Attachment 13_ MECSP.docx

DOCX document 28 KB Posted

Attached to
N3220525R6003 - SURTASS-E RFP
Solicitation number
N3220525R6003
Issued by

About this file

This document is a Mission Essential Contractor Services Plan (MECSP) Worksheet associated with the SURTASS-E RFP (Solicitation N3220525R6003) issued by the Department of the Navy Military Sealift Command. The worksheet requires contractors to provide detailed responses addressing six critical elements of operational continuity, including provisions for acquiring essential personnel and resources, challenges during extended events like pandemics, time lapses in personnel acquisition, personnel identification and training for relocation or remote work, alert and notification procedures, and communication strategies for employee roles during crisis situations.

The worksheet is specifically designed to ensure contractor preparedness for maintaining essential services for up to 30 days or until normal operations can be resumed, in alignment with Defense Federal Acquisition Regulation Supplement (DFARS) requirements. Contractors must provide narrative descriptions for each element, referencing specific sections of their proposed Mission Essential Contractor Services Plan, with the expectation that any gaps will be addressed through this worksheet as an addendum to their original plan.

View the file

Other files

File Type Posted
Solicitation Amendment N3220525R60030007 SF 30.pdf PDF
Solicitation Amendment N3220525R60030006 SF 30.pdf PDF
A0006 Attachment 2_Wage Determination.pdf PDF
SF1449 - N3220525R60030006 - per Amendment 0006.pdf PDF
SF1449 - N3220525R60030005 - per Amendment 0005.pdf PDF
Solicitation Amendment N3220525R60030005 SF 30.pdf PDF
A0004 Attachment 1_SPECIALTIME 2026 (02-26).docx DOCX document
SF1449 - N3220525R60030004 - per Amendment 4.pdf PDF
A0003 Attachment 6_ Crew Complement.docx DOCX document
A0003 Attachment 21_Guidelines for Off-Hire.pdf PDF
A0003 Attachment 14_CDRL.pdf PDF
A0003 Attachment 10 _ CBRN.pdf PDF
A0003 Attachment 2_Wage Determination.pdf PDF
A0003 Attachment 8_Request for Clarifications.docx DOCX document
A0003 Attachment 4_Basic Pricing Data.xlsx XLSX spreadsheet
A0003 Attachment 17_Technical Evaluation Worksheet.xlsx XLSX spreadsheet
A0003 Attachment 16 _ MECSP.docx DOCX document
A0003 Attachment 9_ ATFP.pdf PDF
A0003 Attachment 12_ SFLLL.pdf PDF
A0003 Attachment 7_PWS (Performance Work Statement).docx DOCX document
A0003 Attachment 3_ GFP.xlsx XLSX spreadsheet
A0003 Attachment 5_DD-254 Rev.pdf PDF
A0003 Attachment 1_SPECIALTIME 2026 (02-26).docx DOCX document
SF 1449 - N3220525R6003 Original Posting.pdf PDF
SF 1449 - N3220525R60030002 per Amendment 2.pdf PDF
Solicitation Amendment N3220525R60030002 SF 30.pdf PDF
Attachment 12_CDRL Rev 1 per Amendment A0002.docx DOCX document
Attachment 14_Technical Evaluation Worksheet Rev 1 per Amendment 0002.xlsx XLSX spreadsheet
Attachment 3_Basic Pricing Data Rev 1 per Amendment 0002.xlsx XLSX spreadsheet
Attachment 16 _ Amendment 0002 QA_s.docx DOCX document
Attachment 9 _ CBRN Rev 1 per Amendment 0002.pdf PDF
Attachment 8_ ATFP Rev 1 per Amendment 0002.pdf PDF
Attachment 6_PWS (Performance Work Statement) Rev 1 per Amendment 0002.pdf PDF
Attachment 13 _ MSCSP Rev 1 per Amendment 0002.docx DOCX document
Solicitation Amendment N3220525R60030001 SF 30.pdf PDF
Attachment 15_ Shipyard Data.xlsx XLSX spreadsheet
Attachment 9_ CBRN.pdf PDF
Attachment 7_ Request for Clarifications.docx DOCX document
Attachment 14_ Technical Evaluation Worksheet.xlsx XLSX spreadsheet
Attachment 11_ MSC SOM.pdf PDF
Attachment 1_ Wage Determination.pdf PDF
SF 1449 - N3220525R6003.pdf PDF
Attachment 8_ ATFP.pdf PDF
Attachment 12_ CDRL.docx DOCX document
Attachment 10_ SFLLL.pdf PDF
Attachment 6_ PWS (Performance Work Statement).pdf PDF
Attachment 5_ Crew Complement.docx DOCX document
Attachment 4_DD-254.pdf PDF
Attachment 3_Basic Pricing Data.xlsx XLSX spreadsheet
Attachment 2_ GFP.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT IX (P)

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN (MECSP) WORKSHEET

MISSION ESSENTIAL CONTRACTOR SERVICES PLAN WORKSHEET

In accordance with DFARS 252.237-7024, NOTICE OF CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES offerors are required to submit a Mission Essential Contractor Services Plan (MECSP). Section L-4.11 of the RFP also requires that offerors on the subject procurement complete and submit this MECSP Worksheet.

For each of the below required elements of a MECSP, set forth by DFARS 252.237-7023, offerors must respond with a narrative description of how the proposed MECSP provides the required information. References to the section and page number of the MECSP in which the requirement is addressed must also be provided. If the required information is not included in the proposed MECSP, the response provided in the below worksheet will be considered an addendum to the proposed MECSP. Please attach additional sheets, if more space is required than provided below.

1. Identify provisions made for the acquisition of essential personnel and resources, if necessary, for continuity of operations for up to 30 days or until normal operations can be resumed (DFARS 252.237-7024(b)(1)).

2. Address challenges associated with maintaining essential contractor services during an extended event, such as a pandemic that occurs in repeated waves (DFARS 252.237-7024(b) (2) (i)).

3. Address the time lapse associated with the initiation of the acquisition of essential personnel and resources and their actual availability on site (DFARS 252.237-7024(b) (2) (ii)).

4. Address the components, processes, and requirements for the identification, training, and preparedness of personnel who are capable of relocating to alternate facilities or performing work from home (DFARS 252.237-7024(b) (2) (iii)).

5. Address any established alert and notification procedures for mobilizing identified “essential contractor service” personnel (DFARS 252.237-7024(b) (2) (iv)).

6. Address the approach for communicating expectations to contractor employees regarding their roles and responsibilities during a crisis (DFARS 252.237-7024(b) (2) (v)).

MSC DRYTIME 202X (Rev 1 (0#-2X))

File details come from the government source that posted it. Updated .