Attachment 10 - Acronyms Abbreviations and Definitions.docx
DOCX document 165 KB Posted
- Solicitation number
- 12012025
About this file
This document is an Acronyms, Abbreviations, and Definitions attachment for a U.S. Customs and Border Protection (CBP) Non-Intrusive Inspection (NII) Systems contract focusing on Large-Scale Fixed Systems. The comprehensive document provides an extensive glossary of technical and administrative terms related to non-destructive cargo inspection technologies, specifically for High-Energy Rail (HE-Rail) inspection systems. Key technical domains include radiation detection equipment, imaging systems, vehicle scanning portals (LEP Type 1-3), and advanced signal processing technologies for threat identification.
The attachment covers critical definitions for system components such as Mobile type systems, Large Scale equipment capable of scanning cargo including pallets, sea containers, and trucks, and various inspection portal configurations. Importantly, the document establishes precise technical definitions for terms like Controlled Environment, Non-Intrusive Inspection, Image Data Set, and specifies threshold and objective performance values. The attachment was prepared by CBP's Office of Field Operations Innovation and Strategy Directorate's Non-Intrusive Inspection Program, with the first draft dated 7/14/2025 created by Kaitlin Merli and Cindy Savage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 07 - Deliverables.xlsx | XLSX spreadsheet | |
| Attachment 01 - HE Rail System FRD_2025-10-14 (1).docx | DOCX document | |
| Attachment 04 - Training Requirements revised.docx | DOCX document | |
| Attachment 02_Exhibit A_NII_POV_ICD_VENDOR_v5.9.docx | DOCX document | |
| 1. SOW_Large-Scale Fixed Systems_HE Rail.docx | DOCX document | |
| RFI_HE Rail.docx | DOCX document | |
| Attachment 02 - Integration Overview 09222025.docx | DOCX document | |
| RFI Contractor Response Matrix.xlsx | XLSX spreadsheet | |
| Attachment 11 - Information Technology Clauses and Terms and Conditions.docx | DOCX document | |
| Attachment 06 - Lifecycle Sustainment and Support Requirements without comments.docx | DOCX document | |
| Attachment 05 - Testing Requirements.docx | DOCX document | |
| Attachment 03 - Design Construction and Installation Requirements.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Large-Scale Fixed Systems
ATTACHMENT 10 – ACRONYMS, ABBREVIATIONS, & DEFINITIONS
U.S. Department of Homeland Security U.S. Customs and Border Protection
Attachment 10 – Acronyms, Abbreviations, and Definitions
For:
U.S. CUSTOMS AND BORDER PROTECTION
NON-INTRUSIVE INSPECTION SYSTEMS
Large-Scale Fixed Systems
PREPARED BY:
OFFICE OF FIELD OPERATIONS
INNOVATION AND STRATEGY DIRECTORATE
NON-INTRUSIVE INSPECTION PROGRAM
Table of Contents
| 1 | Acronyms and Abbreviations | 5 |
| A | 5 | |
| B | 6 | |
| C | 6 | |
| D | 6 | |
| E | 7 | |
| F | 7 | |
| G | 7 | |
| H | 7 | |
| I | 8 | |
| J | 8 | |
| L | 8 | |
| M | 8 | |
| N | 9 | |
| O | 9 | |
| P | 9 | |
| Q | 10 | |
| R | 10 | |
| S | 10 | |
| T | 11 | |
| U | 11 | |
| V | 11 | |
| W | 11 | |
| X | 11 | |
| Y | 11 | |
| Z | 11 | |
| 2 | Definitions | 11 |
| A | 11 | |
| B | 11 | |
| C | 11 | |
| D | 12 | |
| E | 12 | |
| F | 12 | |
| G | 12 | |
| H | 12 | |
| I | 12 | |
| J | 13 | |
| K | 13 | |
| L | 13 | |
| M | 13 | |
| N | 13 | |
| O | 13 | |
| P | 13 | |
| Q | 14 | |
| R | 14 | |
| S | 14 | |
| T | 14 | |
| U | 14 | |
| V | 14 | |
| W | 14 | |
| X | 14 | |
| Y | 14 | |
| Z | 14 |
| Version |
| Date |
| Comments |
| V1 |
| 7/14/2025 |
| First draft, Kaitlin Merli and Cindy Savage |
Acronyms, Abbreviations, and Definitions
Acronyms and Abbreviations
A
| ACE | Automated Commercial Environment |
| AES | Advanced Encryption Standard |
| ANSI | American National Standards Institute |
| Ai | Inherent Availability |
| Ao | Operational Availability |
| AQUA | Advanced Qualified Unlading Approval |
| ASC | Area Surveillance Camera |
| ASCE | American Society of Civil Engineers |
| ATO | Authority to Operate |
| ATP | Acceptance Test Plan |
| ATS | Automated Targeting System |
B
| BLSR | Baseline Security Requirements |
| BPMN | Business Process Modeling Notation |
| BSLR | Baseline Security Requirements |
C
| CA | Chief Architect |
| CBP | Customs and Border Protection |
| CCTV | Closed Circuit Television |
| CFR | Code of Federal Regulations |
| CICS | Customer Information Control System(s) |
| CIO | Chief Information Officer |
| CIRT | Computer Incident Response Team |
| CISO | Chief Information Security Officer |
| CLIN | Contract Line Item Number |
| CMII | Institute for Configuration Management |
| CO | Contracting Officer |
| CONOP | Concept of Operations |
| CONUS | Continental United States |
COOP Continuity of Operations
| COR | Contracting Officer Representative |
| COTS | Commercial Off the Shelf |
| CPARS | Contractor Performance Assessment Reports |
| CSO | Chief Security Officer |
| CTO | Chief Technology Officers |
| CUI | Controlled Unclassified Information |
| CWT | Customer Wait Time |
D
| DHS | Department of Homeland Security |
| DID | Data Item Description |
| DS | Data Store |
| DTOPS | Decal and Transponder Online Procurement System |
| DUNS | Data Universal Numbering System |
E
| EA | Enterprise Architecture |
| ECP | Engineering Change Proposal |
| EDMO | Enterprise Data Management Office |
| EIOD | Enterprise Infrastructure and Operation Directorate |
| EIT | Electronic and Information Technology |
| ESOC | Enterprise Security Operations Center |
| ETA | Estimated Time of Arrival |
F
| FAR | Federal Acquisition Regulations |
| FAT | Factory Acceptance Test / First Article Test |
| FCR | Final Configuration Review |
| FCU | Flex Control Unit |
| FEA | Federal Enterprise Architecture |
| FIPS | Federal Information Processing Standards |
| FISMA | Federal Information Security Management Act |
| FLETC | Federal Law Enforcement Training Center |
| FRD | Functional Requirements Document |
| FSE | Field Service Engineer |
| FT | Factory Test |
G
| GFE | Government Furnished Equipment |
| GFI | Government Furnished Information |
| GIF | Graphics Interchange Format |
| GOTS | Government Off the Shelf |
| GSA | General Services Administration |
| GSS | General Support System |
H
| HE Rail | High-Energy Rail Inspection System |
| HLS | Homeland Security |
| HMI | Human Machine Interface |
| HRM | Human Resources Management |
| HTTP | Hyper Text Transfer Protocol |
| HTTPS | Hyper Text Transfer Protocol Secure |
I
| IA | Information Assurance |
| IB | In Bound |
| ICCB | Infrastructure Change Control Board |
| ICD | Interface Control Document |
| ICAM | Identity Credential and Access Management |
| ID | Identification |
| IDIQ | Indefinite Delivery/Indefinite Quantity |
| IDP | Integrated Data Package |
| IDS | Image Data Set |
| ILD | Integrated Logistics Division |
| IMI | Interactive Multimedia Instruction |
| IPP | Invoice Processing Platform |
| IPT | Integrated Project Team |
| ISB | Instructional Systems Design |
| IT | Information Technology |
| ITB | Interdiction Technology Branch |
J
JSON JavaScript Objection Notification
L
| LBI | Land Border Integration |
| LED | Light Emitting Diode |
| LEP | Low-Energy Portal |
| LPR | License Plate Reader |
| LS | Large Scale |
| LSC | Lane Security Controller |
| LSSD | Laboratories and Scientific Services Directorate |
M
| MD | Management Directive |
| MEP | Multi-Energy Portal |
| MM | Mexican State Codes |
| MSD | Mission Support Directorate |
| MSDS | Material Safety Data Sheet |
| MTBF | Mean Time between Failures |
| MTTR | Mean Time to Repair |
N
| NEC | National Electrical Code | |
| NIDS | Network Intrusion Detection System | |
| NIEM | National Information Exchange Model | |
| NII | Non-Intrusive Inspection | |
| NII PMO | Non-Intrusive Inspection Program Management Office | |
| NIST | National Institute of Standards and Technology | |
| NRC | Nuclear Regulatory Commission | |
| NSA | National Security Agency |
O
| OAST | Office of Accessible Systems and Technology |
| OCONUS | Outside Continental United States |
| OCR | Optical Character Recognition |
| OEM | Original Equipment Manufacturer |
| OFO | Office of Field Operations |
| OIT | Office of Information and Technology |
| OMB | Office of Management and Budget |
| O&M | Operations and Maintenance |
| OSHA | Occupational Safety and Health Administration |
| OTD | Office of Training and Development |
P
| PALMS | Performance and Learning Management System |
| PCII | Protected Critical Infrastructure Information |
| PII | Personally Identifiable Information |
| PIV | Personal Identity Verification |
| PLC | Programmable Logic Controllers |
| PKI | Public Key Infrastructure |
| PM | Program Manager |
| PMR | Program Management Review |
| POA&M | Plan of Action and Milestone |
| POC | Point of Contact |
| POE | Port of Entry |
| POL | Petroleum, Oil, and Lubricants |
| POV | Privately Owned Vehicles |
| PPIP | Preplanned Product Improvement Plan |
| PNG | Portable Network Graphics |
| PQS | Personal Qualification Standard |
Q
| QAP | Quality Assurance Plan |
| QASP | Quality Assurance Surveillance Plan |
| QCP | Quality Control Plan |
| QR | Quick Reader |
R
| RDE | Radiation Detection Equipment |
| RFIC | Radio Frequency Integrated Circuit |
| RFID | Radio-Frequency Identification |
| RFP | Request for Proposal |
| ROI | Region of Interest |
| RPM | Radiation Portal Monitor |
| RV | Recreational Vehicles |
S
| SAT | Site Acceptance Test | |
| SATP | Site Acceptance Test Plan | |
| SCORM | Sharable Content Object Reference Model | |
| SDLC | System Development Life Cycle | |
| SIEM | Security Information Event Management | |
| SLEP | Service Life Extension Programs | |
| SPII | Sensitive Personally Identifiable Information | |
| SOC | Security Operations Center | |
| SOW | Statement of Work | |
| SR | System Review | |
| STIG | Security Technical Implementation Guide |
T
| TBD | To be determined |
| TCS | Traffic Control System |
| TI | Technology Insertion |
| TIFF | Tag Image File Format |
| TO | Task Order |
| TRM | Technical Reference Model |
| TSD | Technology Service Desk |
U
| UML | Universal Modeling Language |
| UL | Underwriter’s Laboratories |
| USBP | United States Border Patrol |
| USC | United States Code |
| USGCB | US Government Configuration Baseline |
| UVBS | Under-Vehicle Back-Scatter System |
V
W
| WCF | Work Completion Form |
| WME | Weapons of Mass Effect |
| WO | Work Order |
X Y Z
Definitions
A Advanced "smart" signal processing - Automatically identifies threats in an image without any Operator action.
B C Capture – Recording a readable image of the license plate.
Command Center – Defined location in which the controls for a system reside.
Configuration Baseline –
· An agreed-to description of the attributes of a product, at a point in time, which serves as a basis for defining change.
· An approved and released document, or set of documents, each of a specific revision; the purpose of which is to provide a defined basis for managing change.
· The currently approved and released configuration documentation.
· A released set of files comprising a software version and associated configuration documentation.
Controlled Environment - Any personnel, systems, networks, vehicles or facilities that are under direct operations and security of CBP personnel.
Corrective Maintenance – Any maintenance and sustainment activity which is required to diagnose, correct equipment malfunctions, failures, and outages that have occurred or is in the process of occurring.
Critical Design Review - the last review of the contractor’s proposed system to conform to SOW/FRD requirements prior to Factory Testing and production of systems. In essence, CBP’s last review of the system to ensure it meets our requirements.
Critical Item – An identified weak link in a system, has an adverse impact on, or contributes to failures of the system performing its mission, creates potential safety problems, or contributes to other areas of high risk to overall system reliability.
D Data Item Description - A completed document that defines the data required of a Contractor.
Day – Means “calendar” day unless otherwise specified.
E Engineering Change Proposal – Proposals to enhance the value of the finished goods or services to the Government or reduce the cost of the goods or services.
F First Article – Means the initial production unit from the first lot.
G Government Furnished Information - data and information in the possession of or acquired by the Government and made available to the Contractor.
H I Image Data Set - All elements of a scanned image to include the radiographic image, snapshots, data sheets or scanned manifests, notes and the release/hold resolution.
Information Assurance – Is considered a requirement for all systems used to input, process, store, display, or transmit sensitive or national security information.
J K L Large Scale - Equipment capable of scanning large cargo to include pallets, sea containers, trucks and similar.
LEP Type 1 - Portals with a limited footprint to support high traffic volume scanning in pre/post primary passenger vehicle operations.
LEP Type 2 - Portals with a larger footprint and top down and side views to support secondary passenger vehicle operations.
LEP Type 3 - Portals to accommodate Bus and Truck/Semi-Trailer scanning operations.
M Maximum Controlled Operating Area - Area defined by this document in which specified equipment must be able to operate.
Mobile type systems - Imaging systems which are mounted on a self- powered vehicle and capable of being driven on public roads.
N Non-Intrusive Inspection - Non-destructive methods of inspecting and identifying goods in transportation systems.
O Objective – A level of performance that significantly improves mission performance, safety, or supportability beyond that of the threshold value, and represents the maximum desired yield for system performance is considered an objective.
Objective Values are not required but can be defined to provide guidance to the Contractor with respect to areas where increased capability is of interest/value to the Government. If Objectives are defined, the interval between the Objective and Threshold values for a given parameter is the government program manager’s (PM) trade-space.
P Payment Request – any request for contract financing payment or invoice payment by the Contractor. The Payment request shall comply with the requirements identified in FAR 32.905(b), “Payment documentation and process” and the applicable Prompt Payment clause in the awarded contract.
Preventative Maintenance – Any scheduled and planned maintenance actions performed to maintain the target Operational Availability (Ao) and maintenance metrics to include periodic inspections, calibration, oil change, filter replacement, wiper blades, tires, condition monitoring, critical item replacement, and vehicle/chassis and system servicing requirements.
Q R Radiation Control Area - An area to which access is managed to protect individuals from exposure to radiation or radioactive material.
Radiographic Image - An image produced by a panel of solid state detectors after the radiation from a source has passed through the object being imaged or has been reflected back by it.
S Single Requirement – Some requirement will have only a single parameter value and, when this is the case, these values are thresholds.
T Threshold - The minimum level of operational performance that the Government is willing to accept is considered a threshold value.
Throughput - Number of scans of objects within a defined time.
U V Video Image Capture "snapshot" - Capturing a snapshot or still image of an area or object on a video screen.
W Warranty - Guarantee stipulating repeat failure or collateral damage due to a faulty replacement part or workmanship will be repaired by the Contractor free of charge for a minimum period of one (1) year or more.
Work Completion Form – A unique service ticket or form specific to each vendor or O.E.M.
Work Order – A Government assigned work ticket number that is unique to a specific maintenance event; there is one (1) WO per requested individual activity or reported problem.
X Y Z
Remainder of page left intentionally blank image1.jpg image2.jpeg
File details come from the government source that posted it. Updated .