Attachment 12 - MPDE WMSL Deliverables - 70Z08526DLREP0003.pdf
PDF 120 KB Posted
- Attached to
- WMSL MPDE Dockside Scheduled Maintenance and Emergent Repairs Contract - 70Z08525RLREP00020
- Solicitation number
- 70Z08526DLREP0003
About this file
This document is an Attachment 12 Deliverables table from a federal contract that details specific technical reports, documentation, and compliance documents required from the contractor throughout the contract's lifecycle. The deliverables cover a wide range of technical services including condition found reports, engineering support summaries, inspection reports, performance documentation, and operational test reports. Key submission requirements include technical reports after each task, visual documentation for specific inspections, monthly travel expense claims, alignment and rigging plans, safety documentation, quality assurance plans, and various performance reports such as sea trial and dock trial performance reports. Each deliverable specifies the due date/frequency, document type, responsible party (consistently the Contractor), point of contact (primarily the Contracting Officer's Representative or Contracting Officer), and corresponding Performance Work Statement (PWS) sections, ensuring comprehensive tracking and documentation of contract activities.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 12 - Deliverables
Deliverable Due Date /
Frequency Document Type Responsible Party POC PWS Section
Condition Found
Report (CFR) After each task Technical Report Contractor COR Sections 2, 3, 4, 5.2
Summary of Technical
Services After each service Service Summary Report Contractor COR Sections 2.1–2.3
Engineering Support
Summary
After engineering consultations
Technical Engineering
Report Contractor COR Section 2.4
Final Inspection Report
(DEI)
After MPDE inspection Inspection Report Contractor COR Section 3.1
LOS Data Plots With final inspection report Data Plot Attachment Contractor COR Section 3.1
Travel Expense Claims Monthly Expense Report Contractor COR Section 2.9
Borescope Photo
Documentation
With cooler/intercooler/ camshaft inspections
Visual Documentation Contractor COR Sections 3.19–3.24, 3.29–3.30
Alignment Report After alignment check Alignment Report Contractor COR Section 3.16
Rigging Plan Prior to rigging operations Planning Document Contractor COR Section 5.7
Safety Plan With quote submission
Safety Compliance
Document Contractor
Contracting
Officer Section 6.6
Quality Assurance
Surveillance Plan
(QASP)
Prior to contract execution Quality Control Plan Contractor
Contracting
Officer Section 7
GFP Inventory &
Inspection Report
Upon receipt of
GFP
Condition Found Report
(CFR)
Contractor COR Section 5.2
Bilge Clean-Up
Verification
After overhaul completion
Environmental
Compliance Report Contractor COR Sections 4.1–4.4
50-Hour Service
Completion Report After sea trials
Service Completion
Report Contractor COR Sections 2.5, 4.1–4.4
Sea Trial Performance
Report After sea trials Operational Test Report Contractor COR Sections 2.7, 4.1–4.4
Dock Trial Performance
Report After dock trials Operational Test Report Contractor COR Section 2.6
Overhaul Completion
Reports (8k, 16k, 24k)
At end of each overhaul cycle
Comprehensive Overhaul
Report Contractor COR Sections 4.1–4.3
MPDE Commissioning
Report
After commissioning and sea trials
Commissioning Report Contractor COR Section 2.5
Emergency/Security
Incident Notification
Immediately upon awareness Incident Report Contractor COR Section 6.5
Mandatory Turn-In
Items (MTI) Incident Report Contractor COR
Section 3.1,3.7, 3.10,3.11,3.12,3.13.3.14,3.17
,3.18,3.20,3.23, 3.25,3.26,3.28, 3.31, 3.33, 3.35,3.36, 3.37,3.39,3.40, Removal or disposal of hazardous substances -
Applicable Licenses and
Permits
10 days after award
Licenses/Permits Contractor
COR Solicitation (Section H)