Attachment_1_-_Statement_of_Work.pdf
PDF 5 MB Posted
- Attached to
- Repaint FMO Trailer Building at Lake Mead NRA
- Solicitation number
- 140P8123Q0041
About this file
This statement of work document outlines requirements for a federal contract to repaint the exterior of a modular building located at the Fire Management Office in Lake Mead National Recreation Area in Nevada. The project involves surface preparation and painting of approximately 2,600 square feet of exterior walls, skirting, trim, doors, and window casings on the building. The contractor will pressure wash, remove loose paint, patch holes, and caulk doors and windows before applying one coat of primer and two finish coats of all-acrylic exterior paint. The performance period is 60 calendar days from award. The solicitation was issued by the National Park Service's Pacific West Region for this repainting project located at Lake Mead National Recreation Area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8123Q0041_Amd_0001.pdf | ||
| Attachment_3_-_Q_A_0001.pdf | ||
| Attachment_2_-_Wage_Determination_-_Clark_County.pdf | ||
| Sol_140P8123Q0041.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE MEAD NATIONAL RECREATION AREA
BOULDER CITY, NEVADA
PMIS No. 323167
PAINT EXTERIOR OF FIRE MANAGEMENT OFFICE (FMO) MODULAR
BUILDING
PROJECT SPECIFICATIONS
NATIONAL PARK SERVICE
AUGUST 16, 2023
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work…………………………………………………………………………..
01 11 40 Work Restrictions…………………………………………………………………………..
01 27 00 Definition of Contract Price Items………………………………………………………….
01 32 16 Project Schedue……………………………………………………………………………..
01 33 23 Submittal Procedures……………………………………………………………………….
01 35 23 Safety Requirements………………………………………………………………………..
01 40 00 Quality Requirements……………………………………………………………………… 01 50 00 Temporary Facilities & Controls…………………………………………………………...
01 73 01 Cutting & Patching………………………………………………………………………… 01 73 40 Execution…………………………………………………………………………………...
01 74 19 Waste Management & Disposal…………………………………………………………….
01 77 00 Closeout Procedures………………………………………………………………………...
01 82 00 Demonstration & Training………………………………………………………………….
DIVISION 09 – FINISHES
09 91 31 Exterior Paints and Coatings………………………………………………………………..
APPENDICES
1. Map with Project Location
2. Photos
DIVISION 01
GENERAL REQUIREMENTS
LAKE – 323167 01 11 00 - 1
SUMMARY OF WORK
SECTION 01 11 00
PART 1 – GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: This project is located at Fire Management Office (FMO) in Boulder City, Nevada.
1. 101 Katzenbach Dr, Boulder City, NV 89005
B. The work consists of the following: Painting approximately 2,600 square feet of exterior FMO modular building. Specifically includes, but it not limited to, the following:
1. Surface Preparation (2,600 square feet) – Prepare surfaces (e.g. pressure wash, remove loose paint, patch holes, caulk doors and windows, etc.).
2. Skirting (279 square feet) – Replace particle board skirting, including horizontal and vertical skirting trim.
• Painting included in the above quantity.
• South Skirting – 28’ length x 3’ height.
• East Skirting – 65’ length x 3’ height.
3. Exterior Walls (2,600 square feet) – Prepare, prime, and paint particle board walls.
4. Exterior Trim – Prepare, prime, and paint particle board trim.
5. Exterior Door (two doors) - Prepare, prime, and paint metal doors (exterior surface only).
6. Door Casing (two doors) – Prepare, prime, and paint particle board door casing (exterior only).
7. Window Casing (eight windows) – Prepare, prime, and paint particle board window casing (exterior only).
8. Existing Signs (three signs)– Reinstall signs after painting.
C. Misc. Information/Instructions:
1. All procedures will be completed in accordance with the manufacturer’s instructions.
2. One (1) coat primer and two (2) coats of paint.
3. Exterior walls and exterior skirting: SW 6114 Bagel water based exterior paint with an all-acrylic binder with satin sheen.
4. Exterior trim, exterior door, exterior door casing, and exterior window casing: SW 6083
Sable water based exterior paint with an all-acrylic binder with semi-gloss sheen.
5. Reinstall signs after painting.
D. Field Verification: The vendor shall field verify existing conditions affecting the work in this contract before ordering materials. The scheduling of field verification site visit(s) shall be coordinated with the Contracting Officer’s Representative (COR).
E. Project will be under a single prime contract.
F. Capital Asset (Facility FMSS Location):
LAKE – 323167 01 11 00 - 2
1. [38791] BC FMO Double Wide Trailer 19
G. Performance Period: 60 calendar days after Award.
1.2 GOVERNMENT-FURNISHED ITEMS
A. The Government may furnish products and materials for incorporation into the work.
1. The vendor will arrange and pay for delivery of government furnished items to the project site based on the vendor’s approved installation schedule.
2. After delivery, the government will inspect delivered items for damage. If items are damaged, defective, or missing, the government will arrange for replacement.
3. The vendor is responsible for receiving, unloading, and handling government furnished items at project site for use in the work.
4. The vendor is responsible for protecting government furnished items during storage, handling, and the work, including damage from exposure to the elements.
5. If government furnished items are damaged as a result of the vendor’s operations, the vendor shall repair or replace the items in-kind.
B. Government-Furnished Items: The government will furnish the following products or materials for use on this contract:
1. None anticipated.
1.3 PUBLIC USE OF THE SITE
A. General: The project site will be closed to the public but open to Park employees during installation.
1.4 VENDOR USE OF SITE
A. General: Vendor shall have full use of the site for installation operations during the installation period. Vendor’s use of the site is limited only by the Government’s right to perform work or to retain other vendors on portions of Project. Limit use of the site during the installation period to the project area limits as outlined on the attached site map. Do not disturb portions of the site beyond the project area limits.
B. Park Entry: Vehicles associated with the vendor shall be waived entrance fee upon entering in a marked company. The entrance fee is waived only for the purpose of reporting directly to a specific work location. Any deviation for recreational purposes is subject to payment of required entrance fees.
LAKE – 323167 01 11 00 - 3
C. Site Access: The vendor shall access the project site as outlined on the attached site map. Do not drive vehicles off road or access non-project areas without permission from the contracting officer or park superintendent.
D. Park Regulations: Ensure all personnel entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
E. Working Hours: Regular work hours and days shall be limited to daylight hours from 8:00 a.m. until 5:00 p.m. Monday through Friday, excluding federal holidays. Work outside regular hours and days requires approval from the contracting officer.
1. January 1, New Year's Day
i. January 1 on Saturday, New Year's Day observed on Friday
ii. January 1 on Sunday, New Year's Day observed on Monday
2. 3rd Monday in January, Martin Luther King, Jr Birthday
3. 3rd Monday in February, Washington's Birthday (Presidents' Day)
4. 4th Monday in May, Memorial Day
5. June 19, Juneteenth National Independence Day
i. June 19 on Saturday, Independence Day observed on Friday
ii. June 19 on Sunday, Independence Day observed on Monday
6. July 4, Independence Day
i. July 4 on Saturday, Independence Day observed on Friday
ii. July 4 on Sunday, Independence Day observed on Monday
7. 1st Monday in September, Labor Day
8. 2nd Monday in October, Columbus Day
9. November 11, Veterans Day
i. November 11 on Saturday, Veterans Day observed on Friday
ii. November 11 on Sunday, Veterans Day observed on Monday
10. 4th Thursday in November, Thanksgiving Day
11. December 25, Christmas Day
i. December 25 on Saturday, Christmas observed on Friday
ii. December 25 on Sunday, Christmas observed on Monday
F. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings, buildings under installation, and buildings under renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.
G. Staging and Storage: Confine storage of equipment and materials to the staging / lay-down / storage areas as established by the COR.
LAKE – 323167 01 11 00 - 4
H. Parking: The vendor shall park vehicles and heavy equipment in designated areas for vendor use or as established at the COR. Vehicles are not permitted within long-term or overnight parking along roads or in associated overlooks / pull-outs.
I. Driveways and Entrances: The vendor shall keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles at all times.
J. Preservation of Natural Features: Prevent damage to natural surroundings. Restored damaged areas and replace damaged trees, vegetation, and grass at no expense to the government.
K. Refer also to Section 01 11 40 Work Restrictions and Section 01 50 00 Temporary Facilities
& Controls.
1.5 REFERENCE DOCUMENTS / REPORTS
A. General: The following reference documents / reports are available upon request to supplement the information specified in the contract documents:
1. N/A.
END OF SECTION 01 11 00
LAKE – 323167 01 27 00 - 1
DEFINITION OF CONTRACT PRICE ITEMS
SECTION 01 27 00
PART 1 – GENERAL
1.1 LIST OF CONTRACT LINE ITEMS
A. Contract Price Item No. 10 – Paint Exterior of FMO Modular Building.
1. This price item consists of all necessary material, labor, and equipment required to paint the exterior of FMO modular building. All removed/demolished equipment and materials shall be transported and legally disposed of off-site.
2. No separate measurement will be made.
3. Payment will be made at the contract unit price.
B. Contract Price Item No. 00 – N/A.
1. This price item consists of all necessary material, labor, and equipment required to . All removed/demolished equipment and materials shall be transported and legally disposed of off-site.
C. Contract Price Item No. 00 – N/A.
of off-site.
1.2 LIST OF CONTRACT BID OPTIONS
A. Contract Price Item No. 00 – N/A.
of off-site.
B. Contract Price Item No. 00 – N/A.
of off-site.
LAKE – 323167 01 27 00 - 2
C. Contract Price Item No. 00 – N/A.
of off-site.
1.3 SCHEDULE OF VALUES (PRICE SCHEDULE)
A. Submit a schedule of values IAW Section 01 32 16 Project Schedule.
a. N/A.
END OF SECTION 01 27 00
DIVISION 09
FINISHES
LAKE – PMIS 323167 09 91 21- 1
INTERIOR PAINTS AND COATINGS
SECTION 09 91 31
EXTERIOR PAINTS AND COATINGS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Exterior paints and coatings systems including surface preparation.
1.2 REFERENCES
A. Material Safety Data Sheets / Environmental Data Sheets: Per manufacturer's MSDS/EDS for specific VOCs (calculated per 40 CFR 59.406). VOCs may vary by base and sheen.
B. UL 2818 - GREENGUARD Certification Program for Chemical Emissions for Building Materials.
1.3 SUBMITTALS
A. Submit under provisions of Section 01 30 00 - Administrative Requirements.
B. Product Data: Manufacturer's data sheets on each paint and coating product should include:
1. Product characteristics.
2. Surface preparation instructions and recommendations.
3. Primer requirements and finish specification.
4. Storage and handling requirements and recommendations.
5. Application methods.
6. Clean-up Information.
7. VOCs.
C. Selection Samples: Submit a complete set of color chips that represent the full range of manufacturer's products, colors and sheens available.
D. Verification Samples: For each finish product specified, submit samples that represent actual product, color, and sheen.
E. Coating Maintenance Manual: upon conclusion of the project, the Contractor or paint manufacturer/supplier shall furnish a coating maintenance manual, such as Sherwin- Williams "Custodian Paint Maintenance Manual" report or equal. Manual shall include an Area Summary with finish schedule, Area Detail designating where each product/color/finish was used, product data pages, Safety Data Sheets, care and cleaning instructions, touch-up procedures, and color samples of each color and finish used.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: A firm or individual experienced in applying paints and coatings similar in material, design, and extent to those indicated for this Project, whose work has resulted in applications with a record of successful in-service performance.
B. Paint exposed surfaces. If a color of finish, or a surface is not specifically mentioned, COR
LAKE – PMIS 323167 09 91 21- 2
will select from standard products, colors and sheens available.
C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels unless indicated.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Deliver manufacturer's unopened containers to the work site. Packaging shall bear the manufacturer's name, label, and the following list of information.
1. Product name and type (description).
2. Application and use instructions.
3. Surface preparation.
4. VOC content.
5. Environmental handling.
6. Batch date.
7. Color number.
B. Storage: Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
C. Store materials in an area that is within the acceptable temperature range, per manufacturer's instructions. Protect from freezing.
D. Handling: Maintain a clean, dry storage area, to prevent contamination or damage to the coatings.
1.6 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not apply coatings under environmental conditions outside manufacturer's absolute limits.
B. This specification does not take into consideration wet areas or areas needing high performance coatings.
1.7 EXTRA MATERIALS
A. Furnish extra paint materials from the same production run as the materials applied and, in the quantities, described below. Package with protective covering for storage and identify with labels describing contents. Deliver extra materials to Owner.
B. Furnish Owner with an additional one percent of each material and color, but not less than 1 gal (3.8 l) or 1 case, as appropriate.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer: Sherwin-Williams, which is located at: 101 Prospect Ave.;
Cleveland, OH 44115; Toll Free Tel: 800-524-5979; Tel: 216-566-2000; Fax: 440-826-1989;
Email: request info (specifications@sherwin.com); Web: http://www.sherwin-williams.com
Or Equal http://admin.arcat.com/users.pl?action=UserEmail&company=Sherwin-Williams&coid=35477&rep=&fax=440-826-1989&message=RE:%20Spec%20Question%20(09912swi):%20%20&mf=
LAKE – PMIS 323167 09 91 21- 3
B. Substitutions: Not permitted.
C. Requests for substitutions will be considered in accordance with provisions of Section 01 67 00 - Product Requirements.
2.2 PAINT MATERIALS - GENERAL
A. Paints and Coatings:
1. Unless otherwise indicated, provide factory-mixed coatings. When required, mix coatings to correct consistency in accordance with manufacturer's instructions before application. Do not reduce, thin, or dilute coatings or add materials to coatings unless such a procedure is specifically described in manufacturer's product instructions.
2. VOC numbers used in this document need to be confirmed by using the products EDS sheets.
B. Coating Application Accessories: Provide primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials required, per manufacturer's specifications.
C. Color: Refer to Finish Schedule for paint colors, or as selected by the COR
2.3 EXTERIOR PAINT SYSTEMS
A. Walls, trims, wood, metal, PVC etc.
1. Water based exterior paint with an all-acrylic binder.
a. SW 6114 Bagel with satin sheen: for exterior walls/siding.
b. SW 6083 Sable with semi-gloss sheen: for exterior trim and door/window casings.
PART 3 EXECUTION
3.1 EXAMINATION
A. Do not begin application of coatings until substrates have been properly prepared. Notify COR of unsatisfactory conditions before proceeding.
B. Proceed with work only after conditions have been corrected and approved by all parties, otherwise application of coatings will be considered as an acceptance of surface conditions.
3.2 SURFACE PREPARATION
A. Surfaces must be dry and in sound condition. Remove oil, dust, dirt, loose rust, peeling paint or other contamination to ensure good adhesion. Recognize that any surface preparation short of total removal of old coating may compromise the service length of the applied coating system.
B. It is recommended to test cleaners on a small, inconspicuous areas prior to use.
C. Mildew Removal: Prior to painting.
1. Bleach Solution: 1 part liquid household bleach, 3 parts warm water.
a. Apply solution and scrub mildewed area.
b. Allow solution to remain on surface for 10 minutes.
c. Rinse thoroughly with clean water. Allow surface to dry before painting.
d. Wear protective glasses or goggles, waterproof gloves, and protective clothing.
LAKE – PMIS 323167 09 91 21- 4
e. Quickly wash off any of the mixture coming in contact with your skin.
f. Do not add detergents or ammonia to the bleach/water solution.
2. Bleach and bleaching type cleaners may damage or discolor existing paint films.
Bleach alternative cleaning solutions may be advised.
D. Remove items including but not limited to thermostats, electrical outlets, switch covers and similar items prior to painting.
1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved.
E. No painting should take place when the exterior temperature is below 50 degrees F (10 degrees C) unless the specified product is designed for these conditions.
F. Aluminum: Remove all oil, grease, dirt, oxide and other foreign material by cleaning per SSPC-SP1, Solvent Cleaning.
G. Block (Cinder and Concrete): Remove all loose mortar and foreign material. Surface must be free of laitance, concrete dust, dirt, form release agents, moisture curing membranes, loose cement, and hardeners.
1. Cure concrete and mortar at least 30 days at 75 degrees F (24 degrees C) unless manufactures products are designed for application prior to the 30-day period.
2. Surface pH: Between 6 and 9, and moisture content to be 15 percent lower.
3. Commercial detergents and abrasive blasting may be necessary to prepare surfaces of tilt-up and poured-in- place concrete.
4. Fill bug holes, air pockets, and other voids with cement patching compound. Masonry surfaces must be dry before priming.
H. Concrete per SSPC-SP13 or NACE 6: This standard gives requirements for surface preparation of concrete by mechanical, chemical, or thermal methods prior to the application of bonded protective coating or lining systems.
1. This standard's requirements are applicable to all types of cementitious surfaces including cast-in-place concrete floors and walls, precast slabs, masonry walls, and shotcrete surfaces.
2. Acceptably prepared concrete surfaces should be free of contaminants, laitance, loosely adhering concrete, and dust, and provide a sound, uniform substrate suitable for the application of protective coating or lining systems.
3. Cement Composition Siding/Panels: Remove all surface contamination by washing with an appropriate cleaner, rinse thoroughly and allow to dry.
a. Existing Peeled or Checked Paint: Scrape and sand to a sound surface.
b. Pressure Clean: If needed, with 2100 psi minimum pressure to remove all dirt, dust, grease, oil, loose particles, laitance, foreign material, and peeling or defective coatings.
c. Allow the surface to dry thoroughly.
d. Surface pH: Between 6 and 9, unless products are designed to be used in high pH environments.
4. Interior Drywall: Must be clean and dry.
a. All nail heads must be set and spackled and joints must be taped and covered with a joint compound.
b. Spackled nail heads and tape joints must be sanded smooth and all dust removed prior to painting.
5. Galvanized Metal: Clean per SSPC-SP1 using detergent and water or a degreasing cleaner to remove greases and oils.
LAKE – PMIS 323167 09 91 21- 5
a. Apply a test area, priming as required.
b. Allow the coating to dry at least one week before testing.
c. If adhesion is poor, Brush Blast per SSPC-SP16 as necessary to remove these treatments.
6. Plaster: Must be allowed to dry thoroughly for at least 30 days before painting, unless the manufactures products are designed for application prior to the 30-day period.
a. Plastered area must be ventilated while drying.
b. In cold, damp weather, plastered area must be heated.
c. Damaged Areas: Repaired with appropriate patching material.
d. Bare plaster must be cured and hard.
e. Textured, Soft, Porous, or Powdery Plaster: Treat with solution of 1-pint household vinegar to 1 gallon of water.
1) Repeat until the surface is hard.
2) Rinse with clear water and allow to dry.
7. Steel: Structural, Plate, etc.: Clean by one or more of the surface preparation standards described below. The methods described in these standards are used throughout the world for cleaning structural steel. Visual standards are available through the Society of Protective Coatings. A brief description of these standards together with numbers by which they can be specified follow.
a. Solvent Cleaning, SSPC-SP1: Solvent cleaning is a method for removing all visible oil, grease, soil, drawing and cutting compounds, and other soluble contaminants. Solvent cleaning does not remove rust or mill scale. Change rags and cleaning solution frequently so that deposits of oil and grease are not spread over additional areas in the cleaning process. Be sure to allow adequate ventilation.
b. Hand Tool Cleaning, SSPC-SP2: Hand Tool Cleaning removes all loose mill scale, loose rust, and other detrimental foreign matter. It is not intended that adherent mill scale, rust, and paint be removed by this process. Beforehand tool cleaning, remove visible oil, grease, soluble welding residues, and salts by the methods outlined in SSPC-SP1 or other agreed upon methods.
c. Power Tool Cleaning, SSPC-SP3: Power Tool Cleaning removes all loose mill scale, loose rust, and other detrimental foreign matter. It is not intended that adherent mill scale, rust, and paint be removed by this process. Before power tool cleaning, remove visible oil, grease, soluble welding residues, and salts by the methods outlined in SSPC-SP1 or other agreed upon methods.
d. Commercial Blast Cleaning, SSPC-SP6 or NACE 3: A Commercial Blast Cleaned surface, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxides, corrosion products, and other foreign matter, except for staining. Staining shall be limited to no more than 33 percent of each square inch of surface area and may consist of light shadows, slight streaks, or minor discoloration caused by stains of rust, stains of mill scale, or stains of previously applied paint. Before blast cleaning, visible deposits of oil or grease shall be removed by any of the methods specified in SSPC-SP1 or other agreed upon methods.
e. Power Tool Cleaning to Bare Metal, SSPC-SP11: Metallic surfaces that are prepared according to this specification, when viewed without magnification, shall be free of all visible oil, grease, dirt, dust, mill scale, rust, paint, oxide corrosion products, and other foreign matter. Slight residues of rust and paint may be left in the lower portions of pits if the original surface is pitted. Prior to power tool surface preparation, remove visible deposits of oil or grease by any of the methods specified in SSPC-SP1, Solvent Cleaning, or other agreed upon
LAKE – PMIS 323167 09 91 21- 6
methods.
f. Water Blasting, NACE Standard RP-01-72: Removal of oil grease dirt, loose rust, loose mill scale, and loose paint by water at pressures of 2,000 to 2,500 psi at a flow of 4 to 14 gallons per minute (Liters per second).
g. Wood: Must be clean and dry. Knots and pitch streaks must be scraped, sanded, and spot primed before a full priming coat is applied. Patch all nail holes and imperfections with a wood filler or putty and sand smooth.
3.3 INSTALLATION
A. Apply all coatings and materials with the manufacturer's specifications in mind. Mix and thin coatings according to manufacturer's recommendation.
B. Do not apply to wet or damp surfaces.
1. Wait at least 30 days before applying to new concrete or masonry or follow manufacturer's procedures to apply appropriate coatings prior to 30 days.
2. Test new concrete for moisture content.
3. Wait until wood is fully dry after rain or morning fog or dew.
C. Apply coatings using methods recommended by manufacturer.
D. Uniformly apply coatings without runs, drips, or sags, without brush marks, and with consistent sheen.
E. Apply coatings at spreading rate required to achieve the manufacturer's recommended dry film thickness.
F. Regardless of number of coats specified, apply as many coats as necessary for complete hide, and uniform appearance.
G. Inspection: The coated surface must be inspected and approved by the COR just prior to the application of each coat.
3.4 PROTECTION
A. Protect finished coatings from damage until completion of project.
B. Touch-up damaged coatings after substantial completion, following manufacture's recommendation for touch up or repair of damaged coatings. Repair any defects that will hinder the performance of the coatings.
END OF SECTION 09 91 21
APPENDIX
Th e
St ri p
4 mi 6 km
7 mi 11 km
2 mi 3 km
7 mi 11 km
12 mi 19 km
8 mi 13 km
10 m i 16 km
33 m i 53 km
2 mi 3 km
2 mi 3 km
3 mi 5 km
8 mi 13 km
3 mi 5 km
5 mi 8 km
10 mi 16 km
14 mi 22 km
13 mi 21 km
3 mi 5 km1 mi
2 km
25 mi 40 km
14 mi 22 km
8 mi 13 km
4 mi 6 km
15 mi 24 km
4 mi 6 km
4 mi 6 km
36 mi 58 km
14 mi 22 km
5mi 8km
20 mi 32 km
26 mi 42 km
19 mi 31 km
4 mi 6 km
22 mi 35 km
22 mi 35 km
17 mi 27 km
22 mi 35 km
27 mi 43 km
24 mi 39 km
M uddy
River
Red Lake
BO
N
EL
LI
B
AY
H u al ap ai
W as h
Kingman W ash
Petro glyph Wash
D etrital W ash
G yp su m
W as h
Echo Wash
Boulder
W ash
Las Vegas W ash
Tassi Spring
G ra n d
Quail Springs Wash
Catclaw Wash
W as h
Sandy Cove
Wishing Well Cove
Boathouse Cove
Cathedral Cove
Salt Bay
Colorado River
Colorado R ive r
Colorado
River
Chili Pepper Cove
Sidewinder Cove
Jeep Cove
Arizona Bay
Nevada Bay
Columbine Falls
Lake Las Vegas
Hualapai Bay
Glory Hole
Davis Dam
Hoover Dam
A R
M
O V
E R
T
N
L A K E M E A D
T E M P L E B A S I N
G R
E
A S
I N
BOULDER BASIN
VIRGIN BASIN
Copper Basin
A R
IZ
O
N A
B A
IN
CO
TTO
N
W O
D
BA
SIN
L
K E
H A
V E
V ir g in iv er
VALLEY OF FIRE
STATE PARK
DESERT WETLANDS
PARK
H U A L A P A I
I N D I A N
R E S E R V A T I O N
M O A P A
I N D I A N
R E S E R V A T I O N
L A K E M E A D N A T I O N A L
R E C R E A T I O N A R E A
G R A N D C A N Y O N
N A T I O N A L P A R K
G R A N D C A N Y O N - P A R A S H A N T
N A T I O N A L M O N U M E N T
( N P S / B L M )
M O J A V E N A T I O N A L P R E S E R V E
Lakeshore Drive
Northshore Road
Lake Mead NRA lands north of the Colorado River in Arizona are part of Grand Canyon-Parashant National Monument
Hiking trail
Unpaved road78
Picnic area
Boat launch
Campground
Lodging
Marina
Ranger station
0 10 Miles5
10 Kilometers5
Emergency telephone
Drive only on approved backcountry roads in the park. Approved roads are signed with a yellow arrow.
Inquire about unpaved road conditions before traveling.
See Lake Mead Guide for GPS coordinates of many park sites.
Do not use this map for lake or backcountry travel. Use nautical charts and the park’s Approved Backcountry Roads maps.
L e g e n d
North
Some facilities may be closed or moved because of low or fluctuating levels of lake water.
Inquire before traveling.
40 93
To 15
To and Los Angeles
BR
No personal watercraft permitted in Grand Canyon National Park
Houseboats not recommended beyond this point
Caution shifting sandbars and low water
N E
V A
D A
A R
IZ
O
N A
P a ci fi c ti m e z o n e
M o u n ta in t im e z o n e
NEVADA
CALIFORNIA
N
EVADA
A
RIZONA
NEV
A
ARIZO
Pacifi c Time Zone
M ountain Time Zone
M o u n tain Tim e Zo n e Pacifi c Tim e Zo n e
La ke
M ea d Parkway
Lake Mead Boulevard
Boulder Highw ayLa s V eg as lv d
La s V egas B lvd
Pa ra d is e R d
Tropicana Ave
Rancho Drive
Charleston Blvd
Summerlin Pkwy
Stockton H ill Road
A ntares Road
Pi er ce F er ry
R oad
Henderson
Las
Vegas
North Las
Vegas
Boulder City
Bullhead City
Kingman
Grasshopper Junction
Chloride
Laughlin
Searchlight
Cal-Nev-Ari
Nelson
Meadview
Logandale
Overton
Dolan Springs
L A S V
E G A
S V
A L L E
Y
U D
D Y
M O
U N T A I N S
G A L E H I L L S
V I R G I N M O U N T A I N S
B L A C K M O U N T A I N S
SOUTH
VIRGIN
MOUNTAINS
G R
A
C
I
F F
A
L
L
B L A C K R
I D G E
S O
U T
H V
I R
P
A K
R I D
G E
H I L L E R M O
U N
T A
I T
I L
QUARTERMASTER CANYON
R
A P
E V
A
A S H
I F
F
D O
R A
U N
T A
I
T R
I T
L
L
BLACK
N Y c
C U
L L
O U
N
D O
R A
L L
N E W
O R
K M
O U
N T
A
P I U
T E
V A
L L
E Y
N E
W B
E R
U N
T A
R B
T
U N
T A
I
C R
A M
E N
T O
V A
L L
U N
T A
I
U
A L
A P
I
L
L
S A N U P P L A T E A U
L
A
PY
A
ID
N Y
PEARCE CANYON
IC
EB
ER
G
C A
N Y
O N
BOULD
ER C
ANYON
VIRGIN CANYON
St Thomas Point
Bighorn Island
Gull Island
Heron Island
GYPSUM
REEFS
Beacon
Rock
Sentinel Island
Castle Reef
Black Island
Saddle Island
Ramshead Island
Echo Bay
Callville Bay
Las Vegas Bay
Boulder Beach Boulder Harbor
Boulder City Airport
Entrance Station
Entrance Station
Entrance Station
Entrance Station
Entrance Station
Entrance Station
Entrance Station
Wetlands Trail
Historic Railroad Trail
Bluffs Trail
Northshore Summit Trail
Visitor Center
White Rock Canyon Trail
Liberty Bell Trail
River Mountains Loop Trail
Blue Point Spring (no drinking water)
Stewarts Point
Middle Point
East Point
Napoleons Tomb
The Head
Boat Wreck Point
Heron Point The
Temple
Sandy Point
The Haystacks
Delmar Butte
Rogers Spring (no drinking water)
Redstone Redstone Dune Trail (no drinking water)
Hemenway Harbor
Lakeview Overlook
Fish hatchery
Fish hatchery
Cottonwood East
Greggs Hideout
Park Headquarters
Airstrip
Airstrip
M O
A
PA
V
LLEY
The Narrows
To St. George, Utah
To Ely
To Spring Mountains National Recreation Area (USFS), Death Valley National Park, and Reno
To Los Angeles
To Death Valley NP
To Red Rock Canyon National Conservation Area
(BLM)
BIG G
YPS
UM
L
ED
GES
Black M esa
Airstrip
Airstrip
Airstrip
Airstrip
Airstrip
Temple Bar
South Cove (no drinking water)
Jean
Hackberry
Eldorado Canyon
Willow Beach
Cottonwood Cove
Katherine Mine
Princess Cove (no drinking water)
North Arizona Telephone Cove
South Arizona Telephone Cove (no drinking water)
Nevada Telephone Cove
Katherine Landing
To Needles, California
Union Pass
Gods P oc ke t
H
EL
LS
IT
C
EN
McCarran International Airport
Malpais Flattop Mesa
Railroad Pass
Canyon Grapevine
To Needles, California andTo Needles, California and
Lost City Museum
Te m p le
B ar
R oa d
Diam ond Bar Road
Bowl of Fire
Pinto V alle y
Tents only
Mile 25
Lava Point
Paint Pots
OVERTON
WILDLIFE
MANAGEMENT AREA
Boulder Peak
Hamblin Mountain
3225ft 983m
Muddy Peak 5387 ft 1642 m
Sunrise Mountain 3364 ft 1025 m
Frenchman Mountain 4052 ft 1235 m
Garrett Butte
Gold Cross Peak 3414 ft 1041 m
Mica Peak 5758 ft 1755 m
Gold Butte
Jumbo Peak 5763 ft 1757 m
Bonelli Peak 5334 ft 1626 m
Snap Point 6706 ft 2044 m
Squaw Peak 3200 ft 975 m
Golden Rule Peak 3863 ft 1177 m
Senator Mountain 5127 ft 1563 m
Table Mountain Plateau 5175 ft 1577 m
Mount Tipton 7148 ft 2179 m
Mount Perkins 5456 ft 1663 m
Mount Davis 2034 ft 620 m
Long Mountain 4351ft 1326 m
Silver Mountain Peacock Peak
Christmas Tree Pass (steep and rocky)
Fire Mountain
Opal Mountain
Black Mountain
Copper Mountain
McCullough Mountain 7026 ft 2141 m
Crescent Peak 5997 ft 1828 m
Spirit Mountain 5639 ft 1719 m
Lava Butte
Mount Wilson 5445 ft 1660m
Fortification Hill
BLACK
CANYON
WILDERNESS
ELDORADO
WILDERNESS
(NPS & BLM)
IRETEBA
WILDERNESS
(NPS & BLM)
NELLIS WASH
WILDERNESS
SPIRIT MOUNTAIN
WILDERNESS
(NPS & BLM)
BRIDGE
CANYON
WILDERNESS
PINTO VALLEY WILDERNESS
MUDDY MOUNTAINS
WILDERNESS
(NPS & BLM)
JIMBILNAN
WILDERNESS
MOUNT WILSON
WILDERNESS
(BLM)
GRAND WASH
CLIFFS
WILDERNESS
(BLM)
LIME CANYON
WILDERNESS
(BLM)
JUMBO
SPRINGS
WILDERNESS
(BLM)
MOUNT NUTT WILDERNESS
(BLM)
MOUNT TIPTON
WILDERNESS
(BLM)
To Grand Canyon Skywalk, Hualapai Indian Reservation (not part of Grand Canyon National Park)
Grand Canyon Skywalk Grand Canyon West
Airstrip (not part of Grand Canyon National Park)
To Grand Canyon National Park, South Rim
To Grand Canyon National Park, North Rim (summer only)
Visitor Center
Hoover Dam Visitor Center slluke Callout
PROJECT LOCATION
WAREHOUSE COMPLEX MAP
avryan Callout Gate Entry to Site avryan Text Box FMO Building
EXTERIOR BUILDING IMAGES
PMIS 323167
East- facing building side (front)
South-facing building side
West-facing building side (back)
North-facing building side
Crack in skirt of building on south-facing building side
| COVER |
| TABLE OF CONTENTS |
| DIVISION 01 - Header |
| SECTION 01 11 00 - Summary of Work |
| SECTION 01 27 00 - Definition of Contract Price Items |
| DIVISION 09 - Header |
| SECTION 09 91 31 - Exterior Paints Coating |
| Appendix - Header |
| Map - Project Location |
| Appendix - WC Map |
| Appendix - Photos |