This Statement of Work details HVAC repair and replacement services for the Angeles National Forest (ANF) across four locations: Oak Flat Fire Station, Bear Divide Fire Station, Acton Work Center, and Angeles NF Supervisors Office Headquarters. The project involves replacing aging HVAC systems that are compromising air quality and staff comfort, with specific requirements including installing new rooftop package units, mini-split systems, and repairing a Carrier rooftop package unit. The contract has a 100-day performance period, with most work anticipated to be completed promptly after the Notice to Proceed.
The scope of work includes detailed specifications for each location, such as installing 2-ton to 4.5-ton packaged rooftop units with 17 SEER2 efficiency, removing and recycling existing units, performing electrical connections, and ensuring proper system functionality. The project requires adherence to National Electrical Code, Environmental Protection Agency standards, and Los Angeles County building codes. The Service Contract Act applies to wages, and the procurement is set aside for 100% small businesses with a NAICS code of 238220 and a small business size standard of $19M.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Photos of Units for all locations.zip | ZIP file | |
| Sign In Sheet.pdf | ||
| Amendment to Solicitation 127EAT25Q0031.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Acton Unit (Item 0004).JPG | JPG image | |
| Acton Unit (Item 0004) Up Close.JPG | JPG image | |
| Wage Determination 2015-5613 Rev 29.pdf | ||
| Solicitation 127EAET25Q0031.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
2025 ANF HVAC REPAIRS AND REPLACEMENTS
SCOPE OF WORK
Contents
PROJECT TITLE
PERIOD OF PERFORMANCE
BACKGROUND
PROJECT LOCATIONS
PROJECT OBJECTIVES
CODES AND STANDARDS
PROJECT SITES CLEANUP
PREVAILING WAGES
SAM REGISTRATION
MAPS
PROJECT TITLE
ANGELES NATIONAL FOREST HVAC REPAIRS AND REPLACEMENTS
PERIOD OF PERFORMANCE
The Contractor will have 100 days to complete the work.
** While the contract Period of Performance (POP) is established at 100 days, the primary scope of work is anticipated to be completed promptly following the issuance of the Notice to Proceed (NTP). The 100-day period is intended to provide sufficient lead time for the replacement of Item 004 on the contract list. Work associated with Item 004 shall be completed without delay upon receipt of the required part.
BACKGROUND
The Angeles National Forest (ANF) needs services for the aging HVAC systems that are well beyond their operational life. The units are failing and are compromising the air quality and comfort of the staff. The work being requested is to replace and/or repair the existing HVAC systems at the following locations.
PROJECT LOCATIONS
Item 002 – Oak Flat Fire Station 38001 Golden State Hwy Castaic, CA 91384
GPS: 34.5987, -118.7227
Item 003 – Bear Divide Fire Station Item 005 – Angeles NF Supervisors Office 21501 N Sand Cyn Rd Headquarters Canyon Country, CA 91387 701 N Santa Anita Ave GPS: 34.3595, -118.3967 Arcadia, CA 91006
GPS: 34.1473, -118.0328
**Item 004 – Acton Work Center 33708 Crown Valley Rd Acton, CA 93510
GPS: 34.4944, -118.1978
PROJECT OBJECTIVES
Item 002 – Oak Flat Fire Station The scope of work outlines the services and materials that are to be provided by the contractor for the replacement of the existing rooftop package unit with a modern in-kind replacement or equivalent unit:
• One (1) new 2-ton, 17 SEER2, 208/230V, packaged rooftop unit
• Install new electrical disconnect and fuses.
• New curb adapter
• Provide and install all necessary materials for the connection of electrical, control wiring, and condensate drain lines.
• Recovery and proper recycling of existing refrigerant from the existing rooftop unit.
• Provide crane services for the removal of the old rooftop unit for proper California EPA recycling and disposal.
• Provide crane services for the placement of the new packaged rooftop unit onto the rooftop pad
• Connection of electrical and piping to the new unit.
• Start up and test all new equipment to ensure proper operation and functionality.
Item 003 – Bear Divide Fire Station The scope of work outlines the services and materials that are to be provided by the contractor for the replacement of the existing rooftop package unit with a modern in-kind replacement or equivalent unit:
• One (1) new 4.5-ton or higher capacity, 17 SEER2, 208/230V, packaged rooftop unit
• New Plenums and Transitions, if necessary.
• Install new electrical disconnect and fuses
• Provide and install all necessary materials for the connection of electrical, control wiring, and condensate drain lines.
• Recovery and proper recycling of existing refrigerant from the existing rooftop unit.
• Provide crane services for the removal of the old rooftop unit for proper California EPA recycling and disposal.
• Provide crane services for the placement of the new packaged rooftop unit onto the rooftop pad
• Provide and install all necessary materials for the connection of electrical and piping of the new unit.
• Start up and test all new equipment to ensure proper operation and functionality.
Item 004 – Acton Work Center The work below outlines the services and materials that are needed for the repair of the Carrier rooftop package unit:
• Recovery and proper recycling of the existing R-410A refrigerant.
• Remove and replace the failed compressor and the existing filter drier from the unit with an in-kind replacement.
• Evacuate the system to a vacuum level below 500 microns.
• Pressure test the system with nitrogen.
• Charge the system with new R-410A refrigerant to the manufacturer’s recommended specifications.
• Test and operate the system to ensure proper function.
Item 005 – Angeles NF Supervisors Office Headquarters The work below outlines the services and materials that are needed for the replacement of the existing ‘mini-split’ ductless HVAC system or equivalent unit:
• One (1) new 1.5 Ton, 17 SEER2, 208/230V, Mini-Split Outdoor Heat Pump Unit
• One (1) new 1.5 Ton, 17 SEER2, 208/230V, Mini-Split Indoor Wall Unit
• Remove and properly dispose the existing outdoor and indoor units.
• Recovery and proper recycling of the existing refrigerant and line set.
• Replace and install all necessary materials for the connection of electrical, communication wire, control wiring, condensate drain lines, and all other mechanical/electrical connections.
• Install new electrical disconnect, fuses, and wiring for the outdoor unit.
• Install all the necessary mounting hardware for indoor and outdoor units.
• Proper disposal and recycling of all removed equipment, refrigerant, and materials
• Charge the system with new refrigerant to the manufacturer’s recommended specifications.
• Test and operate the system to ensure proper function.
Contractor shall modify the inlet and outlet transition ducts as required to accommodate the new equipment. Dispose of old equipment and properly dispose of in accordance with EPA requirements.
Recover and recycle old refrigerant from existing condenser unit. New ducts shall be insulated properly.
Contractor shall flush out existing cooper lines, provide all equipment and supplies, transportation, labor and parts. Perform all electrical connections to Code. Load system with refrigerant per Manufacturer Specifications, start up, test and balance system.
All work performed shall adhere to the industry best practices for HVAC installation, repair, and service, executed in a good and workmanlike manner in compliance with all applicable codes and specifications.
CODES AND STANDARDS
Work performed under this section shall meet the requirements of the most current edition of the National Electrical Code, Environmental Protection Agency, and the Building code for the County of Los Angeles.
PROJECT SITES CLEANUP
Project site cleanup includes the removal and proper disposal of all construction trash, debris and residue off National Forest Land. All spills of petroleum products including leak spots from parked vehicles shall be removed and properly disposed according to all local, State, and Federal laws and regulations governing such disposal. If needed during the performance of the work, the Contractor shall be required to furnish dumpsters or other trash receptacles and to empty such containers either as they become full or weekly, whichever is more frequent. The Contractor shall not place materials of any kind into private or Government trash bins or dumpsters.
PREVAILING WAGES
Service Contract Act shall apply to wages on this contract.
SAM REGISTRATION
MAPS
| PROJECT TITLE |
| PERIOD OF PERFORMANCE |
| BACKGROUND |
| PROJECT LOCATIONS |
| PROJECT OBJECTIVES |
| CODES AND STANDARDS |
| PROJECT SITES CLEANUP |
| PREVAILING WAGES |
| SAM REGISTRATION |
| MAPS |
File details come from the government source that posted it. Updated .