This document contains a pricing proposal for exploratory water well construction at the Pueblo of Santa Ana in New Mexico. The proposal includes pricing for drilling four wells - one 4-inch observation well to 1,100 feet, one 12-inch pumping well to 1,100 feet, one 4-inch observation well to 400 feet, and aquifer testing of the 12-inch pumping well. It also provides pricing for furnishing and installing three water level recorders. Pricing is provided for mobilization, drilling footage, equipment hours, materials, subcontracted services, and per diem costs for each well. The related federal contract opportunity is solicitation number 140A0721Q0010 from the Department of the Interior Bureau of Indian Affairs Albuquerque Acquisition Office seeking proposals for exploratory water well construction at the Pueblo of Santa Ana.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140A0721Q0010_Amd_0001.pdf | ||
| 140A0721Q0010_PG4_54_Amend_1_0001.pdf | ||
| D_2(b)_Site_Pictures_0001.pdf | ||
| D_1_Davis-Bacon_Act_WD___NM20210041_010121.pdf | ||
| 140A0721Q0010_PG4_53.pdf | ||
| D_2_Location_Maps_011921.pdf | ||
| Attachment_140A0720Q0010_Pricing.xlsx | XLSX spreadsheet | |
| Sol_140A0721Q0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING
Task Exploratory Drilling - Pueblo of Santa Ana, NM Depth (ft) Total 1 Drill One (1), 4” Observation Well to 1100’ (4D) 1110'
2 Drill One (1), 12” Pumping Well to 1100’ (10D) 1110"
3 Drill One (1), 4” Observation Well to 400’ (4S) 410'
4 Aquifer Testing of the 10" Pumping Well
Furnish & Install Three (3) Water Level Recorders &
Vented Cables
Well 4D
Item Task 1 Description - Well 4D Qty Unit Unit Cost Total
I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB
I2 Mileage: Rotary Mud Drill Rig MILE
I3 14 3/4" Diameter Bore Hole 110 FOOT
I4 9 7/8" Diameter Bore Hole 1000 FOOT
I5 Equipment - Hourly Rate 210 HOUR
I6 Equipment - Standby Rate 32 HOUR
I7 Welding - Hourly Rate 18 HOUR
I8 Welding - Overtime Rate 6 HOUR
I9 Per Diem/Per Person 98 DAY
M Materials and/or Services
M1 Furnish 12" conductor casing 115 FOOT
M2 Furnished 4" blank casing 830 FOOT
M3 Furnished 4" mill slot casing 280 FOOT
M4 Furnish 4" bull nose/end cap/centralizers 1 EACH
M5 Furnish Filter Sand 150 100# BAGS
M6 Furnish Annular Material 18 CUBIC YD
M7 Furnish Cement for Pad 1 CUBIC YD
M8 Furnish 4" Pipe for Bollards 28 FOOT
M9 Subcontract Services 1 JOB
M10 Geophysical Logging 1 JOB
Well 10D
Item Task 2 Description - Well 10D Qty Unit Total
I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB
I2 Mileage: Rotary Mud Drill Rig MILE
I3 26" Diameter Bore Hole 110 FOOT
I4 17 1/2" Diameter Bore Hole 1000 FOOT
I5 Equipment - Hourly Rate 210 HOUR
I6 Equipment - Standby Rate 32 HOUR
I7 Welding - Hourly Rate 22 HOUR
I8 Welding - Overtime Rate 8 HOUR
I9 Per Diem/Per Person 100 DAYS
M Materials and/or Services
M1 Furnish 20" conductor casing 115 FOOT
M2 Furnish 10" blank casing 830 FOOT
M3 Furnish 10" mill slot casing 280 FOOT
M4 Furnish 10" bull nose/end cap/centralizers 1 EACH
M5 Furnish Filter Sand 370 100# BAGS
M6 Furnish Annular Material 43 CUBIC YD
M7 Furnish Cement for Pad 1 CUBIC YD
M7 Furnish 4" Pipe for Bollards 30 FOOT
M9 Subcontract Services 1 JOB
Project Total=
Well 4D
Task Total=
Well 10D
Well 4S
Item Task 3 Description - Well 4S Qty Unit Unit Cost Total
I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB
I2 Mileage: Rotary Mud Drill Rig MILE
I3 14 3/4" Diameter Bore Hole 80 FOOT
I4 9 7/8" Diameter Bore Hole 330 FOOT
I5 Equipment - Hourly Rate 77 HOUR
I6 Equipment - Standby Rate 14 HOUR
I7 Welding - Hourly Rate 10 HOUR
I8 Welding - Overtime Rate 5 HOUR
I9 Per Diem/Per Person 40 DAY
M Materials and/or Services
M1 Furnish 12" conductor casing 85 FOOT
M2 Furnished 4" blank casing 290 FOOT
M3 Furnished 4" mill slot casing 120 FOOT
M4 Furnish 4" bull nose/end cap/centralizers 1 EACH
M5 Furnish Filter Sand 70 100# BAGS
M6 Furnish Annular Material 8 CUBIC YD
M7 Furnish Cement for Pad 1 CUBIC YD
M8 Furnish 4" Pipe for Bollards 30 FOOT
M9 Subcontract Services 1 JOB
Item Task 5 Description - Aquifer Testing of the 10D Qty Unit Unit Cost Total
I1 50 Ton Workover Rig 2 JOB
I2 Mileage - Workover Rig 300 MILE
I3
50 Ton Workover Rig - Furnish, Install & Remove test pump 50 HOUR
I4 50 Ton Workover Rig - up to 7 Hour Step Rate Test 7 HOUR
I6 50 Ton Workover Rig -76 Hour Pump Test 76 HOUR
I7 50 Ton Workover Rig - Standby Rate 36 HOUR
I8 Per Diem/Per Person 32 DAY
M Materials and/or Services
M1 Furnish Test Pump - To Be Determined 1 EACH
M2 take water quality sample 1 EACH
M3 Rent Generator for Test Pump 1 EACH
Item Task 4 Description - Furnish Water Level Recorders Qty Unit Unit Cost Total
M Materials and/or Services
M1 Furnish & Install Water Level Recorders 3 EACH
M2 Furnish & install vented cables with desiccants up to 320' 960 FOOT
Company Name Date
Well 4S
Task Total=
Task Total=
Aqtest
Task Total= in-situ transducers
Task Total=