Attachment 11 - MSS.pdf

PDF 56 KB Posted

Attached to
Repair Hangar Deficiencies
Solicitation number
FA301022R0030
Issued by

View the file

Other files

File Type Posted
Attachment 19 - 4254 Pressure Results.pdf PDF
Solicitation Amendment FA301022R00300002 SF 30.pdf PDF
Solicitation Amendment - FA301022R00300003.pdf PDF
Attachment 18 - Questions and Answers 29 August 2022.pdf PDF
Solicitation Amendment FA301022R00300003 SF 30.pdf PDF
Solicitation Amendment - FA301022R00300001.pdf PDF
Solicitation Amendment FA301022R00300001 SF 30.pdf PDF
Solicitation Amendment - FA301022R00300002.pdf PDF
Attachment 20 - 4278 Pressure Results.pdf PDF
Site Visit Sign In 20220817.pdf PDF
Attachment 3 - B. UFC 4-211-01 Aircraft Maintenance Hangers.pdf PDF
Attachment 13 - Past Performance Reference List.pdf PDF
Attachment 17 - Wage Determination.pdf PDF
Attachment 1 - SOW 20220624.pdf PDF
Attachment 7 - F. Sundown Policy Foam Fire Suppression Systems.pdf PDF
Attachment 6 - E. Evaluation AF Fire Protection Features Hangers B4278.pdf PDF
Attachment 2 - A. UFC 3-600-01 Fire Protection for Facilities.pdf PDF
Attachment 12 - Past Performance Questionnaire.pdf PDF
Attachment 14 - SF 1444.pdf PDF
Attachment 8 - G. As-Built Plans B4247.pdf PDF
Attachment 5 - D. Evaluation AF Fire Protection Features Hangers B4254.pdf PDF
Attachment 4 - C. Evaluation AF Fire Protection Features Hangers B4247.pdf PDF
Attachment 10 - I. As-Built Plans B4278.pdf PDF
Attachment 15 - Notice of Compliance.pdf PDF
Solicitation - FA301022R0030.pdf PDF
Attachment 9 - H. As-Built Plans B4254.pdf PDF
Attachment 16 - Submittal Procedures.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Material Submittals Print on Legal size paper ( 8 x 14 ).

Approved Disapproved

HazMat Questionnaire 1 5 Days Prior to Start Date

HazMat MSDS 1 5 Days Prior to Start Date

Hazmat Reporting Entry Form 1 5 Days Prior to Start Date

4 Hazmat Reporting Entry Form 1 End of Contract

5 Recycling and Landfill Report 1 End of Contract

6 Warranty (Manufacturer's) 1 End of Contract

7 1-Year Warranty (Contractor) 1 End of

Contract 8 Miscellanous Material conduit/wire 1 10 Days after

NTP

9 24x36" Shop Drawings 3 30 Days after

NTP

10 All Fire Protection Eq. Pumps, motors, etc.

1 10 days after Shop Drawing

Approval

Re tu rn

S us pe ns e D at e

Te ch ni ca l D at a

Te st

R ep or ts

D at e to

C iv il En gi ne er in g

Sa m pl es

Co lo r S el ec tio n

M an uf ac tu re r's R ec om m en da tio n

W ar ra nt y- M an uf ac tu re r a nd /o r W or km an sh ip

Ca ta lo g

D at a

Project Number:

MAHG21-1003

Repair Hanger Deficencies from AFCEC Report B4247, B4254, B4278 Solicitation / Contract Number:

WO# 83097

Remarks

(To be completed by Project Engineer)

Li ne

N um be r

Re qu ire d

Su bm is si on D at e

Item or Description of Item, Contract Reference, Type of Submittal

Ce rt ifi ca te o f C om pl ia nc e

Sh op

D ra w in gs

Date Contractor Notified

(To be completed by Contract Administrator)

Su bm itt al

N um be rs

Co nt ra ct or R es ub m itt al

Fi na l A pp ro va l

Number of Copies Required (if not electronically submitted)

D at e Re ce iv ed in

C on tr ac tin g

Fi el d Re po rt s

O pe ra tin g In st ru ct io ns

Sc he du le s, Li st in gs , R ep or ts , P la ns

File details come from the government source that posted it. Updated .