Attachment 05 - CUI Bid Schedule.xlsx

XLSX spreadsheet 39 KB Posted

Attached to
PKA - Repair Flightline Gates Travis AFB, CA
Solicitation number
FA442725R0008
Issued by

About this file

This is a CUI (Controlled Unclassified Information) bid schedule spreadsheet template containing two separate pricing worksheets - one for a rubber removal project and another for repairing flightline gates at Travis Air Force Base, CA. The first worksheet details line items for rubber removal work including materials, labor, and other direct costs for activities such as rubber removal passes, waste hauling, friction testing, mobilization, paint removal, airfield striping, and equipment rentals. The second worksheet covers the flightline gates repair project with line items for superintendent, project manager, laborers, safety personnel, gate operators, keypads, remotes, sensors, and associated mechanical/electrical work. The template includes columns for quantities, unit costs, labor hours, and other direct costs, with instructions for contractors to complete their pricing breakdown with 6% overhead, 8.5% profit, and 1% bond rates applied to the total direct costs.

The bid schedule relates to solicitation FA442725R0008 for the Department of the Air Force Air Mobility Command to repair flightline gates at Travis AFB. The solicitation includes a site visit scheduled for March 10, 2025 at 1300 PDT, with RSVP required by March 7, 2025. Questions must be submitted in writing by March 17, 2025 to both the Contracting Specialist and Contracting Officer.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1

IGE- XDAT 21-1000

60 CESFOUO
TRAVIS AFB, CA
FY21 Rubber Removal BasePROPOSED CONTRACT PRICE$ - 0
Ph I: Oct 2020
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850)MSF
2Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)Mile
3Waste (water) disposal turnkey (non-contaminated/non-hazardous)gal
4Waste (solid) disposal turnkey (non-contaminated/non-hazardous)Mile
5Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20ydea
6Friction Test, 40 and 60 MPH, pre and post testseach
7MobilizationLS
8Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT)WK
9Superintendenthr
10PMhr
11Laborershr
12Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400)SF
13Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210)SFrestripe

+ no bead

14Airfield Striping (no beads) (RSMeans 32 17 23.13 1200)SFERROR:#REF!
15Storage tank (water waster) Rental, 21K gallonls
16Runway signs UFC 3-535-01ea
17Dumpter (solid waste) rental, 20 CY capacityea
18Barricade Rental (30 ea)week
19Lighted X's (2 each)weekERROR:#REF!
20BiologisthrERROR:#REF!
ERROR:#REF!
Total (for 1 phase)
ERROR:#REF!

Sheet

CUI
XDAT 24-1025
60 CES
TRAVIS AFB, CA
Repair Flightline GatesPROPOSED CONTRACT PRICE$ - 0
Full Closure:
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1SuperintendentContract
2PMWKS
3LaborersWKS
4QC MANAGERWKS
5SSHOWKS
6Engineering feesEA
7Demolition, MechanicalHRS
8Demolition, ElectricalHRS
9Gate OperatorEA
10Keypad(s)EA
11Keypad programmingHRS
12Remote(s)EA
13Remote programmingHRS
14Saefty sensorsEA
15Mechanical, laborHRS
16Mechanical, materialEA
17Electrical, laborHRS
18Electrical, materialEA
19Clean upEA
20Dumpster (solid waste) rentalHRS

Total (for 1 phase)

Base (B)

CUI
INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN
Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit
itemizing of all direct costs.
Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF,
linear feet - LF, board feet - BF, each - EA, pound - LB).
Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the
Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise,
the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of
significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE:In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last
page as follows
TOTAL MATERIAL COSTS$

TOTAL LABOR COSTS $

TOTAL OTHER DIRECT COSTS $

TOTAL DIRECT COSTS $ 0.00

OVERHEAD 6.00 % $ 0.00

SUBTOTAL $ 0.00

PROFIT 8.50 % $ 0.00

SUBTOTAL $ 0.00

Bond 1.00 % $ 0.00

TOTAL PRICE $ 0.00