Attachment 10 Cost Proposal Form vers2.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Electric Vehicle Charging Program RFP 2
Solicitation number
RFP 605 2400000175 4
Issued by
Kentucky

About this file

This is a Cost Proposal Form (Attachment 10) for an Electric Vehicle Supply Equipment (EVSE) installation project issued by the Kentucky Division of Purchases. The form requires proposers to submit a separate Cost Proposal Form for each designated site in accordance with Section 5.4 of the RFP. The spreadsheet is structured to capture all project costs across a five-year operational period, divided into design and construction phases followed by Years 1 through 5 of operations. Proposers must itemize utility interconnection and upgrade costs in Table 10-1, including components such as power transformers, transformer pads, utility poles, pole risers, pole terminators, three-phase primary line extensions, and protection equipment. All project costs must be detailed in Table 10-2, encompassing design and permitting, utility interconnection/upgrade costs, construction, EVSE hardware and software, administrative costs, operations, maintenance, and utility demand and energy charges.

The cost proposal requires proposers to identify all requested subsidies separately in Table 10-3, with a mandatory requirement that proposers provide funding for at least 20% of the entire cost related to each site. The form includes optional Tables 10-4 and 10-5 for proposers to submit futureproofing design options with associated costs and subsidy requests. All utility costs must be included with specified units (either Lump Sum or Price Each), and costs must be broken down and explained in a cost narrative. The spreadsheet is locked for consistency with only orange cells available for editing, and proposers must submit completed forms in .xlsx format. Questions regarding the cost proposal form should be directed to Laura Hagan, Director of the Division of Purchases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Proposal Form

Attachment 10. Cost Proposal Form
Proposers shall complete a separate Cost Proposal Form for each Site in accordance with Section 5.4 (Cost Proposal) of the RFP. This document is locked for consistency. Orange cells are available to edit. Proposers shall not otherwise modify this spreadsheet. When complete, submit in .xlsx format.

Any questions may be directed to Laura Hagan, Director, Division of Purchases (Laura.Hagan@ky.gov).

Proposer Name
Designated Zone
Proposal No

Proposer to include all utility costs in Table 10-1. Under the Unit column, please include if the cost is either Lump Sum (LS) or Price Each (EA). For Lump Sum costs, use a quantity of 1 in the Quantity column.

Table 10-1: Utility Interconnection / Upgrade Costs
DescriptionUnitQuantityUnit CostTotal Cost
Power Transformer
Transformer Pad
Utility Pole
Pole Riser
Pole Terminator
3-Phase Primary Line Extension
Protection
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Other (Please add if desired)
Total Utility Interconnection / Upgrade Costs

*Total Utility Interconnection / Upgrade Costs as shown in Table 10-1 is equal to Utility Costs as shown in Table 10-2 during design and construction. A breakdown of costs related to all required utility costs should be included in Table 10-1 and explained in the cost narrative.

Proposer to include all Project costs in Table 10-2.
Table 10-2: Cost Proposal FormOperational Period
DescriptionDesign and ConstructionYear 1Year 2Year 3Year 4Year 5
Design and Permitting
Utility Interconnection / Upgrade Costs
Construction
EVSE Hardware and Software
Administrative Costs
Operations
Maintenance
Utility Demand Charges
Utility Energy Charges
Total

Cost Proposal Form Costs

Proposer to include all requested subsidies in Table 10-3.
Table 10-3: Subsidy RequestedOperational Period
DescriptionDesign and ConstructionYear 1Year 2Year 3Year 4Year 5
Design and Permitting
Utility Interconnection / Upgrade Costs
Construction
EVSE Hardware and Software
Administrative Costs
Operations
Maintenance
Utility Demand Charges
Utility Energy Charges
Total

Grand Total - Requested Subsidy

Subsidy Percentage of CostERROR:#VALUE!
*Proposer must provide funding for at least 20% of the entire cost related to a Site

NOTE TO PROPOSERS: The following section is optional, and should only be filled in to include options for futureproofing

Proposer to include all Project costs in Table 10-4, for future proofing design option
Table 10-4: Cost Proposal Form, Including Futureproofing Design Layout CostsOperational Period
DescriptionDesign and ConstructionYear 1Year 2Year 3Year 4Year 5
Design and Permitting
Utility Interconnection / Upgrade Costs
Construction
EVSE Hardware and Software
Administrative Costs
Operations
Maintenance
Utility Demand Charges
Utility Energy Charges
Total

Cost Proposal Form Costs w/ Futureproofing

Proposer to include all requested subsidies in Table 10-5, for future proofing design option
Table 10-5: Subsidy Requested, Including FutureproofingOperational Period
DescriptionDesign and ConstructionYear 1Year 2Year 3Year 4Year 5
Design and Permitting
Utility Interconnection / Upgrade Costs
Construction
EVSE Hardware and Software
Administrative Costs
Operations
Maintenance
Utility Demand Charges
Utility Energy Charges
Total

Grand Total - Requested Subsidy with Futureproofing

Subsidy Percentage of CostERROR:#VALUE!
*Proposer must provide funding for at least 20% of the entire cost related to a Site