Attachment 1- Statement of Work Flooring 1643 20260313.pdf

PDF 1 MB Posted

Attached to
B1643 Flooring Federal contract opportunity
Solicitation number
FA930226Q0017
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This is a Statement of Work (SOW) for carpet removal and installation of vinyl plank flooring at Building 1643, Edwards Air Force Base, California, dated March 11, 2026.

The contractor must remove existing carpet and install Gerflor brand Creation 70 Clic Wild Oak vinyl plank flooring (product number 60090359) in highlighted areas totaling approximately 7,368 square feet across three sections (3,310.32 sq ft, 3,566.44 sq ft, and 491 sq ft). The government furnishes the flooring material only; the contractor provides all labor, tools, equipment, materials, supervision, and transportation. Work includes lifting modular furniture during installation and installing new cove base. The period of performance shall not exceed 30 days, with work conducted Monday through Friday from 06:30 to 15:30 hours, and optionally on weekends and federal holidays during the same hours. The contractor must provide a written cost estimate within three business days of a site visit with the Facility Manager (Curtis Peltier, 661-275-7763), and all deliveries must be coordinated with the Facility Manager. The government will inspect deliverables within two workdays of receipt. Work must minimize disruption, control dust and debris, and maintain clean premises with all debris removed outside Edwards AFB in accordance with environmental regulations.

The contractor must comply with extensive requirements including OSHA safety standards, environmental protection measures, hazardous materials management, security protocols requiring background checks and base access credentials, personnel requirements (U.S. citizens, English-speaking), contractor uniforms with company identification, and vehicle registration with insurance. A Safety and Health Plan must be submitted within 10 days of award. Environmental minimization measures address air quality, emissions standards, hazardous waste disposal, asbestos and lead management, recycling programs, and natural resources protection (desert tortoise awareness). The contractor must maintain operations security (OPSEC) training completion within 90 days and comply with all federal, state, and local regulations.

View the file

Other files for this federal contract opportunity

Other files attached to B1643 Flooring, newest first.
File Type Posted
FA930226Q0017 QA.pdf PDF
Attachment 3- B1643 Dimensions.pdf PDF
Attachment 2- Wage Determination Kern County.pdf.pdf PDF
Solicitation - FA930226Q0017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

CARPET REMOVAL, INSTALLATION OF PLANK FLOORING

AT

Building 1643 Edwards, Air Force Base CA

11 March 2026

Page 1/24

FLOORING REMOVAL, INSTALLATION AND REPAIR

BLANKET PURCHASE AGREEMENT (BPA)

SERVICES

Table of Contents

1.0 SECTION I: DESCRIPTION OF SERVICES

1.1 General

1.2 Background

1.3 Inherently Governmental Function

1.4 Period of Performance

1.5 Place of Performance

1.6 Specific Tasks

1.7 Deliverables

2.0 SECTION II: GOVERNMENT FURNISHED PROPERTY and SERVICES

2.1 Utility Conservation

2.2 Emergency Medical Services

2.3 Security Police and Fire Protection

2.4 Utilities

3.0 SECTION III: GENERAL INFORMATION

3.1 Hours of Operation

3.2 Contractor Personnel

3.3 Environmental Protection

3.4 Security

3.5 Regulations

3.6 Physical Security

3.6.1 Opsec

3.7 Safety

4.0 SECTTION IV MISCELLANEOUS

4.1 Continuation of Essential DoD Contractor Services During Crisis

4.2 Safety and Health Standards

4.3 Freedom of Information Act (FOIA)

4.4 Controlled Unclassified Information (CUI).

4.5 Notification of Debarment/Suspension Status

4.6 Correspondence

4.7 Post award Conference

4.8 Records

4.9 Hazardous Materials

4.10 Inclement Weather

5.0 Appendix 1 Facility 1643 layout

Page 2/24

SECTION I

1.0 DESCRIPTION OF SERVICES

1.1. General. This is a non-personal services agreement to provide carpet removal, and installation of vinyl plank flooring as shown in highlighted areas in Facility 1643 as shown in attachment 1. The government shall not exercise any supervision or control over the contractor employees performing the services herein. Such contractor employees shall be accountable solely to the contractor who, in turn is responsible to the government.

The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks under this contract. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. Additionally, under no circumstances shall the Government direct the purchase of materials or equipment on this contract.

Purchases should be made at the discretion of the Contractor for contractual needs covered by the work to be performed as outlined in the Statement of Work (SOW). It shall be the responsibility of the Contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services, and additionally to ensure that material/equipment purchases are made in accordance with this SOW. If the Contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the Contractor’s responsibility to notify the Contracting Officer (CO) immediately. Additionally, it is the Contractor’s responsibility to report to the CO all inappropriate direction by the Government to procure materials/equipment to which the Contractor does not have direct use for on this contract. Such contractor employees shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1.1. Description of Services/Objectives. The contractor shall provide all management, personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform carpet removal and vinyl plank flooring installation and repair to include new cove base as defined in this SOW except for those items specified as Government Furnished Property and services. No moisture testing of existing flooring or slab is required or allowed. The contractor shall perform to the standards in this contract. This includes the planning, coordination, and surveillance of the activities necessary to ensure disciplined work performance and timely resources application to accomplish all tasking under the contract. The contractor shall perform lifting of modular furniture when installing vinyl flooring. The contractor shall be responsible for maintaining communication with the contracting officer (CO) and the Government Project Manager (GPM), and to immediately notify both the CO and the GPM of any problems that would prevent timely performance of this contract. The contractor is responsible for and required to implement, and maintain management control systems necessary to plan, organize, direct, and control all activities under this contract.

At the time of the award and throughout the entire period of performance, the contractor shall have and maintain all necessary certifications and/or licenses to complete any and all work as directed in this SOW.

1.2. Background. All work shall be accomplished in accordance with industry standards, base design standards and commonly accepted commercial practices.

1.3. Inherently Governmental Function. The contractor shall not perform inherently governmental functions as defined in FAR Subpart 7.5 in relationship to this SOW.

1.4. Period of Performance. Period of Performance shall not exceed 30 days.

Page 3/24

1.5. Place of Performance. The contractor shall perform the services in the SOW at building 1643 on Edwards Air Force Base, CA.

1.6. Specific Tasks. The Contractor shall provide all labor, tools, equipment, transportation, and materials necessary to remove existing flooring, install new flooring and perform flooring repairs. New flooring material shall be provided by the customer. The contractor shall perform lifting of modular furniture when installing vinyl tiles. The Facility Manager shall be responsible for coordinating the removal and replacement of furniture and furnishings, to include computers prior to flooring installation.

1.6.1. Specific Tasks. The Contractor, Facility Manager and Contracting Officer/Contract Administrator shall conduct a site visit to identify and measure flooring requirements. A written cost estimate for each requirement shall be provided to the Contracting Officer/Contract Representative within three (3) business days.

1.6.2. Specific Tasks. Work shall be performed in such a manner as to cause minimum disruption to the regular routine of the occupants in the area. Care shall be taken to minimize the spread of dust, debris and airborne particles. At all times during course of installation the premises shall be kept free from accumulation of waste materials and debris. All debris shall become the property of the Contractor unless specifically exempted in the specifications and shall be disposed of by the contractor outside of EAFB, AFRL and AFP42 in accordance with local, state and federal environmental regulations.

1.6.3. Trash and Litter Control. The contractor shall clean up and remove all packaging materials and associated litter from installation site. This includes supplying an adequate number of trash receptacles in all appropriate locations. Contractor is responsible for the disposal of all packaging/packing materials and associated litter.

1.7. Deliveries.All flooring deliveries and schedules shall be coordinated with the Facility Manager Curtis Peltier

WP: 661-275-7763

Cell: 661-816-3512.

Curtis.peltier.1@us.af.mil

FOB is Edwards AFB, CA 93524

1.7.1. Inspection. Deliverables will be inspected by the government within two (2) workdays of receipt.

Progress meetings may be held as required.

Page 4/24

SECTION II

2.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES

The Government shall provide the plank flooring material, Gerflor brand Creation 70 Clic Wild Oak, 60090359. The contractor shall be responsible for providing all other materials and equipment to complete the installation.

2.1. Utility Conservation. The Contractor shall adhere to all base level utility conservation practices or requirements. The Contractor shall be responsible for operating under conditions that prevent waste of utilities.

2.2. Emergency Medical Services. Edwards AFB does not provide emergency medical services. In the event of an emergency please contact Security Forces Squadron (661) 277-3340.

2.3. Security Police and Fire Protection. Phone number for Security Forces Squadron, (661) 277-3340 Fire Protection, 911.

2.4. Utilities. The government will provide all electricity, water and sewage at no additional cost to the contractor. The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish requirements under this SOW.

Page 5/24

SECTION III

3.0 GENERAL INFORMATION

3.1. Hours of Operation. The contractor shall perform the services required under this agreement during the following hours: [06:30hrs-15:30hrs] Monday thru Friday except when the government facility is closed due to local or national emergencies, administrative closings, or similar government directed facility closings. The contractor may work on weekends and Federal holidays during the following hours [06:30hrs – 15:30hrs].

3.1.1. Recognized Holidays. Currently observed Federal Holidays can be found at the web portal for the Office of Personnel Management, OPM.gov (https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/)

3.2. Contractor Personnel

3.2.1. Contractor Program Manager (CPM). The contractor shall provide a contractor program manager and alternate(s) who are knowledgeable of flooring removal, installation and repair. The contractor shall submit the name, address, telephone number and a resume of the CPM to the CO within 2 days of agreement start date. The list shall be kept current throughout the life of the contract. The CPM or alternate(s) shall have full authority to act for the contractor on all matters relating to daily operation of this agreement. The CPM or alternate(s) shall be available within one (1) day to meet on the installation with government personnel designated by the CO to discuss problem areas. The CPM and alternate(s) shall be able to read, write, and speak English. The CPM shall be able to effectively communicate with contractor employees.

3.2.2. Contractor Employees: Contractor employees shall be U.S. citizens. Foreign born employees shall be required to show proof of citizenship, no non-citizens are allowed within the compound. The Contractor shall not employ persons who are identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.

The contractor shall not employ any person who is an employee of the U.S. Government if it presents a conflict of interest per DoD directive 5500.7; applies to both military and civilians. The on-site contractor employees must be able to read, write, speak and understand English.

3.2.2.1. Contractor Employees: Contractor employees shall wear distinctive clothing bearing the company name or logo. This identifies Contractor personnel easily and quickly for security, safety and personal protection.

3.2.2.2. Appearance. Contractor’s uniform must be easily recognized. This shall be accomplished by wearing distinctive clothing bearing the name of the company and/or by wearing badges that contain the company name and employee name.

3.2.2.3. Uniforms. The contractor shall furnish uniforms for its employees in performance of this contract. Uniforms shall be consistent throughout the staff. Uniforms will be clean, presentable, and in good repair.

Page 6/24 https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/ https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/

3.2.2.4. Identification of Contractor Employees. When contractor status is not obvious to third parties, contractor must identify themselves as such to avoid creating an impression that they are government officials. All documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed

3.2.3. Contractor Vehicles. The Contractor shall provide and maintain all vehicles necessary to perform the requirements of this BPA. Contractor vehicles shall have the company name prominently displayed on both sides of the vehicle and be maintained to meet a neat, professional appearance. All Contractor vehicles shall be properly registered, licensed and insured. The CO and/or GPM may inspect the contractor’s vehicles at any time and direct the removal of any unsafe or unusable vehicle from the installation. Contractor vehicles shall be used solely for the intended purpose of performing services in accordance with this BPA. Vehicle failure shall not alleviate the contractor from performing any requirement contained in this BPA.

3.2.3.1. Privately Owned Vehicles. Each contractor employee driving a privately owned vehicle on the installation must carry minimum liability insurance as required by the state. Contractor employees shall adhere to all posted speed limits and shall not use hand-held cellular telephones while driving on the installation for phone calls or texting. Use of seatbelts is mandatory. Any contractor employee cited for driving under the influence will have their driving privileges immediately revoked for a period to be determined.

3.2.3.2. Insurance. The contractor shall obtain the necessary insurance The minimum amounts of insurance will be maintained.

3.2.4. Contractor Equipment. The Contractor shall provide and maintain all equipment necessary to perform the requirements of this flooring contract. Equipment found to be unsafe or unable to function as designed, shall not be used in performance of this flooring contract. The CO and/or Facility Manager may inspect the contractor’s equipment at any time and direct the removal of any unsafe or unusable equipment from the installation. The Contractor shall provide adequate numbers of equipment items to effectively fulfill the scope of this flooring contract. Equipment failure shall not alleviate the Contractor from performing any requirement in this flooring contract.

3.3. Environmental Protection. The Contractor shall comply with all applicable Federal, state and local laws, regulations and standards that are or may become applicable to the Contractor’s activities in performance of this SOW.

Environmental Minimization Measures (Checklist). The Contractor shall comply with the most current Environmental Minimization Measures Checklist see attached Environmental Management Measures pertaining to this SOW. During the course of work, the Contractor shall have a quality control and oversight procedure to ensure the requirements of the environmental checklist see attached Environmental Management Measures are met and documented.

3.4. Security.

3.4.1. General Security. All Contractor employees accessing Edwards AFB, AFRL, or AFP42 will be subject to a criminal history background check IAW Air Force Manual (AFMAN) 31-113, Installation Perimeter Access Control, and 412th Test Wing Integrated Defense Plan (IDP) 31, Volume I (the AFMAN and IDP are both limited access documents but more details on the requirements/process in terms of background checks can be provided by the Contracting Office upon request). Vehicle registration, proof of insurance, and a valid driver's license must be presented for vehicles.

Installation

Page 7/24

Commanders may deny access and credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline, and morale of the installation.

3.4.2. Base Access. Contractor personnel requiring frequent base access to perform work at Edwards AFB will be granted access via an Edwards AFB Form 496, Application for Defense Biometric Identification System (DBIDS) Card. The prime contractor shall submit a written request on company letterhead to the Contracting Officer Representative with the following information (prior to submitting a request for Base access via an Edwards AFB Form 496): 1) contract number, 2) location of work, 3) expiration date (must be on or before contract’s expiration date), and 4) names of employees/ subcontractor employees needing access to the base, to include each employee’s company name.

It is recommended that the Prime Contractor provide a copy of the request letter to each employee for verification purposes when the employee comes to the Contracting Office at Building 2800 to get their Edwards AFB Form 496 signed. Employees for which no request letter can be found or provided will result in the employee being asked to return on another date/time so verification can be made.

Base passes will be limited to the length of the contract not to exceed 3 years from the date the Edwards AFB Form 496 is submitted to the Contracting Office for signature.

The Edwards AFB Form 496 will be reviewed/approved by the CO, then taken by the Contractor employee to the Edwards AFB Pass & Registration Office in Building 3000, or the Visitor Control Center in Building 1004, for authentication and issuance of the Base pass.

3.4.3. Access to the 411th FLTS compound will require the following information for each individual provided in PDF format on the contractor’s letterhead: Full Name, Place of Birth, Date of Birth, Full Social Security Number, Citizenship.

3.4.5. During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel.

3.5. Regulations. The contractor shall comply with all base security regulations and with actions dictated by force protection (FPCON) and health protection (HPCON) condition changes/measures. For real-world situations/exercises, changes to FPCON or HPCON could impact contractor performance of work and can include denial of access to the installation to perform work.

3.5.1. The contractor and its employees shall comply with all base traffic regulations.

3.5.2. Contractor employees are prohibited from possessing weapons, firearms or ammunition, on themselves or within contractor-owned or privately owned vehicle while on Air Force installations.

3.5.3. The contractor shall report suspicious activity to Security Forces at (661) 277-3340 in a timely manner.

3.6. Physical Security. The contractor shall be responsible for safeguarding all government equipment, Page 8/24 information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

3.6.1 Opsec. The Contractor shall comply with DOD, USAF, and locally established Operations Security (OPSEC) policies and procedures to protect sensitive and unclassified information and/or equipment, which is furnished to and operated by the Contractor, and prevent compromise of classified information and equipment.

Contractor shall maintain Operations Security (OPSEC) in accordance with DOD Directive & Manual 5205.02, DOD Operations Security (OPSEC) Program, AFI 10-701, Operations Security (OPSEC), and Edwards AFB OPSEC policies and procedures.

Completion of OPSEC Training of contractor employees offered by the Government IAW AFI 10-701, para. 4.1 and 4.2.3 shall be required of all Contractor employees within 90 days of initiating work. Access to mission critical information will not be allowed until OPSEC education has been completed and documented. This training provides Contractor employees with the requisite knowledge necessary to remain vigilant for possible threats, understand basic security procedures, understand the obligation to report security violations and the continued obligation to safeguard information. The requiring unit Security Manager/OPSEC Coordinator will coordinate and track completed training with the Contractor.

Contact the unit Security Manager/OPSEC Coordinator or Wing OPSEC Signature Manager at

(661) 277-2066 for questions or reporting.

3.7. Safety.

It is the contractor's responsibility to ensure its employees and managers have a comprehensive understanding of and full compliance with OSHA requirements. Detailed information is available on the OSHA website at http://www.osha.gov. It is the contractor's sole responsibility for compliance with OSHA, Public Law 91-596. The contractor shall comply with all federal, state and local laws, and Air Force Instructions for the protection of their employees while working on an Air Force Installation or property. The protection of contractor employees is exclusively the obligation of the contractor.

Contractor shall manage all work areas to ensure the safety of building occupants, base personnel, or visitors in or near the areas.

3.7.1. The contractor shall submit a Safety and Health Plan that describes the capabilities and processes to ensure compliance with safety and health requirements during the performance of the work described in the solicitation. The contractor's plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct and track alleged safety and health violations and/or uncontrolled hazards in contractor work areas. Contractor must ensure that personnel are properly trained on the equipment they are tasked to operate. The contractor shall develop site specific mishap reporting procedures which result in damage to government property or injury to Air Force personnel. These procedures are to be included in the safety and health plan for review. In accordance with AFI 91-202, AFMC Supplement, Safety Program, the contractor shall submit a Safety and Health Plan to the CO for review and acceptance by the safety office prior to agreement award.

3.7.2. Safety Equipment. The contractor shall furnish personal safety equipment for its employees in performance of this contract. Safety equipment includes shoes or boots, eyewear, respirators, and gloves.

Page 9/24

3.7.3. Safety Threats. The government reserves the right to restrict the employment, under this contract, of any contractor employee, or prospective contractor employee who is identified as a potential threat to health, safety, security, general wellbeing, or the operational mission of the installation and its population. Contractor shall perform background checks, at contractor's expense, to ensure that said employee has not been convicted of any sexual crime or any crime against children.

SECTION IV

4.0 MISCELLANEOUS PARAGRAPHS:

4.1. Continuation of Essential DoD Contractor Services During Crisis. In Accordance With DoDI 1100.22, (12 Apr 2010) Continuation of Essential DoD Contractor Services During Crises, DFARS 237.76, and the Air Force implementation thereof, unless otherwise directed by the CO or GPM, it is determined that the services as identified in this SOW ARE NOT essential for performance during a crisis.

4.2. Safety and Health Standards. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.

It is the Contractor’s sole responsibility for compliance with all OSHA standards. The Contractor must submit a Safety and Health Plan and corresponding site safety checklist to the Contracting Officer (CO) 10 days after agreement award. The Contractor’s plan shall include appropriate measures to ensure the Contractor reacts promptly to investigate, correct and track alleged safety & health violations and/or uncontrolled hazards in contractor work areas.

The plan shall:

a. Demonstrate a management commitment to employee safety and health;

b. Identify the application of the safety and health plan to subcontractors;

c. Identify the roles and responsibilities of the following individuals:

Management;

Supervisors;

Employees;

Safety Coordinator;

d. Identify applicable safety rules and regulations;

e. Include a worksite hazard analysis to include base-line hazard identification and required control measures;

f. Include a job site analysis to include hazards of tasks required to control measures;

g. Identify employee safety and health training requirements and the documentation process;

h. Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

i. Include employee hazard reporting procedures;

j. Identify individual(s) responsible for corrective action hazards;

k. Identify first aid/injury procedures;

l. Identify procedures for accident investigation and reporting;

m. Identify emergency response procedures; and

n. Identify the process for tracking controlled hazards in contractor work areas

Page 10/24

Contractor is responsible for establishing these requirements for all subcontractors who qualify as subcontractors under the resulting contract.

4.2.1. Non-compliance. If the contractor is found to not be in compliance with any of these regulations, there may be cause for the facility to shut down until the contractor, when within the contractor’s control or the government, has remedied the problem. Any sanitary deficiencies shall require immediate correction.

4.3. Freedom of Information Act (FOIA). All official government records affected by this agreement are subject to the provisions of the FOIA (5 U.S.C. 552/DoD 5400.7-R/AF Supplement). Any request received by the contractor for access/release of information from these records to the public (including government/contractor employees acting as private citizens), whether oral or in writing, shall be immediately brought to the attention of the CO for forwarding to the Base FOIA Manager to ensure proper processing and compliance with the Act.

4.4. Controlled Unclassified Information (CUI). Contractor should be aware of CUI, information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations and government-wide policies but is not classified under Executive Order 13526.

4.5. Notification of Debarment/Suspension Status. The contractor shall provide immediate notice to the CO in the event of being suspended, debarred or declared ineligible by any other federal department or agency, or upon receipt of a notice of proposed debarment from another DoD Agency, during the performance of this contract.

4.6. Correspondence. The government singularly identifies each agreement with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The government issued contract number is to be referenced on all official communication starting upon notice of award.

4.7. Post Award Conference. The contractor agrees to attend any post award conference convened by the CO IAW FAR Part 42.5. These meetings shall be at no additional cost to the government.

4.8. Records. All records created and received by the contractor in the performance of this agreement shall be maintained and readily accessible. Records shall remain the property of the government.

4.9. Hazardous Materials.

(1) Prior to use, the contractor shall provide the Base Hazardous Material Pharmacy, through the

CO, a list of all hazardous materials the contractor brings onto government property and shall submit and AF Form 3952 along with a Material Safety Data Sheet (MSDS) for each Hazardous Chemical listed in OSHA Hazard Communication Standard 29 CFR 1910.1200. The purpose of the inventory is to provide information for Emergency Planning and Community Right-to-Know Act (EPCRA) reporting.

(2) Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from government property. Criteria for identifying hazardous waste are contained in Subpart C of 40 CFR Part 261. NOTE: Products containing chlorofluorocarbons (CFC’s) or ozone depleting substances shall not be allowed or approved for use.

(3) The contractor shall ensure that all contractor employees complete the local Air Force Hazardous Communication, HAZMart, and hazardous waste training. The contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors are responsible for training

Page 11/24 all contractor personnel regarding hazardous material containers maintained on base and complete MSDSs immediately upon receipt of new chemicals, products, or materials.

4.10. Inclement Weather. If the base closes due to inclement weather, the contractor will be released, by the installation commander, with the general population of the base at no changes to the approved price list. The contractor will follow the local procedures for reporting in inclement weather as advertised on local television and radio stations.

4.12. No Smoking Policy. There is an Air Force Policy of NO SMOKING in any Government vehicle, building, or nearby any building, in accordance with AFI 40.102, Tobacco Free Living.

Page 12/24

ENVIRONMENTAL MANAGEMENT MEASURES

This project (Control No. 25-0151, Replace Carpet with Vinyl Plank Flooring, Building 1643) qualifies for a categorical exclusion A2.3.8 (Performing interior and exterior construction within the 5-foot line of a building…). The project is approved contingent upon completion (compliance) of the following minimization measures.

NEPA/EIAP:

1. The proponent/contractor shall inform Environmental Management’s EIAP Planners of all changes to the project scope and addition/inclusion of an Environmental Protection Plan. The proponent/contractor shall also provide the Statement of Work to ensure that the National Environmental Policy Act (NEPA) analysis stays current and that all environmental issues are addressed. Contact Environmental Management at (661) 277-9225, 277-1450, 277-9238 or e-mail 412ceg.ceva.eiapworkflow@us.af.mil for more information.

Air Quality:

2. Should you have any questions or concerns about permitting requirements, please contact 412 CE/CEVC Environmental Management, Air Quality Program. For permitting requirements and mitigation measures, please contact:

• John Vidic; tel. no. (661) 277-1457, e-mail address: john.vidic@us.af.mil

• Nadine Bernal; tel. no. (661) 277-1913, e-mail address: nadine.bernal.1@us.af.mil

3. Maintain speed limits on unpaved roads on base between 5 and 35 miles per hour (mph) according to the posted speed limit. Use water trucks once or twice a day to keep soil damp on frequently traveled unpaved roads (more than 20 vehicle trips per day). Maximum speed limit on unpaved roads that do not employ dust control measures is 15 mph. Apply gravel, mulch, or chemical stabilizers to suppress dust on unpaved roads longer than 75 feet long.

Chemical/organic stabilizers and dust suppressants shall not violate State Water Quality Control Board standards and be accepted by CARB, EPA, and the local District. (EKAPCD Rule 402.IV.A.6 & 402.V.B,E.3 & 402.VII.A-D; MDAQMD Rule 403.C.8.b; AVAQMD Rule 403.C.8,9 & 403.F.2.b).

4. All vehicles hauling bulk materials or debris must be adequately sealed, (tailgate closed with no gaps), covered with a tarp, and leave a freeboard of 6 inches when transporting material a distance of 12 feet or greater. (EKAPCD Rule 402.IV.A.3,C.3 & 402.V.B; MDAQMD Rule 403.C.6 & C.8.e; & AVAQMD Rule 403.C.5,6)

5. All portable engines (emergency generators, start carts, air/power carts, etc.) with a rating of 50 brake horsepower and greater must either have an air quality permit, be registered under the California Air Resources Board (CARB) Statewide Portable Equipment Registration Program (PERP), or, if DoD owned, must be listed under the DoD Tactical Support Equipment (TSE) permit. Information must be provided to Environmental Management describing the make, model, serial number, capacity, horsepower, electrical rating, and other appropriate parameters of the engine. (13 CCR 2450; 17 CCR 93116; EKAPCD Rule 202.I.D; MDAQMD Rule 219.E.1.d; AVAQMD Rule 219.E.2.f & 2100)

Page 13/24 mailto:412ceg.ceva.eiapworkflow@us.af.mil mailto:nadine.bernal.1@us.af.mil

6. All portable engines and off-road vehicles must be certified to the appropriate EPA Tier rating and CARB Executive Order emission standards. All new portable engines (including off-road equipment) must meet Tier IV emissions rating, except TSE may use a lower Tier rating not lower than Tier 2. In-use portable engines may be certified to lower Tier emissions standards provided documentation of existing air permits or CARB registration demonstrate the engine meets the appropriate Tier standard for the year placed in service. (40 CFR 89 & 94 & 1039 & 1042; 13 CCR Chapter 2400-2450; 17 CCR 93116 EKAPCD Rule 202.I.D; MDAQMD Rule 219.E.1.d; AVAQMD Rule 219.E.2.f & 2100)

7. Owners and/ or operators of in-use off-road diesel, gasoline, liquefied petroleum gas (LPG), and other alternate fuels vehicles rated 25 horsepower (hp) or greater (i.e. loaders, crawlers tractors, skid steers, backhoes, forklifts, etc.) must meet current emission standards and fleet requirements pursuant to California Air Resources Board (CARB) regulations. The equipment must be registered under the Diesel Off-road Online Reporting System (DOORS) or maintain a local permit. New equipment must be certified to an equivalent of Tier 3 or higher emission standard. (13 CCR Chapter 2430a.1 & 2449.b.1, d.6.C; EKAPCD Rule 202.I.D; MDAQMD Rule 219.E.1.d; AVAQMD Rule 219.E.2. f & 2100)

8. Only use gasoline, diesel, or alternative fuels that meet California Air Resources Board (CARB) certification specifications for ultra-low sulfur content and aromatic hydrocarbon content requirements. (13 CCR 2281-2285; 17 CCR 93114)

9. CARB Fleet requirements for in-use off road equipment rated 25 hp or greater (construction equipment) and on-road diesel fueled vehicles with a gross vehicle weight greater than 10,000 pounds (semis, trucks, buses) limit idling to no more than 5 minutes when not actively in use.

A vehicle may be allowed to idle for longer periods provided idling is necessary for safe operation of the vehicle or safety of the vehicle operator (emergency vehicles, air conditioning during excessive heat warnings, heating when temperature is below freezing) and other allowable idling cases as described in CARB advisory 377. (13 CCR Chapter 2449.b.1, d.2 & 2480 & 2485; CARB Advisory 377)

10. For any portable engine or off-road vehicle used by a contractor, rental agency, or other party registered with CARB, the proponent/contractor shall be responsible for maintaining PERP/TSE/DOORS registration and notifying the Air Pollution Control District of any generators (EKAPCD, MDAQMD, or AVAQMD) brought on Edwards AFB, if required. (13 CCR 2450; 17 CCR 93116; EKAPCD Rule 202.I.D; MDAQMD Rule 219.E.1.d; AVAQMD Rule 2100)

11. Proposed projects that use coatings, adhesives, lubricants, cleaners or solvents must comply with volatile organic compound (VOC) content and Hazardous Air Pollutant (HAP) limitations at levels ranging between 0 to 730 grams/liter, depending upon the application and regulating authority. Coatings used in construction activities must comply with Architectural Coating Rules and Organic Solvent Rules. Coatings used in manufacturing or industrial applications may require a permit to operate while others may qualify as an exemption. Contact Environmental Management for additional guidance. (40 CFR 59 & 60.390, 60.740, 63.741, 63.460, 63.480, 63.530, 63.741, 63.820, 63.3080, 63.3880, 63.4480, 63.4680, 63.5780; 17 CCR 93101-103, 93111-93112, 94500-94700; EKAPCD Rule 410, 410-1A, 410-2, 410-3, Page 14/24

410-4, 410-4A, 410-5, 410-7, 410-8 ,410-9, & 432; MDAQMD Rule 442, 443, 1104, 1106, 1113, 1114, 1115, 1116, 1117, 1118, & 1162, 1168; AVAQMD Rule 442, 443, 481, 1104, 1106-1, 1107, 1108, 1108-1, 1113, 1122, 1124, 1130, 1136, 1141-1, 1145, 1151, 1151-1, 1162, 1168, & 1171)

12. Common household and automotive products must comply with VOC and HAP content regulated under the CARB Consumer Products Rule regardless of exemption granted through the Hazmart Pharmacy. Compliance with CARB coatings, solvents, and consumer product rules can be achieved by using products manufactured for sale in California. Base personnel shall report all chemicals/materials they procure for this project by any means other than the Hazmat Pharmacy to Environmental Management in order to determine if a permit to operate may be required. (40 CFR 59; 17 CCR 94500-94700; EKAPCD Rule 202.II.I; MDAQMD Rule 219.E.13; AVAQMD Rule 219.E.12)

13. The use of abrasive blasting, sanding, rock crushing, cement batching, woodworking, metalworking or coating spray equipment may require a permit to operate depending on hours of use and the method of application. Additionally, reasonable control measures such as using only approved materials or particulate matter collection apparatus may be required for operation. Provide equipment specifications to Environmental Management for additional guidance on permit applicability. (13 CCR 2457, 17 CCR 92000; EKAPCD Rule 202.II.I,J,LM & 404.1 & 405; MDAQMD Rule 219.E & 220 & 404 & 405; AVAQMD Rule 219.E & 404 & 405 &1140)

14. Contractors are responsible for obtaining all required permits and registrations prior to bringing any equipment/vehicles on Base. Emissions from permitted devices and activities must be tracked and reported to the California Air Resources Board (CARB), local air quality district and the U.S. EPA. Air quality permits, if required, shall be coordinated through the lead agency for air quality permitting and Environmental Management. Records of permits, CARB registrations, and required monitoring must be forwarded to Environmental Management upon request. (40 CFR 70 & 71; 13 CCR 2450; EKAPCD Rule 201; MDAQMD Rule 201-203;

AVAQMD Rule 201-203)

15. The project is to remove carpet and install vinyl plank flooring in Facility 1643.

16. Portable power equipment measures are included. Project must ensure compliance is met by using CARB registered portable equipment.

17. Equipment specifications and current CARB registration or permits for construction equipment, abrasive blasting, sanders, rock crushers and the like must be provided to Air Quality within Environmental Management prior to operation.

18. Paint and other coatings must comply with EKAPCD Organic Solvent Rules 410, 410-2, and Architectural Coating Rule 410-1A.

Environmental Restoration Program (ERP)

Page 15/24

19. The project location for B1643 (attached ERP Map) within the Environmental Restoration Program (ERP) Site No. 021 (attached ERP Map), Site title as ST021. ERP wells including groundwater monitoring well location is located northwest of the project location (attached ERP Map). Damage to ERP equipment and infrastructure must be avoided (Measure 20) or Measure 21 shall be followed. There are Groundwater Solvent Related Contamination plumes (within the northern and northeastern portion of the building 1643), and petroleum related contamination plumes (within the northern and northeastern portion of Building 1643). If the proponent/contractor notices soil discoloration or odors during any indoor/outdoor activities, they shall report this observation immediately to Bioenvironmental Engineering (412 OMRS/SGPB) at (661) 277-3272. Contact [Operable Unit Manager Julia Tseng] at (661) 277- 1415 or 277-1401 for additional information about this ERP site.

20. To avoid damage to ERP equipment and infrastructure, maintain a 10 ft buffer around them.

Be caution of the groundwater monitoring wells when staging equipment in the northwest area of the building 1643 and maintain 10-ft buffer if encountered.

21. If change and/or damage to ERP equipment and infrastructure occurs during your project activities, the proponent/contractor are responsible to re-establish and/or repair them by accredited ERP subcontractor within the time frame agreed upon with ERP Manager.

22. Vapor intrusion concern. As described in my previous Sections 1 & 2, contaminated groundwater is shown within the project locations (ERP Map). If people will be working in the facility and soil of Building 1643 will be exposed, then to mitigate vapor intrusion (VI) risk, include vapor barrier device with the new foundation if disturbed. Additionally, apply ventilation inside the building (it should be well ventilated during the presence of workers inside building 1643) to mitigate the exposure to contaminants inhalation.

Toxic Substances/Asbestos/Lead/Mercury/PCBs

23. All industrial structures and all pre-1981 non-industrial structures are assumed to contain asbestos and lead-based paint until testing has proven otherwise.

24. All untested building materials, except unpainted wood, metal and glass, regardless of age, are assumed to contain asbestos until testing has proven otherwise.

25. All paint, regardless of age, is assumed to contain lead for OSHA purposes, until testing has proven otherwise.

26. National Emission Standards for Hazardous Air Pollutants (NESHAP) Notification is required by regulation to be submitted to the Eastern Kern Air Pollution Control District (EKAPCD) for ALL DEMOLITIONS and for ANY PROJECT (demolition or renovation) disturbing regulated asbestos containing material (RACM) above the EKAPCD de minimis amounts. Per the Edwards AFB Asbestos Management Plan (AMP), courtesy notification is required for any project that disturbs any asbestos, even below de minimis amounts. All asbestos notifications

Page 16/24 are required to be submitted to through the Contracting Officer or Air Force project manager to the 412 CES/CEOER (Asbestos and Lead Operations Officer) and 412 CEG/CEV (Environmental Management, Toxic Substances) for review and approval five working days prior to submission of the notification to EKAPCD; revision shall be submitted for approval before the revised work commences.

27. This project has the potential to encounter or disturb asbestos-containing material (ACM) and/or lead paint. Contact the 412 CES/CEOER (Asbestos and Lead Operations Officer) at

(661) 277-4475 for survey data and potential survey requirements. If additional information is still required regarding Edwards AFB rules and regulations, contact 412 CEG/CEV (Environmental Management, Toxic Substances) at (661) 277-1468.

28. This project has the potential to encounter asbestos-containing material (ACM) and/or lead-based paint (LBP) during excavation. If excavation uncovers any buried debris/materials or disturbs utilities, contact the 412 CES/CEOER (Asbestos and Lead Operations Officer) at (661) 277-4475 for asbestos/lead material testing and potential additional abatement and disposal requirements.

29. Asbestos (and lead) material survey(s) and inspection(s) require a thorough and detailed sampling plan to be developed in accordance with the Edwards AFB Asbestos Operating Plan (AOP), and submitted through the Air Force project manager to the 412 CES/CEOER (Asbestos and Lead Operations Officer), 412 CEG/CEV (Environmental Management, Toxic Substances), and 412 OMRS/SGPB (Bioenvironmental Engineering) for review and acceptance. For questions regarding the sampling plan contact the 412 CES/CEOER (Asbestos and Lead Operations Officer) at (661) 277-4475.

30. Prior to being accepted as final to ensure all applicable rules and regulations are met (typically AOP, project specifications, 40 CFR Part 61, Federal and California OSHA, HUD Guidelines, etc); all asbestos and/or lead survey inspection reports shall be submitted through the Air Force project manager to the 412 CES/CEOER (Asbestos and Lead Operations Officer), 412 CEG/CEV (Environmental Management, Toxic Substances), and 412 OMRS/SGPB (Bioenvironmental Engineering) for review and approval.

31. Areas that will be disturbed by the proposed project activities contract the 412 CES/CEOER (Asbestos and Lead Operations Officer) at (661) 277-4475 for asbestos-containing materials (ACM)/lead-based paint (LBP) survey information. The Asbestos and Lead Operations Officer will advise if existing survey information is adequate or if additional sampling is required in order to determine if ACM/LBP is present in areas to be disturbed.

32. If asbestos or lead is detected in areas that will be disturbed, contact the 412 CES/CEOER (Asbestos and Lead Operations Officer) at (661) 277-4475 for direction regarding asbestos and/or lead removal and disposal requirements, and work plan submittal requirements. For questions regarding rules and regulations contact 412 CEG/CEV (Environmental Management, Toxic Substances) at (661) 277-1468 or 277-1867.

33. Asbestos and/or lead related project work plans, survey/inspections, and/or specification and design packages shall be submitted in accordance with the Edwards AFB Asbestos and/or Lead

Page 17/24

Management Plans, through the Contracting Officer or the Air Force Project Manager to the 412 CES/CEOER (Asbestos and Lead Operations Officer), 412 CEG/CEV (Environmental Management, Toxic Substances), and 412 OMRS/SGPB (Bioenvironmental Engineering) for review and comment (or approval as applicable) to determine if all applicable rules and regulatory requirements have been followed. Asbestos and lead work plans shall be authored and signed by a Certified Asbestos Consultant (CAC), certified by the California Division of Occupational Safety and Health, site specific, and submitted separately per the Edwards AFB Asbestos and Lead Specifications.

34. No materials that contain asbestos or lead above the allowed Consumer Product Safety Commission limit shall be used in new construction. Ensure that the specifications and contracts for services indicate that no asbestos and/or lead materials will be used at Edwards AFB unless specified by a Technical Order of other documentation, and have the contractor sign a document stating that no asbestos and/or lead materials have been used.

35. The installation will not specify, purchase, use, or approve for use any asbestos and/or paint (or other materials) containing lead above 0.009 percent by weight as specified by the Consumer Product Safety Commission.

36. Transite utility lines, if encountered, must be removed appropriately by trained workers.

37. Materials unearthed or discovered during excavation (for example, piping, conduit, utilities, building material debris, etc.) have the potential to be asbestos-containing material (ACM) and/or have lead paint. To comply with potential OSHA, EPA and hazardous waste requirements, contact the 412 CES/CEOER (Asbestos and Lead Operations Officer) at

(661) 277-4475 for survey and potential abatement, and disposal requirements.

38. Mercury can be found in some types of flooring and must be managed as a hazardous or universal waste. Contact 412 CEG/CEVC’s Consolidation, Recycling, and Universal Waste (CRUW) Facility at (661) 277-3681 or 412 CEG/CEVC at 277-1885 for instructions on the classification and management of these wastes.

Hazardous Materials/Hazardous Waste:

39. If there is an accidental pollution release, all associated costs of response actions and cleanup to protect human health and the environment, are the responsibility of the organization that caused the release. All spills or releases of hazardous materials or hazardous wastes that occur during this project, regardless of quantity or location of spill, must be reported immediately to the Base Fire Dept. Call 911 from a landline or (661) 277-4550 from a cell phone to reach emergency response and request they notify Environmental Management. (This includes wastewater and POL).

40. The Proponent/Contractor shall ensure all hazardous materials (HM) are authorized and managed in compliance with FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data, FAR Clause 52.223-5, Pollution Prevention and Right-to-Know Information and applicable sections of Air Force Manual 32-7002, Environmental Compliance and Pollution Prevention, and Edwards Air Force Base (AFB) HM policy, to ensure

Page 18/24 compliance with Emergency Planning and Community Right-to-Know Act of 1986 (42 U.S.C.

11001-11050), and Pollution Prevention Act of 1990 (42 U.S.C. 13101-13109).

• For all chemicals/materials (paints, adhesives, solvents, lubricants, cleaners, etc.) procured for this project by any means other than an installation HAZMART, the Proponent/Contractor shall provide the following to the Contracting Officer Representative (COR), at least 45 days prior to the start of the project:

o Completed Contractor Hazardous Materials Usage Tracking Form o Current Safety Data Sheets

• The Proponent/Contractor shall continue to provide material usage updates to the COR by the 5th of each month until the term of contract. The COR will forward all contractor provided information to the 412CEG/CEVC HM Program Manager. For guidance regarding tracking of HM, usage and regulatory requirements, or questions regarding completing this form, contact the Edwards AFB Environmental Management Office at

(661) 277-1401, or email 412CEG.CEVC.HMWorkflow@us.af.mil . For questions concerning projects at AFRL, call (661) 277-5135.

41. The proponent/contractor shall ensure that all solid and hazardous waste management on this project complies with all applicable sections of AFMAN 32-7002, and the Edwards Air Force Base Hazardous Waste Management Plan (HWMP) and Integrated Solid Waste Management Plan, the California Health and Safety Code (HSC), Title 22 California Code of Regulations (CCR), and Title 40 Code of Federal Regulations (CFR).Hazardous/regulated waste shall be disposed of under the Edwards AFB, US Environmental Protection Agency (EPA) ID number, with Edwards AFB as the Generator, unless the Proponent/Contractor is considered “other persons” under the Resource Conservation and Recovery Act (RCRA) and operates their HW activities independent of Edwards AFB using their own US EPA ID number.

• Signed HW disposal manifests shall be required for HW that may be generated on this project prior to transportation for off-site disposal to a California Department of Toxic Substance Control (DTSC) and/or US EPA-approved landfill or treatment facility.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .