This document includes a solicitation for design and construction services for Masons Clinic in Copesville, Pietermaritzburg, South Africa. The US Army Corps of Engineers, Europe District is soliciting proposals for a design-build project to construct the Masons Clinic. Interested offerors must submit a non-price proposal and price proposal by the date specified in the solicitation. Offerors must be registered in the System for Award Management to be eligible for award. The solicitation provides basic design criteria and scope of work details, and intends to award a single contract to a design-build contractor to complete 100% design and construction. The project location is provided, and an industry day presentation on the USACE website offers instructions for working with the agency. The response must follow the solicitation instructions and include all requirements.

View the file

Other files

File Type Posted
W912GB22R0031_0003 Amendment Signed.pdf PDF
ATTACHMENT 2 - AMENDED Concept Site Plan _ ar164_Att 2_Conceptual Site Plan_Mod.01.pdf PDF
ATTACHMENT 7 - AMENDED Statement of Work _ ar164 011010 - amendment 1.pdf PDF
ATTACHMENT 16 - ar164_Att 6_Municipal Sewer Manhole Location Map_Mod.01.pdf PDF
W912GB22R0031_0003 Modification Summary of Changes.pdf PDF
W912GB22R0031_0002_Amendment_Signed.pdf PDF
W912GB22R0031_0001_Amendment.pdf PDF
W912GB22R0031_0001_Amendment_Signed.pdf PDF
ATTACHMENT 10 Commitment Letters.docx DOCX document
ATTACHMENT 8 Bank Letter of Assurance (BLA) Template_New.docx DOCX document
ATTACHMENT 5 Dedication Plaque.pdf PDF
ATTACHMENT 13 VAT Information.docx DOCX document
W912GB22R0031_Construct Masons Clinic_South Africa.pdf PDF
ATTACHMENT 7 Statement of Work (SOW).pdf PDF
ATTACHMENT 4 Structural calculations Guideline.pdf PDF
ATTACHMENT 15 Site Visit Attendee Worksheet.xlsx XLSX spreadsheet
ATTACHMENT 9 Bank Letter of Guarantee (BLG) Template.docx DOCX document
ATTACHMENT 3 Architectural Drawings.pdf PDF
ATTACHMENT 2 Concept Site Plan.pdf PDF
ATTACHMENT 12 Experience Information Sheet.docx DOCX document
ATTACHMENT 6 SPECIFICATIONS BINDER.pdf PDF
ATTACHMENT 1 Project Location Map.pdf PDF
ATTACHMENT 11 Past Performance Questionnaire.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POP and LD Clauses

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

06/19

PART 1 GENERAL

PHASING REQUIREMENTS

PAYMENT TYPES

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Construct New Clinic Building

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction for new clinic building as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Demolish Footings of and Sidewalk to Temporary Ablution Building

Unit of Measure: Job.

Payment will be made for costs associated with the demolition of the footings of and sidewalk to temporary ablution building as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

SCHEDULE OF ITEMS: OPTION ITEMS

Option 1: Item 0003: Construct New Waste Building

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the new waste building as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.

Option 2: Item 0004: Construct Site Improvements including paved Access drive, and Paved Walkways

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction of the site improvements including paved access drive, and paved walkways as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.

Option 3: Item 0004: Provision of Emergency Power with Diesel Generator

Unit of Measure: Job.

Payment will be made for costs associated with the provision of emergency power with diesel generator as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section -- V3.0 Jun 2019

SECTION 01 22 00 Page 1

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation/Request for Proposal. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation/Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation/Request for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. Refer to Section 01 22 00 Price and Payment Procedures for the period of performance and liquidated damages associated with option items.

Item No.
Description
Quantity
Unit
Unit Price
Amount

BASE ITEMS

0001
Construct New Clinic Building
1
Job
$
$
0002
Demolish Footings of and Sidewalk to Temporary Ablution Building
1
Job
$
$
Total of Base Items 0001 thru 0002
$

OPTION ITEMS

0003
Construct New Waste Building
1
Job
$
$
0004
Construct Site Improvements including Paved Access Drive, and Paved Walkways
1
Job
$
$
0005
Provision of Emergency Power with Diesel Generator
1
Job
$
$
Total of Option Items 0003-0005
$
Total of all Base and Option Items
$

EVALUATION OF OFFERS.

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --

ATTACHMENT 1

PRICE SCHEDULE

Masons Clinic Copesville Pietermaritzburg, South Africa

01 December 2020

Masons Clinic Copesville Pietermaritzburg, South Africa

COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use no later than 450 calendar days after the contractor receives the Notice to Proceed. Any options, if awarded, shall be completed concurrently with all other work.

The time stated for completion shall include final cleanup of the premises. The Government intends to issue a single Notice to Proceed for all work.

LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12)

If the Contractor fails to complete the work within the time specified in clause 52.211-10 COMMENCEMENT PROSECUTION AND EXECUTION OF WORK, the Contractor shall pay liquidated damages to the Government in the amount of $426.00 for each calendar day of delay until the work is completed or accepted.

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.