140A0720Q0010_Pricing.pdf

PDF 173 KB Posted

Attached to
EXPLORATORY WATER WELLS CONSTRUCTION AT THE PUEBLO Federal contract opportunity
Solicitation number
140A0721Q0010
Issued by
Department of the Interior Bureau of Indian Affairs Albuqerque Acquisition Office

About this file

This document contains a pricing proposal for exploratory water well construction at the Pueblo of Santa Ana in New Mexico. The proposal includes pricing for drilling four wells - one 4-inch observation well to 1,100 feet, one 12-inch pumping well to 1,100 feet, one 4-inch observation well to 400 feet, and aquifer testing of the 12-inch pumping well. It also provides pricing for furnishing and installing three water level recorders. Pricing is provided for mobilization, drilling footage, equipment hours, materials, subcontracted services, and per diem costs for each well. The related federal contract opportunity is solicitation number 140A0721Q0010 from the Department of the Interior Bureau of Indian Affairs Albuquerque Acquisition Office seeking proposals for exploratory water well construction at the Pueblo of Santa Ana.

View the file

Other files for this federal contract opportunity

Other files attached to EXPLORATORY WATER WELLS CONSTRUCTION AT THE PUEBLO, newest first.
File Type Posted
Sol_140A0721Q0010_Amd_0001.pdf PDF
140A0721Q0010_PG4_54_Amend_1_0001.pdf PDF
D_2(b)_Site_Pictures_0001.pdf PDF
D_1_Davis-Bacon_Act_WD___NM20210041_010121.pdf PDF
140A0721Q0010_PG4_53.pdf PDF
D_2_Location_Maps_011921.pdf PDF
Attachment_140A0720Q0010_Pricing.xlsx XLSX spreadsheet
Sol_140A0721Q0010.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING

Task Exploratory Drilling - Pueblo of Santa Ana, NM Depth (ft) Total 1 Drill One (1), 4” Observation Well to 1100’ (4D) 1110'

2 Drill One (1), 12” Pumping Well to 1100’ (10D) 1110"

3 Drill One (1), 4” Observation Well to 400’ (4S) 410'

4 Aquifer Testing of the 10" Pumping Well

Furnish & Install Three (3) Water Level Recorders &

Vented Cables

Well 4D

Item Task 1 Description - Well 4D Qty Unit Unit Cost Total

I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB

I2 Mileage: Rotary Mud Drill Rig MILE

I3 14 3/4" Diameter Bore Hole 110 FOOT

I4 9 7/8" Diameter Bore Hole 1000 FOOT

I5 Equipment - Hourly Rate 210 HOUR

I6 Equipment - Standby Rate 32 HOUR

I7 Welding - Hourly Rate 18 HOUR

I8 Welding - Overtime Rate 6 HOUR

I9 Per Diem/Per Person 98 DAY

M Materials and/or Services

M1 Furnish 12" conductor casing 115 FOOT

M2 Furnished 4" blank casing 830 FOOT

M3 Furnished 4" mill slot casing 280 FOOT

M4 Furnish 4" bull nose/end cap/centralizers 1 EACH

M5 Furnish Filter Sand 150 100# BAGS

M6 Furnish Annular Material 18 CUBIC YD

M7 Furnish Cement for Pad 1 CUBIC YD

M8 Furnish 4" Pipe for Bollards 28 FOOT

M9 Subcontract Services 1 JOB

M10 Geophysical Logging 1 JOB

Well 10D

Item Task 2 Description - Well 10D Qty Unit Total

I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB

I2 Mileage: Rotary Mud Drill Rig MILE

I3 26" Diameter Bore Hole 110 FOOT

I4 17 1/2" Diameter Bore Hole 1000 FOOT

I5 Equipment - Hourly Rate 210 HOUR

I6 Equipment - Standby Rate 32 HOUR

I7 Welding - Hourly Rate 22 HOUR

I8 Welding - Overtime Rate 8 HOUR

I9 Per Diem/Per Person 100 DAYS

M Materials and/or Services

M1 Furnish 20" conductor casing 115 FOOT

M2 Furnish 10" blank casing 830 FOOT

M3 Furnish 10" mill slot casing 280 FOOT

M4 Furnish 10" bull nose/end cap/centralizers 1 EACH

M5 Furnish Filter Sand 370 100# BAGS

M6 Furnish Annular Material 43 CUBIC YD

M7 Furnish Cement for Pad 1 CUBIC YD

M7 Furnish 4" Pipe for Bollards 30 FOOT

M9 Subcontract Services 1 JOB

Project Total=

Well 4D

Task Total=

Well 10D

Well 4S

Item Task 3 Description - Well 4S Qty Unit Unit Cost Total

I1 Mobilization: Conventional Hydraulic Rotary Mud Drill Rig 1 JOB

I2 Mileage: Rotary Mud Drill Rig MILE

I3 14 3/4" Diameter Bore Hole 80 FOOT

I4 9 7/8" Diameter Bore Hole 330 FOOT

I5 Equipment - Hourly Rate 77 HOUR

I6 Equipment - Standby Rate 14 HOUR

I7 Welding - Hourly Rate 10 HOUR

I8 Welding - Overtime Rate 5 HOUR

I9 Per Diem/Per Person 40 DAY

M Materials and/or Services

M1 Furnish 12" conductor casing 85 FOOT

M2 Furnished 4" blank casing 290 FOOT

M3 Furnished 4" mill slot casing 120 FOOT

M4 Furnish 4" bull nose/end cap/centralizers 1 EACH

M5 Furnish Filter Sand 70 100# BAGS

M6 Furnish Annular Material 8 CUBIC YD

M7 Furnish Cement for Pad 1 CUBIC YD

M8 Furnish 4" Pipe for Bollards 30 FOOT

M9 Subcontract Services 1 JOB

Item Task 5 Description - Aquifer Testing of the 10D Qty Unit Unit Cost Total

I1 50 Ton Workover Rig 2 JOB

I2 Mileage - Workover Rig 300 MILE

I3

50 Ton Workover Rig - Furnish, Install & Remove test pump 50 HOUR

I4 50 Ton Workover Rig - up to 7 Hour Step Rate Test 7 HOUR

I6 50 Ton Workover Rig -76 Hour Pump Test 76 HOUR

I7 50 Ton Workover Rig - Standby Rate 36 HOUR

I8 Per Diem/Per Person 32 DAY

M Materials and/or Services

M1 Furnish Test Pump - To Be Determined 1 EACH

M2 take water quality sample 1 EACH

M3 Rent Generator for Test Pump 1 EACH

Item Task 4 Description - Furnish Water Level Recorders Qty Unit Unit Cost Total

M Materials and/or Services

M1 Furnish & Install Water Level Recorders 3 EACH

M2 Furnish & install vented cables with desiccants up to 320' 960 FOOT

Company Name Date

Well 4S

Task Total=

Task Total=

Aqtest

Task Total= in-situ transducers

Task Total=

File details come from the government source that posted it. Updated .