determines can be made available at Wright-Patterson Air Force Base, Ohio, where this contract shall be performed. The Contractor will be required to maintain a clean and organized facility, equipment and work area while using this Government-controlled rent-free workspace during the period of performance. Until 31 July 2027, certain government owned equipment may be required simultaneously by the incumbent RDIF contractor; the RDIF Program Manager will deconflict equipment requirements. Unless otherwise stipulated in the contract schedule, the Contractor will use base support on a no-charge-for-use basis, and the value shall be a part of the Government’s contract consideration. The Contractor should immediately report to the CO any inadequacies, defective base support, or non-availability of support stipulated by the contract schedule, together with the recommended plan for obtaining the required support. Facilities are not to be purchased under this contract by the Contractor. Additionally, the Contractor (or authorized representative) shall not purchase or otherwise furnish any base support requirement provided by the PWS (or authorize others to do so) without prior written approval of the CO regarding the price, terms, and conditions of the proposed purchase or approval of other requirements.
17.1 BASE SUPPORT LOCATION: The following installation is where base support will be provided: Wright-Patterson Air Force Base, Ohio, Building 148.
17.2 BASE SUPPORT EQUIPMENT LIST: The base support to be furnished under this contract is listed at Attachment 6, Equipment List. Because of the nature and location of the work performed, the value of such support is undeterminable. The Contractor is not authorized to incur any costs resulting from nonsupport prior to CO direction.
18. SERVICES SUMMARY: See following pages.
Performance Objective PWS para. Performance Threshold Remedy
CAD/CAM drawing PWS 5.2.1 >Design, read, manipulate, and print using SolidWorks CAD software. > Receive SolidWorks data and load/translate to CNC machines.
Re-perform
CNC and manual mills, lathes, and grinding associated with precision machining
PWS 5.2.2 >Perform precision machining in accordance with current industry standards.
Re-perform
Welding, heat treating, painting, and plating
PWS 5.2.3 >Perform these tasks in accordance with current industry standards.
Re-perform
Sheet metal components and assembly
PWS 5.2.4 >Perform these tasks in accordance with current industry standards.
Re-perform
Maintenance and overhaul of aircraft components
PWS 5.2.5 >Perform these tasks in accordance with current industry standards.
Re-perform
Mechanical assembly PWS 5.2.6 >Design, fabricate, test, and document mechanical assemblies.
Re-perform
Hydraulic testing and repair
PWS 5.2.7 >Troubleshoot, repair, test, and document work on hydraulic systems.
Re-perform
Electro-mechanical device repair and overhaul
PWS 5.3.1 >Troubleshoot, repair, test, and document work on electro-mechanical systems.
Re-perform
Circuit board layout repair and assembly
PWS 5.3.2 >Troubleshoot, repair, test, and document work on circuit boards.
Re-perform
Cables and wiring harnesses (Design and assembly)
PWS 5.3.3 >Design, fabricate, test, and document cable and wiring harnesses.
Re-perform
Purchasing material support such as raw materials, fabricated piece parts, mechanical and electrical components, integrated subsystems and other hardware
PWS 5.4.1 > Orders placed within 10 workdays after each task order award.
> On time deliveries of ordered products.
Performance Objective PWS para. Performance Threshold Remedy
Integration (Mechanical and electrical subsystems)
PWS 5.4.2 > Perform electrical subsystem integration.
> Perform mechanical subsystem integration.
Re-perform
Research and development and prototyping to include reverse engineering
PWS 5.4.3 > Perform product research.
> Able to develop new solutions/systems and prototype the idea.
> Ability to perform reverse engineering.
Re-perform
Test and evaluation PWS 5.4.4 > Perform and document 100% testing of new designs.
Re-perform
Quality assurance/In-process inspection/FAA certification
PWS 5.4.5 > 100% detection of poor workmanship.
Re-perform
Engineering and technical support
PWS 5.4.6 > Timely and relevant to the assigned task.
Re-perform
Aircraft modification PWS 5.4.7 > Planned and executed on cost and schedule.
Re-perform
Aircraft ground operations and maintenance
PWS 5.4.8 > No aircraft delays due to mechanical failure.
> No aircraft delays due to maintenance failure.
Re-perform
Training and training materials
PWS 5.4.9 > Relevant to product.
> Easy to follow.
Re-perform
Graphics PWS5.4.10 > Clear and easy to understand.
Re-perform
Data and drawings PWS 5.4.11 > Timely submission with accurate information.
Re-perform
Program Management
PWS 5.4.12 > Keep customer informed.
> Timely and accurate
| 5.4 Other Capabilities |
| 7. INCENTIVES: N/A |
| 10. GOVERNMENT-FURNISHED EQUIPMENT, PROPERTY AND INFORMATION |
| 12.3. Controlled Unclassified Information (CUI) |
| 14. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES: DoD |
| 16. ORDERING PROCEDURES: |
| 16.1 Authorized ordering activity: Only COs from AFLCMC/WISK are authorized to issue and administer task orders under this contract. Orders will be issued by a CO in accordance with the Ordering clause, FAR 52.216-18, of this contract. Additionally... |
| 16.1.1 The CO will provide the Contractor with a copy of the notification of each proposed order, which will include a description of work to be performed, description of expertise required, desired completion date, and any other instructions or infor... |
| 16.1.2 The Contractor shall then: |
| 16.1.2.1 Submit to the CO a brief technical discussion describing how the work will be performed. |
| 16.1.2.2 Submit a proposal identifying labor categories and number of hours within each category required for performance of the proposed work. |
| 16.1.2.3 Identify and provide rationale for all material and subcontracted labor required for performance, including price, subcontractor name and business type specifying whether the subcontractor is a large or small business and, if a small business... |
| 16.1.2.4 Identify any GFP or Government-owned property at the RDIF required for performance. |
| 16.1.2.5 Include the price proposed for the order. |
| 16.1.2.6 Include Certificate of Current Cost or Pricing Data above the Truth in Negotiations Act (TINA) in accordance with FAR 15.406-2. |
| 16.2 Authorized labor rates and Material Markup: Authorized labor rates and Material Markup proposed by the Contractor shall come from the RDIF Price Matrix incorporated into the IDIQ. The Contractor shall not propose any other labor rates or Materi... |
| 16.3 Actions after receipt of proposal: Upon receipt of the proposal, the CO will analyze the proposal and, if acceptable, issue an order directing the Contractor to commence performance; if the proposal is not fully acceptable as offered, negotiatio... |
| 17.1 BASE SUPPORT LOCATION: The following installation is where base support will be provided: Wright-Patterson Air Force Base, Ohio, Building 148. |
| 17.2 BASE SUPPORT EQUIPMENT LIST: The base support to be furnished under this contract is listed at Attachment 6, Equipment List. Because of the nature and location of the work performed, the value of such support is undeterminable. The Contractor ... |
| 18. SERVICES SUMMARY: See following pages. |