This document is a Waste Diversion Plan for a federal contract opportunity related to the renovation of a Department of Transportation (DOT) warehouse for the Maritime Administration (MARAD). The plan outlines the anticipated waste diversion targets and methods for various construction materials, as well as a table for converting volume to weight measurements. The related federal contract opportunity is for the renovation of the two-story office area on the East side of the 1930s DOT warehouse for the relocation of MARAD from the Hale Boggs Building. The work includes demolition of interior finishes, partial removal of exterior cladding, and removal of MEP, fire sprinkler, and other systems, as well as new interior finishes, exterior cladding, MEP systems and fixtures, fire sprinklers, and other related systems. This procurement is a 100% Small Business Set-Aside with an estimated construction cost magnitude between $1,000,000 and $5,000,000. The applicable NAICS code is 236220 Commercial and Institutional Building Construction. A site visit is scheduled for July 25, 2024, and the solicitation closing date is August 29, 2024.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

Project Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):Waste Diversion Report (Final) :
Updated 10/25/2023The general info in these gray cells replicates onto the Report tabs.
Project Name:[66518] HB MARAD 2 DOT NDRF, WharfProject Manager:Peter L. LongerichKahua Project # :1996
Project Short Description:Warehouse RennovationPM email or phone:504-239-6509gBUILD Project # :0
Building Number:LA9901Service Center / Field Office:NOLABudget Activity:BA80RWA/PA # :2143350

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
Asphalt50%000n/a
Brick, Masonry, and Tile50%000n/a
Cardboard50%000n/a
Carpet, including Padding50%000n/a
Ceiling tile50%000n/a
Concrete50%000n/a
Drywall/ sheetrock (unpainted)50%000n/a
Metals50%000n/a
Painted wood, drywall, or plywood50%000n/a
Reusable items50%000n/a
Roofing50%000n/a
Soil, Rock, Land Clearing Debris50%000n/a
Wood (unpainted)50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Other: ____________________50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.