This statement of work outlines the inspection and repair of the HVAC system at the Heritage Center in Yellowstone National Park. Key tasks include inspecting and repairing the HVAC system components including air handlers, heat pumps, boilers, cooling towers, and generators. The contractor will upgrade the humidification system, install a new web server to provide open access to the building automation system, relocate cooling tower lines, and inspect and service all HVAC equipment. As an option, the contractor may remove an underground water storage tank if additional funding is provided. The work must be completed within 90 days of the notice to proceed. The related federal contract opportunity is solicitation number 140P1423R0004 issued by the National Park Service Intermountain Region to perform inspection and repair of the HVAC system at the Heritage Center.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

Project Description / Summary Objectives Background Specific Work / Tasks Optional Work / Tasks Government Furnished Equipment / Materials / Other Special Conditions / Requirements Place of Performance Performance Period / Schedule Requirements

PROJECT DESCRIPTION / SUMMARY:

The primary work of this project includes but is not limited to inspect and repair as per the original manufacture procedures and instructions of a commercial building automated HVAC system . The commercial HVAC system located at the Heritage Center in Gardiner Montana. The HVAC system is a Heat Pump, humidifier/dehumidifier, heated water system with air handler. The project includes a cooler tower upgrade, humidification system upgrade, Operator front end access to the Building Automation System, (BAS new web server), and heat pump upgrades. The work shall include as an option line, the excavation, and removal of an underground water storage heat transfer tank.

The contractor shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation and other items and non-personal services necessary to provide HVAC services in accordance with this Performance Work Statement (PWS) except as those items specified as government furnished property and services. The contractor shall perform to the standards in the contract as well as all local, state, and federal regulations.

Compliance:

The contractor shall be fully responsible for compliance with all, local, state, and Federal environmental/occupational safety laws, rules and regulations. The contractor shall follow life and safety codes and take necessary actions to avoid conditions that may be hazardous to the health and safety of museums personnel and artifacts. The contractor is responsible for meeting all applicable OSHA and Federal guidelines for safe working processes; example: lockout/tagout. All work for the duration of the contract shall be performed by trained technicians.

1.0 OBJECTIVES:

The objective of this contract is to inspect and repair the HVAC system , provide full front-end access to the BAS system and repair, upgrade of nonfunctioning components.

The awarded contractor shall inspect, repair, replace and perform initial startup (commissioning is required)

2.0 BACKGROUND:

The HVAC system is greater than 20 years old with no current system upgrades. Components are failing and front-end access requires a new web server for NPS technician to access the controls. The building is critical to the preservation of YNP artifacts and requires numerous components to function properly. The HVAC system includes Air handlers, humidity controllers and heat exchangers/pumps.

3.0 SPECIFIC WORK / TASKS:

1. Humidification system inoperative (5 each unit)

2. NPS service technicians do not have front end access to MTI proprietary system. The project requires the install of a new Web Server with nonproprietary characteristics.

3. Inspection of the BAS system (building automation system) to move from a proprietary system to a non-proprietary fully automated system with full remote access by NPS service technicians (install a new web server)

4. Web Server Front End (Qty 1)

5. Tridium Niagara web server ▪ Includes 5 years of software update subscription

6. Install a Graphics, trends & alarms

7. The new BAS system shall include an open license for non-proprietary access On-site training for the web server with a 1-year warranty

8. Provide an inspection report of all components of the HVAC system deficiencies

9. Relocate cooling tower lines (supply and return lines). The old lines shall be rerouted above grade and this task may require concrete boring.

10. All exterior piping shall be insulated in kind and equipped with thermal protection (heat tape)

Follow manufacturers recommendations the awarded contractor shall perform a service on the HVAC system.

Items requiring service: (including but not limited to)

· Draft fan and Variable Frequency drive control unit

· Cooling fan, motor, and belts

· Electrical equipment

· Spray pump: pump, motor

· Piping, spray headers & nozzles

· Tower media

· Tower sump basin

· Tower discharge dampers

· Sump heater

· Chemical treatment system

· Piping heat trace system

· Air handling unit (Qty 1)

· Boiler system (Qty 1)

· Cooling tower system (Qty 1)

· Heat pumps (Qty 25) ▪ Including 5 with humidity devices

· Emergency generator (Qty 1)

· Inspection report of deficiencies

· Refurbish cooling tower

Generator inspection – 100-hour service:

a) Load Bank Testing – Generator is placed under load for a period of time using an external load bank tester.

b) Confidence Test – Generator is placed under load for a period of time using facility as a load.

c) Fluid Analysis – Lubricating oil, and coolant analysis performed by laboratory.

d) Drain lubrication system – change filters and oil.

e) Drain coolant – change coolant filters and coolant.

f) Replace air filters.

4.0 OPTIONAL WORK / TASKS:

Funding dependent for option line

· The below grade thermal 5000-gallon freshwater storage tank has an external leak between the tank and isolation valves (Tank is to be removed and disposed of). Excavation site is to be completed with the removal of the tank, cap the lines, and backfilled to grade.

· All Tank system lines to be mechanically capped

· The requirement is to remove the tank fill the excavation site with government provided soil and mechanically cap all lines.

5.0 GOVERNMENT FURNISHED EQUIPMENT / MATERIALS / OTHER:

The Government shall provide all backfill material for the dirt work removing the underground storage tank. If the option line is funded

6.0 SPECIAL CONDITIONS / REQUIREMENTS:

· Due to the sensitive and historic contents located within this structure. The building requires NPS staff present for all work to be performed.

7.0 PLACE OF PERFORMANCE:

Heritage Center HVAC location: Yellowstone National Park Heritage Center Building 20 Old Yellowstone Trail Road Gardiner MT 59030

8.0 PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:

The Period of performance after Notice to Proceed 90 days image1.png