Attachment_140A0720Q0010_Pricing.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- EXPLORATORY WATER WELLS CONSTRUCTION AT THE PUEBLO Federal contract opportunity
- Solicitation number
- 140A0721Q0010
About this file
This document contains a pricing sheet for exploratory water well construction services at the Pueblo of Santa Ana in New Mexico. The pricing sheet outlines costs for five tasks: drilling one 4-inch observation well to 1,110 feet; drilling one 12-inch pumping well to 1,110 feet; drilling one 4-inch observation well to 410 feet; performing aquifer testing of the 10-inch pumping well; and furnishing and installing three water level recorders and vented cables. Unit costs are provided for various materials, equipment, and labor required to complete each drilling and testing task. The related federal contract opportunity is solicited by the Department of the Interior Bureau of Indian Affairs Albuquerque Acquisition Office for exploratory water well construction at the Pueblo of Santa Ana under solicitation number 140A0721Q0010.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A0721Q0010_Amd_0001.pdf | ||
| 140A0721Q0010_PG4_54_Amend_1_0001.pdf | ||
| D_2(b)_Site_Pictures_0001.pdf | ||
| D_1_Davis-Bacon_Act_WD___NM20210041_010121.pdf | ||
| 140A0721Q0010_PG4_53.pdf | ||
| D_2_Location_Maps_011921.pdf | ||
| 140A0720Q0010_Pricing.pdf | ||
| Sol_140A0721Q0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PRICING
| Task | Exploratory Drilling - Pueblo of Santa Ana, NM | Depth (ft) | Total | ||
| 1 | Drill One (1), 4” Observation Well to 1100’ (4D) | 1110' | |||
| 2 | Drill One (1), 12” Pumping Well to 1100’ (10D) | 1110" | |||
| 3 | Drill One (1), 4” Observation Well to 400’ (4S) | 410' | |||
| 4 | Aquifer Testing of the 10" Pumping Well | ||||
| 5 | Furnish & Install Three (3) Water Level Recorders & Vented Cables | ||||
| Project Total= | |||||
| Well 4D | Well 4D | ||||
| Item | Task 1 Description - Well 4D | Qty | Unit | Unit Cost | Total |
| I1 | Mobilization: Conventional Hydraulic Rotary Mud Drill Rig | 1 | JOB | ||
| I2 | Mileage: Rotary Mud Drill Rig | MILE | |||
| I3 | 14 3/4" Diameter Bore Hole | 110 | FOOT | ||
| I4 | 9 7/8" Diameter Bore Hole | 1000 | FOOT | ||
| I5 | Equipment - Hourly Rate | 210 | HOUR | ||
| I6 | Equipment - Standby Rate | 32 | HOUR | ||
| I7 | Welding - Hourly Rate | 18 | HOUR | ||
| I8 | Welding - Overtime Rate | 6 | HOUR | ||
| I9 | Per Diem/Per Person | 98 | DAY | ||
| M | Materials and/or Services | ||||
| M1 | Furnish 12" conductor casing | 115 | FOOT | ||
| M2 | Furnished 4" blank casing | 830 | FOOT | ||
| M3 | Furnished 4" mill slot casing | 280 | FOOT | ||
| M4 | Furnish 4" bull nose/end cap/centralizers | 1 | EACH | ||
| M5 | Furnish Filter Sand | 150 | 100# BAGS | ||
| M6 | Furnish Annular Material | 18 | CUBIC YD | ||
| M7 | Furnish Cement for Pad | 1 | CUBIC YD | ||
| M8 | Furnish 4" Pipe for Bollards | 28 | FOOT | ||
| M9 | Subcontract Services | 1 | JOB | ||
| M10 | Geophysical Logging | 1 | JOB | ||
| Task Total= | |||||
| Well 10D | Well 10D | ||||
| Item | Task 2 Description - Well 10D | Qty | Unit | Total | |
| I1 | Mobilization: Conventional Hydraulic Rotary Mud Drill Rig | 1 | JOB | ||
| I2 | Mileage: Rotary Mud Drill Rig | MILE | |||
| I3 | 26" Diameter Bore Hole | 110 | FOOT | ||
| I4 | 17 1/2" Diameter Bore Hole | 1000 | FOOT | ||
| I5 | Equipment - Hourly Rate | 210 | HOUR | ||
| I6 | Equipment - Standby Rate | 32 | HOUR | ||
| I7 | Welding - Hourly Rate | 22 | HOUR | ||
| I8 | Welding - Overtime Rate | 8 | HOUR | ||
| I9 | Per Diem/Per Person | 100 | DAYS | ||
| M | Materials and/or Services | ||||
| M1 | Furnish 20" conductor casing | 115 | FOOT | ||
| M2 | Furnish 10" blank casing | 830 | FOOT | ||
| M3 | Furnish 10" mill slot casing | 280 | FOOT | ||
| M4 | Furnish 10" bull nose/end cap/centralizers | 1 | EACH | ||
| M5 | Furnish Filter Sand | 370 | 100# BAGS | ||
| M6 | Furnish Annular Material | 43 | CUBIC YD | ||
| M7 | Furnish Cement for Pad | 1 | CUBIC YD | ||
| M7 | Furnish 4" Pipe for Bollards | 30 | FOOT | ||
| M9 | Subcontract Services | 1 | JOB | ||
| Task Total= | |||||
| Well 4S | Well 4S | ||||
| Item | Task 3 Description - Well 4S | Qty | Unit | Unit Cost | Total |
| I1 | Mobilization: Conventional Hydraulic Rotary Mud Drill Rig | 1 | JOB | ||
| I2 | Mileage: Rotary Mud Drill Rig | MILE | |||
| I3 | 14 3/4" Diameter Bore Hole | 80 | FOOT | ||
| I4 | 9 7/8" Diameter Bore Hole | 330 | FOOT | ||
| I5 | Equipment - Hourly Rate | 77 | HOUR | ||
| I6 | Equipment - Standby Rate | 14 | HOUR | ||
| I7 | Welding - Hourly Rate | 10 | HOUR | ||
| I8 | Welding - Overtime Rate | 5 | HOUR | ||
| I9 | Per Diem/Per Person | 40 | DAY | ||
| M | Materials and/or Services | ||||
| M1 | Furnish 12" conductor casing | 85 | FOOT | ||
| M2 | Furnished 4" blank casing | 290 | FOOT | ||
| M3 | Furnished 4" mill slot casing | 120 | FOOT | ||
| M4 | Furnish 4" bull nose/end cap/centralizers | 1 | EACH | ||
| M5 | Furnish Filter Sand | 70 | 100# BAGS | ||
| M6 | Furnish Annular Material | 8 | CUBIC YD | ||
| M7 | Furnish Cement for Pad | 1 | CUBIC YD | ||
| M8 | Furnish 4" Pipe for Bollards | 30 | FOOT | ||
| M9 | Subcontract Services | 1 | JOB | ||
| Task Total= | |||||
| Aqtest | |||||
| Item | Task 5 Description - Aquifer Testing of the 10D | Qty | Unit | Unit Cost | Total |
| I1 | 50 Ton Workover Rig | 2 | JOB | ||
| I2 | Mileage - Workover Rig | 300 | MILE | ||
| I3 | 50 Ton Workover Rig - Furnish, Install & Remove test pump | 50 | HOUR | ||
| I4 | 50 Ton Workover Rig - up to 7 Hour Step Rate Test | 7 | HOUR | ||
| I6 | 50 Ton Workover Rig -76 Hour Pump Test | 76 | HOUR | ||
| I7 | 50 Ton Workover Rig - Standby Rate | 36 | HOUR | ||
| I8 | Per Diem/Per Person | 32 | DAY | ||
| M | Materials and/or Services | ||||
| M1 | Furnish Test Pump - To Be Determined | 1 | EACH | ||
| M2 | take water quality sample | 1 | EACH | ||
| M3 | Rent Generator for Test Pump | 1 | EACH | ||
| Task Total= | |||||
| in-situ transducers | |||||
| Item | Task 4 Description - Furnish Water Level Recorders | Qty | Unit | Unit Cost | Total |
| M | Materials and/or Services | ||||
| M1 | Furnish & Install Water Level Recorders | 3 | EACH | ||
| M2 | Furnish & install vented cables with desiccants up to 320' | 960 | FOOT | ||
| Task Total= |
| __________________________________________________ | ___________ |
| Company Name | Date |
File details come from the government source that posted it. Updated .