Statement of Work – SOW Modular Furniture
This Statement of Work details requirements for the design, delivery, and installation of modular furniture systems at Building 1840, Peterson Space Force Base, Colorado Springs, Colorado. The project involves furnishing a space with new 50" powered panels, 16" stack panels added to existing 66" high panels, powered workstations, and associated components including curved wave corner work surfaces, overhead storage units with LED lights and tack boards, panel-mounted coat hooks, and duplex outlets. All finishes are specified in grade 2 fabrics with metallic paint and wood grain laminate work surfaces. The contractor must be an authorized dealer of specified furniture manufacturers and must provide all electrical connections, disconnections, and infrastructure installation, including licensed electrician services for power disconnects, connections, and wire installation from junction boxes and spider box. Workers must be U.S. citizens with proper identification documentation provided three to five days before site access.
The contractor is responsible for design services including space planning, site verification, material selection, and programming, with design deliverables including basic component floor plans, panel and hardware layout sheets, and furniture power distribution sheets in 1/4" = 1'-0" scale, all due within three business days of initial request with up to two revisions included prior to final approval. All delivery, installation, and removal services are contractor-provided, including transportation, unloading, storage, assembly, and inspection of products for shipping damage. Installation must be performed by manufacturer-certified professionals and completed in accordance with approved design drawings, with all trash disposed of per state law and recyclable materials recycled. Standard site conditions include free and clear access to receiving and installation locations, parking and off-loading areas suitable for semi-trailer access within 100 feet of the building entrance, staging area for sorting and uncrating, electric power and working lights, and a building ready for furniture installation. Customer service must be available during normal duty hours, 0700-1700 Monday through Friday except federal holidays, with all Space Force inquiries responded to within two business days. Contractor personnel must present valid identification at base gates, follow all security guidelines, and comply with OSHA Voluntary Protection Program requirements, National Electrical Code (NFPA 70), and National Life Safety Code (NFPA 101) standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI No. 1 FA251726QA004.pdf | ||
| Amendment 01 FA251726QA004.pdf | ||
| SSJ B1840 Workstations_v3_CM_Redacted.pdf | ||
| Attachment 3 - Parts List.xlsx | XLSX spreadsheet | |
| FA251726QA004 - SSC 1840 Additional Workstations With Clauses.pdf | ||
| Attachment 2- Building 1840 Layout.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Modular Furniture
USSF/SSC Bldg. 1840, RM LO3D
PETERSON SFB, COLORADO SPRINGS, CO 80914
20 August 2025
1.0 Scope
This project will be bid using non-standard and typical configurations. Variation from the typical configuration will be documented in paragraphs below and floorplan. This effort will be awarded on Limited Source Justification (LSJ)
1.1 This project will utilize new 50” powered panels added to support surfaces, 16” stack panels added to existing 66” high panels, new panels, worksurfaces and station components to match existing (66” high with 16” stack) as noted on the drawing, powered workstations per floorplan. Layout and sizes have been established, see attached drawings (PSFB + MCo- Building 1840 L03 Delta Dwg).
Unless noted on drawings, each workstation shall have (1) BBF, (1) FF pedestal, curved wave corner work surfaces, overhead storage units with LED lights/tack boards, panel mounted coat hooks, (3) duplex outlets. Finish shall be quoted in grade 2 fabrics, with metallic paint with wood grain laminate work surfaces. Contractor shall include all electrical connects and disconnections to existing workstations in L-03D, and power/shall include base feeds. Provide powered panels along floor for power distribution and base in-feeds. See Attachment (PSFB + MCo- Building 1840 L03 Delta Dwg). Contractor shall include all electrical connects in LO3D to building power including base feeds and install infrastructure from spider box to j boxes location underfloor.
1.2 The contractor shall be responsible to provide licensed electrician for power disconnects, connections, and installing wire from j boxes and spider box as needed.
1.3 Project is located is in Bldg. 1840, Peterson AFB, CO 80914.
1.3.1 Workers must be US citizens and the company will have to provide a listing of workers including full name, ssn, place of birth, and citizenship on a signed memo 3 days before the visit.
1.3.2 If the company needs assistance getting on to PSFB, a listing of personnel including Full Name, Date of Birth, Driver’s License Number, and Issuing State of DL no less than 5 days before entering the installation.
1.4 Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions/field measurements/electrical requirements as well as any specific programming needs of the customer prior to placing order. Even with Space Force efforts to standardize furnishings under this program, design work after evaluation of proposals will reveal that the number of cubicles is custom finishes and custom sizes. It is understood that the actual site parameters or certain customer requirements will deviate from the standard typical layouts;
therefore any deviation that causes an increase in the price submitted during the bid process must be documented in writing and submitted to the Contracting Officer for review, along with a floor plan reference to show just cause. A final furniture layout and Bill of Materials (BOM) will then be provided that meets the customer requirements and accommodates the physical environment.
Design parameters and expectations are followed in Section 3.2.
See Attachment (PSFB + MCo- Building 1840 L03 Delta Dwg) for a plan view and isometric layout of each workstation, along with a description of sizes and components included.
2.0 Description of General Services
2.1 Coordination and management of all new product, equipment and people required to create, deliver and install new systems and modular furniture within an Space Force location. This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.
2.2 The contractor shall perform tasks on Systems/Modular Furniture in accordance with the requirements stated in this section.
2.3 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install systems and modular furniture.
2.4 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Statement of Work (SOW).
2.5 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.
2.6 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer (CO) within 10 days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.
2.7 The contractor shall provide a Project Manager responsible for project site management, scheduling, coordination and technical assistance to the Space Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.
2.8 All contractors shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state identification, to meet local Space Force security requirements. (Please note that many installations require this information be coordinated days in advance).
2.9 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.
2.10 The contractor shall be an authorized dealer of the specific Systems and Modular furniture manufacturers specified on the project.
2.11 The vendor shall manage ordering, shipment, delivery and installation of all new furniture from manufacturer to final acceptance by the designated Government Acceptor.
2.12 The contractor shall provide customer service during normal duty hours, 0700-1700 hours, Monday through Friday; except for federal holidays.
2.13 Recognized US Federal Holidays are as follows: New Year’s Day, Martin Luther King Day, Presidents Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.
2.14 When the contractor desires to work other than standard times, a written request shall be submitted to the Facility Manger and Government Acceptor for approval. Written approval from the Contracting Officer must be received before proceeding with the work.
The request shall be submitted at least five (5) workdays prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.
2.15 The contractor shall provide alternate work locations for employees or allow employees to take vacation during designated Government non- workdays or other periods where government offices are closed.
2.16 All Space Force inquiries shall be responded to by a contractor representative within two business days.
2.17 Meetings may periodically be held between top level base personnel and contractor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.
2.18 Vehicle registration, proof of insurance and a valid driver’s license shall be presented to gain base access.
2.19 The contractor shall be responsible for coordination of an escort through any controlled areas through the assigned Facility Manager and Government Acceptor.
2.20 Lost vehicle and entry passes shall be reported immediately to the Security Police as well as the Government Acceptor in accordance with the local security forces policy.
2.21 The contractor shall be responsible for any storage of all new systems/modular/demountable wall furniture, components, parts and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.
2.22 The contractor shall maintain continuity between the support operations at Peterson AFB and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract.
The contractor shall, as a minimum, maintain a single point of contact for this effort to be available in person to Facility Manager (Mr. Dave Clarke CTR) at Bldg. 1840, during the same business day.
2.23 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
3 Design Services
Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.
3.1 Following award, within parameters specified below, a complete design that takes into account site condition considerations, as well as information gathered during initial customer review, shall be provided.
3.2 The contractor shall be able to provide design services, including space planning, site verification, material selection and programming as necessary for each project.
3.3 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to: reproduction machines, plotters, paper, pencils, fax machines, and office furniture.
3.4 The contractor shall be responsible for collection of information relevant to the design of a space. Examples could include personnel interviews, questionnaires and walk-through inspections of the facility.
3.5 Services shall include site evaluation to ensure proper fit of the new furniture within the given space and that all structural and other anomalies are taken into account.
3.6 The contractor is responsible for notifying the Facility Manager/Government Acceptor of all power requirements regarding location of communication, LAN and power junction boxes. Power connection to building power & furniture will be required by the contractor.
3.7 Power poles shall not be used in this project. Power will be ran under the raised floor or connected using existing systems.
3.8 Work shall comply with applicable building standards and codes, specifically: National Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).
3.9 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.
3.10 Design shall not allow more than four cubicles to be served by a single circuit.
3.11 Design shall ensure that no more than two triplex outlets (six plug in points) are put onto the same circuit.
3.12 Design shall ensure that no existing floor electronic box or thermostats are covered or concealed by panels or other systems furniture components.
3.13 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by, qualified professional Interior Designers.
3.14 The contractor shall meet with the Government Acceptor and/or Government Project
Manager and Facility manager to review the installation drawings prior to submission of a final price quote and finalize finishes.
3.15 The contractor shall provide additional drawings of furniture layouts, if requested by base organizations on a non-rewritable CD or DVD in both .dwg and .pdf formats unless otherwise specified in the contract.
3.16 The hardware/software shall perform computerized inventory, computer aided design, automated take-off function, and report generation for all product purchased. The software for this contract shall be compatible software for AutoCAD and Micro station. The software shall be fully compatible with Microsoft Windows, the most current version.
3.17 Design service shall include an initial complete design with up to two additional revisions prior to final approval.
3.18 Designs of each location shall include a Basic component floor plan sheet in which all systems furniture and workstation is tagged: to include graphic symbols for all major hanging components (flipper cabinets, shelves, task lights, tack boards, work surfaces, drawers, etc.) as determined by the government. This design sheet shall include station numbers and movable wall and associated product locations, in 1/4" = 1'- 0" scale.
3.19 Designs of each location shall include a Panel and Hardware Layout sheet: to include all finish colors and fabrics, panel widths (30", 36", 42", etc.), in 1/4" = 1'0" scale, in addition to display hardware, keys and locksets shall be included.
3.20 Design sheet layouts of each location shall include a Furniture Power Distribution sheet in 1/4" = 1'0" scale to include: the location of all new powered panels, powered components, receptacles, communication ports, power poles, powered raceways, base electrical feeds and building connection points.
3.21 Design/redesign timelines shall be expected:
3.22 Design sheet layouts for all phases of design (initial, revisions and final) of 1-19 workstations, conference area, and ancillary areas shall be received within 3 business days unless otherwise directed in the contract.
3.23 Within ten (10) workdays after the final design has been accepted by the base requesting organization, a bill of materials detailing all new inventory, and (3) copies of all plans including basic floor plan, movable wall, panel and electrical layouts will be provided to the Government Acceptor and Facility Manager for the project.
3.24 The contractor shall maintain an updated, automated master copy of all furniture layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.
3.25 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected drawing and bill of materials shall be delivered to the government within three calendar days of the request.
3.26 Contractor shall provide the Government Acceptor a copy of the installation drawings and bill of materials via mutually agreed upon electronic media.
3.27 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.
3.28 Design shall conform to the parameters established in the Architectural Barriers Act regarding accessibility of persons with disabilities.
4. Product Markings/Documentation/Tools
Items used after product acceptance used to identify or modify a particular product.
4.1 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the Government Acceptor and/or Government Project Manager upon completion of the installation.
4.2 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the Government Acceptor and/or Government Project Manager prior to final Government acceptance of products and services.
5. Delivery Services
5.1 Transportation of all new products, loading, unloading, storage and all necessary movement from factory to final onsite set up.
5.2 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries of their product, to include access to and operation of any equipment needed for unloading and movement of materials or product.
5.3 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non- existence of loading docks and equipment at any given location. Special circumstances may be identified by and negotiated with the Contracting Officer.
5.4 Delivery shall be in accordance with the terms of the contractor's agreement. If the ordering activity designates an accelerated delivery schedule it will be identified in the contract.
5.5 A maximum of 30 days storage for new products shall be included in the contractor's agreement.
5.6 Work shall comply with applicable building standards and codes, specifically: National Electrical Code (National Fire Protection Association (NFPA 70) and National Life Safety Code (NFPA 101).
5.7 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
5.8 The contractor shall maintain accountability and control of any keys provided and shall return them to the Facility Manager and or Government Acceptor upon completion of work. Duplication of keys or other means of access is not authorized.
5.9 The contractor shall prevent its personnel from entering any area other than the designated work area.
5.10 The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.
5.11 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.
6. Installation and Removal Services
Manufacturer certified professionals to install systems and modular furniture per the approved design drawings.
6.1 Each dealership shall be able to provide, or capable of obtaining support services to include removal and warehousing of the proposed systems furniture and demountable walls.
6.2 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the Facility Manager and/or Government Acceptor and/or Government Project Manager.
6.3 The contractor representative shall meet with Facility Manager and/or Government Acceptor and/or Government Project Manager to review the installation drawings prior to installation.
6.4 The contractor shall install new systems and modular furniture in accordance with each requirement statement and basic component floor plan, panel plan and electrical plan, designed and provided by the contractor with each purchase.
6.5 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.
6.6 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes but will be responsible to pay for damages. The government will make repairs and back charge the installation contractor.
6.7 The contractor shall uncrate/unpack all new items and perform required assembly in accordance with the manufacturer instructions.
6.8 Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the authorized government representative and make all arrangements for replacement or repair of the item(s) damaged. Damaged items are not to be installed unless otherwise directed by the Facility Manager and Government Acceptor.
6.9 Services shall include assembly of new product to conform to final Space Force approved design drawings.
6.10 Any furnishings attached to the building shall be attached securely.
6.11 Installation of new systems and modular furniture must be under the oversight of an onsite manufacturer certified installer.
6.12 The contractor shall ensure that all communication outlet faceplates are provided with the new furniture and accommodate a standard RJ45 quad port or fiber-inserts that will be provided by the local communications group or general contractor.
6.13 Services shall include removal of packing materials from the installation.
6.14 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled where ever possible.
6.15 The contractor shall maintain environmental controls when working in any Space Force facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.
6.16 Light fixtures shall have appropriate lamps and be in working order.
6.17 Prior to acceptance, the contractor shall clean all new furniture only with the manufacturer's recommended cleaning agents/products.
6.18 The contractor shall provide all new components, completely assembled, installed, and operational, including keys in each lock set.
6.19 New furniture, equipment, and accessories shall be level, square, and in proper alignment with adjoining furniture. All drawers should operate smoothly and stay closed when not in use.
6.20 The contractor shall inspect to ensure the new furniture is free of surface dirt and defects, the installation is complete, and the new furniture is ready for use.
7.0 Inspection/Acceptance Checklist
Validation between the contractor and the Facility Manager and/or Government Acceptor that all products have been installed according to manufacturer guidelines and customer specifications.
7.1 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and Facility Manager and/or Government Acceptor and/or Government Project Manager.
7.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the authorized government representative upon completion of a joint walk through by the contractor and authorized government representative.
7.3 A final walk through will be performed with the contractor and Facility Manager and/or the Government Acceptor and/or Government Project Manager to ensure all punch list items have been addressed to the satisfaction of the Government Acceptor.
8.0 Product
8.1 Monolithic Panels and Components
The contractor shall supply all monolithic panel system parts and components needed to fulfill a complete office as conforming to the floorplan accompanying this SOW.
8.2 Modular Furniture
The contractor shall supply a modular furniture product sufficient to satisfy requirements of the workspaces shown.
9.0 Voluntary Protection Program (VPP)/Safety
12.1 Voluntary Protection Program: The Space Force is part of the AOSHA VPP. All contractors are required to familiarize themselves with the requirements of the
VPP. Information on VPP can be accessed at http://www.osha.gov/desp/vpp/index.html.
10.0 Base/Installation Specifics
10.1 All commercial trucks must enter through East Gate, which is off Marksheffel Rd. for inspection. In accordance with the Installation Peterson SFB entry procedures must adhere to delivery vehicle process requirements mandated by the Wing. Once at East Gate, the driver must have a current pass/bill of lading. Bldg. 1840 located at 130 Paine St, Peterson SFB, CO 80914. Directions from East Gate follow Stewart west towards main base, left on Peterson Blvd. left on Paine to 1st parking lot entrance into Bldg.
1840.
• A current Vehicle Registration
• A current Proof of Insurance
• A valid and current Driver's License for the driver
• A valid and current Driver's License or other State Identification for any passenger(s) in the vehicle.
10.2 Gate Procedures:
• Once at East Gate, be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.
• If the final destination requires the driver to leave through East Gate and re- enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.
• Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.
• This procedure will occur each time a commercial truck requests access to the base.
10.3 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).
10.4 Personnel should the following items when entering an installation:
• Current Registration for all vehicles
• Current Proof of Insurance for all vehicles
• Valid driver’s license for each driver
• Valid driver’s license or other state identification for each passenger http://www.osha.gov/desp/vpp/index.html
• Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at Pass & ID, West Gate Visitor Center Bldg. 1329.
• The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government POC prior to their arrival so as to coordinate the arrival time accordingly. Sponsors may request that a pass be applicable for multiple days if needed.
10.5 Mission Essential Services: Contractors are not considered mission essential.
10.6 Prohibitions: Firearms may not be brought on base under any circumstances.
Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.
11.0 Site Conditions
1 1 . 1 Standard site conditions shall be considered those that include:
11.1.1 Free and clear hard surface access to the receiving and installation location during regular working hours
11.1.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area
11.1.3 Threat condition level of the base is Alpha. This requires dealer personnel to get base access in order to complete the product installation
11.1.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials
11.1.5 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor
11.1.6 Current and correct CAD drawings of the building shell not necessary
11.1.7 A building ready for the installation of furniture (i.e. other tasks such as painting and flooring are complete so as not to cause any delays in performance)
11.2 Contractor shall notify the Contracting Officer of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price
| 1.0 Scope |
| 2.0 Description of General Services |
| 3 Design Services |
| 4. Product Markings/Documentation/Tools |
| 5. Delivery Services |
| 6. Installation and Removal Services |
| 7.0 Inspection/Acceptance Checklist |
| 8.0 Product |
| 8.1 Monolithic Panels and Components |
| 8.2 Modular Furniture |
| 9.0 Voluntary Protection Program (VPP)/Safety |
| 10.0 Base/Installation Specifics |
| 11.0 Site Conditions |