Attachment 1 Statement of Work.pdf

PDF 505 KB Posted

Attached to
Payload Handling System
Solicitation number
N4523A20R1080
Issued by

About this file

This performance work statement outlines requirements for the development of a Payload Handling System Machined Canister. The Navy requires fabrication services to manufacture one complete Payload Handling System Machined Canister assembly according to supplied drawings. The performance work statement specifies tasks for developing fabrication plans, quality measurement plans, and forging sketches. It also outlines requirements for fabricating forgings, performing welding and cladding, conducting inspections and tests, and delivering final machined components. The Navy may exercise options to procure additional lower weldment and upper forging components, as well as a fully assembled canister. Quality assurance documentation and reporting requirements are defined.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR MANUFACTURE OF THE

PAYLOAD HANDLING SYSTEM (PHS)

MACHINED CANISTER

PART 1

GENERAL INFORMATION

1. OVERVIEW

1.1. Summary: This is a non-personnel services contract to provide one complete Payload

Handling System Machined Canister consisting of the manufacture and assembly of drawings listed in Part 3. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.2. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform engineering services to build the Payload Handling

System Canister Assembly within the confines of specifications as defined in this Performance

Work Statement. The contractor shall perform to the standards in this contract.

1.3. Background: The development of Payload Handling System (PHS) Machined Canister is to satisfy the needs of the Navy to deploy large diameter payloads from submarine platforms. The

PHS is a research and development effort to design build, and test a first article system. This is a risk reduction effort for the future of Virginia Class (VACL) Blocks V/VI with the

VIRGINIA Payload Module (VPM). Initial installation shall be on an Ohio Class (SSGN).

Basic functions of the PHS are to extend and retract vertically, pivot horizontally, and stow payloads. The PHS Machined Canister shall be a First Article, which is a major structural component of the system.

1.4. Objectives: Vendor to Provide fabrication services, to manufacture and deliver one each

Payload Handling System (PHS) Machined Canister, including all non-destructive testing and inspection documentation.

1.5. Scope: The vendor shall provide services for fabrication and delivery of one each complete

First Article Payload Handling System Machined Canister consisting of fabrication, and assembly of tube weldment, upper forging weldment, and lower forging weldment.

Fabrication shall include weld cladding of surfaces, application of welded nonferrous inserts, and precision machining as identified per applicable references. The vendor shall invite

Government representatives and allow access to witness all testing and inspection. The vendor shall provide first article testing on the upper and lower canister forgings. The vendor shall package and arrange shipping FOB PSNS Bremerton.

1.6. Period of Performance: The period of performance is 01 August 2020 to 01 May 2022. Base option estimates a total 30 weeks for delivery of forgings to support Option 1. Option 1 manufacture estimates 33 weeks for the execution of Option 1 for delivery of one each complete upper forging machined, and one each complete lower forging weldment machined to support Option 2. Option 2 manufacture estimates 32 weeks delivery of May 2022.

1.7. Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.8. Recognized Holidays: Days are listed below and work is not required if the business is not normally open on the below holidays.

New Year’s Day

Martin Luther King Jr.’s Birthday

President’s Day

Memorial Day

Independence Day

Labor Day

Columbus Day

Veteran’s Day

Thanksgiving Day

Christmas Day

1.9. Place of Performance: The work to be performed under this contract will be performed at the awarded vendor’s place of business

1.10. Type of Contract: The government will award a (Type of contract to be determined by CCE and the customer).

1.11. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.12. Contracting Officer Representative (COR): The (COR) will be identified by separate letter.

The COR monitors all technical aspects of the contract and assists in contract administration.

The COR is authorized to perform the following functions: 1) assure that the Contractor performs the technical requirements of the contract, 2) perform inspections necessary in connection with contract performance, 3) maintain written and oral communications with the

Contractor concerning technical aspects of the contract, 4) issue written interpretations of technical requirements, including Government drawings, designs, specifications, 5) monitor

Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, 6) coordinate availability of government furnished property, and 7) provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.13. Key Personnel: The following are key personnel by the government:

James McCready (COR)

James.McCready@navy.mil

360-627-5075

Jonathan Jordan (ACOR)

Jonathan.d.Jordan@navy.mil

360-627-5077

Jeremy Lamb (Lead Engineer, NSWCPD)

Jeremy.Lamb@navy.mil

215-897-7548

Isaac Swain (Project Engineer)

Isaac.Swain@navy.mil

360-627-5203

Ryan Freke (Lead Development Engineer)

Fyan.Freke@navy.mil

360-627-5106

James Blythe (Program Manager)

James.Blythe@navy.mil

360-627-5141

1.14. Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the

Contracting Officer. All materials supplied to the Government shall be the sole property of the

Government and may not be used for any other purpose. This right does not abrogate any other

Government rights. At the end of the contract period, all materials, deliverables, and intellectual property rights procured or produced specific to the design, manufacture, and/or test of items under this contract shall become property of the Government and delivered to that effect. These items include, but are not limited to:

Fabrication Plan

Forging Sketch Upper Canister

Forging Sketch Lower Canister

Forging Sketch Upper Canister First Article

Forging Sketch Lower Canister First Article

Test Certifications

1.15. Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR

Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The

Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the

Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.16. Contractor Point of Contact: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S.

Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.

This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. HINDCAST. The mean value of span ± 2s, as well as the mean value.

2.1.7. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key

Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.8. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.9. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.10. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.11. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.12. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The

Government does not have private of contract with the subcontractor.

2.1.13. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.14. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

AFARS Army Federal Acquisition Regulation Supplement

AR Army Regulation

CCE Contracting Center of Excellence

CDRL Contract Data Requirements List

CFR Code of Federal Regulations

COC Certification of Compliance - Conformance

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTR Contracting Officer's Technical Representative

COTS Commercial-Off-the-Shelf

DA Department of the Army

DD250 Department of Defense Form 250 (Receiving Report)

DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement

DMDC Defense Manpower Data Center

DOD Department of Defense

DWG Drawing

FAR Federal Acquisition Regulation

FAT First Article Test Report

HIPAA Health Insurance Portability and Accountability Act of 1996

IAW In Accordance With

KO Contracting Officer

MT Magnetic Particle Test Report

NDT Non-Destructive Testing

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Program

RT Radiography Test Report

TE Technical Exhibit

UT Ultrasonic Test Report

VT Visual Inspection Test

V&V Verification and Validation

PART 3

APPLICABLE REFERENCES

3. APPLICABLE REFERENCES:

a) 8681502 REV- CANISTER, MACHINED

b) 8681503 REV- CANISTER, WELDMENT

c) 8681504 REV- CANISTER, UPPER FORGING MACHINED

d) 8681505 REV- CANISTER, MID WELDMENT

e) 8681506 REV- CANISTER, LOWER WELDMENT MACHINED

f) 8681508 REV- FOUNDATION RAIL

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1. General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2. Materials. The Contractor shall provide all materials required to manufacture requested items.

4.3. Equipment. The Contractor shall provide all equipment necessary to manufacture requested items.

4.4. DELIVERABLE ITEMS

4.4.1. Base Deliverables:

4.4.1.1. One (1) each Fabrication Plan for one (1) each Complete Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this PWS. (Pre-deliverable)

4.4.1.2. One (1) each Quality Dimensional Measurement Plan for one (1) each Complete

Machined Canister IAW references (a), (b), (c), (d), (e), and (f) per part 3 of this

PWS. (Pre-deliverable)

4.4.1.3. One (1) each Canister, Lower Forging sketch IAW DWG 8681506 (Pre-deliverable)

4.4.1.4. One (1) each Canister, Lower Forging, First Article Sketch IAW DWG 8681506

(Pre-deliverable)

4.4.1.5. One (1) each Canister, Lower Forging, First Article produced with V&V testing included and rough machined IAW DWG 8681506, and the Canister, Lower

Forging, First Article Forging sketch, and the Quality Dimensional Measurement

Plan.

4.4.1.6. One (1) each Canister, Lower Forging, produced and rough machined IAW DWG

8681506, and the Canister, Lower Forging sketch, and the Quality Dimensional

Measurement Plan.

4.4.1.7. One (1) each Canister, Lower Forging, conformance inspection report IAW DWG

8681506, the Canister, Lower Forging sketch and the Quality Dimensional

Measurement Plan.

4.4.1.8. One (1) each Canister, Lower Forging, first article inspection report IAW DWG

8681506, the Canister, Lower Forging, First Article Forging sketch and the Quality

Dimensional Measurement Plan.

4.4.1.9. One (1) each Canister, Upper Forging, sketch IAW DWG 8681504 (Pre-deliverable)

4.4.1.10. One (1) each Canister, Upper Forging, First Article sketch IAW DWG 8681504

(Pre-deliverable)

4.4.1.11. One (1) each Canister, Upper Forging, First Article, produced with V&V testing included and rough machined IAW DWG 8681504, the Canister Upper Forging

First Article Forging sketch, the Fabrication Plan and Quality Dimensional

Measurement Plan.

4.4.1.12. One (1) each Canister, Upper Forging, produced and rough machined IAW DWG

8681504, the Canister Upper Forging sketch, the Fabrication Plan and Quality

Dimensional Measurement Plan.

4.4.1.13. One (1) each Canister, Upper Forging, conformance inspection report IAW DWG

8681504, Canister, Upper Forging sketch and Quality Dimensional Measurement

Plan.

4.4.1.14. One (1) each Canister, Upper Forging, first article inspection report IAW DWG

8681504, Canister, Upper Forging, First Article sketch and Quality Dimensional

Measurement Plan.

4.4.1.15. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for base option requirements.

4.4.2. Deliverables Option 1:

4.4.2.1. One (1) each Canister, Lower Weldment Machined, complete IAW DWG 8681506 and the Fabrication Plan and the Quality Dimensional Measurement Plan

4.4.2.2. One (1) each Canister, Lower Weldment Machined inspection report IAW DWG

8681506, Fabrication Plan, and Quality Dimensional Measurement Plan

4.4.2.3. One (1) each Canister, Upper Forging Machined, complete IAW DWG 8681504, Fabrication Plan, and Quality Dimensional Measurement Plan

4.4.2.4. One (1) each Canister, Upper Forging Machined conformance inspection report

IAW DWG 8681504, the Fabrication Plan, and the Quality Dimensional

Measurement Plan

4.4.2.5. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for option 1 requirements.

4.4.3. Deliverables Option 2:

4.4.3.1. One (1) each Complete Machined Canister IAW DWG 8681502, 8681503 and

8681505, and 8681508. Utilizing Canister Lower Machined DWG 8681506, Canister Upper Machined DWG 8681504, the Fabrication Plan, and the Quality

Dimensional Measurement Plan

4.4.3.2. One (1) each conformance inspection reports as defined IAW DWG 8681502, 8681503 and 8681505, the Fabrication Plan, and Quality Dimensional

Measurement Plan

4.4.3.3. Provide a monthly Contractor's Progress, Status and Management Report for the manufacture, testing and V&V for option 2 requirements.

PART 5

QUALITY ASSURANCE SURVEILLANCE PLAN

5. QUALITY ASSURANCE SURVEILLANCE PLAN

5.1. Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the SOW. The QASP will be used primarily as a tool to verify that the contractor is performing all services and delivery/installation of replacement parts required by the PWS in a timely, accurate and complete fashion.

5.2. The Contractor as the OEM is solely responsible for the quality of services provided. PSNS may witness manufacture and testing at any time of PHS Canister.

Requirement Performance

Standards

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Fabrication Plan for one (1) each Complete

Machined Canister

IAW references (a), (b), (c), (d), (e), and

(f) per part 3 of this

PWS. (Pre-deliverable

4.4.1.1)

The Contractor will provide complete

Fabrication Plan

(Deliverable 4.4.1.1) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.1. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with fabrication plan requirements, Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Quality Dimensional

Measurement Plan for one (1) each Complete

Machined Canister

IAW references (a), (b), (c), (d), (e), and

(f) per part 3 of this

PWS. (Pre-deliverable

4.4.1.2)

The Contractor will provide Dimensional

Measurement Plan

(Deliverable 4.4.1.2) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.2. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with Quality

Dimensional Measurement Plan requirements, Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Lower

Forging sketch IAW

DWG 8681506 (Pre-deliverable 4.4.1.3)

The Contractor will provide Canister Lower

Forging Sketch

(Deliverable 4.4.1.3) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.3. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with Canister, Lower Forging Sketch requirements Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Lower

Forging, First Article

Sketch IAW DWG

8681506 (Pre-deliverable 4.4.1.4)

The Contractor will provide Canister Lower

Forging First Article

Sketch (Deliverable

4.4.1.4) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.4. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with Canister, Lower Forging, First Article

Sketch requirements, Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Lower

Forging, First Article produced with V&V testing included and rough machined IAW

DWG 8681506, and the Canister, Lower

Forging, First Article

Forging sketch, and the Quality

Dimensional

Measurement Plan.

(Deliverable 4.4.1.5.)

The Contractor will provide One (1) each

Canister, Lower Forging, First Article produced with

V&V testing included and rough machined IAW the

Canister, Lower Forging, First Article Forging sketch, and the Quality

Dimensional Measurement

Plan. (Deliverable 4.4.1.5.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case by case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.5. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with first article requirements, Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Lower

Forging, produced and rough machined IAW

DWG 8681506, and the Canister, Lower

Forging sketch, and the Quality

Dimensional

Measurement Plan

(Deliverable 4.4.1.6.)

The Contractor will provide One (1) each

Canister, Lower Forging, produced and rough machined IAW the

Canister, Lower Forging sketch, and the Quality

Dimensional Measurement

Plan (Deliverable 4.4.1.6.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case by case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.6. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681506, Forging sketch, and the

Quality Dimensional

Measurement Plan, Contractor

Report requirements, Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Require ment

Performance

Standards

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Lower

Forging, conformance inspection report IAW

DWG 8681506, the

Canister, Lower

Forging sketch and the Quality

Dimensional

Measurement Plan.

(Deliverable 4.4.1.7.)

The Contractor will provide One (1) each

Canister, Lower Forging, conformance inspection report IAW DWG

8681506, the Canister, Lower Forging sketch and the Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.7.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.7. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681506, forging sketch, and quality dimensional plan

Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Lower

Forging, first article inspection report IAW

DWG 8681506, the

Canister, Lower

Forging, First Article

Forging sketch and the Quality

Dimensional

Measurement Plan.

(Deliverable 4.4.1.8.)

The Contractor will provide One (1) each

Canister, Lower Forging, first article inspection report IAW DWG

8681506, the Canister, Lower Forging, First

Article Forging sketch and the Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.8.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.8. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with first article requirements of DWG 8681506, forging sketch, and Quality dimension plan Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Upper

Forging, sketch IAW

DWG 8681504

(Pre-deliverable

4.4.1.9.)

The Contractor will provide One (1) each

Canister, Upper

Forging, sketch IAW

DWG 8681504 (Pre

Deliverable 4.4.1.9.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.9. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG 8681504 forging sketch requirements, Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Upper

Forging, First Article sketch IAW DWG

8681504

(Pre-deliverable

4.4.1.10.)

The Contractor will provide One (1) each

Canister, Upper

Forging, First Article sketch IAW DWG

8681504 (Pre

Deliverable 4.4.1.10.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.10. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681504, forging first article sketch requirements Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Upper

Forging, First Article, produced with V&V testing included and rough machined IAW

DWG 8681504, the

Canister, Upper

Forging, First Article

Forging sketch, the

Fabrication Plan and

Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.11.)

The Contractor will provide One (1) each

Canister, Upper Forging, First Article, produced with V&V testing included and rough machined IAW the Canister, Upper

Forging, First Article

Forging sketch, the

Fabrication Plan and

Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.11.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.11. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with first article requirements, Contracting Officer

Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Upper

Forging, produced and rough machined IAW

DWG 8681504, the

Canister, Upper

Forging sketch, the

Fabrication Plan and

Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.12.)

The Contractor will provide One (1) each

Canister, Lower Forging, produced and rough machined IAW the

Canister, Lower Forging sketch, and the Quality

Dimensional Measurement

Plan (Deliverable

4.4.1.12.) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.12. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681504, the Canister, Upper

Forging sketch, the Fabrication

Plan and Quality Dimensional

Measurement Plan, Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Upper

Forging, conformance inspection report IAW

DWG 8681504,

Canister, Upper

Forging sketch and

Quality Dimensional

Measurement Plan.

(Deliverable 4.4.1.13.)

The Contractor will provide One (1) each

Canister, Upper Forging, conformance inspection report IAW DWG

8681504, Canister, Upper

Forging sketch and Quality

Dimensional Measurement

Plan. (Deliverable 4.4.1.7.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable

4.4.1.13. Any part of the deliveries that

reveals non-conformance with the SOW must be communicated to the COR at

Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG 8681504, Canister, Upper

Forging sketch and Quality

Dimensional Measurement Plan.

Contracting Officer Representative will request a corrective action plan from the Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Upper

Forging, first article inspection report IAW

DWG 8681504,

Canister, Upper

Forging, First Article sketch and Quality

Dimensional

Measurement Plan.

(Deliverable 4.4.1.14.)

The Contractor will provide One (1) each

Canister, Upper Forging, first article inspection report IAW DWG

8681504, Canister, Upper

Forging, First Article sketch and Quality

Dimensional Measurement

Plan. (Deliverable

4.4.1.14.) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable

4.4.1.14. Any part of the deliveries that

reveals non-conformance with the SOW must be communicated to the COR at

Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance first article inspection report IAW

DWG 8681504, Canister, Upper

Forging, First Article sketch and

Quality Dimensional Measurement

Plan requirements, Contracting Officer

Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with

Allowable Deviation Surveillance Method Correction Procedures

Provide a monthly

Contractor's Progress, Status and

Management Report for the manufacture, testing and V&V for base option requirements.

(Deliverable 4.4.1.15.)

The Contractor will provide a monthly

Contractor's Progress, Status and

Management Report for the manufacture, testing and V&V for base option requirements.

(Deliverable

4.4.1.15.) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.1.15. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with monthly

Contractor's Progress, Status and

Management Report, Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister; Lower

Weldment Machined, complete IAW DWG

8681506, the

Fabrication Plan, and the Quality

Dimensional

Measurement Plan

(Deliverable 4.4.2.1.)

The Contractor will provide One (1) each

Canister, Lower

Weldment Machined, complete IAW DWG

8681506 and the

Fabrication Plan and the Quality

Dimensional

Measurement Plan

(Deliverable 4.4.2.1.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.1. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681506, the Fabrication Plan, and the Quality Dimensional

Measurement Plan Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Allowable Deviation Surveillance Method Correction Procedures

Provide One (1) each

Canister, Lower

Weldment Machined inspection report IAW

DWG 8681506,

Fabrication Plan, and

Quality Dimensional

Measurement Plan

(Deliverable 4.4.2.2.)

The Contractor will provide One (1) each

Canister, Lower

Weldment Machined inspection report

IAW DWG 8681506,

Fabrication Plan, and

Quality Dimensional

Measurement Plan

(Deliverable 4.4.2.2.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.2. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681506, Fabrication Plan, and

Quality Dimensional

Measurement Plan Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide One (1) each

Canister, Upper

Forging Machined, complete IAW DWG

8681504, Fabrication

Plan, and Quality

Dimensional

Measurement Plan

(Deliverable 4.4.2.3.)

The Contractor will provide One (1) each

Canister, Upper

Forging Machined, complete IAW DWG

8681504, Fabrication

Plan, and Quality

Dimensional

Measurement Plan.

(Deliverable 4.4.2.3.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable 4.4.2.3. Any part of the deliveries that reveals non-conformance with the SOW must be communicated to the COR at Time of delivery.

Contractor must receive notification from the

COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG

8681504, Fabrication Plan, and

Quality Dimensional

Measurement Plan Contracting

Officer Representative will request a corrective action plan from the Contractor. COR must receive Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to

Requirement Performance Standards Allowable

Deviation

Surveillance Method Correction Procedures

Provide One (1) each

Canister, Upper

Forging Machined conformance inspection report IAW

DWG 8681504, the

Fabrication Plan, and the Quality

Dimensional

Measurement Plan

(Deliverable 4.4.2.4.)

The Contractor will provide One (1) each

Canister, Upper Forging Machined conformance inspection report IAW

DWG 8681504, the Fabrication Plan, and the Quality Dimensional Measurement

Plan (Deliverable 4.4.2.4.) following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested test results cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable

4.4.2.4. Any part of the deliveries that

reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with DWG 8681504, the Fabrication

Plan, and the Quality Dimensional

Measurement Plan Contracting

Officer Representative will request a corrective action plan from the

Contractor. COR must receive

Corrective Action Plan within two weeks of notification of non-conformance. Contractor will provide corrective action plan that includes estimated schedule and milestones to achieve compliance with documentation requirements.

Provide a monthly

Contractor's Progress, Status and

Management Report for the manufacture, testing and V&V for option 1 requirements.

(Deliverable 4.4.2.5.)

The Contractor will provide a monthly

Contractor's Progress, Status and

Management Report for the manufacture, testing and V&V for option 1 requirements. (Deliverable 4.4.2.5.)

following the delivery instructions, and include all required submittals with each delivery.

The contractor shall comply with the deliverable requirements and communicate to the government if any of the requested documentation cannot be provided. The government will determine on a case-by-case basis as to the acceptability of the non-conformance.

Contracting Officer Representative and

Customer will coordinate deliveries and provide for inspection and acceptance at point of delivery based on Deliverable

4.4.2.5. Any part of the deliveries that

reveals non-conformance with the SOW must be communicated to the COR at Time of delivery. Contractor must receive notification from the COR of acceptability of each document and provide feedback within two weeks of receipt of each deliverable.

Upon discovery of non-conformance with monthly Contractor's Progress, Status and Management Report

Contracting Officer…

This is the start of the file's text. The full file is on GovTribe.