This notice provides details for a federal design-build demolition contract opportunity. The Department of Veterans Affairs seeks proposals to demolish a 103,000 square foot, three story nursing home facility at the Atlanta VA Medical Center. Offerors should provide architectural, structural, civil, mechanical, plumbing, fire suppression, electrical, and environmental remediation documents and services to demolish the building and related structures. The performance period is approximately 540 calendar days from notice to proceed. The contract value is estimated between $2,000,000 to $5,000,000. The solicitation will be issued in November 2020 as a Request for Proposal under the Two-Phase Design-Build Selection Procedures and set aside entirely for Service-Disabled Veteran-Owned Small Businesses. Questions must be submitted in writing by the specified deadline to the contact provided.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

I

E

I

E

I.E. = 877.5

I.E. = 874

I.E. = 876.4

I.E. = 876.4

I.E. = 876.4

GROUND FLOOR PLAN - PLUMBING (SWV)

GROUND FLOOR PLAN - PLUMBING

SANITARY PIPING ROUTED BELOW CEILING

SHALL BE PROVIDED WITH SHEET METAL PANS

FIRST FLOOR PLAN

SECOND FLOOR PLAN

THIRD FLOOR PLAN

ROOF PLAN

NO DRAIN LINE REQUIRED

PLUMBING FIXTURE SCHEDULE

MARK VA MARK DESCRIPTION WASTE PIPE VENT PIPE COLD WATER HOT WATER

WASTE FIXTURE

UNITS

WATER FIXTURE

UNITS

WRIST BLADE

HANDLES

ELECTRIC

SENSOR

REMARKS

P-1 P-103

WATER CLOSET, WALL

HUNG

4" 2" 1 1/4'' 6 10 N/A NO

WALL-HUNG, ELONGATED, VITREOUS CHINA, LOW CONSUMPTION - 1.1 TO 1.6 GPF, SIPHON-JET ACTION WITH MANUAL FLUSH VALVE, WITH SEAT

P-2 P-401

LAVATORY, WALL HUNG

1-1/2" 1 1/2'' 1/2'' 1/2'' 2 2 YES NO

WAL-HUNG, VITREOUS CHINA, FRONT OVERFLOW, 4" CENTERS, WITH FAUCET - 0.35 GPM, VANDAL-RESISTANT WRIST BLADE HANDLES

P-3 P-508

SINK, SINGLE

COMPARTMENT

1-1/2" 1 1/2'' 1/2'' 1/2'' 2 2 YES NO

SINGLE COMPARTMENT, DROP-IN, SELF-RIMMING, LEDGE-STYLE, 4" CENTERS, INTEGRAL BACK LEDGE, WITH MIXING FACUET WITH 6" RIGID GOOSENECK SPOUT, ADA WRIST BLADE HANDLES

P-4 P-508

SINK, SINGLE

COMPARTMENT

1-1/2" 1 1/2'' 1/2'' 1/2'' 2 2 YES NO

SINGLE COMPARTMENT, DROP-IN, SELF-RIMMING, LEDGE-STYLE, 4" CENTERS, INTEGRAL BACK LEDGE, WITH MIXING FACUET WITH 6" RIGID GOOSENECK SPOUT, ADA WRIST BLADE HANDLES

P-5 P-501 SINK SERVICE 3" 2" 3/4'' 3/4'' 3 4 N/A NO

SINGLE COMPARTMENT, 14 GAUGE, TYPE 304 STAINLESS STEEL, ROLLED RIM, DRAINBOARD AND SINK COMPARTMENT SLOPE TO DRAIN, STAINLESS STEEL TUBULAR LEGS WITH ADJUSTABLE FEET

P-6 P-604 ELECTRIC WATER COOLER 1 1/4'' 1 1/4'' 1/2'' 1 1 N/A NO

BARRIER-FREE, 8.0 GPH OF CHILLED WATER, HIGH EFFICIENT POSITIVE START COMPRESSOR, CABINET FINISH SHALL BE SANDSTONE POWDER COATED ON GALVANISHED STEEL

P-7 P-708

EMERGENCY EYE & FACE

WASH

N/A NO

SELF-CONTAINED EYEWASH UNIT, 0.5 GALLONS/MINUTE, REMOVABLE TANK, WITH INSULATED HEATED JACKET THERMOSTATICALLY CONTROLS WATER IN WEATHER CONDITIONS, MULTIFUNCTION LED INDICATOR

LIGHTS, REFILLABLE TANK FILLS TO 16 GALLONS

P-8 P-801 WALL HYDRANT 3/4'' 5 N/A NO

ENCASED, NON-FREEZE ANTI-SPHON, AUTOMATIC DRAINING, CERAMIC DISC, WITH INTEGRAL BACKFLOW PREVENTER, STAINLESS STEEL BOX WITH HINGED COVER AND OPERATING KEY LOCK

P-9 P-802 HOSE BIBB 3/4'' 5 N/A NO

ROUGH CHROME PLATED FINISH, SOLID BRASS BODY CONSTRUCTION, SLOW COMPRESSION RENEWABLE CARTRIDGE

P-10 - - FLOOR DRAIN SEE PLAN N/A NO

DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, SLOTTED CAST (DUCTILE) IRON, HEAVY DUTY STRAINER, WITH TRAP PRIMER CONNECTION

P-11 - - FLOOR CLEANOUT SEE PLAN N/A NO

ADJUSTABLE LEVELING, DURA-COATED CAST IRON BODY, WITH GAS AND WATERTIGHT ABS TAPERED THREAD PLUG, ROUND SCORIATED SECURED LIGHT DUTY TOP

P-12 - - AREA DRAIN 3" N/A NO

8" x 8" FIXED TOP, EPOXY COATED CAST IRON, WITH SQUARE TOP SLOTTED CAST (DUCTILE) IRON

P-13 - - TRAP PRIMER VALVE N/A NO

FLOOR DRAIN TRAP PRIMER, SURFACE MOUNTED, ELECTRONIC 120V/1PH/60Hz-2A

P-14 - -

COMBINATION

ROOF/OVERFLOW DRAIN

SEE PLAN N/A NO

DURA-COATED CAST IRON, WITH COMBINATION MEMBRANE FLASHING, DOUBLE TOP-SET DECK PLATE AND LOW SILHOUETTE POLY-DOMES

P-15 - - ROOF DRAIN 3" N/A NO DURA-COATED CAST IRON BODY WITH COMBINATION MEMBRANE FLASHING CLAMP'GRAVEL GUARD AND LOW SILHOUETTE POLY-DOME

P-16 - - ROOF HYDRANT N/A NO

EPOXY COATED CAST IRON WITH GASKETED COVER, STAINLESS STEEL ACCESS COVER, VANDAL PROOF STAINLESS STEEL SCREW

P-17 - - WALL CLEANOUT SEE PLAN N/A NO

HOSE CONNECTION BACKFLOW PROTECTED, NO DRAIN LINE REQUIRED, FIELD TESTED DUAL CHECK

P-18 - - GRADE CLEANOUT SEE PLAN N/A NO

ADJUSTABLE ON-GRADE, DUCTILE IRON

COMPRESSOR SCHEDULE

MARK LOCATION AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE TYPE

INLET AIRFLOW DISCHARGE PRESSURE RECEIVER SIZE RECEIVER DIMENSIONS, DIA X

LENGTH

ELECTRIC POWER [60 Hz]

OPER WEIGHT REMARKS

NO. MOTORS

POWER EA.

PHASE VOLT RPM

CFM [L/s] PSIG [kPa] GAL [L] IN [mm] HP [kW] 14-AC1 GENERATORS EB101 BUILDING COMPRESSED AIR OIL-LESS 20.2 100 [ 690 ] 120 [ 450 ] 2 3 [ 2 ] 3 460 780 -----

14-GC-1 OUTSIDE BUILDING GENERATORS EB101 NATURAL GAS 200 [ 1400 ] 80 [ 300 ] 1 7.5 [ 6 ] 3 460 1800 2,000 TO BE PROVIDE BY GENERATOR SUPPLIED BASED ON GENERATOR REQUIREMENTS

14-GC-2 OUTSIDE BUILDING GENERATORS EB101 NATURAL GAS 200 [ 1400 ] 80 [ 300 ] 1 7.5 [ 6 ] 3 460 1800 2,000 TO BE PROVIDE BY GENERATOR SUPPLIED BASED ON GENERATOR REQUIREMENTS

14-GC-3 OUTSIDE BUILDING GENERATORS EB101 NATURAL GAS 200 [ 1400 ] 80 [ 300 ] 1 7.5 [ 6 ] 3 460 1800 2,000 TO BE PROVIDE BY GENERATOR SUPPLIED BASED ON GENERATOR REQUIREMENTS

WATER SOFTENER SCHEDULE

MARK LOCATION AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE TYPE

INCOMING WATER

HARDNESS CONTINUOUS FLOW RATE PEAK FLOW RATE INLET PRESSURE BACK WASH FLOW RATE

CAPACITY/ SALT DOSAGE

TANK SIZE (DIAM) SALT CAPACITY OF BRINE

TANK POWER REQUIRED

REMARKSSALT

DOSAGE

MIN. BED

(SUBFILL OF

SAND)

MAX. BED

PPM GPM [L/s] GPM [L/s] PSIG KPA GPM [L/s] LBS/ CUFT [KGr]/[LB] [KGr]/[LB] IN [mm] LB [KG] AMP PHASE VOLT

14-WS1 WORKROOM EB107 CHP SOFT WATER IONIC C-249 8 [ 1 ] 12 [ 1 ] [ 100 ] [ 690 ] 3 [ ] 15 10 [ 250 ] 30,000 [ 14000 ] 1 1 120 (2) POLYGLASS TANKS WITH CONTROLS

ELECTRIC WATER HEATER SCHEDULE

MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE

STORAGE

CAPACITY

RECOVERY @ 70 °F

[21°C] RISE TIME TO RECOVER

CONTENTS,

MINUTES

RELIEF VALVE

SETTING NO OF

ELEMENTS

ELECTIRCAL INPUT

REMARKS

GAL GAL/HR PSIG TOTAL kW kW PER

ELEMENT PHASE VOLT

WH-1 TOILET EB104 UNISEX TOILET ROOM LAVATORY DOMESTIC HOT WATER POINT OF USE N/A N/A N/A N/A 1 4.1 4.1 1 208 INSTANTANEOUS WATER HEATER - FLOW 0.35 GPM, TEMP. RISE 56°F

WH-2 TOILET EB104A UNISEX TOILET ROOM LAVATORY DOMESTIC HOT WATER POINT OF USE N/A N/A N/A N/A 1 4.1 4.1 1 208 INSTANTANEOUS WATER HEATER - FLOW 0.35 GPM, TEMP. RISE 56°F

WH-3 GENERATORS EB101 GENERATOR ROOM SINK DOMESTIC HOT WATER POINT OF USE N/A N/A N/A N/A 1 8.3 8.3 1 208 INSTANTANEOUS WATER HEATER - FLOW 1.0 GPM, TEMP. RISE 57°F

WH-4 GENERATORS EB101 GENERATOR ROOM SERVICE SINK DOMESTIC HOT WATER POINT OF USE N/A N/A N/A N/A 1 8.3 8.3 1 208 INSTANTANEOUS WATER HEATER - FLOW 1.0 GPM, TEMP. RISE 57°F

WH-5 TESTING E4102 TESTING AREA DOMESTIC HOT WATER POINT OF USE N/A N/A N/A N/A 1 8.3 8.3 1 208 INSTANTANEOUS WATER HEATER - FLOW 1.0 GPM, TEMP. RISE 57°F

PLUMBING PUMP SCHEDULE

MARK LOCATION AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE TYPE

CIRCULATING FLUID ELECTRICAL MOTOR

FLUID

FLOW HEAD NPSH AVAILABLE TEMPERATURE

SP. GR. MIN. % EFF

NOMINAL POWER

PHASE VOLT MAX RPM SPEED

CONTROL REMARKS

GPM FT FT °F HP

14-PP1 PUMPS EB109 WORKROOM LUBE OIL SIMPLEX LUBE OIL 4.2 150 - - - - 0.75 1 115 POSITIVE DISPLACEMENT

14-PP2 PUMPS EB109 WORKROOM LUBE OIL SIMPLEX LUBE OIL 4.2 150 - - - - 0.75 1 115 POSITIVE DISPLACEMENT

14-PP3 GENERATORS EB101 DOSING BOXES UREA DUPLEX UREA 40° - 104° 3 200 PACKAGED DUPLEX UNIT

DIAGRAM - SANITARY SEWER AND VENT - PLUMBING

DIAGRAM - DOMESTIC WATER - PLUMBING

DIAGRAM - STORM SEWER - PLUMBING

DIAGRAMS - NATURAL GAS - PLUMBING

DIAGRAM - UREA - PLUMBING

DIAGRAM - LUBE OIL - PLUMBING

DIAGRAM - COMPRESSED AIR - PLUMBING

leisa_hardage Drew Jackson GA

P

A/C PREP

A/C PREP

SITE PLAN - ELECTRICAL

ENLARGED TRANSFORMER VAULT PLAN

GROUND FLOOR PLAN

MEZZANINE FLOOR PLAN

EXISTING BUILDING D COMMUNITY LIVING CENTER PLAN

ROOF LEVEL PLAN

LIGHTING CONTROL PANEL DETAIL

GROUND FLOOR PLAN

EXISTING BUILDING A CLINICAL ADDITION GROUND FLOOR PLAN

FIRST FLOOR PLAN - POWER

PLC TERMINATION POINTS LIST

ELEVATOR CONTROLLER SPACE

GROUND FLOOR PLAN

EXISTING BUILDING C MAIN HOSPITAL GROUND FLOOR PLAN

EXISTING BUILDING A CLINICAL ADDITION GROUND FLOOR PLAN

PARTIAL SINGLE-LINE DIAGRAM

20KV PARALLEL

CHP - 480V

SINGLE-LINE DIAGRAM

EXISTING HOSPITAL - 480V

SINGLE-LINE DIAGRAM

MOTOR CONTROL CENTER - 14-MCC-1

PARTIAL ONE LINE DIAGRAM

MOTOR CONTROL CENTER - 14-MCC-1

ELEVATION

MOTOR CONTROL CENTER - 14-MCC-2

MOTOR CONTROL CENTER - 14-MCC-2

MOTOR CONTROL CENTER - 14-MCC-3

MOTOR CONTROL CENTER - 14-MCC-3

FIRE ALARM SYSTEM

RISER DIAGRAM

CCTV & ACCESS CONTROL SYSTEMS

RISER DIAGRAM

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

| Ä Ä

Ä Ä

Ä

Volume 2 cover VA ATL CHP - ARCHITECTURAL STAMPED
GI-100.2 COVER SHEET
GI-001.2-INDEX AND SYMBOLS
2014-11-19_VA ATL CHP - Mechanical
VA ATL CHP - ELECTRICAL STAMPED 2014-11-21
FIRE SUPPRESSION 2014-11-18.pdf
FX-001 General Notes & Abbreviations - Fire Suppression FX-001 (1)
FX-002 Symbols - Fire Suppression FX-002 (1)
FX-101 Ground Floor Plan - Fire Suppression FX-101 (1)
FX-102 First & Second Floor Plans - Fire Suppression FX-102 (1)
FX-103 Third Floor and Roof Plans - Fire Suppression FX-103 (1)
FX-601 Fire Suppression Diagram FX-601 (1)