Attachment 13_Price Schedule.docx

DOCX document 38 KB Posted

Attached to
Southernwood Primary School Renovation, South Africa
Solicitation number
W912GB23R0002
Issued by

About this file

This document contains a solicitation for design and construction services for the renovation of the Southernwood Primary School in East London, South Africa. The U.S. Army Corps of Engineers Europe District is seeking proposals for a design-build project to construct a new three-classroom building, renovate the existing main building and an existing classroom building to add accessible toilets, construct exterior stairs, ramps, and walkways. Offerors must be System for Award Management registered and submit both price and non-price proposals by the deadline of 16 November 2022. A pre-proposal site visit will be held on 8 November 2022. Interested parties must pre-register by 4 November 2022. The period of performance is 420 calendar days from notice to proceed. Liquidated damages of $426 per day will be assessed for delays in completion.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POP and LD Clauses

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

06/19

PART 1 GENERAL

PHASING REQUIREMENTS

PAYMENT TYPES

SINGLE JOB PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job or unit price payment item, are included in the listed job item most closely associated with the work involved.

The job price and payment made for each item listed constitutes full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

If there is any work required of this contract that is not associated with a base bid item description or bid option description, then the costs for that work shall be included in the first base bid item.

SCHEDULE OF ITEMS: BASE ITEMS

Base Item 0001: Construct a New Three (3) Classroom Building

Unit of Measure: Job.

Payment will be made for costs associated with the design and construction for a new three (3) classroom buildings as indicated in the SECTION 01 10 10 and shown on the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0002: Renovation of Existing Main Building to Add two (2) Wheelchair Accessible Toilets

Unit of Measure: Job.

Payment will be made for costs associated with the design and renovation of the existing main building to add two (2) wheelchair accessible toilets as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

Base Item 0003: Exterior Stairs, Handicap Ramps, and Walkways

Payment will be made for costs associated with the design and construction of the exterior stairs, handicap ramps, and walkways as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below. This work shall include all applicable demolition and removals work to support the work elements contained in this item.

SCHEDULE OF ITEMS: OPTION ITEMS

Option 1: Item 0004: Renovation of Existing Classroom Building

Unit of Measure: Job.

Payment will be made for costs associated with the design and renovation of the existing classroom building as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.

Option 2: Item 0005: Construct a Pre-School Building

Payment will be made for costs associated with the design and construction for a pre-school building as indicated in SECTION 01 10 10 and the conceptual layout, with the exceptions of the bid options listed below.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section -- V3.0 Jun 2019

SECTION 01 22 00 Page 1

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Scope of Work (SOW), Solicitation/Request for Proposal. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Solicitation/Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the Solicitation/Request for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. Refer to Section 01 22 00 Price and Payment Procedures for the period of performance and liquidated damages associated with option items.

Item No.
Description
Quantity
Unit
Unit Price
Amount

BASE ITEMS

0001
Construct a Three (3) Classroom Building
1
Job
$
$
0002
Renovation of Existing Main Building to Add two (2) Accessible Toilets
1
Job
$
$
0003
Exterior Stairs, Handicap Ramps, and Walkways
1
Job
$
$
Total of Base Items 0001 thru 0003
$

OPTION ITEMS

0004
Renovation of Existing Classroom Building
1
Job
$
$
0005
Construct a Pre-School Building
1
Job
$
$
Total of Option Items 0004 thru 0005
$
Total of all Base and Option Items
$

EVALUATION OF OFFERS.

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

ATTACHMENT 1

PRICE SCHEDULE

Southernwood Primary School East London, South Africa

-- END OF PROPOSAL SCHEDULE --

16 November 2020

Southernwood Primary School Pumlani, South Africa

COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use no later than 420 calendar days after the contractor receives the Notice to Proceed. Any options, if awarded, shall be completed concurrently with all other work.

The time stated for completion shall include final cleanup of the premises. The Government intends to issue a single Notice to Proceed for all work.

LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12)

If the Contractor fails to complete the work within the time specified in clause 52.211-10 COMMENCEMENT PROSECUTION AND EXECUTION OF WORK, the Contractor shall pay liquidated damages to the Government in the amount of $426.00 for each calendar day of delay until the work is completed or accepted.

If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.