Attachment 10 - NAPS Track and Athletic Field BID SCHEDULE - 08 Aug 2024.docx

DOCX document 31 KB Posted

Attached to
Design Build – Replace Surfaces at Nimitz Field and NAPS McCool Track, NAVAL STATION NEWPORT, NEWPORT, RI
Solicitation number
N4008524R5722
Issued by

About this file

This document is a Price Schedule for the NAPS Track and Athletic Field construction project at Naval Station Newport in Newport, RI under Solicitation N4008524R5722. The contract will be solicited as a base bid to provide construction services, with options for additional work. The base bid includes resurfacing the McCool running track, replacing the athletic field turf system, work within the track oval, and investigating/removing a manhole. Options include installing athletic turf in the semicircular areas and providing electrical power to the press box. The planned contract duration is 298 calendar days, with the design portion to be completed by 31 March 2025 and the construction work between mid-May 2025 to 31 July 2025. The contract is limited to the NEWPORT/NEW LONDON MACC holders listed in the solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAPS Track and Athletic FieldWON 802525
NAVAL STATION NEWPORT, NEWPORT, RIMAX GH3NDG

Aug 08 2024

PRICE SCHEDULE

PART 1 GENERAL

1.0 PROJECT

Basis of Bid for shall be the construction work in accordance with WON 1802525 RM24-2342 NAPS TRACK AND ATHLETIC FIELD, Naval Station Newport, RI.

This contract will be solicited as Base Bid to provide Construction Services. A description of the base bid and options is contained herewith under WON 1802525.

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Basis of Bid for Item CLIN 0001 shall be all construction work as noted in the scope of work for Base Bid CLIN 0001a through 0001d.

Provide the Contract Line Item (CLIN) lump sum price for the following items:

CLIN
DESCRIPTION
TOTAL PRICE FOR CLINS

0001a thru 0001d

0001a
Base Bid: Work to resurface the McCool running track and associated work (includes work on the perimeter drain system and LID)
0001b
Base Bid: Work to replace the athletic field turf system and associated work (including perimeter concrete curbs).
0001c
Base Bid: Work within the track oval at each end, replacing the long jump and pole vault surfaces to the north, the half-round warm up stretching area to the south, and manicuring all grass areas in each location.
0001d
Base Bid: Work to investigate and remove the manhole on the north end of the work site.

Option 1: Work to introduce athletic turf in the semicircular area at each end within the track oval

Option 2: Work to provide electrical power supply to the press box

PLANNED CONTRACT DURATION: 298 calendar days from date of award. Design portion of work must be completed by 31 March 2025. Work must be completed between mid-May 2025 to 31 July 2025. All MILESTONE dates subject to change.

-- End of Document -- Document 00 22 13.00 20 Page 1