Attachment 1 - Statement of Work.pdf
PDF 266 KB Posted
- Attached to
- 321 STS - DC2 Tactical Operations Center
- Solicitation number
- FA558726Q0074
About this file
This Statement of Work (SOW) specifies requirements for providing modernized command and control (C2) communications equipment and related services to the 321st Special Tactics Squadron (STS) at Royal Air Force Lakenheath, effective July 7, 2022, Revision 1.
The contractor must supply and deliver a complete "TOC in a Box" system consisting of eleven line items: two portable audio systems, two mobile C2 flat panel displays (minimum 55 inches), two mobile command stations with triple-head monitor arrays, two quad-view screens, two 65-inch displays with auto-lift capability, two side-by-side 65-inch display systems, one interactive touch display (minimum 55 inches), five power outlet/strip accessory kits, five hardened tactical folding tables, and freight to England. All equipment must be housed in hardened cases suitable for mobile operations and tactical deployment. The contractor is responsible for providing all necessary personnel, equipment, tools, materials, supervision, transportation, safety equipment, and technical training materials. A minimum one-year warranty covering replacement, maintenance, and technical support is required, along with initial training for the 321st STS on all equipment. Work hours are Monday through Friday, 0800 to 1700 UK time, excluding US federal and UK bank holidays. No installation is required; however, airfield sealing operations must remain capable during delivery.
Shipping terms vary by vendor location. For UK-based vendors, FOB Destination applies with all costs included in the total purchase price. For vendors outside the UK, three options are available: United States Postal Service (individual shipments not exceeding 70 lbs and 119 inches length/72 inches width or height); commercial small parcel carrier (not exceeding 300 lbs and same dimensions); or consolidated shipping point (exceeding 300 lbs and 72 inches in any dimension). Contractor personnel require valid DoD installation access passes, with the contractor responsible for submitting employee documentation no later than 30 days before needed access. The contractor must promptly report all mishaps to the Contracting Officer within 24 hours and comply with organizational operational security policies and critical information protection requirements. Appendix materials include a CRAFCO Inc. price quote attached to the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation - FA558726Q0074 V.3.pdf | ||
| Attachment 2 - Quote Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
Statement of Work
(SOW)
“321st STS Distributed Command and Control
(DC2) Communications Equipment – Tactical
Operation Center” at
Royal Air Force (RAF) Lakenheath
“Rev. 1, 07 July 2022”
1.0 Introduction
1.1 Scope: This solution will equip the 321 STS with a modernized, resilient, and agile infrastructure required for multi-domain operations in the European theater. The TOC in a Box provides a modular C2 hub, drastically reducing the logistical footprint and time required to establish an effective command node.
This system provides commanders with enhanced situational awareness and facilitates faster decision-making.
2.0 General Requirements
2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The
Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.
2.2 Contract Management & Administration
2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.
2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the
Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.
2.2.3 Contract Warranty: The Contractor shall establish at minimum a one-year warranty covering replacement, maintenance, & technical support for the identified equipment.
2.2.4 Contract Training: The Contractor shall establish initial training for the 321st STS to cover all associated equipment ensuring the unit is able to properly employ usage of the entire system.
2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract. There will be no need or requirement from the Contractor for installation of requested product(s).
2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.
Work hours are from 0800 to 1700 local UK time.
3.0 Product Specifications & Installation Requirements
3.1 The contractor must provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, any other items and services necessary to successfully implement the new system. To include all hardware, software, and accessory equipment and training material or technical manuals.
Line
Part Description Detailed Description Qty UoM
01 Audio System Portable Audio System for complete surround sound within TOC/JOC
• 110/220V power supply
• 6 – 8 hours on a single
• Bluetooth wireless capability
• Universal microphone input jacks
• Supports 2 wireless inputs
• Housed in hardened case
2 EA
02 Mobile command and control
Display.
• Mobile command and control C2 flat panel display, utilizing rugged components for mobile operations.
• Minimum 55in display.
• Housed in hardened case
2 EA
03 Mobile Command Station Multiple screens, mobile Command and Control system ideal for battle command applications. All-in-one system with switched IP networks and video distribution system.
• Triple Head monitor array/extends laptops
• Can accept input/push output through VGA, DVI & twisted pair
• Switch/IP configured out of box for connections
• Housed in hardened case
2 EA
04 Quad-view screens are capable of multi-view layouts.
The multi-view system contains a quad-view unit that allows four inputs to be sent to a single screen in one of four multi-view layouts or one of the four inputs can be selected to fill the entire screen.
• Housed in hardened case
2 EA
06 65-inch display A rugged auto-lift, 65-inch display housed in a mobile hardened case.
2 EA
07 65-inch side-by-side display Side-by-Side framed display system, easy-to-deploy dual monitor display with rugged components for mobile operations.
• Housed in a hardened case.
2 EA
08 Command and control interactive touch display
A robust and rapidly deployable touch display system used for mission planning. Tabletop that can be easily maneuvered for planning.
• Minimum 55 inches
• External I/O panel
• Compatible with Windows
• Ability to tilt out of box for accessible touch screen planning
• Housed in hardened case
1 EA
09 Power outlet/strip accessories kit
110 ~ 220 Volt/electrical accessories 5 EA
10 Folding tables Hardened Tactical Folding Tables 5 EA
11 Shipping to England Total Cost of Freight 1 EA
3.2 It is a requirement for this installation to maintain the capability conducting sealing operations on the airfield.
4.0 Special Requirements
4.1 Security & Safety
4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.
4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to
Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting
Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.
4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the
Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.
4.3 Shipping Instructions
4.3.1 For vendors located inside the United Kingdom.
4.3.1.1 Shipment shall be FOB Destination.
4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).
4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2 For vendors located outside of the United Kingdom.
4.3.2.1 Option One: United States Postal Service.
4.3.2.1.1 Shipping shall be FOB Destination.
4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.
4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.1.5 Hazardous material is not submitted.
4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.
4.3.2.2 Option Two: Commercial small parcel carrier.
4.3.2.2.1 Shipping shall be FOB Destination.
4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.
4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.
4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.
4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.
4.3.2.3 Option Three: Consolidated Shipping Point.
4.3.2.3.1 Shipping shall be FOB Destination.
4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).
4.3.2.3.3 Weight of individual shipments must exceed 300lbs.
4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).
4.3.2.3.5 Hazardous material may be shipped via this method.
4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.
4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED
STATES AIR FORCE” in order to ensure shipments clear customs.
4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.
4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)
4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.
4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.
4.3.3.3 Commercial phone number; +44 01638 52620.
4.4 Government Furnished Material: N/A
4.5 Applicable Directives: N/A
5.0 Appendix: Related Documents
PDF CRAFCO Inc quote attached to SOW.
mailto:48lrs.lgrddc.inboundcustoms@us.af.mil mailto:48lrs.inboundcargo@us.af.mil
File details come from the government source that posted it. Updated .