Repair of 2 Radiators on Standby Generators
Solicitation number
1232SA25Q0114
Issued by

About this file

This Statement of Work (SOW) details generator radiator repair services for the U.S. Horticultural Research Laboratory in Fort Pierce, Florida. The project involves repairing radiators on two Kohler standby generators: a 1000 KW generator located at the research laboratory and a 750 KW generator located at the research farm. The generators are critical to the facility's research mission and hurricane preparedness, with a recent example highlighting their importance during Hurricane Milton in October 2024.

The scope of work requires the contractor to perform comprehensive radiator repairs, including draining and disposing of old coolants, removing radiators, re-coring them in a professional shop, reinstalling them, replacing cooling system components, refilling with manufacturer-specified coolant, and testing generator operation. Key deliverables include scheduling repairs for each generator, reporting completion to the Contracting Officer's Representative (COR), and performing work during regular weekday hours. The contractor must provide qualified technical staff, adhere to OSHA safety standards, and be responsible for travel expenses and on-site sanitary facilities. The service will be performed within 60 days after receipt of order, with the 1000 KW generator repair being the priority.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Generator Radiator Repairs for:

U.S. Horticultural Research Laboratory

2001 South Rock Road

Fort Pierce, FL 34945

Project:

Repair of radiators on two (2) standby generators at U.S. Horticultural Research Laboratory

General Information

1.0 Scope of Work:

The Contractor shall provide complete radiator repair service to the following:

(1) Standby Kohler, 1000 KW, Model # 1000ROZD, Serial # 397465 Located as the U.S. Horticultural Research Laboratory, 2001 S. Rock Road, Fort Pierce, Florida 34945

(1) Standby Kohler, 750 KW, Model# 750ROZD, Serial# 396917 Located at the USHRL Research Farm, 10000 Picos Road, Fort Pierce, Florida 34945

2.0 Background

The Government conducts routine inspections on critical building equipment. During a recent inspection, they found that the generator engine radiator core on two standby generators has deteriorated and leaking coolant. These generators are vital to the research mission of the U. S.

Horticultural Research Laboratory and are a key component of the hurricane preparedness plans. These plans are not abstracts or “just in case” scenarios, on October 9, 2024, Hurricane Milton spawned an EF3 tornado that traveled 18-miles through the area and passed within 100 yards of the U.S. Horticultural Research Laboratory, destroying much of the electrical infrastructure in the area. The 1000 KW generator ran for four days after the storm had passed thereby saving hundreds of thousands of dollars’ worth of research samples and sensitive scientific instruments.

Contractor Requirements

3.0 Technical Requirements / Tasks

Repair services provided must be in accordance with specifications herein listed and industry standards.

Repair service shall be performed by qualified service technicians.

During the course of their work, Contractor shall rigorously adhere to all applicable safety standards under OSHA 29 CRF 1910.

The following tasks will be performed:

1. Contractor technicians will travel to both locations

2. They will drain and properly dispose of old coolants from both generators

3. Radiators will be removed from their generator housing and transported to a shop designed to professionally complete the radiator re-coring process.

4. Radiators will be re-cored and reassembled

5. Contractor technicians will travel to locations and reinstall radiators.

6. All cooling system hoses, clamps, and radiator caps will be replaced.

7. Cooling system will be refilled with the manufacturer specified amount of new coolant.

8. Contractor technicians will run the generator to operating temperature to test for leaks and to confirm proper operation.

9. Contractor is responsible for safe and legal disposal of all repair debris.

4.0 Government Furnished Equipment

Government shall furnish no equipment other than utilities for the generator. Contractor shall be responsible for sanitary facilities while on-site.

5.0 Deliverables / Schedule

Key Deliverables

Item No. Deliverable Objective Due 1 Schedule Radiator

Repair on 1000KW generator

This generator is a priority. Contractor will provide a schedule of what week generator will be down for repair

No later than five (5) business days after contract award

2 Radiator Repair on 1000KW generator

Report completion of this repair to USHRL COR and FSE

Upon completion of the operation test of generator

3 Schedule Radiator Repair on 750KW generator

Contractor will provide a schedule of what week generator will be down for repair

No later than five (5) business days after the completion of 1000KW generator repair

4 Radiator Repair on 750KW generator

Report completion of this repair to USHRL COR and FSE

Upon completion of the operation test of generator

6.0 Travel

Any travel expenses incurred by Contractor must be included in the proposal.

7.0 Contractor’s Key Personnel

Contractor shall supply qualified technical staff to service the listed generators to industry standards.

8.0 Security Requirements and Work Schedule

Service shall be performed by the Contractor during regular weekday, daylight working hours (excluding holidays). During work period, Contractor will be given site access and issued a temporary contractor’s key badge. Contractor shall return any key badges assigned to them upon completion of repairs.

9.0 Data Rights

No data rights assigned to this contract.

10.0 Section 508 – Electronic and Information Technology Standards No IT resources assigned to this contract.

Project:
General Information
1.0 Scope of Work:
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished Equipment
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements and Work Schedule
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards

File details come from the government source that posted it. Updated .