This file contains electrical plans and diagrams for Building 551, showing power and lighting configurations that appear to be related to repairs at Travis Air Force Base. The drawing includes a power & lighting plan layout, electrical panel schedules for Panel H (480V) and Panel HL (208V), and a line diagram for a new transformer.
Key technical details include the installation of a new 300KVA transformer to replace an existing 150KVA transformer, panel schedules showing circuit breaker configurations and loads, and various electrical modifications including new receptacles, switches, and disconnects. The plans specify several equipment installations including an ultrasonic cleaner, hose cutoff machine, hose assembly machine, and hydraulic test stand. General notes indicate the presence of asbestos joint compound in Room 104 requiring abatement, and that new outlets and switches will not be rated for explosion proof use. The drawings also show new full-height wall installations with specific construction requirements including 4" metal studs, insulation, and sound dampening fiberboard.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W R
PNL HL
PNL H
CKT 8
PNL H
CKT 7
PNL HL
CKT 28
PNL H
CKT 11
PNL H
CKT 2
J
PNL HL
J
(E)
E
(E)
J
J
J
J
PNL H
CKT 10
400/3
NEW 300KVA
XFMR
(E) MANHOLE
400/3
480V PANEL H - BLDG. 551
(N) GROUNDING
E
S
U P
P L Y
F
A N
S
E
S
U P
P
Y
N
S
A C
A
E M
O N
D
M O
N
M E
T E
R
H O
S E
S
E M
B L Y
H O
U T
O F
F
K
V
X
M
R
T
O
P N
L
H
L
E
C O
M P
R E
S S
O R
H Y
D R
A U
L I C
T E
T
A
N D
U L T
R A
S O
N I C
C L E
A N
I N
G
(E) 45KVA
XFMR
AS-BUILTS
D
2 3
C
4 5
A
B
SHEET
IDENTIFICATION
SHEET OF
P R
O
F
E
S
S
I
O N
A
L
Scale: 3/16"" = 1'-0"
POWER & LIGHTING PLAN - BLDG. 551
LEGEND
INDICATES NEW FULL HEIGHT WALL. 4" METAL STUD,
INSULATION, TWO SHEETS OF 5/8" DRYWALL AND
SOUND DAMPENING FIBER BOARD ON INTERIOR WALL.
LEVEL 3 FINISH AND PAINT.
INDICATES NEW WALL TO TBAR HEIGHT. 4" METAL
STUDS AND DRYWALL. LEVEL 3 FINISH AND PAINT.
INDICATES A FUSED DISCONNECT SWITCH.
SINGLE GANG DUPLEX RECEPTACLE
SINGLE GANG DUPLEX RECEPTACLE WITH GROUND
FAULT INTERRUPTOR
SINGLE GANGE BOX WITH 1" CONDUIT UP ABOVE TBAR
FOR NEW COMM.
KEY NOTES
1 PROVIDE POWER BACK TO PANEL 'H' FOR THE NEW COMPRESSOR. INCLUDE A
480V RECEPTACLE.
2 POWER BACK TO PANEL 'HL' FOR THE NEW ULTRASONIC CLEANER. PROVIDE (N)
DISCONNECT SWITCH ON WALL. TIE IN BY OTHERS.
3 PROVIDE POWER BACK TO PANEL 'H' FOR THE NEW HOSE CUTOFF MACHINE
AND HOSE ASSEMBLY MACHINE. PROVIDE (N) DISCONNECT SWITCH ON WALL.
TIE IN BY OTHERS.
4 PROVIDE POWER BACK TO PANEL 'HL' FOR THE NEW PD-680 TANK. ASSUME
LOAD AS 2A @ 110V. INCLUDE A STANDARD GFI RECEPTACLE.
5 PROVIDE POWER BACK TO PANEL 'H' FOR THE NEW HYDRAULIC TEST STAND
EQUIPMENPROVIDE (N) DISCONNECT SWITCH ON WALL. TIE IN BY OTHERS.
6 RECONFIGURE (E) CIRCUITS TO SUPPORT THE REPLACEMENT OF PANELS 'H'
AND 'HL' WITH NEW.
7 - -
8 PROVIDE A NEW 300KVA TRANSFORMER AND GROUNDING.
9 PROVIDE NEW RECEPTACLES IN THE NEW WALLS BACK TO THE (E) PANEL 'HL'.
10 PROVIDE NEW COMM OUTLETS TO INCLUDE; SINGLE GANG BOX, 1-1/4" CONDUIT
UP TO ABOVE THE TBAR, AND STRING.
11 REWIRE (E) LIGHTS TO ACCOMODATE NEW SWITCHES AND TO REWIRE (E)
SWITCHES FOR RECONFIGURED BUILDING LAYOUT. ADDED ROOMS 108, 109, 110,
111. TYPICAL.
12 RELOCATE (E) LIGHT FIXTURES TO NEW LOCATION SHOWN. LOCATION
APPROXIMATE, COORDINATE WITH (E) CONDITIONS AND TBAR.
13 REPLACE DEMOLISHED (E) PANEL 'H' WITH A NEW 400AMP 480V PANEL. REPLACE
FEEDERS BACK TO SUBSTATION, APPROXIMATELY 150LF AWAY FROM BUILDING
551. EXISTING EMON DMON METER TO REMAIN IN PLACE.
14 (N) PANEL 'HL'. RECONFIGURE EXISTING CIRCUITS TO SUPPORT THE NEW PANEL
GENERAL NOTES
1 THERE IS ASBESTOS JOINT COMPOUND IN ROOM 104. ABATE PRIOR TO
DEMOLITION ACTIVITIES IN THAT SPACE.
2 DEMO (E) ELECTRICAL INFRASTRUCTURE FOR THE 400HZ SYSTEM IN ROOM 105
AND THE OUTLETS THROUGHOUT THE FACILITY, AS NEEDED. 400HZ
GENERATOR TO BE REMOVED BY OTHERS.
3 (E) COMPRESSOR TO BE RELOCATED TO ROOM 106.
4 (E) PANEL LOADS ARE ASSUMED TO BE SUFFICIENT FOR THE NEW EQUIPMENT.
WILL NEED TO CONFIRM ACTUAL LOADS PRIOR TO START. LOADS LISTED IN
PANEL SCHEDULE ON SHEET E2 AND E1 WERE PULLED FROM AS-BUILT
DRAWINGS.
5 NEW OUTLETS, SWITCHES, DISCONNECTS, ETC. WILL NOT BE RATED FOR
EXPLOSION PROOF.
6 PROVIDE A NEW 300KVA TRANSFORMER TO REPLACE THE (E) 150KVA
TRANSFORMER. REUSE (E) EQUIPMENT PAD. PROVIDE NEW GROUNDING.
PANEL: H | MAIN: CIRC. BRKR. | PHASE: 3PH | MOUNTING: SURFACE
VOLT: 277 / 480 | AMPS: 400A | WIRE: 4W | A/C
CIR
No.
BREAKER
CKT DESCRIPTION
WATTS (PHASE)
AMPS POLE A B C
15A 3 EMON DMON METER -- -- --
30A 3 ULTRASONIC CLEANING EQUIP. 12000 12000 12000
30A 3 A/C #1 4900 4900 4900
30A 3 A/C #2 2270 2270 2270
20A 3 (E) SUPPLY FAN S-1 720 720 720
20A 3 (E) SUPPLY FAN S-2 720 720 720
20A 3 HOSE CUTOFF 1760 1760 1760
20A 3 HOSE ASSEMBLY 1122 1122 1122
70A 3 45KVA XFMR TO PNL HL 10380 10380 10380
20A 3 (E) COMPRESSOR
200A 3 HYDRAULIC TEST STAND
- - BLANK
CONNECTED LOAD TBD TBD TBD
(TYPICAL)
PANEL: HL | MAIN: LUGS | PHASE: 3PH | MOUNTING: SURFACE
VOLT: 120 / 208 | AMPS: 225A | WIRE: 4W | A/C
CIR
No.
BREAKER
CKT DESCRIPTION
WATTS (PHASE)
AMPS POLE A B C
1 20A 1 RECPTACLES - OFFICES & SHOP AREA 1500
2 20A 1 LIGHTING - WAREHOUSE 1500
3 20A 1 RECPTACLES - OFFICES & SHOP AREA 1500
4 20A 1 LIGHTING - WAREHOUSE 1500
5 20A 1 RECPTACLES - WAREHOUSE & TEST AREA 1500
6 20A 1 LIGHTING - WAREHOUSE 1500
7 20A 1 RECPTACLES - OFFICES & BATHROOM 1500
8 20A 1 LIGHTING - WAREHOUSE 1500
9 20A 1 SPARE - -
10 20A 1 LIGHTING - TEST AREA 1500
11 20A 1 RECEPTACLES - OFFICES & SHOP AREA 1500
12 20A 1 LIGHTING - TEST AREA 1500
13 20A 1 RECEPTACLES - OFFICES & SHOP AREA 1500
14 20A 1 LIGHTING - CONTACTOR COIL 900
15 20A 1 SPARE - -
16 20A 1 LIGHTING - SHOP AREA & BATHROOM 1500
17 20A 1 RECEPTACLES - SHOP AREA 1500
18 20A 1 LIGHTING - OFFICES 1500
19 20A 1 SPARE - -
20 20A 1 EXTERIOR SECURITY GATE TBD
21 20A 1 TESTING AREA EXHAUST FAN EF2 500
22 20A 1 FURNACE #1 800
23 20A 1 RECEPTACLES - SHOP AREA 1500
24 20A 1 FURNACE SPARE - -
25 20A 1 FIRE ALARM CONTROL PANEL TBD
26 20A 1 FURNACE #2 800
27 20A 1 SPARE - -
28 20A 1 RECEPTACLE PD-680 300
29 20A 1 SPARE - -
30 20A 1 RECEPTACLE TEST AREA & EF RELAY - -
31 20A 1 SPARE - -
32 20A 1 SPARE - -
33 20A 1 SPARE - -
34 20A 1 SPARE - -
35 20A 1 SPARE - -
36 20A 1 SPARE - -
37 20A 1 SPARE - -
38 20A 1 SPARE - -
39 15A 1 SPARE - -
40 20A 1 SPARE - -
41 15A 1 SPARE - -
42 20A 1 SPARE - -
CONNECTED LOAD TBD TBD TBD
(TYPICAL)
(TYPICAL)
(TYPICAL)
(TYPICAL)
(TYPICAL)
Scale: 3/16"" = 1'-0"
LINE DIAGRAM - NEW TRANSFORMER B551
R
E V
I S
D
P
H
D
L
I N
E
D
R A
W I N
G S
1026222903C Rectangle
1026222903C Rectangle
1026222903C Rectangle
1026222903C Rectangle
File details come from the government source that posted it. Updated .